GLE INVESTMENT DATABASE @ December 2009

Current Future Current Future Current Future Current Future


Nominal Nominal
Storage Storage Last Update Date
Type of Max. Send-Out Max. Send-Out Annual Annual Nº LNG Nº LNG Source
Country Company Name of facility Access Regime Investment Status Capacity (m3 Capacity (m3 Expected Date Comments
facility Capacity (Nm3/h) Capacity (Nm3/h) Capacity Capacity tanks tanks of Info
LNG) LNG)
(bcm/y) (bcm/y)
BELGIUM FLUXYS LNG Zeebrugge rTPA on-shore Expansion Planned 1,700,000 - 9 - 380,000 - 4 - - December 2009 GLE Member Open Season in progress
CROATIA E.ON Ruhrgas, OMV Gas, Total and Geoplin Adria LNG Exempted on-shore New Facility Planned - - - 10-15 - - - - by 2014 December 2009 Public Info Public info from Adria LNG; Nominal Annual Capacity between 10 and 15 bcm/y
CYPRUS Cyprus Government Vassiliko - on-shore New Facility Planned - - - - - - - - - December 2009 Public Info
ESTONIA - - - on-shore New Facility Planned - - - - - - - - -
FRANCE ELENGY Montoir rTPA on-shore Existing Committed (a) 1,600,000 (a) 10 (a) 360,000 (a) 3 (a) (a) December 2009 GLE Member (a) Extension under consideration for increasing the capacity from 10,0 bcm/y up to 16,5 bcm/y
FRANCE ELENGY Fos Tonkin rTPA on-shore Existing Committed (b) 1,150,000 (b) 7 (b) 150,000 (b) 3 (b) (b) December 2009 GLE Member (b) Open season under way for extending terminal' s commercial operation beyond 2014
FRANCE STMFC Fos Cavaou rTPA on-shore New Facility Under Construction (c) - 1,160,000 - 8.25 - 330,000 - 3 early 2010 December 2009 GLE Member (c) Under commissioning period
FRANCE GAZ DE NORMANDIE Le Havre - Antifer ? on-shore New Facility Planned - 1,150,000 - 9 - 510,000 - 3 2014 December 2009 Public Info
FRANCE DUNKERQUE LNG Dunkerque ? on-shore New Facility Planned - 1,400,000 - 10 - 380,000 - 2 2014 December 2009 Public Info variation : 1 900 000 Nm3/h, 13 bcm/y, 570 000 m3 LNG, 3 tanks
FRANCE FOS FASTER LNG Fos-sur-Mer ? on-shore New Facility Planned - 1,150,000 - 8 - 360,000 - 2 end 2016 December 2009 Public Info
FRANCE 4GAS FRANCE - PEGAZ Le Verdon ? on-shore New Facility Planned ? - 800,000 - 6 - 310,000 - 2 2014 December 2009 Public Info variation : 1 000 000 Nm3/h, 9 bcm/y
GERMANY DFTG Wilhelmshafen Exempted on-shore New Facility Planned - 1,200,000 - - - 320,000 - 2 - Dec-09 Public Info Public info from DFTG
GREECE DESFA Revithoussa rTPA on-shore Existing Committed 750,000 930,000 5.3 7.3 130,000 225,000 2 3 2015 December 2009 GLE Member
GREECE DESFA Palei Galini -Iraklion-Crete Island rTPA on-shore New Facility Planned - 250,000 - - - 175,000 - 1 2016 December 2009 GLE Member Public info from GIIGNL
IRELAND Shannon LNG Shannon Exemption requested on-shore New Facility Planned - (d) - - - 800,000 - 4 - December 2009 Public Info Public Info from CER /// (d) From 670.000 to 1.105.000. [17 to 28 mscm/day] //// Number of tanks: Up to 4 /// Regasification capacity: Up to 800.000
ITALY Snam Rete Gas (GNL Italia) Panigaglia-Portovenere rTPA on-shore Expansion Planned 439,000 915,000 3.4 8 100,000 240,000 2 2 by 2014 December 2009 GLE Member Public info also available on AEEG
ITALY Adriatic LNG Porto Levante Partially exempted off-shore New Facility Live 1,000,000 1,100,000 7.4 8 250,000 250,000 2 2 - December 2009 GLE Member
ITALY Brindisi LNG Brindisi Partially exempted on-shore New Facility Planned - - - 8 - 320,000 - 2 - March 2009 Public Info Public Info from AEEG
ITALY OLTOffshore Toscana Offshore 100% exemption requested off-shore New Facility Under Construction - - - 3.75 - - - - by 2010 March 2009 Public Info Public Info from AEEG
