MEMÓRIA DE CÁLCULO

CBMM
HOMOGENEIZAÇÃO DE MINÉRIO - CLASSIFICAÇÃO

CRÉDITOS DESCONTOS
ITEM DA
PLANILHA
DESCRIÇÃO UN TOTAL
COMPRIMENTO x x ALTURA x QUANTIDADE TOTAL C X L X H X QTD = TOTAL =
LARGURA

SISTEMA DE ALIMENTAÇÃO / CLASSIFICAÇÃO

DESENHOS - 112.140.017-3 E 112.140.018-3

RADIER - CONCRETO MAGRO ESPESSURA 5 CM 54.73

RADIER - ELEV. 1098,400 36.82 10.80 0.05 1.00 19.88 0.00 19.88

0.80 0.40 0.05 10.00 0.16 0.00 0.16

27.50 14.80 0.05 1.00 20.35 0.00 20.35

26.55 10.80 0.05 1.00 14.34 0.00 14.34

FORMA 4,974.88

RADIER - 1ª ETAPA 36.82 1.00 1.50 2.00 110.46 0.00 110.46

11.60 1.00 1.50 2.00 34.80 0.00 34.80

0.40 1.00 1.50 8.00 4.80 0.00 4.80

RADIER - 2ª ETAPA 27.50 1.00 1.10 2.00 60.50 0.00 60.50

10.80 1.00 0.70 2.00 15.12 0.00 15.12

1.60 1.00 0.40 4.00 2.56 0.00 2.56

0.63 0.50 0.40 4.00 0.50 0.00 0.50

RADIER - 3ª ETAPA 12.06 1.00 1.10 2.00 26.53 0.00 26.53

10.80 1.00 0.60 2.00 12.96 0.00 12.96

1.60 1.00 0.50 4.00 3.20 0.00 3.20

0.63 0.50 0.50 4.00 0.63 0.00 0.63

RADIER - 4ª ETAPA 14.49 1.00 1.10 2.00 31.88 0.00 31.88

10.80 1.00 0.60 2.00 12.96 0.00 12.96

1.60 1.00 0.50 4.00 3.20 0.00 3.20

0.63 0.50 0.50 4.00 0.63 0.00 0.63

PAREDE 1 - 1ª ETAPA 18.00 1.00 4.70 1.00 84.60 0.00 84.60

15.80 1.00 4.70 1.00 74.26 0.00 74.26

PAREDE 1 - 2ª ETAPA 18.00 1.00 3.70 1.00 66.60 0.00 66.60

15.80 1.00 3.70 1.00 58.46 0.00 58.46

PAREDE 1 - 3ª ETAPA 18.00 1.00 5.20 1.00 93.60 0.00 93.60

15.80 1.00 5.20 1.00 82.16 0.00 82.16

PAREDE 2 - 1ª ETAPA 21.60 1.00 4.70 1.00 101.52 0.00 101.52

20.00 1.00 4.70 1.00 94.00 0.00 94.00

PAREDE 2 - 2ª ETAPA 21.60 1.00 3.70 1.00 79.92 0.00 79.92

20.00 1.00 3.70 1.00 74.00 0.00 74.00

PAREDE 2 - 3ª ETAPA 21.60 1.00 5.20 1.00 112.32 0.00 112.32

20.00 1.00 5.20 1.00 104.00 0.00 104.00

PAREDE 3 27.50 1.00 3.06 1.00 84.15 0.00 84.15

27.50 1.00 3.06 1.00 84.15 0.00 84.15

PAREDE 4 - PARTE A 12.06 1.00 4.00 1.00 48.24 0.00 48.24

12.06 1.00 4.00 1.00 48.24 0.00 48.24


MEMÓRIA DE CÁLCULO

CBMM
HOMOGENEIZAÇÃO DE MINÉRIO - CLASSIFICAÇÃO

CRÉDITOS DESCONTOS
ITEM DA
PLANILHA
DESCRIÇÃO UN TOTAL
COMPRIMENTO x x ALTURA x QUANTIDADE TOTAL C X L X H X QTD = TOTAL =
LARGURA

