# Description First Start Date Actual Start Date First Completion Date Actual End Date
1 Data Collection
4 Data Compilation
5 Generate Copy
Proposed By Reviewed By
Leonard Juan
Document Control
CONTRACT NO. : CH2/CO/2008/DKB/166
CLIENT : PETRONAS CARIGALI SDN BHD
PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND MODIFICATIONS
Volume 2 - QA/QC Documentation 20% 349 27 27 0 322 5.42% 1.55% 0.00% 1.39% 0 A4
Volume 3 - Material Documentation 20% 284 0 0 0 284 0.00% 0.00% 0.00% 0.00% 0 A4
Volume 4 - Testing, Precommissioning & Commissioning Doc. 10% 691 1 1 0 690 0.00% 0.00% 0.00% 0.01% TBA 0 A4
DOC. DESCRIPTION AS PER TOC DOC I.D. Scanning Doc.(PDF No. of Sheet Status Remarks
RECEIVED COMPILED 4.0+300s) / Final
Compilation
1.3 N/A
TRUNNION BALL VALVES - (30" x 900# RB LOW TEMP(K510) TAG NO: VX-
2.1 23029, VX-23030, VX-23035, VX-23036), (20" x 900# FB LOW TEMP(K-520)
TAG NO: VX-63007) & (20" x 150# FB LOW TEMP(K-530) TAG NO: VX-63016)
DUAL PLATE CHECK VALVE (TAG NO: VX-23032, VX-23038, VX-23017, VX-
2.2
23016)
2.2.1 Equipment Information Sheets YES YES
2.2.2 Engineering Data Sheets YES YES
2.2.3 Warranty Certification YES YES
2.2.4 As Built Vendor Drawings YES YES
2.2.5 Operating & Maintenance Manual
- Recommended Spare Part Lists : N/A NA NA
- Recommended Maintenance Schedule Summary : N/A NA NA
2.2.6 Factory Acceptance Procedure / Report YES YES
2.2.7 Design Calculation : N/A NA NA
2.2.8 Test Certification YES YES
2.2.9 Material & Inspection Report YES YES
2.2.10 Other YES YES
Contractor Supplied
Ball Valve Interlock Device - (VX63008, VX63010, VX63012, VX63018, VX63019,
2.3
VX63021, VX63022, VX63024 & VX63025)
2.3.1 Equipment Information Sheets
2.3.2 Engineering Data Sheets
2.3.3 Warranty Certification
2.3.4 As Built Vendor Drawings
2.3.5 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
2.3.6 Factory Acceptance Procedure / Report
2.3.7 Design Calculation
2.3.8 Test Certificates
2.3.9 Material & Inspection Report
2.3.10 Other
2.4 Manual Valve - Ball Valve (31 unit) - (Size-DN20, 25, 50& 100)
2.4.1 Equipment Information Sheets
2.4.2 Engineering Data Sheets
2.4.3 Warranty Certification
2.4.4 As Built Vendor Drawings
2.4.5 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
2.4.6 Factory Acceptance Procedure / Report
2.4.7 Design Calculation
2.4.8 Test Certificates
2.4.9 Material & Inspection Report
2.4.10 Other
4.2 Safeguarding System (ASD) and Fire & Gas System (FGS)
4.2.1 Equipment Information Sheet
4.2.2 Instrument Index
4.2.3 Instrument Calibration Certificate
4.2.4 engineering Data Sheet
4.2.5 Warranty Certification
4.2.6 As Built Vendor Drawings
4.2.7 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
4.2.8 Factory Acceptance Procedure & Report
4.2.9 Design Calculation
4.2.10 Test Certification
4.2.11 Material & Inspection Report
4.2.12 Other
PRSB Supplied
4.3 Field Instruments - Flow Instruments-Restriction Orifice Plate- (02-RO-201 & 02-RO-217)
4.3.1 Equipment Information Sheet
4.3.2 Instrument Index
4.3.3 Instrument Calibration Certificate
4.3.4 engineering Data Sheet
4.3.5 Warranty Certification
4.3.6 As Built Vendor Drawings
4.3.7 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
4.3.8 Factory Acceptance Procedure & Report
4.3.9 Design Calculation
4.3.10 Test Certification
4.3.11 Material & Inspection Report
4.3.12 Other
4.4 Field Instruments - Pressure Instruments-Pressure Gauges - (02-PG-201, 02-PG-202, 02-PG-203 & 02-PG-204)
4.4.1 Equipment Information Sheet
4.4.2 Instrument Index
4.4.3 Instrument Calibration Certificate
4.4.4 engineering Data Sheet
