REFERENCES AND BIBLIOGRAHPY

REFERENCES

Akintoye A and Skitmore M (1991) ‘Profitability of UK construction contractors’,

Journal of Construction Management and Economics, Volume 9, No.3, pp. 311-

325.

Ankrah N A (2007) ‘An investigation into the impact of culture on construction project

performance’, PhD thesis, School of Engineering and the Built Environment,

University of Wolverhampton, Wolverhampton.

Assaf, S.A. and Al-Hejji, S. (2006) ‘Causes of delay in large construction projects’,

International Journal of Project Management, Volume 24, No 43. pp.349-357

Babbie, E. R. (1990) Survey research methods, Belmont, California, Wadsworth

Publishing Company.

Blaxter L, Hughes C and Tight M (2006) How to Research (3rd edn), Berkshire: Open

University Press.

Cagan P (1956) ‘The Monetary Dynamics of Hyperinflation’ in Friedman M (ed)

Studies in the Quantity Theory of Money: University of Chicago Press

Chan,D.W.M and Kumaraswamy,M.M, (1997) ‘A Comparative study of causes of time

overruns in Hong Kong construction project’, International Journal of Project

Management, Vol 15, No 1, pp 55-63.

Chan.D.W.M and Kumaraswamy.M.M, (1996) ‘An Evaluation of Construction Time

Performance in the Building Industry’, Building and Environment, Vol. 31, No. 6.

pp. 569- 578, Elsevier Science Ltd

Coggan, D.R. (2001) ‘Construction Contract incentivisation Schemes: lessons from

past experience’, London, CIRIA C554, CIRIA publication:

Coltart, D. (2008) ‘A Decade of Suffering in Zimbabwe’, Centre for Global Liberty and

Prosperity, March, No.5.


Nilson Biton
Student Number 9756570 BSc Construction Management Page 63
REFERENCES AND BIBLIOGRAHPY

Denscombe M (2007) ‘The Good Research Guide for small-scale social research

projects’ (3rd edn), Berkshire: Open University Press.

Dubois.A, and Gadde.L, (2002) ‘The construction industry as a loosely coupled

system-implications for productivity and innovation’, Construction Management

and Economics, Volume 20, pp 621-631.

Egan J (1998) ‘ Rethinking Construction’ ,The report of the Construction Task Force to

the Deputy Prime Minister , John Prescott, on the scope for improving the

quality and efficiency of UK Construction, London

Gombera P.P. and Okoroh, M.I. (1999), ‘Zimbabwe Public Sector Procurement

Strategies: Trial and Error combinations in Ogunlana S (ed) ,Profitable

Partnering in Construction Procurement: London, E and FN Spon.

Hughes, W. (1999) What makes a good research paper, Department of Construction

Management and Engineering, UK ,University of Reading.

Hughes. W. (1994) ‘The PhD in construction management’, Department of

Construction Management and Engineering, UK, University of Reading.

JCT (2008) ‘Practice Note’, Deciding on the appropriate JCT contract, London,

www.jctcontracts.com

Kamig.P.F, Olomolaiye.P.O, Holt.G.D and Harris C.F, (1997)’Factors influencing

construction time and cost overruns on high rise projects in Indonesia’,

Construction Management and Economics, Vol15, pp. 83-94.

Kometa, S., Olomolaiye, P.O. and Harris, F.C. (1995), ‘An evaluation of clients’ needs

and responsibilities in the construction process’, Engineering, Construction and

Architectural Management, Vol. 2 ,No. 1, pp. 45-56.

Nilson Biton
Student Number 9756570 BSc Construction Management Page 64
REFERENCES AND BIBLIOGRAHPY

Latham, M. (1994) Constructing the team, Final report of the government/industry

review of procurement and contractual arrangements in the United Kingdom

construction industry, London, HMSO, Department of Environment.

Makochekanwa A (2007) ‘A Dynamic Enquiry into the Causes of hyperinflation in

Zimbabwe’, Working Paper: 2007-10, University of Pretoria.

Mbiba B and Ndubiwa M (2006) ‘Decent work in Construction and The Role of Local

Authorities The Case of Bulawayo City , Zimbabwe, University of Geneva.

Naoum S G (2007) ‘Dissertation Research and Writing for Construction Students’ (2nd

edn) Oxford: Elsevier Ltd.

Nkado, R.N. (1995) ‘Construction time-influencing factors: the contractor’s perspective’,

Construction Management and Economics, Vol 13, No. pp.81-89.