ITALY Gas Natural Internacional Taranto Partially exempted on-shore New Facility Planned - - - 8 - 300,000 - 2 - March 2009 Public Info Public Info from AEEG and Gas Natural
ITALY GdF-Suez Senigaglia/Ancona Partially exempted off-shore New Facility Planned - - - 5 - - - - - March 2009 Public Info Public Info from AEEG
ITALY LNG MedGas Terminal Gioia Tauro Partially exempted on-shore New Facility Planned - - - 12 - - - - by 2014 March 2009 Public Info Public Info from AEEG
ITALY Shell Energy Italia + ERG Power & Gas Rada di Augusta-Priolo Partially exempted on-shore New Facility Planned - - - 8 - - - - - March 2009 Public Info Public Info from AEEG
ITALY Nuove Energie Srl (ENEL 90%) Porto Empedocle Partially exempted on-shore New Facility Planned - - - 8 - - - - by 2010 March 2009 Public Info Public Info from AEEG
ITALY Edison, BP, Solvay Rosignano Partially exempted off-shore New Facility Planned - - - 8 - - - 1 - March 2009 Public Info Public Info from AEEG
ITALY Atlas Ing (Gruppo Bellini) Ravenna Partially exempted off-shore New Facility Planned - - 8 - - - - - March 2009 Public Info Public Info from AEEG
ITALY Endesa Europa Trieste Partially exempted off-shore New Facility Planned - - - 8 - - - - - March 2009 Public Info Public Info from AEEG
ITALY Gas Natural Internacional Zaule Partially exempted on-shore New Facility Planned - - - 8 - 300,000 - 2 by 2013 March 2009 Public Info Public Info from AEEG and Gas Natural
LITHUANIA Lithuanian Government Klaipeda or Butinge - on-shore New Facility Planned - - - - - - - - by 2013 December 2009 Public Info
POLAND Polskie LNG Sp. z o.o. Swinoujscie rTPA on-shore New Facility Committed - 656,000 - 5 - 320,000 - 2 by 2014 December 2009 GLE Member
PORTUGAL Ren Atlantico Sines rTPA on-shore Expansion Committed 900,000 1,350,000 5.5 8.3 240,000 390,000 2 3 by 2012 December 2009 GLE Member
SPAIN Enagas Barcelona rTPA on-shore Expansion Under Construction** 1,950,000 1,950,000 17.1 17.1 540,000 680,000 6 5 by 2011 December 2009 GLE Member 2 new tanks (150.000 m3 each one) will be commissioned and 3 tanks (2 x 40.000 m3 and 1 x 80.000 m3) will be removed
SPAIN Enagas Huelva rTPA on-shore Expansion Under Construction** 1,350,000 1,350,000 11.8 11.8 460,000 610,000 4 5 by 2010 December 2009 GLE Member
SPAIN Enagas Cartagena rTPA on-shore Expansion Under Construction** 1,350,000 1,350,000 11.8 11.8 437,000 590,000 4 5 by 2010 December 2009 GLE Member
SPAIN Enagas Musel rTPA on-shore New Facility Under Construction** - 800,000 - 7.0 - 300,000 - 2 by 2011 December 2009 GLE Member
SPAIN BBG Bilbao rTPA on-shore Expansion Under Construction** 800,000 1,200,000 7.0 10.5 300,000 450,000 2 3 by 2012 December 2009 GLE Member
SPAIN Saggas Sagunto rTPA on-shore Expansion Under Construction** 1,000,000 1,200,000 8.8 10.5 450,000 600,000 3 4 by 2011 December 2009 GLE Member
SPAIN Gascan Tenerife rTPA on-shore New Facility Under Construction** - 150,000 - 1.3 - 150,000 - 1 by 2012 December 2009 GLE Member
SPAIN Gascan Gran Canaria rTPA on-shore New Facility Under Construction** - 150,000 - 1.3 - 150,000 - 1 by 2013 December 2009 GLE Member
SPAIN Reganosa El Ferrol rTPA on-shore Expansion Under Construction** 412,000 825,000 3.6 7.2 300,000 300,000 2 2 by 2013 December 2009 GLE Member
SPAIN BBG Bilbao (2nd expansion) rTPA on-shore Expansion Under Construction** - 1,400,000 - 12.3 - 600,000 - 4 by 2011 December 2009 GLE Member Increase of send-out capacity conditioned to UGS (Gaviota) and gas pipeline (Arrigorriaga - Lemona) development
SPAIN Enagas Cartagena (2nd expansion) rTPA on-shore Expansion Under Construction** - 1,650,000 - 14.5 - 590,000 - 5 by 2014 December 2009 GLE Member