4.4.5 Warranty Certification
4.4.6 As Built Vendor Drawings
4.4.7 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
4.4.8 Factory Acceptance Procedure & Report
4.4.9 Design Calculation
4.4.10 Test Certification
4.4.11 Material & Inspection Report
4.4.12 Other
4.6 Field Instruments - Pressure Instruments-Pressure Safety Relief Valve - (02-PSV-201, 02-PSV-202, 02-PSV-203)
4.6.1 Equipment Information Sheet
4.6.2 Instrument Index
4.6.3 Instrument Calibration Certificate
4.6.4 engineering Data Sheet
4.6.5 Warranty Certification
4.6.6 As Built Vendor Drawings
4.6.7 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
4.6.8 Factory Acceptance Procedure & Report
4.6.9 Design Calculation
4.6.10 Test Certification
4.6.11 Material & Inspection Report
4.6.12 Other
4.9 Fire & Gas Devices - IR Gas Detector (Point Type) - 60-XA-1865, 60-XA-1866, 60-XA-1874, 60-XA-1875, 60-XA-1876, 60-XA-1877)
4.9.1 Equipment Information Sheet
4.9.2 Instrument Index
4.9.3 Instrument Calibration Certificate
4.9.4 engineering Data Sheet
4.9.5 Warranty Certification
4.9.6 As Built Vendor Drawings
4.9.7 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
4.9.8 Factory Acceptance Procedure & Report
4.9.9 Design Calculation
4.9.10 Test Certification
4.9.11 Material & Inspection Report
4.9.12 Other
4.10 Fire & Gas Devices - IR Flame Detector (Open Path) - (60-XA(R)-1879 & 60-XA(T)-1879)
4.10.1 Equipment Information Sheet
4.10.2 Instrument Index
4.10.3 Instrument Calibration Certificate
4.10.4 engineering Data Sheet
4.10.5 Warranty Certification
4.10.6 As Built Vendor Drawings
4.10.7 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
4.10.8 Factory Acceptance Procedure & Report
4.10.9 Design Calculation
4.10.10 Test Certification
4.10.11 Material & Inspection Report
4.10.12 Other
4.11 Fire & Gas Devices - IR Flame Detector (60-XZA-1976, 60-XZA-1977, 60-XZA-1978, 60-XZA-1979, 60-XZA-1985, 60-XZA-1986)
4.11.1 Equipment Information Sheet
4.11.2 Instrument Index
4.11.3 Instrument Calibration Certificate
4.11.4 engineering Data Sheet
4.11.5 Warranty Certification
4.11.6 As Built Vendor Drawings
4.11.7 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
4.11.8 Factory Acceptance Procedure & Report
4.11.9 Design Calculation
4.11.10 Test Certification
4.11.11 Material & Inspection Report
4.11.12 Other
4.12 Fire & Gas Devices - ESD Break Glass Station (60-H-97)
4.12.1 Equipment Information Sheet
4.12.2 Instrument Index
4.12.3 Instrument Calibration Certificate
4.12.4 engineering Data Sheet
4.12.5 Warranty Certification
4.12.6 As Built Vendor Drawings
4.12.7 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
4.12.8 Factory Acceptance Procedure & Report
4.12.9 Design Calculation
4.12.10 Test Certification
4.12.11 Material & Inspection Report
4.12.12 Other
4.15 Fire & Gas Devices - Gas Horn Silence Push Button (60-HS-1880)
4.15.1 Equipment Information Sheet
4.15.2 Instrument Index
4.15.3 Instrument Calibration Certificate
4.15.4 engineering Data Sheet
4.15.5 Warranty Certification
4.15.6 As Built Vendor Drawings
4.15.7 Operating & maintenance Manual
- Recommended Spare Part Lists
- Recommended Maintenance Schedule Summary
4.15.8 Factory Acceptance Procedure & Report
4.15.9 Design Calculation
4.15.10 Test Certification
4.15.11 Material & Inspection Report
4.15.12 Other
PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BINTULU INTEGRATED FACILITIES(BIF) ONSHORE
UPGRADING AND MODIFICATIONS
Compilation
available?
No. of Set
Soft Copy
Soft Copy
(20%)
(10%)
C'klist
recv'd
Reviewed
Received
Recv. by
by Proc.
