India's largest single stream COUNOU of Essar Refinery at Vadinar
successfully commissioned on November 27, 2006.
BUSINESS TREND
Domestic
SI. No. Project Title & Scope of Services Client I Location
I
1. Consultancy services for PX-PTA Project IOCL, Panipat
!
at Panipat Refinery (additional work) I
1
l
Corporation Limited, !
,
I,Hyderabad I
I Review of NIO scope of work for SPM i HPCL, Mumbai-'
facility at Visakh Refinery
~_ .. _ .. ~-
PMC services for Strategic Crude Oil IISPRL, Delhi
facilities at Visakhapatnam
9. PMC services for B-22 Field Development
I Project
'-,
,10. ' Design
and detail engineering for
L. .modification
I jobs in FCCU
Overseas
ISI. No. Project Title & Scope of Services Client/Location
r1. Technical assistance to SABIC, Saudi Saudi Basic Ind
Arabia Corp., Saudi Ara bia
PROPOSALS SUBMITTED
Domestic
I
S. No. Project Title & Scope of Services Client I Location
1. Detailed feasibility report for LNG Adani Group, I
Terminal at Mundra Ahmedabad ,
2
!
--------,."._--------_._----~
5. 'I' Techno Economic Feasibility Study for I BRPL, Bongaigaon:l
HS Crude Processing at BRPL, !
I Bongaigaon I
6. -'1 DFR for'T~a-p-.~O~ff~T~e-r-m~i-na-I-F-a-c-il-ity-a-t
-·-~N-R-L,-Numalrgarhl
L..._~' _G._u_w_a_ha_ti
__ . . ., . _
Overseas
irS!: I Project Title & Scope of Services ~ient I Location ..
. No.
IT' : Technical Assistance Services for Bintan ~m-in-iu-m-I-ndustry-
Alumina PrOJect,Indonesia Professionals Inc.
, .1
Canada
~-2-.- Feasibility Report & Mining Plan for SRK Consulting,
h
Ii
I Project in Kuwait
r---;----+-O;C-~~---o--~=c=--~___+=c----='~~~
' 4 Consultancy Services for FEED Review The National Co. for
I
of Revamp of Meena AI-Ahmedi Burnery Mech & Elect.
f- for smokeless Operation of MAA Refinery Works Ltd, Kuwai!.J
I PMC services Phase-I for the ENIP, Algeria I
PROJECT HIGHLIGHTS
------- Annexure I u _
FINANCIAL HIGHLIGHTS
Cumulative position of Turnover and Profit After Tax from April 2006 till
November 2006 was Rs. 360.31 crores and Rs. 82.86 crores respectively.
3
l
ANNEXURE - I
REFINERY DIVISIONS
130 Nos Structural drawings and 54 Nos Piping AFC Drawings released
for Construction. RFQ for all 18 MRs of I MTO Piping Materials issued,
order placed for 16 MRs out of 18 MR's. Order placed for Controlled
volume pumps, Ejectors, HV Switchgear, Displacer level instruments
Magnetic level gauges, On-off valves and Gate/Globe/Check valves
during the month. HP Heat Exchangers- Price opened, Cooling Towers-
final recommendation sent on 18.11.2006 Single vertical tender-
Recommendation for initial short listing sent for approval of IOCl on
07.11.2006.
Process package for DCU received. MRs for Electric heater (ISOM),
Vaporiser & Reactors (MS Block) released TBA for CCR Reactors
released. Enquiry issued Civil/Strl. Works of MS Block, Electric Heater
for ISOM unit, Structured packing & associated internals. Order placed
for Reactors/separator (HCU), Cast and Glass preheater, Column &
Vessels (CDUNDU). Bids for Crude & Intermediate tank works at Bina
and Crude oil storage tanks at Vadinar are under evaluation Contract for
CDUNDU-Heater Works and Civil & Strl. Works, HCU/DHDT Civil/Stri
work and Consultancy services for Raw water intake awarded.
Construction of Boundary Wall, Site Grading, Site Office, Ware House,
Watch Tower, Control Room, SRR & S/S and Construction Water storage
& Distribution reservoir are in progress.