PAREDE 4 - PARTE B 4.20 1.00 4.24 1.00 17.80 0.00 17.80

4.20 1.00 4.24 1.00 17.80 0.00 17.80

PAREDE 4 - PARTE C 10.27 0.50 4.24 1.00 21.76 0.00 21.76

10.27 0.50 4.24 1.00 21.76 0.00 21.76

PAREDE 5 - 1ª ETAPA 18.00 1.00 4.70 1.00 84.60 0.00 84.60

15.80 1.00 4.70 1.00 74.26 0.00 74.26

PAREDE 5 - 2ª ETAPA 18.00 1.00 3.70 1.00 66.60 0.00 66.60

15.80 1.00 3.70 1.00 58.46 0.00 58.46

PAREDE 5 - 3ª ETAPA 18.00 1.00 5.20 1.00 93.60 0.00 93.60

15.80 1.00 5.20 1.00 82.16 0.00 82.16

PAREDE 6 - 1ª ETAPA 21.60 1.00 4.70 1.00 101.52 0.00 101.52

20.00 1.00 4.70 1.00 94.00 0.00 94.00

PAREDE 6 - 2ª ETAPA 21.60 1.00 3.70 1.00 79.92 0.00 79.92

20.00 1.00 3.70 1.00 74.00 0.00 74.00

PAREDE 6 - 3ª ETAPA 21.60 1.00 5.20 1.00 112.32 0.00 112.32

20.00 1.00 5.20 1.00 104.00 0.00 104.00

PAREDE 7 27.50 1.00 3.06 1.00 84.15 0.00 84.15

27.50 1.00 3.06 1.00 84.15 0.00 84.15

PAREDE 8 - PARTE A 12.06 1.00 4.00 1.00 48.24 0.00 48.24

12.06 1.00 4.00 1.00 48.24 0.00 48.24

PAREDE 8 - PARTE B 4.20 1.00 4.24 1.00 17.80 0.00 17.80

4.20 1.00 4.24 1.00 17.80 0.00 17.80

PAREDE 8 - PARTE C 10.27 0.50 4.24 1.00 21.76 0.00 21.76

10.27 0.50 4.24 1.00 21.76 0.00 21.76

PAREDE 9 - 1ª PARTE 11.60 1.00 4.70 1.00 54.52 54.52

9.60 1.00 4.70 1.00 45.12 0.00 45.12

PAREDE 9 - 2ª PARTE 11.60 1.00 3.70 1.00 42.92 42.92

9.60 1.00 3.70 1.00 35.52 0.00 35.52

PAREDE 9 - 3ª PARTE 11.60 1.00 5.20 1.00 60.32 60.32

9.60 1.00 5.20 1.00 49.92 0.00 49.92

PAREDE 10 - 1ª ETAPA 9.60 1.00 4.70 2.00 90.24 0.00 90.24

PAREDE 10 - 2ª ETAPA 9.60 1.00 5.55 2.00 106.56 0.00 106.56

1ª FASE VIGAS / LAJES 0.00 0.00 0.00

V1 9.35 1.00 0.60 2.00 11.22 0.00 11.22

V2 9.35 1.00 0.60 2.00 11.22 0.00 11.22

V3 9.35 1.00 0.60 2.00 11.22 0.00 11.22

V4 9.35 1.00 0.60 2.00 11.22 0.00 11.22

V5 9.60 1.00 1.00 1.00 9.60 0.00 9.60


MEMÓRIA DE CÁLCULO

CBMM
HOMOGENEIZAÇÃO DE MINÉRIO - CLASSIFICAÇÃO

CRÉDITOS DESCONTOS
ITEM DA
PLANILHA
DESCRIÇÃO UN TOTAL
COMPRIMENTO x x ALTURA x QUANTIDADE TOTAL C X L X H X QTD = TOTAL =
LARGURA