Pearce, D. (2003) ‘The social and economic value of construction: The construction

industry's contribution to sustainable development’, London, NCRISP.

Robertson R (2007), ‘August 2007 Forecast paper’, Robertson Economic Information

for Zimbabwean statistics, http://www.economic.co.zw

Santos, A (1999) ‘Application of flow principles in the production management of

construction sites’, PhD Thesis, School of Construction and Property

Management , Salford, UK, University of Salford.

Takim .R, Akintoye, (2002) ‘Performance indicators of successful construction project

performance’, Association of Researchers in Construction Management, Vol

2, pp.545-555.

Walker D. H. T (1997) ‘Choosing an appropriate research methodology’, Journal of

Construction Management and Economics, Vol 15 ,pp 149-159.

Wikipedia,‘Hyperinflation’,http://en.wikipedia.org/w/index.php?title=Hyperinflation

accessed on 14 May 2008.

Nilson Biton
Student Number 9756570 BSc Construction Management Page 65
REFERENCES AND BIBLIOGRAHPY

Wit de B and Dyk van B (1996) ‘Lessons from a Brazilian Miracle: Surviving and

Thriving in Highly Inflationary Environment’, The Columbian Journal of World

Business, fall.

Xiao, H. & Proverbs, D. (2002a) ‘The performance of contractors in Japan, the UK and

the USA: a comparative evaluation of construction cost’, Construction

Management and Economics, Vol 20, No 5, pp 425-435.

Xiao, H. & Proverbs, D. (2002b) ‘The performance of contractors in Japan, the UK and

the USA: an evaluation of construction quality’, International Journal of Quality

and Reliability Management, Vol 19, No (6/7), pp672- 687.

Xiao, H. & Proverbs, D. (2003) ‘Factors influencing contractor performance: an

international investigation’,Engineering Construction and Architectural

Management, 10 (5), 322-332.

Yin, R. K (1994) ‘Case Study Research: Design and methods (2nd edn) in Santos, A

(1999) ‘Application of flow principles in the production management of

construction sites, PhD Thesis, School of Construction and Property

Management , Salford, UK ,University of Salford.

Nilson Biton
Student Number 9756570 BSc Construction Management Page 66
REFERENCES AND BIBLIOGRAHPY

BIBLIOGRAHPY

Atkinson.R,(1999) ‘Project management-cost, time and quality-two best guesses and

phenomenon, its time to accept other success criteria’ International

Journal of Project Management ,Vol 17,No 6,pp 337-342.Akintoye.A,

Skitmore.M, (1991),’ Profitability of UK Construction Contractors’ Construction

Management and Economics ,Vol 9, pp 311-325.

Best.R,Langston C,(2006) ‘Evaluation of construction contractor performance-A critical

analysis of some recent research’ Construction Management and

Economics ,Vol 24,pp 439-445.

Beathan.S, Anumba.C and Thorpe, (2004) ‘KPI`s- a critical analysis appraisal of their

use in construction’ Benchmarking an International Journal, Vol 11, No 1, pp

93-117.

Birgouul.M.T and Han.S, (2007),’Using fuzzy risk assessment to rate cost overrun risk

in international construction projects’,International Journal of Project Management, Vol

25, pp 494-505.

Curtis.B, Ward.C.S and Chapman.C.B, (1991) Objectives and performance in

construction projects: Construction Management and Economics,Vol 9, pp 343-

353.

Colin.E,Terry.W and Ackerman.F ,(2005) ‘Analysing project cost overruns-comparing

the ‘measured mile’ analysis and system dynamics modeling’ International

Journal of Project Management ,Vol 23,pp 135-139.

Chan.A.P.C, Chan.A.P.L (2004) Key performance indicators for measuring

construction success: Benchmarking an International Journal, Vol 11, No.2, pp

203-221.

Nilson Biton
Student Number 9756570 BSc Construction Management Page 67
REFERENCES AND BIBLIOGRAHPY

Chan.D.W.M and Kumaraswamy.M.M,(1997) A comparative study of causes of time

overruns in Hong Kong construction projects: International Journal of Project

Management,Vol 15,No1,pp 55-63.

Daniel.W.M, Kumaraswamy.M.M, (1996) Contributors to construction delays,

Department of Civil and Structural Engineering, Hong Kong ,The University of

Hong Kong. .

David.J, Robinson.L, (2005), ‘Client versus contractor perspectives on project success

criteria’ International Journal of Project Management, Vol 23, pp 622-629.

