Project consists of the construction of a plant for a production of Biodiesel with a capacity production of 120,000 gallons per day. Estimated Annual Emission Reductions (tCO2 / year): an average of 85,300 tCO2-equivalent per year. Project is located in the department of Lima, province of Barranca.
Project consists of the construction of a plant for a production of Biodiesel with a capacity production of 120,000 gallons per day. Estimated Annual Emission Reductions (tCO2 / year): an average of 85,300 tCO2-equivalent per year. Project is located in the department of Lima, province of Barranca.
Direitos autorais:
Attribution Non-Commercial (BY-NC)
Formatos disponíveis
Baixe no formato PDF, TXT ou leia online no Scribd
Project consists of the construction of a plant for a production of Biodiesel with a capacity production of 120,000 gallons per day. Estimated Annual Emission Reductions (tCO2 / year): an average of 85,300 tCO2-equivalent per year. Project is located in the department of Lima, province of Barranca.
Direitos autorais:
Attribution Non-Commercial (BY-NC)
Formatos disponíveis
Baixe no formato PDF, TXT ou leia online no Scribd
Description: The purpose of the project is to change the energy generation system of Agro Industrial Paramonga S.A., from the actual residual fuel oil based energy generation system, to a new sugar cane bagasse energy system. It will be located in the department of Lima, province of Barranca.
Current Status: Projects Benefits:
Earliest project start date: 2006. Sustainable development contribution: Operation start date: 2007. It displaces a fossil fuel system with a biomass based renewable energy Project lifetime: 30 years. system. Current Status: Feasibility study is finished. Environmental Impact Stu- It reduces local air pollutants and environmental impacts associated dies is finished. It was approved by Designated National Authority. New with the burning of residual fuel oil. PDD is under elaboration. It contributes significantly to reducing global warming by displacing GHG emissions. Estimated Annual Emission Reductions (tCO2/year): CER´s negotiation: An average of 85,300 tCO2-equivalent per year. Sell Commitment.
Project Participant and Financing
Total project cost: US$ 5,369,000 Contact Information: Name: Hugo Ayón Sources of finance to be sought or already identified: Company: Agroindustrial Paramonga S.A. Equity: 15 % Title: Director of Finance Debt: 85 % Phone: (51-1) 2021111 E-mail: hayon@agroparamonga.com
HEAVEN Biodiesel Production and Distribution for Automobile Transportation B4
Description: The project consists of the construction of a plant for a production of Biodiesel with a capacity production of 120,000 gallons per day. The Biodiesel will be use as substitute of diesel. The project is located in the department and province of Lima.
Current Status: Projects Benefits:
Earliest project start date: 2006. Number of direct and indirect jobs generated: Operation start date: May 2007. It generates 15,000 indirect works. Project lifetime: Indefinite. Sustainable development contribution: Current Status: Authorization by Municipality is already given. Environ- It displaces a fossil fuel system with a clean fuel that not contains sul- mental Impact Assessment Study approved by Ministry of Agriculture. phur. It has signed an agreement with Endesa Carbono Consultants to deve- It contributes significantly to reducing global warming by displacing lop PDD and CERs commercialization. Feasibility study is finished. The GHG emissions. plant is in operation. It implements social responsibility activities and social plants.