8.40 1.00 0.80 1.00 6.72 0.00 6.72

V6 8.40 1.00 0.80 2.00 13.44 0.00 13.44

V7 8.40 1.00 0.80 2.00 13.44 0.00 13.44

V8 9.60 1.00 1.00 1.00 9.60 0.00 9.60

8.40 1.00 0.80 1.00 6.72 0.00 6.72

LAJE - EIXOS A a E 0.00 0.00 0.00

FUNDO 9.60 20.60 1.00 1.00 197.76 0.00 197.76

BEIRAL 9.60 1.00 0.20 2.00 3.84 0.00 3.84

1.80 1.00 0.20 2.00 0.72 0.00 0.72

5.34 1.00 0.20 2.00 2.14 0.00 2.14

7.94 1.00 0.20 2.00 3.18 0.00 3.18

2ª FASE VIGAS / LAJES 0.00 0.00 0.00

V101 9.35 1.00 0.60 2.00 11.22 0.00 11.22

V102 9.35 1.00 0.60 2.00 11.22 0.00 11.22

V103 9.35 1.00 0.60 2.00 11.22 0.00 11.22

V104 9.35 1.00 0.60 2.00 11.22 0.00 11.22

V105 9.60 1.00 1.00 1.00 9.60 0.00 9.60

8.40 1.00 0.80 1.00 6.72 0.00 6.72

V106 8.40 1.00 0.80 2.00 13.44 0.00 13.44

V107 8.40 1.00 0.80 2.00 13.44 0.00 13.44

V108 9.60 1.00 1.00 1.00 9.60 0.00 9.60

8.40 1.00 0.80 1.00 6.72 0.00 6.72

LAJES 0.00 0.00 0.00

FUNDO 9.60 20.60 1.00 1.00 197.76 0.00 197.76

BEIRAL 9.60 1.00 0.20 2.00 3.84 0.00 3.84

1.80 1.00 0.20 2.00 0.72 0.00 0.72

5.34 1.00 0.20 2.00 2.14 0.00 2.14

7.94 1.00 0.20 2.00 3.18 0.00 3.18

3ª FASE VIGAS / LAJES 0.00 0.00 0.00

V200, 201, 203, 204, 206 e 207 15.55 1.00 0.80 2.00 24.88 0.00 24.88

16.55 1.00 0.70 2.00 23.17 0.00 23.17

6.30 1.00 0.80 2.00 10.08 0.00 10.08

7.30 1.00 0.70 2.00 10.22 0.00 10.22

9.60 1.00 1.50 1.00 14.40 0.00 14.40

9.60 1.00 1.30 1.00 12.48 0.00 12.48

17.95 1.00 1.90 2.00 68.21 0.00 68.21

6.30 1.00 1.30 2.00 16.38 0.00 16.38

V202 5.50 1.00 0.60 2.00 6.60 0.00 6.60

V205 9.60 1.00 0.60 1.00 5.76 0.00 5.76

9.20 1.00 0.60 1.00 5.52 0.00 5.52

LAJES 0.00 0.00 0.00

FUNDO 9.60 8.05 1.00 1.00 77.28 0.00 77.28

BEIRAL 4.50 1.00 0.20 2.00 1.80 0.00 1.80

1.60 1.00 0.20 2.00 0.64 0.00 0.64

LAJE EL. 1103,200 - ENTRE EIXOS E e F 27.50 8.00 1.00 1.00 220.00 0.00 220.00

27.50 1.13 1.00 2.00 62.15 0.00 62.15

27.50 1.00 1.10 2.00 60.50 0.00 60.50

10.80 1.00 1.10 2.00 23.76 0.00 23.76

0.80 0.50 0.60 4.00 0.96 0.00 0.96

0.00 0.00 0.00

LAJE EL. 1103,100 - ENTRE EIXOS F e G 12.06 9.60 1.00 1.00 115.78 0.00 115.78

12.06 1.00 1.00 2.00 24.12 0.00 24.12

10.80 1.00 1.00 2.00 21.60 0.00 21.60

0.00 0.00
MEMÓRIA DE CÁLCULO

CBMM
HOMOGENEIZAÇÃO DE MINÉRIO - CLASSIFICAÇÃO

CRÉDITOS DESCONTOS
ITEM DA
PLANILHA
DESCRIÇÃO UN TOTAL
COMPRIMENTO x x ALTURA x QUANTIDADE TOTAL C X L X H X QTD = TOTAL =
LARGURA

CONCRETO FCK = 30 Mpa 2,831.86

RADIER - 1ª ETAPA 36.82 10.80 1.50 1.00 596.48 0.00 596.48

35.02 7.00 0.70 (1.00) (171.60) 0.00 (171.60)

