Você está na página 1de 31

S

Question Option 1 Option 2 Option 3 Option 4 ol


4, Measure
3, To and review
ensure actual
that cost performance
Which of the following is one of 1, Minimize 2, Maximize of against a
SQA the objectives of business inventory the use of production specified
M001 plan? m investment m resources m is less m benchmark m 4
John Smith has joined as a
management trainee personnel
in XL technologies. His
manager has asked him to
work and analyze details of all
the applicants for the post of
software engineers and match 3,The
the parameters of the 1,The 2,The Performan 4,The
SQA candidates to the job Training Recruitment ce Appraisal
M002 requisitions. Process m Process m Process m Process m 2
Kinks Corporation is a small
scale, manufacturing company 3,Consulti
in the pharmaceutical domain. ng
The company was set up 5 outsourcin
years ago. The management of 1,Consulting g model
Kinks Corporation wants to outsourcing 2,Hosting and 4,Hosting
improve the productivity and model and off- model and off- custom model and
SQA profitability of the company by the-shelf ERP the-shelf ERP ERP custom ERP
M003 using IT to integrate the package m package m package m package m 2
3,
Analyzes
customer
behavior
and
The management of categorize
MaxElectronics felt the need for s
implementation of an effective customers
CRM strategy to ensure loyalty 2, Acts as a into 4, Provides
of customers. The 1, Integrates source of current instant
implementation of CRM must customer collecting and information
help the customer service information customer prospectiv about the
representatives in handling the with the information e customer and
SQA customers at the front-end and product and customer customers its purchasing
M004 the mana information m queries m m details m 4

HK Electronics was facing


problems in meeting the 1, Providing
requirements of the customers. exclusive
Therefore, the management services to 3,
decided to change its existing the customers 2, Enhancing Increasing
business strategy to a new and helping the product sales by 4, Maintaining
customer-oriented strategy. the sales quality by improving the contact
The new strategy adopted by team in improving sales information of
SQA HK Electronics is CRM. Identify achieving the production activities the customers
M005 th sales target m activities m m m 1
Bob is analyzing the results of
a software test. He uses a
scatter plot to understand the
relationship between the
complexity of the program and 2, Tested 4, Tested
the number of errors in the 1, Tested variables have 3, Tested variables
program during development. variables a strong variables have a
SQA On the scatter plot, the tested have negative positive are not positive
M006 variables cluster in a correlation. m correlation. m related. m correlation. m 4
Infinity Ltd. is developing a
payroll system. The system has
to be delivered to the client in
three months. The probability
that the project will exceed its
deadline has a value 0.7 and
the impact of the risk has the
SQA value 3 on the rating
M007 scale.Calculate 1, 0.7 m 2, 3 m 3, 2.1 m 4, 0 m 3
3, Product
informatio 4, Product
2, Product n, time information,
Which of the following set of information, period, time period,
components are essential for 1, Product time period, and work force,
SQA preparing an aggregate information, and work force inventory inventory, and
M008 production plan? m time period m m m time period m 4
3,Less
time for
analysis,
Red Sky Pvt. Ltd. did not follow planning,
any automated HR and
Management System. Which of identifying
the following is not a important
disadvantage that the opportuniti
managers might be suffering 2,Complexity es within 4,More time in
because of manual in maintaining the searching and
SQA management of HR processes? 1,Increased data bases of organizatio selecting
M009 m paper work m employees m nm tasks m 3
3,The
2,The problem problem is
is that the that the
ERP system ERP
lacked system
integration lacks
with a integration
business with an
intelligence eBusiness
tool that would tool. To
use the ERP rectify the
system data to problem
Jawger Inc. is an established 1,The generate trend the ERP
organization in the retail sector. problem is analysis system 4,The
It has been one of the top that the ERP reports. To needs to problem was
organizations in its domain due system data rectify the be that instead of
to its state-of-the-art cannot be problem the integrated an ERP
infrastructure, efficient used for ERP system with an system, they
management and processing, generating needs to be eBusiness only needed
SQA and tech-savvy inclination. trend analysis integrated with application to install a BI
M010 Jawger Inc. has learned th reports. m a BI tool. m .m system. m 2
The management of
PeopleTrust has developed a
CRM strategy for integrating 3,
CRM with the business Elementar
processes in the organization. y, 4,
For developing an effective 2, Basic, extended, Elementary,
CRM strategy, the 1, Basic and extended, and and extended,
management first defined the special custom custom and special
SQA objectives of CRM and then service value service value service service value
M011 defined the service value m m value m m 2
Your organization has recently
purchased an off-the-shelf ERP
package. However, some
business processes need to be
extended to suit the needs of
your organization. Which of the
following components of an 2,Custom 3,Administ
SQA ERP package will help you 1,Service development ration
M012 extend the features of th engine m workbench m utility m 4,Modules m 2
Which phase of the ETVX
SQA process ensures that no activity 1, Verification 2, Entry phase 3, Exit 4, Task phase
M013 ends abruptly? m phase m m phase m m 4