Pipe Line: Recommendation for placement of order for Line Pipe sent on
17.11.2006. Bids for line Pumps are due on 30.11.2006.
Order placed for 261 Nos MRs out of total 287 Nos. Balance ordering
pertains to Top-up piping MTO. All major equipment received except 1
vessel, 1 heat exchanger and 4 pumps for MS Block. Construction works
in progress for MS Block, Offsites, Control room, Sub-Station and Cooling
Tower. Substation -8 completed. OM plant and Nitrogen plant
4
I
.'
All drawings for all units including IBR package for NHT/CCR issued for
construction. Order placed for 12 MRs during the month Out of total 264
MRs, order placed for 242 Nos MRs Out of total 694 Nos Equipment. all
ordered and 564 Nos received at site Recommendation for award Issued
for FGD Package on 22.02.2006. Award is pending with HPCL for quite a
long period Recommendation for award of Instrumentation tender for MS
Block issued on 14.10.2006 and Offsite, Mech I Piping part - B issued on
25.09.2006. Delay in award of these contracts is affecting progress of
work. Contract for Electrical work of units and Tankages work part - II
awarded on 25.10.2006 and 14.11.2006 respectively Act Constn.
Progress for the month: 3.1% (Cum.Sch.95.4%, Cum. Act.452%)
Progress of Construction is affected due to inadequate mobilization of
resources by contractors and delay in award of contract for offsite Mech
IPiping (Part - B).
5
!
6
(
P_ET_R_OC_H_E_M_IC_A_LS_D_IV_IS__IO_N
Out of total 213 Nos eqpt., 212 Nos ordered, 145 Nos received at site and
130 Nos erected. Rotary Dryer erected during the month. Civil Works:
RCC - 14,786 m3 completed out of total 15,550 m3. A1G Piping welding
59,793 10 completed out of total 125;150 10. Erection 67,035 1M
completed out of total 140,107 1M.
EPCC Package - 1(Naphtha Cracker Unit - Mis. Toyo Engg. Corpn. &
L&T): - P&IO review completed. Out of 626 Nos, 343 equipments
ordered. HAZOP Study in progress. Site activities commenced for Site
office/Ware house & pilling work. EPCC Package - 2(PP+HOPE): - PP:
Work awarded to Mis Technimont ASPA Italy on 14.11.2006. HOPE:
Tender annulled. IOCL have issued enquiry for appointing EPCM
Contractor. EPCC Package - 3(LLDPE + HOPE Swing): Tender
7
,
annulled 10CL have asked ElL to submit proposal for the package on
LSTK basis. ElL proposal submitted on 02.11.2006. EPCC Package -
4(Captive Power Plant-Mis. L&T): Utility Boiler. GTG and HRSG ordered.
EPCC Package - 5(Cooling Water Pkg.): Layout, design Basis and U/G
pipe thk. Approved. CW pumps (23 Nos) ordered. EPCC Package -
6(RO based OM Water Plant & Condensate Polishing Unit-Mis. VA Tech
Wabag Ltd.): Plot plan approved. Clarifier, Pressure Vessels & pressure
tubes ordered. EPCC Package - 7(ET Plant Mis NICCO Corporation)
Revised BEP expected by end Nov.'06. Inspection categorization
approved. EPCC Package - 8 (Offsites & Storage Mis 10TL) RFO
issued for LP/HP Compressors, Pumps, Benzene recovery system, HT
Cables, RCC Pipes Site mobilisation is In progress Soil Investigation
report reviewed. Site mobilization is in progress. EPCC Package - 9
(Balance Utilities, Water Block, Interconnection to Panipat refinery,
Marketing Terminal and Flare- Mis Naftogaz) P & IDs for flare package,
Process data sheet for MOVsIPRDs, updates data sheets for
PMT/Refinery transfer pumps and Water pumps completed Survey for
flyover completed. EPCC Package - 10 (MEG Unit) Bids received on
16.102006, Evaluation is in progress. EO Reactors (FIM) Mis L&T- Sub-
ordering of boughtout items is in progress. EPCC Package - 11 (N202 -
BOO): TBA approved by 10CL on 03.11.2006 Condition of agreement is
under finalization by IOPCL. EPCC Package - 12 (Non Plant Buildings)
Feed package under finalization. NIT expected to be released by 1st week
of Dec. '06. EPCC Package - 13(Spent Caustic Treatment): Licensor
selection is in progress. EPCC Package - 14(PSU Revamp)' NIT issued
with bid due date of 11.12.2006.
