Submitted To:
Prof. Chandra Kant

Submitted By:
Shrithi S Kumar
FPB1012/073

| |

|
 |

 | INTRODUCTION| ||

 | CUTIV|UMMARY| ||

 | ROJCT|AN| ||

| DVOING|ROJCT|CHARTR| ||

| DVOING|  ||

| RI
|ANNING| OR| |TA
| | |

 | ROJCT|CHDU| | |

 | CONCUION| ||

|
J JJ 
    

 |  TRODU TO 
This project is based on increasing the typing speed . Current typing speed is 2wpm and the tar geted typing speed is
10-20 wpm. The start date of the project is 27 th ecember 2010 and end date is 14 th February 2011.

J | £ £UT£UMMARY
The purpose of this document is to create a project plan that gives an overall idea of what are the tasks that have
been completed and what are the tasks that have to be completed.

 | PROJ£TPLA 
The project plan mainly focuses on the tasks and the estimated duration for the tasks. Tasks have been created by
the work break down structure and for those tasks risks have also been identified.

 
   J J J    !


 
" #    
J JJ 
    

  | D££LOP PROJ£TART£R
The first step was to develop a project charter and the tasks that involved in creating the project charter were:

1. dentifying goals and objectives.

2. eveloping scope statement.

3. Specifying deliverables.

4. nalyzing the stakeholders.

5. ocumenting the project charter.

 
   J J J   J !


 
" #    
J JJ 
    

ueveloping project charter took 5days as mentioned in the Ms Project and it is represented as 100% as the work has
already been completed.

 J | D££LOP B

The task involved in developing work breakdown struc ture was to build and submit it and then the associated tasks
for each deliverables had to be submitted. The tasks have been marked as 100% as the work has already been
completed.

 
   J J J    !


 
" #    
J JJ 
    

  | RKPLA  FORBTAK
^nce after the tasks were created the risks associated with that tasks was identified and it was analyzed and ways to
minimize the risk was also analyzed.

 
   J J J    !


 
" #    
J JJ 
    

  | PROJ£T£DUL£
^nce after all the initial planning has been done the time for execution of the tasks are analyzed and the tasks have
been scheduled.

 
   J J J   $ !


 
" #    
J JJ 
    

Requirement planning includes gathering of all the requirements that are needed for the execution of the project
and also includes seeking help from the parents. The risks associated with these tasks are also identified and the
tasks have been drawn to mitigate the risks.

^nce after all the risks have been identified and the requirements have been gathered the project is executed by
starting with the basics.

 
   J J J   % !


 
" #    
J JJ 
    

 
   J J J   & !


 
" #    
J J J 
     

T e|e all|is s|assciate |at|eac |sta e| ae|a al ze |a |t ese|is s|ae|t|


e|ta e |cae|til|at|te|e||te|ject |

Te|is s|ae|ee|ta e|i|t|csieati|a|accil |te|e|ate| |


te|ject|is|set|| t|| ea| |

3.5.| CONCL SON


Te| ject| tas s| ae| ee| eesete| a| te| as| | mitiati| te| is s|
ae|als|ee|ietiie|a|te|ati|at|eac|stae||lilli|te|tas s|
ae|ee|set|ic|eses|te|sccess l|cmleti||te|ject |

 
  J

J  J    


 
     