5 MW – Photo voltaic
© 2010
e ntial
nfid
y Co
ictl
Str
¾ Executive Summery
¾Solar Energy Sector
¾ Renewable Energy Opportunity & Energy Mix Forecast
¾ Investment in Renewable
¾ Solar Growth Drivers
¾ Global Market Size & Global Market by Geography
¾ Indian Solar Industry
¾ Financials
¾ Financial Structuring
¾ Company Structuring
¾ Exit Options Available
¾Risk Analysis
¾ Technology
.
Executive Summery
_________________________________________________________________________
• The Primary reason a Solar power plant is financially viable is due to the tremendous
amount of subsidy provided by Govt. of India. Currently electrical power is sold at ` 3.5/unit
by power plants to the govt. Under the Jawaharlal Nehru National Solar Mission any
electricity produced by PV solar power plants is bought by the govt. at the rate of ` 15/unit.
• The equity funding is required to be released only once the Power Purchase agreement
has been signed with the Govt. hence reducing the risk exposure of the equity partner.
•The solar power plant is proposed to be established in Rann of Kutch , Gujarat , India . The
primary reason for the site selection is the intensity of the solar irradiation at the proposed
location . The other influencing factors include favorable govt. support, hard packed soil
(reducing maintenance cost),strong electricity infrastructure availability , lack of socio
economical turbulence etc.
•The technology provider’s engineers work closely with us to develop the PV solar power
plant.
tial
Strictly Confiden
.
Solar Energy Sector
Solar Energy Sector
-Renewable Energy Opportunity
_________________________________________________________________
_______
vddgggggggggggggggggs
Solar Energy Sector
-Evolution of Worlds Energy Mix
_________________________________________________________________
_______
Source : EPIA
Solar Energy Sector
-Investment
_________________________________________________________________
• Each hour the sun delivers to Earth the amount of energy used by humans in a
whole year
Source : EPIA
The expected growth rate is in the range of 20% - 30%, mainly fueled by pro solar
policies being announced by various governments around the world.
Solar Energy Sector
- Global Market by Geography
_________________________________________________________________
_______
Solar Energy Sector
-Indian Solar Industry
_________________________________________________________________
National Solar Mission - The objective of the Jawaharlal Nehru National Solar Mission (JNNSM) under the
brand ‘Solar India’ is to establish India as a global leader in solar energy, by creating the policy conditions for
its diffusion across the country as quickly as possible.
The Mission aims at :
• 100,00 MW by 2030
•Cash infusion required only after a PPA(power purchase agreement ) has been
signed by the Govt. of India –PPA is a promissory by the Govt. to buy the
electricity at a fixed rate for the next 25 years irrespective of the global or
domestic price movement /fluctuation in the unit cost of electricity.
Foreign Market
Manufacturing Consulting Alternative Energy
Entry
Exit options –
•IPO--[MTE] l
n f identia
ly Co
•Securitization --[EE] Strict
The IPO valuation is above 323 cr. ` (without hype) because of the following
reasons :
l
Con f identia
Strictly
Risk Analysis
l
Con f identia
Strictly
Risk Analysis
_________________________________________________________________
Risk Mitigation Measure
_______
Development Risk
Promoter Risk The risk which is higher for the promoters is not going to be shared or transferred
to the Equity or Debt partner , all the responsibility and onus of securing the Ppa
lies with Sun Shakti .
Pre PPA – Risk : High
Once the contract/ppa has been secured with the Govt. the equity and debt
partner come into play hence drastically reducing their risk exposure .
Financing Risk The equity contribution for the project is proposed to be funded through the
promoters’ contribution, private equity investments and unsecured loans. The
company is in discussion with various potential private equity investors for tying
up the requisite equity contribution. The risk assessment is based on the fact that
ppa has been secured or not .
Risk – low
Strictly Confidential
Risk Analysis
_________________________________________________________________
_______
Risk Mitigation Measure
Construction Risk
Cost & Time Overrun The Company proposes to award the contracts on fixed cost basis
Risk to experienced and reputed technology suppliers. The Company
will ensure to keep relevant provision for liquidated damages in
case of delay of project. Such liquidated damages would partially
offset the adverse impact of cost overrun.
A provision of 5% contingency is kept in the Project Cost to meet
any cost overrun due to unforeseen events. Further sensitivity to
increase in capital cost of Project cost, up to an extent of 5%, has
been analyzed and debt servicing has been found to be
Comfortable.
Risk – low
Strictly Confidential
Risk Analysis
_________________________________________________________________
_______
Risk Mitigation Measure
Construction Risk
Infrastructure Risk The project site has adequate transport infrastructure and
connectivity to ensure smooth and timely transportation of heavy
plant and machinery at Site.
Risk – Low
Technology Risk The basic technology risk the project faces is probable breakthroughs in the
field of Photovoltaic's in the next 8-12 years ,hence making the current
technology obsolete .
Risk – Medium
Strictly Confidential
Risk Analysis
_________________________________________________________________
_______
Risk Mitigation Measure
Performance Risk
Fall of Performance Risk 25 years performance guarantee from both our Execution partners and from the
firms we are procuring our cells .
Risk : Low
Maintenance Risk
Operational Risk The company has already brought in experienced executives into the Project
Maintenance Risk The company is bringing in experienced executives into the Project Management
team. After successful execution of Project, the Company will strengthen the team
by bringing in relevant manpower to operate the plant by adopting prudent
practices. The project also has provision for sending relevant employees and
operators for necessary training for managing and running the plant operations
efficiently.