77.04 1.20 0.70 (0.50) (32.36) 0.00 (32.36)

0.80 0.40 1.50 10.00 4.80 0.00 4.80

RADIER - 2ª ETAPA 27.50 14.80 1.10 1.00 447.70 0.00 447.70

27.50 6.60 0.40 (1.00) (72.60) 0.00 (72.60)

27.50 0.50 0.40 (1.00) (5.50) 0.00 (5.50)

RADIER - 3ª ETAPA 12.06 10.80 1.10 1.00 143.27 0.00 143.27

12.06 6.35 0.50 (1.00) (38.29) 0.00 (38.29)

12.06 0.63 0.50 (1.00) (3.77) 0.00 (3.77)

RADIER - 4ª ETAPA 14.49 10.80 0.60 1.00 93.90 0.00 93.90

PAREDE 1 - 1ª ETAPA 18.00 0.60 4.70 1.00 50.76 0.00 50.76

0.80 0.40 4.70 10.00 15.04 0.00 15.04

PAREDE 1 - 2ª ETAPA 18.00 0.60 3.70 1.00 39.96 0.00 39.96

0.80 0.40 3.70 10.00 11.84 0.00 11.84

PAREDE 1 - 3ª ETAPA 18.00 0.60 5.20 1.00 56.16 0.00 56.16

0.80 0.40 5.20 10.00 16.64 0.00 16.64

PAREDE 2 - 1ª ETAPA 21.60 0.60 4.70 1.00 60.91 0.00 60.91

PAREDE 2 - 2ª ETAPA 21.60 0.60 3.70 1.00 47.95 0.00 47.95

PAREDE 2 - 3ª ETAPA 21.60 0.60 5.20 1.00 67.39 0.00 67.39

PAREDE 3 27.50 0.60 3.06 1.00 50.49 0.00 50.49

PAREDE 4 - PARTE A 12.06 0.60 4.00 1.00 28.94 0.00 28.94

PAREDE 4 - PARTE B 4.20 0.60 4.24 1.00 10.68 0.00 10.68

PAREDE 4 - PARTE C 10.27 0.60 4.24 0.50 13.06 0.00 13.06

PAREDE 5 - 1ª ETAPA 18.00 0.60 4.70 1.00 50.76 0.00 50.76

PAREDE 5 - 2ª ETAPA 18.00 0.60 3.70 1.00 39.96 0.00 39.96

PAREDE 5 - 3ª ETAPA 18.00 0.60 5.20 1.00 56.16 0.00 56.16

PAREDE 6 - 1ª ETAPA 21.60 0.60 4.70 1.00 60.91 0.00 60.91

PAREDE 6 - 2ª ETAPA 21.60 0.60 3.70 1.00 47.95 0.00 47.95

PAREDE 6 - 3ª ETAPA 21.60 0.60 5.20 1.00 67.39 0.00 67.39

PAREDE 7 27.50 0.60 3.06 1.00 50.49 0.00 50.49

PAREDE 8 - PARTE A 12.06 0.60 4.00 1.00 28.94 0.00 28.94


MEMÓRIA DE CÁLCULO

CBMM
HOMOGENEIZAÇÃO DE MINÉRIO - CLASSIFICAÇÃO

CRÉDITOS DESCONTOS
ITEM DA
PLANILHA
DESCRIÇÃO UN TOTAL
COMPRIMENTO x x ALTURA x QUANTIDADE TOTAL C X L X H X QTD = TOTAL =
LARGURA

