30 dias/ mes y el costo de 0.7 s/kw-h Pasar a KW = P/1000, 635.8/1000 = 0.6358Kw 0.6358x7 =4.45 Kw-h 4.45kw-h x 30 meses = 133.52 R3 = 27 133.52 Kw-h x 0.7 s/Kw-h = 93.46 soles RT = 46 + 3 + 27 = 76 Ohmios Intensidades Iguales IT = I1 = I2 = I3 Intensidad = V/R = 220v / 76 = 2.89 Amperios Tensiones se suman VT = V1 + V2 + I3 IT = I1 = I2 = I3 = 2.89 A POTENCIAS P = Potencia activa = V x I x cos(ø) V1 = I1 x R1, V2 = I2 x R2, V3 = I3 x R3, VT = IT x RT
Q = Potencia Reactiva = V x I x sen(ø) V1 = 2.89 x 46, V2 = 2.89 x 3, V3 = 2.89 x 27, VT = 2.89 x 76
s = Potencia aparente = V x I V1 = 132.94, V2 = 8.67, V3 = 78.03, VT = 219.64
220v x 85.27 x 1 = 18759.4 3 artefactos encendidos 7 h/d en 30 dias/ mes y el costo de 0.7 s/kw-h Pasar a KW = P/1000, 18759.4/1000 = 18.7594 Kw 18.7594 x7 =131.3158 Kw-h 131.3158 kw-h x 30 meses = 3939.474 3939.474 Kw-h x 0.7 s/Kw-h = 2757.6318 soles Tensiones Iguales VT = V1 = V2 = V3 Intensidades se suman IT = I1 + I2 + I3
POTENCIAS P = Potencia activa = V x I x cos(ø) Q = Potencia Reactiva = V x I x sen(ø) s = Potencia aparente = V x I