DESCRIPTION Vendor Remark
by Eng
QAQC
Final
1.0 MECHANICAL
CARIGALI SUPPLIED ITEM
1.1 NEW PIG TRAP SYSTEM (PIG RECEIVER A-201C) 11 11 0
2.0 PIPING
PCSB SUPPLIED
PRSB SUPPLIED
Ball Valve Interlock Device - (VX63008, VX63010, VX63012,
2.3 0 0 0
VX63018, VX63019, VX63021, VX63022, VX63024 & VX63025)
2.4 Manual Valve - Ball Valve (31 unit) - (Size-DN20, 25, 50& 100) 0 0 0
2.5 Manual Valve - Check Valve (2 unit) 0 0 0
2.6 Manual Valve - Double Block Bleed Valve (10 unit) 0 0 0
2.7 Manual Valve - Gate Valve (10 unit) 0 0 0
2.8 Manual Valve - Globe Valve (7 unit) 0 0 0
2.9 Specialty Item - Bar Tee (5units) 0 0 0
2.10 Specialty Item - Corrossion Coupon / Corrossion Probe - 2unit 0 0 0
2.11 Specialty Item - Flexible Hose / Quick Release coupling 0 0 0
2.12 Specialty Item - High Strength Fittings 0 0 0
3.0 ELECTRICAL
PCSB SUPPLIED
3.1 N/A 0 0 0
PRSB SUPPLIED
3.2 415v Distribution Boards (22-D-6) 0 0 0
3.3 Miscellaneous - Junction Box 0 0 0
3.4 Miscellaneous - Cables 0 0 0
3.5 Lighting System - Emergency Lighting 0 0 0
3.6 Ligthing System - Outdoor Lighting 0 0 0
4.0 INSTRUMENT
PCSB SUPPLIED
4.1 Distribution Control System (DCS) 0 0 0
4.2 Safeguarding System (ASD) and Fire & Gas System (FGS) 0 0 0
PRSB SUPPLIED
Field Instruments - Flow Instruments-Restriction Orifice Plate- (02-
4.3 0 0 0
RO-201 & 02-RO-217)
Field Instruments - Pressure Instruments-Pressure Gauges - (02-
4.4 0 0 0
PG-201, 02-PG-202, 02-PG-203 & 02-PG-204)
Field Instruments - Pressure Instruments-Pressure Transmitters -
4.5 0 0 0
(02-PT-201, 02-PZT-202A/B/C, 02-PDT-204)
11/104
VOLUME 1 - EQUIPMENT DOSSIER
PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BINTULU INTEGRATED FACILITIES(BIF) ONSHORE
UPGRADING AND MODIFICATIONS
Compilation
available?
No. of Set
Soft Copy
Soft Copy
(20%)
(10%)
C'klist
recv'd
Reviewed
Received
Recv. by
by Proc.
DESCRIPTION Vendor Remark
by Eng
QAQC
Final
Fire & Gas Devices - IR Gas Detector (Point Type) - 60-XA-1865,
4.9 0 0 0
60-XA-1866, 60-XA-1874, 60-XA-1875, 60-XA-1876, 60-XA-1877)
12/104
VOLUME 2 - QA/QC DOSSIER
PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND
MODIFICATIONS
Legend - A : Accepted, R : Rejected, F : Final
DOC. DESCRIPTION AS PER TOC DOC I.D. Scanning Doc.(PDF No. of Sheet Status Remarks
RECEIVED COMPILED 4.0+300s) / Final
Compilation
4.2 Cables
4.2.1 Material Verification Record
4.2.2 Installation and Visual Report
4.2.3 NDT Reports
DATA CALCULATION 5% 1% 0% 7%
1
1
1
1 1 1
1 1 1
1 21% 6% 0% 27%
1
1
1 1 1
1
3 3 0 10 0
1
1
1
1 1 1
1 1 1
1 21% 6% 0% 27%
1
1
1 1 1
1
3 3 0 10 0
1
1
21% 6% 0% 27%
1
1 1 1
1 1 1
1 21% 6% 0% 27%
1
1
1 1 1
1
3 3 0 10 0
1
1
1
1 1 1
1 1 1
1 21% 6% 0% 27%
1
1
1 1 1
1
3 3 0 10 0
1
1
1
1 1 1
1 1 1
1 21% 6% 0% 27%
1
1
1 1 1
1
3 3 0 10 0
1
1
1
21% 6% 0% 27%
1 1 1
1 1 1
1 21% 6% 0% 27%
1
1
1 1 1
1
3 3 0 10 0
1
1
1
1 1 1
1 1 1
1 21% 6% 0% 27%
1
1
1 1 1
1
3 3 0 10 0
1
1
1
1 1 1
1 1 1
1 21% 6% 0% 27%
1
1
1 1 1
1
3 3 0 10 0
1
1
1
1
0% 0% 0% 0%
1
1 0% 0% 0% 0%
1
1
1
1
0 0 0 10 0
1
1
1
1 1 1
1 1 1
1 21% 6% 0% 27%
1
1
1 1 1
1
3 3 0 10 0
1
0% 0% 0% 0%
0 0 0 1 0
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
0 0 0 15 0
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
0 0 0 15 0
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
0 0 0 15 0
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