PAREDE 8 - PARTE B 4.20 0.60 4.24 1.00 10.68 0.00 10.68

PAREDE 8 - PARTE C 10.27 0.60 4.24 0.50 13.06 0.00 13.06

PAREDE 9 - 1ª PARTE 11.60 0.60 4.70 1.00 32.71 32.71

PAREDE 9 - 2ª PARTE 11.60 0.60 3.70 1.00 25.75 25.75

PAREDE 9 - 3ª PARTE 11.60 0.60 5.20 1.00 36.19 36.19

PAREDE 10 - 1ª ETAPA 9.60 0.60 4.70 2.00 54.14 0.00 54.14

PAREDE 10 - 2ª ETAPA 9.60 0.60 5.55 2.00 63.94 0.00 63.94

1ª FASE VIGAS / LAJES 0.00 0.00 0.00

V1 9.35 0.60 0.60 1.00 3.37 0.00 3.37

V2 9.35 0.60 0.60 1.00 3.37 0.00 3.37

V3 9.35 0.60 0.60 1.00 3.37 0.00 3.37

V4 9.35 0.60 0.60 1.00 3.37 0.00 3.37

V5 9.60 0.60 0.80 1.00 4.61 0.00 4.61

V6 8.40 0.35 0.80 1.00 2.35 0.00 2.35

V7 8.40 0.35 0.80 1.00 2.35 0.00 2.35

V8 9.60 0.60 1.00 1.00 5.76 0.00 5.76

LAJE - EIXOS A a E 0.00 0.00 0.00

9.60 20.60 0.20 1.00 39.55 0.00 39.55

5.34 1.80 0.20 (1.00) (1.92) 0.00 (1.92)

7.94 1.80 0.20 (1.00) (2.86) 0.00 (2.86)

2ª FASE VIGAS / LAJES 0.00 0.00 0.00

V101 9.35 0.60 0.60 1.00 3.37 0.00 3.37

V102 9.35 0.60 0.60 1.00 3.37 0.00 3.37

V103 9.35 0.60 0.60 1.00 3.37 0.00 3.37

V104 9.35 0.60 0.60 1.00 3.37 0.00 3.37

V105 9.60 0.60 0.80 1.00 4.61 0.00 4.61

V106 8.40 0.35 0.80 1.00 2.35 0.00 2.35

V107 8.40 0.35 0.80 1.00 2.35 0.00 2.35

V108 9.60 0.60 0.80 1.00 4.61 0.00 4.61

LAJES 0.00 0.00 0.00

FUNDO 9.60 20.60 0.20 1.00 39.55 0.00 39.55

BEIRAL 5.64 2.16 0.20 (1.00) (2.44) 0.00 (2.44)

9.34 2.16 0.20 (1.00) (4.03) 0.00 (4.03)

3ª FASE VIGAS / LAJES 0.00 0.00 0.00

V200, 201, 203, 204, 206 e 207 17.95 1.65 0.95 1.00 28.14 0.00 28.14

6.30 1.65 0.95 1.00 9.88 0.00 9.88

17.95 1.65 0.80 2.00 47.39 0.00 47.39

6.30 1.65 0.80 2.00 16.63 0.00 16.63

17.95 1.15 0.70 2.00 28.90 0.00 28.90

7.30 1.15 0.70 2.00 11.75 0.00 11.75

0.00 0.00 0.00

V202 5.50 0.40 0.60 1.00 1.32 0.00 1.32

V205 9.60 0.60 0.80 1.00 4.61 0.00 4.61

LAJES 0.00 0.00 0.00

FUNDO 9.60 8.05 0.20 1.00 15.46 0.00 15.46

4.50 1.60 0.20 (1.00) (1.44) 0.00 (1.44)

LAJE EL. 1103,200 - ENTRE EIXOS E e F 27.50 10.80 1.10 1.00 326.70 0.00 326.70
MEMÓRIA DE CÁLCULO

CBMM
HOMOGENEIZAÇÃO DE MINÉRIO - CLASSIFICAÇÃO

CRÉDITOS DESCONTOS
ITEM DA
PLANILHA
DESCRIÇÃO UN TOTAL
COMPRIMENTO x x ALTURA x QUANTIDADE TOTAL C X L X H X QTD = TOTAL =
LARGURA

