Você está na página 1de 2
LHOTELINOONESIA KEMPINSKIJAKARTA BM GENSET = 5 West Mall Grad Indonesia Project aaa Yor # Generator sets MITSDBIGM BMGS 2020 KTR “his contract Tor Povo Mode 6877425 “Guotity have been filed on BG al in entiation figures and deta st Tow, contractor must very the quartity & ems This is Fc limpsum contrat, any mismatch on the quanti / Rams of works become contractor esponsibty > Time frame wor £09.00 18.00 Wi8 > Contractor must assign one of PIC incharge standby during work progress "The contractor mast ondoct vss with 1 par of ist for replacement of {iter ue fiter and replace water aeator | Felinnares/arsopan ba = Folow al KS & sfety in 10 card and grooniha a must = Eestrica power soutee by owner = Gon defect result and dec folow up defect Ik needed) aby leaning ster worktime and must eoocdaation with Engineering end Secury [Generator MITSUBISHI BMS 2000 KVA Model SIGR-FTA2'S Waintnanca at Pé West Mall Grand Indonesia laintenence to 1 faTENANCET TING BY ROTEL REGUL la. Replacement Part: uelsyrtom Bt [7 epacerent ela ea = Replocement emer RAGOR ‘onsite ie = Replcemaital = Replacement efter and by pass terol [| airintake enka Sater oe = Replacement x er Tenreal gem ia cy [|= Adsitonat eee baer [= costing tone oe = Replacement cooing water with eddional coolant addleive ln Check, nepae, ating anal ering [Fuel Syston et = Check nd inspect el evel fay tank ren seciment of date Check and inspect fuel ine (sting needed) = checkand npect alakages the fle ne Check inspect and leaning fel separator ir hing Wend ‘iste = Checkand inspect of vel aa = Check epee and cling one = Chea and inspect of lakages Tiina 8 ahaa atom = Check, spect and leaning fer = Check nspee and cleaning esheust sem = checnepect nd ashing et syste Tea Sytem et = Check aspect Eater Check ingpect nd etingakrmatov Bat = Ghee, spect and seting starting motoe = Check inepect and uehtening al ermination = Ghack, epect and sating genset Control moa Cheek inspect ane sting AVR ‘cooing Stem = Chek ang spac cooling water atm = Check and inspect coon leakages = Ghedk inspect snd satng Veblt and sioner = Check an inspect ekages& cordon of Water ne ‘Generator Set Tesne = Test unig onset about 10-15 inte without oad = hack, Inspect and sting engine parameters & engine fYotecion Check, inpect and sting parameter gonetor check inspect, sting and cleaning: Foal ster = Check snd nape Fuel aval cay = Drain sediment of ay tank = check and inspect ue ine (ashing needed) Check and inspect alakagesin the feline = Cheek, inspect and cleaning fuel separator / iter using needed) assem ~ check and nspedt ol level = Cheek, spect and clening oF Me chk and spect leakages intake & Brink Stam, = check spect and cleaning te = check, spect ad.clesning exhaust stam "= Check, ngpoct an cen net system. eae Syztom co = Check &inspeet ater "cheek inspect ad sting aernator aE = hack nspectand setting stating motor = Check inspect a ughtening 2 errno = Check nupeet ad sting genset control mod = Check spect and setting AV cooing Sater = Check na speek colin water se = Chak nano cooing atags = Check inspect and sting oe and tansonat = Check ne inspect ieakages & corcon of Watering ‘Generator Set Testing = Test running gnset about 1075 rinute wou oad = Check inspect and sting engine parameters & engine OTN = Check inspect and sting poreoeter generator and over Wor ‘antractor sould provide Chek st, coer Gata, ad Gocient report > Hetel = Conacor shard pv nding for Iiprovarent or recommendation ‘Contactor sould do data ceaning work Before Rand over, dotl ceaning should be done and ready for operational anys Saag of aera tool HD respons ‘Grand Total

Você também pode gostar