DIVISION 1-WHO WAS INVOLVED IN PREPARING THE ESTIMATE 1 2 3 4 5
1.1 Owner’s experience level
1.2 Engineer/Designer experience level
1.3 Relevant experience of the estimating team
1.4 Level of involvement of the project manager
1.5 Involvement of other resources in preparing estimate
1.6 Review and acceptance of estimate by appropriate parties
1.7 Impact of team integration and alignment
1.8 Purpose and intended use of estimate
1.9 Attitude/culture toward changes
Best Worst
DIVISION 2 – HOW WAS THE ESTIMATE PREPARED 1 2 3 4 5
2.1 Completeness of cost information
2.2 Applicability of cost information
2.3 Accuracy and reliability of cost information
2.4 Standard procedure for update cost information
2.5 Time allowed for preparing the estimate
2.6 Alignment of estimate methodology with available project information
2.7 Is the estimating work process formally defined and followed?
2.8 Formal structure to categorize and prepare the cost estimate
2.9 Utilization of checklists to ensure completeness and technical basis
2.10 Documentation of information used in preparing the estimate
2.11 Method used to determine contingency
Best Worst
DIVISION 3 – WHAT WAS KNOWN ABOUT THE PROJECT 1 2 3 4 5
3.1 Capacity
3.2 Technology
3.3 Processes
3.4 Site location
3.5 Plot Plan
3.6 Utility sources and supply conditions
3.7 Environment assessment
3.8 Process flow sheets
3.9 Mechanical equipment lists
3.10 Heat and material balances
3.11 P&ID’s
3.12 Project strategy
3.13 Project design criteria
3.14 Project schedule
Best Worst
OTHERS
1. Type of construction
2. Building type
3. Project Type
4. Building geometry
5. Plan Shape
6. Planning Efficiency
7. Building Size
15. Parameter
16. No of Functional unit
17 No of people
20. Location
Best Worst
SCOPE 1 2 3 4 5
1. Quantities
2. Definition
3. Design Approach
4. State of design
5. Completeness
6. Detail
7. Information
8. Quality
9. Consistency
10. Continuity
11. Project Nature
12. Project
13 Technology
Best Worst
INFORMATION 1 2 3 4 5
1. Processing
2. Sought
3. Availability
4. Validity
5. Completeness
6. Relevance
Best Worst
UNCERTAINTY
1. Technology
2. Project
3. Environmental
4. Productivity
5. Market
6. Construction
7. Project nature
Best Worst
ESTIMATOR
1. Talent
3. Effort Applied
4. Expertise
5. Judgement
6. Knowledge
7. Common Sense
8. Team ability
Best Worst
PROCEDURE
1. Mistake
2. Time Available
3. Measurements
Company: __________________________________
At the time this estimated was prepared, provide the approximate % complete of the following
What was the single biggest factor affecting the difference between the estimated and the actual costs
___________________________________________________________________________________