27.50 0.80 0.80 1.00 17.60 0.00 17.60

0.00 0.00 0.00

LAJE EL. 1103,100 - ENTRE EIXOS F e G 12.06 10.80 1.00 1.00 130.25 0.00 130.25

0.00 0.00

INSERT´S METÁLICOS 825.97

PROJETO 112.140.020-2 825.97 825.97

CHUMBADORES 429.94

DET. 01 = 12 ¢ 1.1/4" 1.49 1.00 6.31 12.00 112.44 112.44

DET. 02 = 12 ¢ 1.1/4" 1.49 1.00 6.31 12.00 112.44 112.44

BASE B1 = 32 ¢ 3/4" 0.84 1.00 2.50 32.00 67.44 67.44

BASE B2 = 12 ¢ 3/4" 0.84 1.00 2.50 12.00 25.29 25.29

BASE B3 = 20 ¢ 3/4" 0.84 1.00 2.50 20.00 42.15 42.15

BASE B4 = 16 ¢ 5/8" 0.67 1.00 1.60 16.00 17.15 17.15

BASE B5 = 18 ¢ 5/8" 0.67 1.00 1.60 18.00 19.30 19.30

BASE B6 = 08 ¢ 3/4" 0.84 1.00 2.50 8.00 16.86 16.86

BASE B7 = 08 ¢ 3/4" 0.84 1.00 2.50 8.00 16.86 16.86

ARMAÇÃO AÇO CA-50 241,935.00

PROJETO 112.140.021-1 7,746.00 7,746.00

PROJETO 112.140.022-1 5,827.00 5,827.00

PROJETO 112.140.023-1 2,733.00 2,733.00

PROJETO 112.140.024-1 3,165.00 3,165.00

PROJETO 112.140.147-2 50,313.00 50,313.00

PROJETO 112.140.148-2 71,630.00 71,630.00

PROJETO 112.140.149-3 30,720.00 30,720.00

PROJETO 112.140.150-3 69,801.00 69,801.00

ESCAVAÇÃO 1,563.48

37.42 12.80 1.50 1.00 718.46 0.00 718.46

28.10 16.00 1.10 1.00 494.56 0.00 494.56

26.55 12.00 1.10 1.00 350.46 0.00 350.46

REGULARIZAÇÃO DE FUNDO DE VALA 1,094.60

RADIER - ELEV. 1098,400 54.73 1.00 0.05 1.00 1,094.60 0.00 1,094.60

REATERRO COMPACTADO 277.33

VOLUME ESCAVADO 1,563.48 1.00 1.00 1.00 1,563.48 0.00 1,563.48

VOLUME DE CONCRETO DO RADIER 1,286.15 1.00 1.00 (1.00) (1,286.15) (1,286.15)

CIMBRAMENTO 4,576.31

EIXOS A a E - LAJE 1ª ETAPA 21.60 9.60 4.70 1.00 974.59 0.00 974.59

EIXOS A a E - LAJE 2ª ETAPA 21.60 9.60 3.70 1.00 767.23 0.00 767.23

EIXOS A a E - LAJE 3ª ETAPA 27.40 9.60 5.20 1.00 1,367.81 0.00 1,367.81

EIXOS E a F - LAJE 27.50 9.60 3.86 1.00 1,019.04 0.00 1,019.04

EIXOS F a G - LAJE 12.08 9.60 3.86 1.00 447.64 0.00 447.64

0.00 0.00 0.00


OBRA
FRENTE HOMOGENIZAÇÃO DE MINÉRIO
N.º PROJETO REVISÃO
CONCRETO ESTRUTURAL, INCLUINDO TODOS OS FORNECIMENTOS,
DESCRIÇÃO DA ATIVIDADE TRANSPORTE E LANÇAMENTO.

