Você está na página 1de 5

1

DESAI JIGNESH R.
SHARJAH
PHONE – 00971 7981509(UAE)
EMAIL - swardesai@yahoo.co.in
Passport no- E3664477
Date: 24.04.2008

To
PLANT HEAD,

SUB: Application for the suitable post for Mechanical Engineer

Dear Sir,

I’ve come to know that there are vacancies in your esteem

Organisation for experienced Mechanical Engineer - operation and I am

applying for the same. I’ve herewith enclosed my BIO-DATA, for your

reference. I hope that my qualification and experience is in line with your

requirement. I shall be glad to furnish any further information you may

require.

Thanking you,

Yours faithfully,

( J R DESAI )
2

BIO - DATA

Personel : (1) B.E.Mechanical


: (2) PG Diploma in “Marketing Management”

Name : DESAI JIGNESH RAMESHCHANDRA


Age : 36 Years
Date of Birth : 16-10-72
Place of Birth : SURAT (Gujarat)
Nationality : Indian
Religion, Caste : Hindu, Anavil Brahmin
Qualification

Sr Examination Board/Universiy Yearof %Marks Class


. passing
1 S.S.C G.S.E.B 1987 79 Dist
2 H.S.C G.S.E.B 1989 70 Dist.
3 B.E.Mechanical Saurastra 1993 64 First
4 PG.Diploma in I.G.N.O.U 1995 SC II
Marketing management
5 Second Class Boiler Govt.of Gujarat 1997 70 Dist
proficiency exam
Details of Employment
Sr Name & Address of Date Designation Department
Organisation From To
1 The Baroda Rayon 13-4-94 15-10-97 Asst.Supdt Power Plant
Co.Ltd. Surat.
2 The Associated 20-10-97 19-11-00 Asst.Manager Power Plant
Cement Companies Operation in charge
Ltd., Kymore, M.P.
3 Gujarat Alkalies & 20-11-00 25-09-06 Shift in charge Power plant
chem.Ltd. DAHEJ.
4 Sharjah Electricity &
And Water Authority 10-09-06 Working Shift in charge Power plant
Sharjah.UAE
(SEWA)

Exposure: Working exposure in ISO9001, ISO14001, ISO18001


Companies.Familier and working with SHE Policy, OHAS Policy.
3

Achievements :
Erection and commission of 25MW CPP plant.
Commissioned 04nos. Frame 9E GE gas turbine.
I got chance in involment in Gas turbine major inspection, Hot Gas Path
Inspection and Steam Turbine major inspection from operation side..
Presently working in project of 2700 MW GE Frame 9E and Mark 6
Combined cycle in SEWA, UAE.

EXPERIENCE Sharjah Electricity and Water Authority.Sharjah


Shift In charge UAE
Working from
Sept 06
At present I am working in project of 2700 MW combined cycle power
plant. Presently four GE Frame 9E machine (capacity 120MW each) having
speedtronic Mark 6 Control are commissioned and are in operation. Balance
plant erection and commissioning activity is in progress. We are working in
132kv, 220kv ABB GIS Switch gear, Fox Boro DCS System (version 8.1)
and 10 mw capacity of each diesel generator (2nos) of Wartsila make for
blackout.

At present I am working as a shift in charge and looking after all operation


activities of Gas Turbine and Electrical System. Responsible for isolation
and de-isolation of mechanical and Electrical equipment and switchgear.
Also involved in commissioning activities of Gas Turbine and Generator
as well as 132kv/220kv switchgear.

I got operation training of frame 9E machine and Mark 6 from GE.


4

EXPERIENCE M/S.GUJARAT ALKALIES & CHEMICAL LTD.


SR.ENGINEER
2000 - 2006
I worked as a shift incharge in 90 MW combined cycle power plant. I am
having operational experience of following equipments.
Gas Turbine : 02 nos.
Make : European Gas Turbine Gmbh, Germany
Type : Frame VI (PG6541)
Capacity : 38.3 each in iso condition.
Control system : MARK V (Speedtronics)
Firing : Naphtha and Natural Gas
Steam Turbine: 01 no.
Make : Ansaldo, ITALY
Type : Controlled Extraction, Condensing Type
Capacity : 35MW
Control system : ESAIG BAILEY(INFI 90)
Heat recovery units : 02 nos.
Make :L&T
Capacity : 62 TPH Each
Type : Dual pressure
Balance of plant :
We also used 60000sm3 LP Gas after compressing it up to 22bar in gas
turbine.
We are having 220 kv, 33kv, 11kv, 3.3 kv & 415v electrical system.
We have DM Plant ,cooling towers, cooling water system, chlorination
system, Back pressure mini steam turbine and Grid islanding system.

EXPERIENCE ASSOCIATED CEMENT COMPANIES


ASST. MANAGER
1997 -2000

Worked in this organization starting from erection of 25MW CPP


,involved in erection & commissioning activities of Boilers ,Turbine
,Auxiliaries of Boilers & Turbine, DM plant , Coal & Ash Handling plant,
operation of 6.6 kv,11kv,415v Electrical system, Tata Honeywell DCS-TDC
3000, UPS , Battery charger, DG Set, Air handling unit & Air conditioning
system.
I am working as a operation incharge under O& M of THE TATA HYDRO –
ELECTRIC POWER SUPPLY COMPANY LIMITED.
PLANT DETAILS:
5

BOILERS : (3 NOS.)
TYPE : FLUDISED BED COMBUSTION
STEAN GEN. CAPACITY : 66 TPH PER BLR.
MAKE : ABB-ABL
TURBINE : THE CONDENSING TURBINE V40 WITH THREE BLEED POINTS
(STEAM FOR LP HEATER ,DEGASIFIER ,HP HEATER )
* CAPACITY : 25 MW
* TURBINE SPEED : 5700 rpm
* GENERATOR SP. : 1500 rpm
* MAKE : ABB,CZECH REPUBLIC
CONTROL AND PROTECTION SYSTEM OF TURBINE:
TYPE : PLC
TURBINE GOVERNING SYSTEM : 509- WOODWARD ,U.K. (ELECTRONIC)
TURBINE MONITORING SYSTEM : 3300 - BENTLY NEVADA,U.S.A
DISTRIBUTED CONTROL SYSTEM: TDS - 3000 - SUPPLIED BY
TATHONEYWELL

EXPERIENCE M/S BARODA RAYON CO .LTD. 1994 -1997


ASST. SUPDT.

I have performed the following responsibilities in the power plant.


• Operation of BHEL MAKE AFBC BOILER of 50 T/H Capacity.
Operation of 2 nos of STROKER FIRED BOILER of 40 T/H capacity (each)
• Operation of 2 nos of Turbine of 5 MW capacity each having a) Single cylinder and
Single extraction which is operating at 415 deg.C and 29 Kg/Sq.cm pressure.

Present Salary: 12000Dhs. + free family airtickets+ Free


transportation, Medical and water-electricity.

Você também pode gostar