Nominal Tariff
Discounted Tariff
Levelised Tariff
Nominal Tariff: Calculated for each year (Fixed Price + Variable Price )
D.F. = 1/(1-d)^n
Levelised Tariff : Tariff calculated for all years .This is a single Tariff for whole Plant life . it is a
weighted mean of all nominal tariff where weigh by the discounting factor (D.F.)
IDC (Interest during Construction) is added in the capital cost where INFIRM POWER is revenue used
to be deducted from the Capital cost.
Working capital: It includes receivables for two months, Salary & Wages for one month, spares for
one and half month for TPP.
1. Return on Equity
2. Return on Debts(loan)
3. Depreciation
4. Interest on Working Components
5. Operational & Maintenance Cost
1. Cost of COAL/kwh
2. Cost of OIL/kwh (from 2009-14) it shift to Fixed Cost.
Assumption & Data Given for TPP
Project Cost (Rs.Crores / MW) 4.00 Assumption
Plant Capacity (MW) 500.0 Assumption
Plant Life (years) 25.0
Capital Structure
Debt(Percentage) 70% (CERC Norms 2009-14)
Equity(Percentage) 30% (CERC Norms 2009-14)
Debt (Rs.Crores) 1400.0
Equity (Rs.Crores) 600.0
Assumptions for Capacity Charges
Interest on Loan capital 12% (CERC Norms 2009-14)
Interest on Working capital 12% (CERC Norms 2009-14)
Return on Equity 15.50% (CERC Norms 2009-14)
O&M expenses ( in % of TPC ) 2.00% (CERC Norms 2009-14)
O&M Expenses Escalation 5.75% (CERC Norms 2009-14)
Maintenace Spares Cost Escalation 6% (CERC Norms 2009-14)
Depreciation (for Tariff Clculation) 5.28% (CERC Norms 2009-14)
Depreciation as per IT Act 7.84% (As per IT Act)
Total number of Years of Operation 25.0 (CERC Norms 2009-14)
Loan Duration (years) 12.0 (CERC Norms 2009-14)
Assumptions for Variable Charges
Cost of Coal(Rs./Ton)(Price + Freight) 804.0 Price-Acc.to Grade of Coal,
Freight-Acc.to Min.of Railways
Ministry of Petroleum & Natural
Secondary Fuel Prices (Rs./kl) Gas
Secondary Fuel Consumptions(ml/kWh) 1.00 (CERC Norms 2009-14)
TECHNICAL ASSUMPTIONS
Installed Capacity of single unit 500.0 MW
No. of installed units --
Total Installed Capacity MW
3504.
Total units generated 0 million units
Target Availability Factor 95%
PLF 85% (CERC Norms 2009-14)
2780.
Gross Station Heat Rate 0 kcal/kWh (CERC Norms 2009-14)
3420.
GCV of Coal 0 kcal/kg Ministry of Coal
GCV of Oil 10.7 kcal/ml Ministry of Petroleum
Auxiliary Consumption 10% (CERC Norms 2009-14)
Coal Transit Loss 0.80% Ministry of Coal
Energy Delivered ExBus (Million units)
THE PLANT IS COAL FIRED WITH COOLING TOWER