Escolar Documentos
Profissional Documentos
Cultura Documentos
)
the location of cables, computers, and other peripherals
the path that the data takes through a network
the wireless signal coverage area
the wiring closet and access point locations
the device names and Layer 3 addressing information
the location of routing, network address translation, and firewall filtering
2 What is the term for the location at the customer premise where the customer network physi
connects to the Internet through a telecommunications service provider?
backbone area
point of presence
network distribution facility
intermediate distribution frame
4 Which device has the ability to break up broadcast and collision domains?
repeater
hub
router
switch
6 What must be added when a network expands beyond the coverage area of the current
telecommunications room?
MDF
POP
IDF
IXP
7 It is said that the goal for availability of a communications system is "five-9s". What is meant
A down time of .00001% is unacceptable.
A network needs to be available 99.999% of the time.
Five percent of all network expense covers 99% of user requirements.
The most critical time for network availability is from 9:00 to 5:00 p.m. five days a week.
The best time to do maintenance on a network is from 5:00 p.m. to 9:00 a.m. five days a
9 Which type of cable has a solid copper core with several protective layers including PVC, bra
shielding, and a plastic covering?
STP
UTP
coaxial
fiber optic
11 Which three issues should be noted on the technician's site survey report? (Choose three.)
unlabeled cables
only two power outlets per wall in each room
poor physical security of network devices
horizontal cabling runs under 100 meters
lack of UPS for critical devices
two users sharing the same computer
13
Refer to the exhibit. To allow IP communication between the two networks, what type of devi
required?
hu
router
switch
access point
15 Why is it important to review the results of an on-site survey report with the customer before
the network design?
to inform the customer of how much time the upgrade will take
to discuss the implementation schedule for the new equipment
to verify that the report accurately describes the current network and any plans for expan
to review the new network design and discuss possible equipment upgrades and replace
16
Refer to the exhibit. Which type of twisted pair cable is used between each device?
A=console, B=straight, C=crossover, D= crossover, E=straight
A=straight, B=straight, C=straight, D=crossover, E=console
A=crossover, B=straight, C=straight, D=crossover, E=crossover
A=console, B=straight, C=straight, D=crossover, E=crossover
A=console, B=crossover, C=crossover, D=straight, E=straight
18 When designing a network upgrade, which two tasks should the onsite technician perform? (
two.)
configure the servers and routers prior to delivery
upgrade the network operating system and all client operating systems
investigate and document the physical layout of the premises
document the final design for approval by the customer
perform a site survey to document the existing network structure
19 In what two ways will entering into a managed service agreement with an ISP for a network u
affect the costs that are incurred by the customer? (Choose two.)
Customer IT training costs will increase to enable operation of the new equipment.
The cost of hardware repairs and support will become the responsibility of the customer.
Network upgrade and maintenance costs will become predictable.
Staffing costs will increase because the customer will need to hire additional IT staff to co
the upgrade.
The company will not need to spend a large amount of money to purchase the equipmen