SPAIN Saggas Sagunto rTPA on-shore Expansion Under Construction** - 1,600,000 - 14.0 - 750,000 - 5 by 2014 December 2009 GLE Member Increase of send-out from 1.400.000 m3/h to 1.600.000 m3/h is conditioned to UGS (Yela & Castor) development in Spain
SPAIN Enagas Musel rTPA on-shore Expansion Under Construction** - 1,200,000 - 10.5 - 600,000 - 4 by 2015 December 2009 GLE Member Increase of send-out capacity from 1.000.000 m3/h to 1.200.000 m3/h conditioned to number of CCGTs in the region.
SPAIN Enagas Huelva (2nd expansion) rTPA on-shore Expansion Under Construction** - 1,800,000 - 15.8 - 760,000 - 6 by 2015 December 2009 GLE Member
SWEDEN AGA Nynäshamn - on-shore New Facility Under Construction - - - - - 20,000 - 1 by 2011 Decmeber 2009 Public Info Public Info from www.aga.se
SWEDEN E.ON Ruhrgas Oxelosund - on-shore New Facility Planned - - - - - - - - - December 2009 Public Info Public Info
THE NETHERLANDS 4Gas Liongas Exempted on-shore New Facility Planned - 1,050,000 - 9 - - - - by 2012 December 2009 Public Info
THE NETHERLANDS Gasunie, Vopak Gate terminal Exempted on-shore New Facility Under Construction - 1,650,000 - 12 - 540,000 - 3 September 2011 December 2009 GLE Member
THE NETHERLANDS Gasunie, Vopak Gate terminal (expansion) Exempted on-shore Expansion Committed - 2,200,000 - 16 - 720,000 - 4 2014/2015 December 2009 GLE Member
THE NETHERLANDS Essent, Gasunie & Vopak Eeemshaven LNG Exempted onshore New Facility Planned - 1,300,000 - 12 - 376,000 - 2 by 2014 December 2009 GLE Member
TURKEY Botas Marmara Ereglisi r-TPA on-shore Existing Live 685,000 - 6.2 - 255,000 - 3 - - December 2009 Public Info Info from GIIGNL
TURKEY Egegaz Aliaga r-TPA on-shore Existing Live 680,000 - 6 - 280,000 - 2 - - December 2009 Public Info Info from GIIGNL
UK Grain LNG (2nd expansion) Isle of Grain Exempted on-shore Expansion Under Construction 1,750,000 2,650,000 13 19.5 770,000 970,000 7 8 by 2011 December 2009 GLE Member
UK Grain LNG (3rd expansion) Isle of Grain Exempted on-shore Expansion Planned - - - - - - - - - December 2009 GLE Member
UK BG, Petronas, 4Gas Dragon LNG Exempted on-shore New Facility Live 1,140,000 - 6 - 320,000 - 2 - - December 2009 Public Info Info from www.dragonlng.co.uk /// Commercially operational since September 2009
UK Qatar Petroleum, ExxonMobil, Total South Hook Exempted on-shore Existing Under Construction 1,220,000 2,440,000 10.5 21 465,000 775,000 3 5 1Q 2010 December 2009 GLE Member 1st Phase Live and commercially operational since October 2009
UK Canatxx Anglesey Exempted on-shore New Facility Planned - - - - - - - - - December 2009 Public Info
UK Hoegh LNG AS PortMeridiam Exempted off-shore New Facility Planned - 1,400,000 - - - - - - by 2013 December 2009 Public Info Info from Portmeridiam website (http://www.hoegh.com/portmeridian/) /// Send-out capacity: 1250 mmscfd (it has been converted to Nm3/h)
UK Total, ConocoPhillips, Statoil, Eni Norsea LNG (Teeside) Exempted on-shore New Facility Planned - - - 20 - - - - - December 2009 Public Info
UK Calor , LNG Japan, Osaka Canvey Island Exempted on-shore New Facility Planned - - - 5 - 240,000 - 2 - December 2009 Public Info Info from Canvey LNG website

TOTAL LNG CAPACITY ADDITIONS 19,876,000 149 6,187,000 56

LEGEND

Status
Planned Project at an early evaluation stage or under study
Committed Project evaluated by the company with detailed studies and possibly undergoing planning and permitting stages
Under Construction Project already started (procurement and physical operations)
Live Project realised - capacity recently delivered

(*) already decided to launch a revamping program in order to extend the life span until 2035, with the present performance level
(**) Under construction and/or included within Mandatory Planning