Risk – Low
Strictly Confidential
Technology
l
Con f identia
Strictly
Technology
___________________________________________________________________
ABC of Photo Voltaic Solar cells
sunlight [photons] hit the solar panel and are absorbed by semiconducting materials
Electrons ( - ve charged) are knocked loose from their atoms, allowing them to flow through the material to
produce electricity.
l
Con f identia
Strictly
Technology
_________________________________________________________________
Solar Cells today are classified into three generations :
First Generation Second Generation Third generation
1st generation accounts for 89% Second gen. uses new Third generation technologies
of 2007 -08’s total production. manufacturing techniques enhance poor electrical
(vapour deposition, performance of thin film
•Large-area, high quality and electroplating). technologies while maintaining
single junction devices , Silicon low production costs.
based standard PV cells . •2nd generation technologies are
faulted for “poor” conversion •Current research is targeting
•Single junction silicon devices efficiencies and despite high Si conversion efficiencies of 30-
are approaching the theoretical prices were unable to gain 60%.
limiting efficiency of 33%. significant market share.
•Most successful 2nd generation •There are a few approaches to
•High production costs -unlikely to materials have been cadmium achieving these high efficiencies:
achieve cost parity with fossil fuel telluride (CdTe), copper indium Multiple junction devices.
energy generation. gallium selenide, amorphous Modifying incident spectrum
silicon, and micromorphous (concentration).
silicon. Use of excess thermal generation
•Materials are applied in thin films to enhance voltages or carrier
to supporting substrates (glass, collection.
ceramics) reducing material mass
and costs
•In 2007-08 CdTe production
represented 4.7% of total market
share, thin film silicon 5.2%
nfidential
Strictly Co
Technology
_________________________________________________________________
In 2007-08 first generation solar cells accounted for 89.6% of commercial production, though
the market share of these solar cells are declining. The manufacturing processes that are used to
produce first generation cells are inherently expensive, meaning that these cells may take years to pay
for their purchasing costs.
A standard example of second generation cells would be the solar cells made by Nanosolar, which uses
a special machine to print the cells at an extremely fast rate. Though these cells have only 10-15%
conversion efficiency, the decreased cost more than makes up for this deficit and it is thought that
second generation solar cells will surpass first generation cells in market share sometime around 2010.
Second generation solar cells have the potential to be more cost effective than fossil fuel, though this
may not occur until 2016 (est.) or later. The great advantage of second generation, thin-film solar cells,
along with low cost, is their flexibility. Thin-film technology has spurred lightweight, aesthetically pleasing
solar innovations such as solar shinglesand solar panels that can be rolled out onto a roof or other
surface.
Third generation solar cells are just a research target, and do not really exist yet. The goal of
third generation solar cell research are low-cost, high efficiency cells. Some analysts predict that
third generation cells could start to be commercialized sometime around 2020, but this is just a guess.
Technologies associated with third generation solar cells include multi junction photovoltaic cells,
tandem cells, nano structured cells to better pick up incident light, and using excess
thermal generation to enhance voltages or carrier collection. l
Con f identia
Strictly
Technology
_________________________________________________________________
Solar cells Efficiency issues
•Solar cell efficiencies vary from ~ 6% for amorphous silicon-based solar cells to ~ 41% with
multiple-junction research lab cells.
•Solar cell energy conversion efficiencies for commercially available multi crystalline Si solar cells
are ~ 14-19%.
•30% efficient multi junction cell based on exotic materials might well cost one hundred times as
much as an 8% efficient amorphous silicon cell in mass production, while only delivering about
four times the electrical power.
•There are still operational and life span issues that have to resolved for 2nd and 3rd generation
cells .
l
Con f identia
Strictly
Technology
_________________________________________________________________
_______
Technology
_________________________________________________________________
•Technology chosen is based on not only the efficiency of the systems but also the long term survivability
of the systems in harsh desert climates .
• The system integration is a major factor in increasing the overall efficiency of the system .
l
Con f identia
Strictly
Government Role &
Project Phases
l
Con f identia
Strictly
Government Role
______________________________________________________________________
•Govt. of India and its various state governments have started playing a primary role in
the development of the solar energy sector in India. This can easily be portrayed by the
stated aims of the Jawaharlal Nehru Solar mission .
• The solar photovoltaic power plants are financially viable and profitable at today’s
technological stage only because of heavy Govt. subsidies ; starting from California to
Germany to India .
• In the clearance department the Solar Power projects have an inherent advantage
over other sectors .The primary clearances required by the solar power plant is an ‘No
objection certificate ‘ for the land usage and a Evacuation availability from GETCO ‘s
nearest 66KVA or higher substation.
• Govt. of India in 2010’s budget has reduces and in some cases waivered the excise
duty for the equipment used in alternative energy segment .
•CERC has made it mandatory for all power utilities to purchase 6% of tpower l
Con f iden ia
generated by green technologies , for example –solar, wind Stricetc
t ly
Project Phrases
_________________________________________________________________
_______
Phase Activity Involved Parties Prerequesits
1Submission of Expression of interest Promoter N/A
2Acknowledgement On submitted letter of Interest GEDA Promoters Background
Successfully short listing of letter
3 Invitation for Application GEDA of interest
Financial criteria
Technical criteria
Demand Draft of 50Lakh
Application fees
Board of Directors
C.E.O.
Scientific Advisor*
Department
Financial Advisory Technology Partners
Heads
l
Con f identia
Strictly
Summery
_________________________________________________________________
• The 5 MW solar PV power project .
• Cash infusion required only after the PPA [power purchase agreement ] has
been signed with the Govt. ,guaranteeing us a steady cash flow for the next 25
years .
• The Power project is phase-I of sun shakti’s expansion plan , Phase-II of the
plan includes a growth of above 30% annually .
• The complete proprietary details of Phase II will be provided only after first round
of discussions .
•The segment in which Sun Shakti is operating is the fastest growing investment
segment in the market .