DIMENSÕES
PEÇA QTDD UNDD COMP. LARGURA ALTURA AUXILIAR TOTAL ACUMULADO
EL 1098,400 - -
REFORÇO DE LAJE DE FUNDO -
PAREDES 1, 2 - (A, B, C, D, E) 1.000 M³ 1.000 1.000 1.000 1.000 1.000 1.000
SALIENCIA DOS PILARES 4.000 M³ 0.800 0.400 0.700 1.000 0.896 1.896
SALIENCIA DOS PILARES 1.000 M³ 0.700 0.400 0.700 1.000 0.196 2.092
REFORÇO DE LAJE DE FUNDO -
PAREDES 5, 6 - (A, B, C, D, E) 1.000 M³ 35.880 1.200 0.700 1.000 30.139 32.231
SALIENCIA DOS PILARES 4.000 M³ 0.800 0.400 0.700 1.000 0.896 33.127
SALIENCIA DOS PILARES 1.000 M³ 0.700 0.400 0.700 1.000 0.196 33.323
REFORÇO DE LAJE DE FUNDO -
PAREDE 9 (A) 1.000 M³ 8.600 1.200 0.700 1.000 7.224 40.547
LAJE DE FUNDO 1 / 2 (A, B, C, D, E) 1.000 M³ 36.340 10.400 0.800 1.000 302.349 342.896
SALIENCIA DOS PILARES 8.000 M³ 0.800 0.800 0.800 1.000 4.096 346.992
SALIENCIA DOS PILARES 2.000 M³ 0.700 0.400 0.800 1.000 0.448 347.440
REFORÇO PAR 3 = PAR 7 2.000 M³ 27.500 3.850 0.400 1.000 84.700 432.140
LAJE DE FUNDO 1 / 2 (E, F) 1.000 M³ 27.500 14.800 0.700 1.000 284.900 717.040
REFORÇO PAR 4 = PAR 8 2.000 M³ 12.040 1.913 0.500 1.000 23.027 740.067
LAJE DE FUNDO 1 / 2 (F, G) 1.000 M³ 12.040 10.800 0.600 1.000 78.019 818.086
LAJE DE FUNDO 1 / 2 (G, H) 1.000 M³ 14.470 10.800 0.600 1.000 93.766 911.851
BASES DA LAJE DE FUNDO - B1 8.000 M³ 0.400 0.450 0.500 1.000 0.720 912.571
BASES DA LAJE DE FUNDO - B2 6.000 M³ 0.400 0.350 0.500 1.000 0.420 912.991
BASES DA LAJE DE FUNDO - B3 10.000 M³ 0.400 0.350 0.500 1.000 0.700 913.691
BASES DA LAJE DE FUNDO - B4=B8 16.000 M³ 0.250 0.250 0.500 1.000 0.500 914.191
BASES DA LAJE DE FUNDO - B5=B9 18.000 M³ 0.250 0.250 0.500 1.000 0.563 914.754
BASES DA LAJE DE FUNDO - B6=B10 4.000 M³ 0.400 0.350 0.500 1.000 0.280 915.034
BASES DA LAJE DE FUNDO - B7 4.000 M³ 0.400 0.350 0.500 1.000 0.280 915.314

DE EL 1098,400 A EL 1103,100
SALIENCIA DOS PILARES 4.000 M³ 0.800 0.400 5.100 1.000 6.528 6.528
SALIENCIA DOS PILARES 1.000 M³ 0.700 0.400 5.100 1.000 1.428 7.956
PAREDE 1=2=5=6 2.000 M³ 36.800 0.600 5.100 1.000 225.216 233.172
PAREDE 9 1.000 M³ 9.600 0.600 5.100 1.000 29.376 262.548
PAREDE 10 1.000 M³ 9.600 0.600 1.100 1.000 6.336 268.884
REFORÇO PAREDE 10 1.000 M³ 0.800 0.600 0.800 1.000 0.384 269.268
PAREDE 3 = 7 - EL 1103,200 2.000 M³ 27.500 0.600 5.200 1.000 171.600 440.868
PAREDE 4 = 8 2.000 M³ 12.080 0.600 5.100 1.000 73.930 514.798
PAREDE 4 = 8 2.000 M³ 4.200 0.600 4.238 1.000 21.360 536.157
PAREDE 4 = 8 1.000 M³ 10.270 0.600 4.238 1.000 26.115 562.272

ELEVAÇÃO 1103,100
VIGA 1, 2, 3, 4 2.000 M³ 18.700 0.600 0.800 1.000 17.952 17.952
VIGA 5, 8 2.000 M³ 9.600 0.600 1.000 1.000 11.520 29.472
VIGA 6, 7 2.000 M³ 9.600 0.350 1.000 1.000 6.720 36.192
LAJE 10 1.000 M³ 9.340 3.300 0.200 1.000 6.164 42.356
LAJE 11 1.000 M³ 9.340 3.300 0.200 1.000 6.164 48.521
LAJE 13 1.000 M³ 4.000 1.800 0.200 1.000 1.440 49.961
LAJE 14 1.000 M³ 1.800 1.400 0.200 1.000 0.504 50.465
LAJE 16 1.000 M³ 9.340 3.300 0.200 1.000 6.164 56.629
LAJE 17 1.000 M³ 9.340 3.300 0.200 1.000 6.164 62.794
LAJE EL 1103,200 (E, F) 1.000 M³ 27.500 9.600 1.100 1.000 290.400 353.194
REFORÇO LAJE EL 1103,200 (E, F) 1.000 M³ 27.500 0.800 0.800 1.000 17.600 370.794
LAJE EL 1103,100 (F, G) 1.000 M³ 12.060 9.600 1.000 1.000 115.776 486.570

