Você está na página 1de 1

180°

1 1' 2 3 3' 4 5 5' 6 7 7' 8 9 9' 10 11 11' 12


db
Dh
rec.

1 2 3 4 5 6
E-05 E-05 E-05 E-05 E-05 E-05
Lh

A'
DOBLEZ A 180°

db Dh Lh
Ø 1" 16.0 cm 21.0 cm
Ø 3/4"
Ø 5/8"
12.0 cm
10.0 cm
16.0 cm
13.0 cm
MUNICIPALIDAD DISTRITAL
Ø 1/2"
Ø 3/8"
8.0 cm
6.0 cm
12.0 cm
11.0 cm
DE UCHUMAYO
Ø 1/4" 4.0 cm 9.0 cm
2019
1
E-05
CC1 CC1 CC1 PROYECTO :
A db
C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3

DOBLEZ A 90°
Dh
db Dh Lh
90° Ø 1" 16.0 cm 41.0 cm
12.0 cm 31.0 cm
Lh Ø 3/4"
Ø 5/8" 10.0 cm 26.0 cm
Ø 1/2" 8.0 cm 21.0 cm

CC1

CC1

CC1

CC1

CC1

CC1

CC1

CC1

CC1
rec. Ø 3/8" 6.0 cm 16.0 cm
Ø 1/4" 4.0 cm 10.0 cm

I.E.I DULCES BROTECITOS ,


DISTRITO DE UCHUMAYO,
AREQUIPA - AREQUIPA
CC1 CC1 CC1 CC1 CC1 CC1 CC1 CC1 CC1
B C1 P2 C2 P1 C1
REFUERZO PRINCIPAL
C1 P1 C2 P2 C1 C1 P2 C2 P1 C1

Z1 Z2 Z2 Z1 Z2 Z1
GANCHOS ESTANDAR Y
1
E-05
DIÁMETROS DE DOBLADO

CC1

CC1
CC2

CC2
EN FRIO

180°
NPT= +0.80

C1 C1 C1 C1 C1 C1
C db
De
rec.

Le

CC2

CC2
CC1

CC1
DOBLEZ A 180°

2 db De Le
E-05 Ø 5/8" 10.0 cm 13.0 cm
Ø 1/2" 8.0 cm 12.0 cm
Ø 3/8" 6.0 cm 11.0 cm
Ø 1/4" 4.0 cm 9.0 cm

NPT= +2.80 Z1 Z1 Z1 Z1 Z1 Z1 acero longitudinal


de elemento estructural
columna, viga, placa, etc.

C1 CC1 P1 P1 CC1 C1 C1 CC1 P1 P1 CC1 C1 C1 CC1 P1 P1 CC1 C1 UBICACION


D rec. db
DEPARTAMENTO :
Le

PD1 PD1 PD1 PD1 PD1 PD1 135° DOBLEZ A 135° AREQUIPA
db De Le
Z4 Z4 Z4 Z4 Z4 Z4 De
Ø 5/8" 10.0 cm 19.0 cm
Ø 1/2" 8.0 cm 15.0 cm PROVINCIA :
Ø 3/8" 6.0 cm 12.0 cm
rec.
Ø 1/4" 4.0 cm 10.0 cm
AREQUIPA
CC3 P2
DISTRITO :
UCHUMAYO
db
PLANO :

CIMENTACIÓN
De
90° DOBLEZ A 90°

ESTRUCTRURAS
db
Le De Le
Ø 5/8" 10.0 cm 16.0 cm
Ø 1/2" 8.0 cm 13.0 cm
3 rec. Ø 3/8" 6.0 cm 10.0 cm
E-05 CC1 Ø 1/4" 4.0 cm 6.0 cm

C11 C11

la losa por
encima es de h=0.20
ESTRIBOS Y GRAPAS
con doble malla
de Ø3/8"@0.20

NPT= +2.00 NPT= +1.00


GANCHOS ESTANDAR Y
C11 CC1 C11

NPT= +3.00
DIÁMETROS DE DOBLADO
NPT= +/-0.00
EN FRIO

PD1 PD1 PD1 PD1 PD1 PD1


Z4 Z4 Z4 Z4 Z4 Z4

CC3
P6

E C4 CC4 C5 CC4 P3 P4 C6 C9 CA3


C8 C8
CA2 CA2 CA2 CA2
CC1 CC1 CC1 C9
Z2 Z2 Z1 Z3
PROPIETARIO :
PD1

CC1

CC1
CC2
CC1

Z4

CA1
CC1

CA1
C3 CC1 C6

C3 C3

JEFE DE PROYECTO:
NPT= +1.00
C3
CC1

C7

CC2

CC1
CC1

F C6 PD1
Z4

C6 C6 C9
C6 CA1 CA1
F' CA1

CC1 CC1 C6 C6 CC1 FECHA :


CC1

CC1
NOVIEMBRE 2019
CC1

C3 C3 C3

CC4
C6 G
C7 C9 CC1
CC1 CC1 ESCALA :
C7 C10
Z2
C3 1:100

CC1

CC1
Z3

CC1
Z2 Z2 Z2 C6 CA1 CA1
C5 CA1
C4 CC4 C5 CC4 CC4 P5 C3
C3 CC1 CC1 CC1
H G'
CA2 CA2 CA2 CA2 C3 C3 APROBADO :
CC1

CA1 C3
CC1

CC1
CC1

CC1

CC4

CC1
CA1

Z2
I C6 CC3
C6 C6 CC3
C6 CC3
CC3
CC3 CC3
C6 CC3
CA1
C6 C10
CC3
C6

LÁMINA :
I

E-01
13 14 15 16 17 18 18' 19 19' 20 21 22 23 24
1 DE 5