Ordering of all items completed. All 322 KM Line Pipe coated and
dispatched to dump sites. Micro tunneling Work (Mis. Ludwig-Pfieffer &
Gypsum Structural JV): Mobilisation is in progress Composite Works of
terminals: - Numaligarh despatch Terminal: Site grading work is in
progress. Siliguri despatch Terminal: Site grading and excavation work
started. Laying of 143.7 KM Pipe out of total 397 KM Completed.
8
l
Works and Composite works in progress for all the terminals except for
Jaipur Terminal Land yet to be acquired for Jaipur terminal
Revised P&IDs, Equipment list & Eqpt Data sheet for balance eqpt
released Pipeline schematics released. MR for control valves released
on 07.11.2006. Final recommendation for linepipes sent on 17 11.2006
Bids due date for Main line & Booster pumps extended to 1512.2006
All Piping GADs issued, Major engineering work completed. Piling, Civil
& Structural, Tankages, Piping and Equipment Erection. Electrical works
in progress. Construction work for Alumina Calciner Package and
Evaporation Package are in advance stage of completion. Construction of
Raw water Intake Well and Pipeline Package, Raw Water Treatment
Package, Effluent treatment Plant and Cooling Tower is in progress.
MR for EOT crane 160T issued. Order placed for Stratified material
insulator, End panel tightness joint panel, BRO Bricks & Grouting
compound and Dry and wet air receivers. NIT issued for CS Strl section
and hot rolled tubes for PSS and enquiries issued for EOT crane
(refloated), Insulating hoses, Local isolation cabinets, flanges, HV cables,
Battery & battery charger. Priced recommendation sent for Pot super
structure, Crust breaker and feeder Assembly, Cathode bars, pot room
liquid bath bins, Crust bath transport bins and heat insulated boxes, CS
9
welded pipes, KUB concrete, Micaveer insulators and Fibro cement
insulators Civil/strl works tender refloated on 07.11.2006 with bid due
date 30.11.2006 and Cooling tower tender floated on 07.11.2006 with bid
due date 07.12.2006. 47 Nos Pot Shells received at site out of total 242
Nos. RCC work of Pot Line, Civil & Structural Work of Pot Room A & B.
Central Duplex Building, are in progress. Piling Work completed
Construction water & Drinking water line completed and charged at pot
line
~~~~~~~~~_.u
MINES and ALUMINA __
REFINERY EXPANSION .
PROJECT ,_
AT
[JAMANJODI, (NALCO), Cum. Physical. Progress,. ~ch.:36..6°&,
Act.:14.2%.
101 Nos AFC Drgs issued out of estimated total of 659 nos. 64 Nos MRs
Issued out of total 150 Nos. Recommendation issued for 12 and order
placed for 9 out of estimated total 150 MRs 3,679MT of BO Plates
received out of total requirement of 3,793MT for Precipitati on Tanks Civil
& Structural Works - RCC work in progress for Precipitation Tanks
Foundation of first tank (No 1122) handed over to tankage contractor
Evaporation Package: Civil and Structural Work is in progress. 1131 MT
Strl Steel received out of 1400 MT and Fabrication of 200MT completed.
Site Grading and Piling work is in progress.
10
EPCC Contarctor mobilized and Area cleaning and site grading work is in
progress. EPCC - 8(Dismantling of existing Paraxylene Recovery Unit):
Contractor mobilised and commenced the work w.e.f 1811.2006.
EPCC - 9 (Fire Water network): Fire water layout, P&IDs, Tanks and
Pump data sheets prepared EPCC - 10(pipelines to Port) Preparation
of Design Basis, Survey and Soil Investigation Layout have been
completed
11