Escolar Documentos
Profissional Documentos
Cultura Documentos
ZHK
ZHK
TABLE OF CONTENTS
ENG’G
EPG
EPG
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
3.0 INFORMATION REQUIRED WITH QUOTATION.................................................. 4
Issued for Final Review
Issued for Review
DESCRIPTION
BI-10-00914/302-0001
JO/EWO NO.
02/26/10
03/26/10
DATE
REV
NO.
DRAWN
DATE
CHECKED
BY
DATE
DISCIPLINE
ENGINEER
DATE
PROJECT
ENGINEER
DATE
CERTIFIED
DATE
CONSTRUCTION
AGENCY
DATE
OPERATIONS
_________________
DATE ___________
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 P PP-117036 2
B
UNTIL CERTIFIED of
AND DATED
6
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. BI-10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
ZHK
ZHK
This specification defines the minimum requirements for the design and
ENG’G
EPG
EPG
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
requirement for the new 230kV substation and the 13.8kV main
Issued for Final Review
switchgear.
Issued for Review
DESCRIPTION
BI-10-00914/302-0001
03/26/10
DATE
DATE
API RP 2003 Protection Against Ignitions Arising out of Static,
Lightning and Stray Currents
PROJECT
ENGINEER
IEEE 80 Guide for Safety in Alternating-Current Substation
DATE Grounding
CERTIFIED
IEEE 81 Guide for Measuring Earth Resistivity, Ground
DATE
Impedance and Earth Surface Potentials of a Ground
CONSTRUCTION System
AGENCY
DATE
IEEE 142 Recommended Practice for Grounding of Industrial
OPERATIONS
and Commercial Power Systems
_________________
DATE ___________
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 P PP-117036 3
B
UNTIL CERTIFIED of
AND DATED
6
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. BI-10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
ZHK
Any deviation shall be brought to the notice of Buyer for their specific
ENG’G
EPG
EPG
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
3.0 INFORMATION REQUIRED WITH QUOTATION
Issued for Final Review
Issued for Review
DESCRIPTION
The Supplier shall furnish the following along with the quotation as a
minimum:
BI-10-00914/302-0001
03/26/10
DATE
DATE The Neutral Grounding Resistor supplied under this specification shall be
suitable for use outdoor in location near the sea that are subject to sand
CERTIFIED
and dust storms, fog, and airborne contaminants, including NaCl (Sodium
DATE Chloride) to 300 ppm and MgCl (Magnesium Chloride) to 50 ppm. All
CONSTRUCTION
Hardware shall be stainless Steel.
AGENCY
DATE
OPERATIONS
_________________
DATE ___________
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 P PP-117036 4
B
UNTIL CERTIFIED of
AND DATED
6
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. BI-10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
5.0 ELECTRICAL
CERT
ZHK
ZHK
EPG
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
Resistance at 25°C 20 ohms
Issued for Final Review
Issued for Review
BI-10-00914/302-0001
03/26/10
DATE
The resistor elements shall be stainless steel with a ceramic core and
element shall be supported at both ends.
REV
NO.
DISCIPLINE
All cable entry shall be from bottom.
ENGINEER
NGR Enclosure shall have adequate space inside to bend and
DATE
terminate the cable.
PROJECT All the required control and monitoring signals, and instruments
ENGINEER
hardwire shall be wired to the control cabinet mounted on the
DATE
transformer.
CERTIFIED
All required materials including hardware, cable lugs, links, etc shall be
DATE included in the supply. Vendor shall provide appropriate labels on all
the cubicle doors.
CONSTRUCTION
AGENCY
No used components, in part or full, shall be used.
DATE
OPERATIONS
_________________
DATE ___________
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 P PP-117036 5
B
UNTIL CERTIFIED of
AND DATED
6
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. BI-10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
7.0 TEST
CERT
ZHK
ZHK
The testing and the ‘Routine Test’ results submitted to the Buyer prior to
ENG’G
EPG
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
Dimensional check to relevant drawing
Issued for Final Review
Issued for Review
DESCRIPTION
8.0 COMPLIANCE
BI-10-00914/302-0001
BI-10-00914/302-0001
JO/EWO NO.
Supplier shall list out clearly the deviations taken in any of the attached
documents with details of the deviation and reason for such deviation.
03/26/10
DATE
Complied
S Brief Description
Document Reference Yes/No
REV
NO.
No.
DRAWN
Built to applicable
1 PP-117036 Section 1.0
DATE standard
CHECKED
Completed Data
2 PP-117036 Section 3.0
BY schedule
DATE
Rated 8kV, 400A,
3 PP-117036 Section 5.0
DISCIPLINE
ENGINEER
20ohms, 10sec.
Testing and Inspection
DATE 4 PP-117036 Section 7.0
requirements
PROJECT
ENGINEER
DATE
9.0 ATTACHMENTS
CERTIFIED
9.1 Q73-P-PP-417364 - Data Schedule, 8kV Neutral Grounding Resistor
DATE
OPERATIONS
_________________
DATE ___________
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 P PP-117036 6
B
UNTIL CERTIFIED of
AND DATED
6
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. BI-10-00914/302-0001