0 0 0 15 0
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
0 0 0 15 0
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
0 0 0 15 0
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
0 0 0 15 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
0 0 0 15 0
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
0 0 0 15 0
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 15 0
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
0 0 0 15 0
1
0% 0% 0% 0%
0 0 0 1 0
1
1
0% 0% 0% 0%
1
0 0 0 3 0
1
1
0% 0% 0% 0%
0% 0% 0% 0%
1
0 0 0 3 0
1
1
0% 0% 0% 0%
1
0 0 0 3 0
1
1
0% 0% 0% 0%
1
0 0 0 3 0
1
1
0% 0% 0% 0%
1
0 0 0 3 0
1
1
0% 0% 0% 0%
1
0 0 0 3 0
1
1
0% 0% 0% 0%
1
0 0 0 3 0
1
1
1 0% 0% 0% 0%
1
0 0 0 4 0
1
1
1 0% 0% 0% 0%
1
0 0 0 4 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
0 0 0 10 0
1
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 12 0
1
1
1
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
1
1
1
0 0 0 17 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
0 0 0 10 0
1
1
1 0% 0% 0% 0%
1
0 0 0 4 0
VOLUME 3 - MATERIAL DOCUMENTATION
PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND
MODIFICATIONS
Legend - A : Accepted, R : Rejected, F : Final
DOC. DESCRIPTION AS PER TOC DOC I.D. Scanning Doc.(PDF No. of Sheet Status Remarks
RECEIVED COMPILED 4.0+300s) / Final
Compilation
1.3 Gratings
1.3.1 Purchase Order
1.3.2 Source Inspection Report
1.3.3 Material Inspection / Receiving Report
1.3.4 Certificates
1.3.4.1 Mill Certificates
1.3.4.2 Manufacturing Certificates
1.3.4.3 Third Party Inspection Certificates
1.3.4.4 Test Certificates
1.3.5 Material Defiency Reports
1.4 Handrail for Concrete Staircase and Retaining Wall
1.4.1 Purchase Order
1.4.2 Source Inspection Report
1.4.3 Material Inspection / Receiving Report
1.4.4 Certificates
1.4.4.1 Mill Certificates
1.4.4.2 Manufacturing Certificates
1.4.4.3 Third Party Inspection Certificates
1.4.4.4 Test Certificates
1.4.5 Material Defiency Reports
2.2 VALVES
2.2.1 Purchase Order
2.2.2 Source Inspection Report
2.2.3 Material Inspection / Receiving Report
2.2.4 Certificates
2.2.4.1 Mill Certificates
2.2.4.2 Manufacturing Certificates
2.2.4.3 Third Party Inspection Certificates
2.2.4.4 Test Certificates
2.4.5 Material Defiency Reports
4.5 Transmitter
4.5.1 Purchase Order
4.5.2 Source Inspection Report
4.5.3 Material Inspection / Receiving Report
4.5.4 Certificates
4.5.4.1 Mill Certificates
4.5.4.2 Manufacturing Certificates
4.5.4.3 Third Party Inspection Certificates
4.5.4.4 Test Certificates
4.5.5 Material Defiency Reports
4.6 SS Tubing
4.6.1 Purchase Order
4.6.2 Source Inspection Report
4.6.3 Material Inspection / Receiving Report
4.6.4 Certificates
4.6.4.1 Mill Certificates
4.6.4.2 Manufacturing Certificates
4.6.4.3 Third Party Inspection Certificates
4.6.4.4 Test Certificates
4.6.5 Material Defiency Reports
5.8 ANALYSER
5.8.1 Purchase Order MCOT/PO/027
5.8.2 Source Inspection Report
5.8.3 Material Inspection / Receiving Report
5.8.4 Certificates
5.8.4.1 Mill Certificates
5.8.4.2 Manufacturing Certificates
5.8.4.3 Third Party Inspection Certificates
5.8.4.4 Test Certificates
5.8.5 Material Defiency Reports
DATA CALCULATION 0% 0% 0% 0%
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
0% 0% 0% 0%
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