Dissanayaka.S.M and Kumaraswamy.M.M, (1999)’ Evaluation of factors affecting time

and cost performance in Hong Kong building projects’,Construction and

Architectural Management,Vol 6,3,pp287-298.

Firuzan.Y, Arditi.D and Mohammadi.S.J, (2002) Assessing Contractor quality

performance: Construction Management and Economics, Vol 20, pp 211-223.

Faradi.S.A, El-Sayegh.M.S, (2006) Significant factors causing delay in the UAE

Construction industry: Construction Management and Economics, 24, pp 1167-

1176.

Iyer.K.C, Jha.K.N, (2005),’Factors affecting cost performance evidence from Indian

construction project’, International Journal of Project Management ,23, pp 283-

295.

Ireland.V,(1985)‘The role of managerial actions in the cost, time and quality

performance of high rise commercial building projects’,Construction

Management and Economics ,Vol 3,pp 59-87.

Jha.K.N, Iyner.K.C, (2007)’Commitment, coordination, competence and the iron

triangle’, International Journal of Project Management, Vol 25, pp 527-540.

Karna.S, Junnon.M, (2002) Customer satisfaction in construction, Helsinka, Finland.

Nilson Biton
Student Number 9756570 BSc Construction Management Page 68
REFERENCES AND BIBLIOGRAHPY

Kashiwoyi.D, Byfiel.R.E, (2002) ‘,Selecting the best contractor to get performance-on

time, on budget, meeting quality expectations’,Journal of facilities management,

Vol 1, No 2, pp 103-116.

Kekale.T, (1996) Construction and triangulation-weaponry for attempts to create and

test theory, Finland ,Technobothnia,

Khang.B.D and Mynint.M.Y, (1999) Time, cost and quality trade off in project

management- a case study: International Journal of Project Management, Vol 17, No

4, pp 249-256.

Koota.J, (2003) Market review and study of success characteristics in construction

companies-case USA, Finland Otamedia Oy.

Lim.C.S and Mohammed.Z.M,(1999),’Criteria of project success-an explanatory

reexamination’,International Journal of Project Management ,Vol 17,No

4,pp243-248.

Love.E.D and Edwards.D.J, (2004),’Determinants of rework in building construction

projects’, Construction and Architectural Management, Vol 11, No4

Mbachu.J and Nkado.R,(2007)’Factors constraining successful building project

implementation in South Africa’,Construction Management and Economics

,Vol 25,pp 39-54.

Morledge.R, Bassett.D and Sharif.A, (1996)‘Client time expectations and construction

industry performance’,RICS research papers.

Mohsini.R.A and Davidson.H.C,(1992)’Determinants of performance in the traditional

building process’, Construction Management and Economics ,Vol10,pp 343-

359.

Ogunsemi and R.D,Jagboro.O.G,(2006)‘Time-cost model for building projects in

Nigeria’,Construction Management and Economics,Vol 24,pp 253-258.

Nilson Biton
Student Number 9756570 BSc Construction Management Page 69
REFERENCES AND BIBLIOGRAHPY

Oyegoke.S.D, (2005) ‘Construction Industry overview in the UK,US,Japan and Finland-

A comparative analysis’,Journal on construction research, Finland,World

Scientific.

Peter.M, (1998) Body of Knowledge 4th Edition, apm, USA.

Proverbs.D.G and Faniran.O.O, (2005)’International construction performance

comparisons-a study of ‘European ‘and Australian contractors’,Engineering,

construction and Architectural Management, Vol 8, No 4,284-291.

Raymond.Y.C and Love.P.E, (2003) ‘An economic analysis of the effect of delays on

project costs’,Journal of construction research, Vol 4, No2, pp155-160, World

Scientific.

Reeve.K, (2002) Construction business systems in Japan-general contractors and

subcontractors, Japan, Ichibancho.

Sadi.A.A and Sadiq.H,(2006)’Causes of delay in large construction projects’,

International Journal of Project Management ,Vol 24,pp 349-357.

Sambasivan.M and Soon.W.Y, (2006)’Causes and effects of delays in Malaysian

construction industry’, International Journal of Project Management, Vol 25,pp

517-526.

Seymour and Rooke.J, (1995) ‘The culture of the industry and the culture of research’,

Construction Management and Economics, 13, pp 511-523.

Siklos.P.L,(2000)Inflation and Hyperinflation,Department of Economics,Wilfrid Lauriel ,

Canada University.

Walker.D.H, (1995) ‘An Investigation into construction time performance’, Construction

Management and Economics, Vol 13, pp 263-277.

Nilson Biton
Student Number 9756570 BSc Construction Management Page 70