DC No : PEIPL/ QA/ SOP / 001

STANDARD OPERATING PROCEDURE Date : 02.05.2020

1. Title : Procedure for Incoming Material inspection ( Verification of purchased product )

2. Purpose : To ensure defect free material.

3. Scope : Raw-material, Critical Bought out items, Consumables, Sub-Contracted Items and others.

4. Responsibility & Auth. : Head of Operations for implementation of this procedure.

5. Distribution : Operations & Stores.

PROCESS FLOW Responsibility Doc. Ref. Record Ref.

Internal Log
Engineer - QA Indent / PO
Viewing of Material MRR/DC, Indent or PO

ITP No Internal Log /ITP


Assign Plan Engineer - QA PROJECT QUALITY PLAN
Plan
Availabl
e
Yes

Transfer material to block


stock & identify the
material and inform to Review note on Test
Not Ok Store and advice Certificate ,
Insp Engineer - QA PROJECT QUALITY PLAN
Purchase dept. for Inspection .Report
. PEIPL/QC/RM/FORM/01
corrective action at
Ok supplier end.

Inspection .Report
Giving clearance for usage Manager – QA PROJECT QUALITY PLAN
PEIPL/QC/RM/FORM/01

6. Abbreviations : Doc. – Document ; QA – Quality Assurance ; ITP – Inspection Test Plan ;.


R – Revision ; QUAL – Quality ; Insp. – Inspection ; Ref. – Reference ;
QM – Quality Module ; DC – Document Control ; PEIPL – Premier Engineering Industries Pvt Ltd.

Prepared by: Engineer - QA Approved by: Manager -QA