Escolar Documentos
Profissional Documentos
Cultura Documentos
CAD/CAM Services
Mechanical Industry
Chemical Industry •Drafting & Detailing. Civil & Architectural Industry
•P&ID. •Component drawing. •Building & System Layout.
•3D plant layout •3D Modeling & Assembly. •Site Development.
•Equipment Specification sheet •Part list & Bill of material. •Structural design services.
•Piping Drawing & Details. •Mechanical Conversion. •Architectural drafting.
•Bill of material. •Product Development •Floor plant layout.
•As built fabrication drawing. •3-D Visualization
Why Chemionix??
Technical knowledge.
Low Cost.
International Quality.
Infrastructure.
Availability (Phone, IM and E-mail).
Experienced and Professional Team.
Cost Advantage
Graphical Representation of Cost
Reduction achieved by Utilizing Chemionix Draftsman Engineers
Services:
$/Month
Chemionix: USD 7500/- Per Month.
Total Saving achieved: 50%.
5
0
USA/Europe Chemionix
Business and Pricing Model
Safety:
We consider safety as our top-most priority in designing of
particular system.
Safety is not compromised at any stage of project, our motto is to
design chemical plant free of any accidents.
Safety is considered integral part of project management.
Our team have designed safe systems for more than 200
Molecules, including toxic chemicals like Bromine, Chlorine,
Thionyl Chloride, Ethylene oxide, etc..
Designed system for high pressure reactions, high vacuum
distillation, high pressure piping.
Achievements
Agrochemical Intermediate Project:
Completed Basic & Detail engineering design for Agrochemical Intermediate of 120
Tons/Months. Total cost of Project is 5 Million USD.
Designed more than 200 process equipments like reactors, tanks, heat exchangers, FFE,
pumps, high vacuum distillation etc..
Utility design & calculations for Boilers, cooling towers, Chilling Plants.
Pipe sizing, routing & isometric of more than 10,000 Mtr of Process & Utility Piping.
Specialty Molecule Project:
Complete turn-key project (inclusive of Process know-how) for specialty molecule. Total
cost of Project is 200,000 USD.
Covered all aspect of process & project management from concept till commissioning and
commercialized production.
Plant commissioned and streamlined in only 1 year time.
Pharma Intermediate Project:
Complete Project of pharma Intermediate. Total cost of Project is 100,000 USD.
This hydrogenation project was challenge because of high temperature & Pressure
involved. Designed system for 40 Bar Pressure reaction. Temperature at 150 Deg C.
Successfully designed & commissioned the complete project.
Contact Us
Chemionix Solutions.
115/116 Krishna Commercial Center,
Udyog Nagar Off S.V.Road,
Goregaon (W)
Mumbai-400062
India.
Phone: +91-022-32630007.
Mobile: +91-9820438182.
Website: http://www.chemionix.com
Email: info@chemionix.com
PLANT LAYOUT – SECTION VIEW (2-D)
PLANT LAYOUT – SECTION VIEW (2-D)
Process & Instrumentation Diagram
Equipment Specification Sheet
Equipment Specification Sheet
Equipment Specification Sheet
Piping Isometric Drawings
Architectural Plot Plans
3-D Plant Layout
3-D Structural Layout
3-D Plant Layout
Plant Layout
From Chemionix Solutions
Rakesh Pandey
Director
Thanking you