DE EL 1103,100 A EL 1106,800
SALIENCIA DOS PILARES 4.000 M³ 0.800 0.400 3.700 1.000 4.736 4.736
SALIENCIA DOS PILARES 1.000 M³ 0.700 0.400 3.700 1.000 1.036 5.772
PAREDE 1=2=5=6 2.000 M³ 36.800 0.600 3.700 1.000 163.392 169.164
PAREDE 9 1.000 M³ 9.600 0.600 3.700 1.000 21.312 190.476
PAREDE 10 1.000 M³ 9.600 0.600 3.700 1.000 21.312 211.788

ELEVAÇÃO 1103,100
VIGAS 101, 102 = 103, 104 2.000 M³ 18.700 0.600 0.800 1.000 17.952 17.952
VIGAS 105 = 108 1.000 M³ 9.600 0.600 1.000 1.000 5.760 23.712
VIGAS 106 = 107 2.000 M³ 9.600 0.350 1.000 1.000 6.720 30.432
LAJE 100 1.000 M³ 9.340 3.120 0.200 1.000 5.828 36.260
LAJE 101 1.000 M³ 9.340 3.120 0.200 1.000 5.828 42.088
LAJE 102 1.000 M³ 3.700 2.160 0.200 1.000 1.598 43.687
LAJE 103 1.000 M³ 9.340 3.120 0.200 1.000 5.828 49.515
LAJE 104 1.000 M³ 9.340 3.120 0.200 1.000 5.828 55.343

DE EL 1106,800 A EL 1112,000
SALIENCIA DOS PILARES 4.000 M³ 0.800 0.400 5.200 1.000 6.656 6.656
SALIENCIA DOS PILARES 1.000 M³ 0.700 0.400 5.200 1.000 1.456 8.112
PAREDE 1=2=5=6 2.000 M³ 36.800 0.600 5.200 1.000 229.632 237.744
PAREDE 9 1.000 M³ 9.600 0.600 5.200 1.000 29.952 267.696
PAREDE 10 1.000 M³ 9.600 0.600 5.200 1.000 29.952 297.648

ELEVAÇÃO 1112,000
VIGA 200, 201, 203, 204 2.000 M³ 16.550 1.650 0.800 1.000 43.692 43.692
REFORÇO VIGAS 200, 201, 203,204 1.000 M³ 16.550 1.650 0.950 1.000 25.942 69.634
BORDA VIGAS 200, 201, 203,204 2.000 M³ 16.550 1.200 0.700 1.000 27.804 97.438
DESCONTO CANALETAS VIGAS 200,
201, 203, 204 (1.000) M³ 16.550 0.350 0.350 1.000 (2.027) 95.411
VIGA 202 1.000 M³ 5.500 0.400 0.800 1.000 1.760 97.171
VIGA 205 1.000 M³ 9.600 0.600 1.000 1.000 5.760 102.931
VIGA 206 = 207 2.000 M³ 9.600 0.800 1.500 1.000 23.040 125.971
BORDA - VIGA 206 = 207 2.000 M³ 6.300 0.500 0.800 1.000 5.040 131.011
LAJE 200 1.000 M³ 3.000 5.500 0.200 1.000 3.300 134.311
DESCONTO VASADO (1.000) M³ 4.300 1.600 0.200 1.000 (1.376) 132.935
LAJE 201 1.000 M³ 4.600 3.500 0.200 1.000 3.220 136.155
LAJE 202 1.000 M³ 9.600 1.950 0.200 1.000 3.744 139.899

DE EL 1112,000 A EL 1112,350
DETALHE 1 - BASES 3.000 M³ 1.000 0.800 0.350 1.000 0.840 0.840
DETALHE 2 - BASES 3.000 M³ 1.000 0.800 0.350 1.000 0.840 1.680

TOTAL 2,668.833