0% 0% 0% 0%
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
0% 0% 0% 0%
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
0% 0% 0% 0%
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
0% 0% 0% 0%
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
0 0 0 9 0
1
1
0% 0% 0% 0%
1
0% 0% 0% 0%
1
1
0 0 0 5 0
VOLUME 4 - TESTING AND PRECOMMISIONING DATA
PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND
MODIFICATIONS
Legend - A : Accepted, R : Rejected, F : Final
DOC. DESCRIPTION AS PER TOC DOC I.D. Scanning Doc.(PDF No. of Sheet Status Remarks
RECEIVED COMPILED 4.0+300s) / Final
Compilation
DATA CALCULATION 0% 0% 0% 0%
1 1 1
0.7 0.2 0 0.9
1 1 0 1 0
1
1
0% 0% 0% 0%
1
0 0 0 3 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
0% 0% 0% 0%
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0% 0% 0% 0%
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
0% 0% 0% 0%
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
0% 0% 0% 0%
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
0% 0% 0% 0%
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0% 0% 0% 0%
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
0% 0% 0% 0%
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
0% 0% 0% 0%
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
0% 0% 0% 0%
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
0% 0% 0% 0%
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
0% 0% 0% 0%
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
0% 0% 0% 0%
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
0% 0% 0% 0%
1
1
0 0 0 5 0
VOLUME 5 - DESIGN DATA
PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND
MODIFICATIONS
Legend - A : Accepted, R : Rejected, F : Final
DOC. DESCRIPTION AS PER TOC DOC I.D. Scanning Doc.(PDF No. of Sheet Status Remarks
RECEIVED COMPILED 4.0+300s) / Final
Compilation
2.0 PIPING
2.1 Pipe Stress Analysis Report (MLNG-2 Tie In)
2.1 (MLNG Host Tie-In) 90% PDMS Model Review Report
DATA CALCULATION 0% 0% 0% 0%
1
1
1
0% 0% 0% 0%
1
1
0 0 0 5 0
1
1 0% 0% 0% 0%
0 0 0 2 0
1
0% 0% 0% 0%
0 0 0 1 0
1
0% 0% 0% 0%
0 0 0 1 0
1
1
0% 0% 0% 0%
1
0 0 0 3 0
VOLUME 6 - AS BUILT DRAWINGS
PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND
MODIFICATIONS
Legend - A : Accepted, R : Rejected, F : Final
DOC. DESCRIPTION AS PER TOC DOC I.D. Scanning Doc.(PDF No. of Sheet Status Remarks
RECEIVED COMPILED 4.0+300s) / Final
Compilation
DATA CALCULATION 0% 0% 0% 0%
1
1
1
1
1
1
1 0% 0% 0% 0%
1
1
1
1
1
0 0 0 12 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1
1
1
1
1
0% 0% 0% 0%
1
1
1
1
1
0 0 0 11 0
1
1 0% 0% 0% 0%
0 0 0 1 1
1
1
1
1 0% 0% 0% 0%
1
1
0 0 0 6 0
1
1
1
1
1 0% 0% 0% 0%
1
1
1
0 0 0 8 0
1
1 0% 0% 0% 0%
0 0 0 2 0
VOLUME 7 - PROJECT SPECIFIC PROCEDURE
PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND
MODIFICATIONS
Legend - A : Accepted, R : Rejected, F : Final
DOC. DESCRIPTION AS PER TOC DOC I.D. Scanning Doc.(PDF No. of Sheet Status
RECEIVED COMPILED 4.0+300s) / Final
Compilation
Remarks
R'CVD C'PLD SCAN TOTAL NA 70% 20% 10% % TOTAL
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1
1 1 1
1 1 1
1 1 1
1 1 1
1
1 1 1
1 1 1
1 1 1
1
53% 15% 0% 68%
1
1 1 1
1 1 1
1 1 1
53% 15% 0% 68%
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1
1
1
1
1 1 1
1
1 1 1
33 33 0 44 2