3, To
2, Create a ensure
1, To provide logical that
information framework for materials
related to the developing are 4, Schedule
requirement and pursuing available manpower
of resources production for and machine
Which of the following is one of and raw strategies over production resources for
SQA the objective of Master materials for a particular at the right maximum
M014 Production Schedule? m production m time period m time m efficiency m 1
Which of the following HRM 3,The
process helps employees to Performan
acquire job-related skills and ce
knowledge and also helps in 1,The Managem 4,The
SQA carrying out their roles and Recruitment 2,The Training ent Appraisal
M015 responsibilities? m Process m Process m Process m Process m 2
Techsoft is a small organization
but in the last few years it has
managed to achieve a
competitive position in the
market. To expand the
business, the management
asked its sales and customer
care executives to collect 3, The 4, Face-to-
SQA customer feedbacks. By 1, Telephonic 2, Written Internet face
M016 reviewing the survey m survey m survey m interviews m 4
KJI Corporation is a large-scale
manufacturer of copper wires.
KJI has a small IT support
department that supports
inventory and accounts
management. Due to lack of
coordinated working between
the production and other
SQA departments, such as purchase 1,Enterprise-
M017 and acc wide m 2,In-house m 3,Partial m 4,Modular m 3
3,Sales 4,Sales
Which of the following sub- order entry master data
systems of the Sales module 1,Shipping 2,Billing and entry and
SQA can help you create delivery Management Management managem management
M018 orders? m m m ent m m 1
Which of the following plans
provides information related to 3, Master
the requirement of resources production
SQA and raw materials for the 1, Business 2, Production schedule 4, Capacity
M019 production? m plan m plan m m planning m 3

Green Carpets Pvt. Ltd. did not


emerge as a successful
organization. The projects were
never completed on time as
deadlines were never correctly
estimated and even the
workload was not properly 3,Fair and 4,Access to
SQA distributed. The reason that 1,Individualisti 2,Judge the just organizational
M020 came into light was that the HR c approach m strength m policies m information m 4
The management of TechPoint
has appointed a technical team
for the implementation of a
CRM system in the 3,
organization. The main task of Providing
the technical team is to develop 1, training 4, Providing a
and customize the CRM Demonstratin 2, Providing material common
system according to the g a test run of user manual and demo training class
SQA requirements of the the CRM and online application for all
M021 organization. Then t system m help m sm employees m 3
Smart Accessories Inc. is a
leading large-scale
manufacturer of biking
accessories, having state-of-
art manufacturing machinery.
They don’t only excel in the
manufacturing infrastructure
but also in being tech-savvy.
SQA Every department has custom 2,Outsourcing 3,In-house
M022 develope 1,Modular m consultancy m m 4,Hosting m 3

The sales representatives of


GemTech found that the
purchasing habits of customers
vary depending upon their age
groups and the section of
society they belong to. The
customer details along with
SQA their purchasing habits helps to 1, Data 2, Web 3, Data 4, Data
M023 derive useful information, refining m tracking m analysis m mining m 4
Which of the following defines 3,3 ,Test
SQA the scope of the testing 2, Test script specificati 4, Test
M024 activity? m 1, Test plan m m ons m procedure m 1
3,
Which of the following plan acts Inventory
SQA as an input for preparing MRP? 2, Capacity Planning 4, Resource
M025 m 1, MPS m Planning m m Planning m 1

Which of the following


statement is false?
Statement A: Employment
function focuses on paying fair,
consistent, and equitable
remuneration to the workforce.
Statement B: Maintenance
function identifies the selected
SQA candidate's potential and also 3,Both A 4,None of
M026 helps in 1,Only A m 2,Only B m and B m these m 3

The management of Magnum


Tours was hopeful that after
the implementation of the CRM 1, CRM 2, 3,
system the organization will be strategy not Unwillingness Required 4, Effective
able to improve its service inline with the of the production training
quality. But, to their dismay, corporate employees in targets are programs are
even after implementing the strategy and using the not not provided
SQA CRM system the organization lack of data CRM system achieved to the
M027 was not able to solve al integration m m on time m employees m 1
NTB Inc. is a small scale
manufacturer of nuts and bolts.
The management has
observed that the working of
the organization is not as
efficient as that of its
competitors. The management
decided to consult some
SQA experts in their domain and get 1,Enterprise-
M028 tips on impro wide m 2,In-house m 3,Partial m 4,Modular m 4

The technical team of


MaxElectronics has
implemented a CRM system
and integrated the CRM system
with all the existing enterprise 1,
applications, such as Upgradation 2, Complex 4,
Enterprise Resource Planning will result to design and 3, No Upgradation
(ERP), Web server, and data loss of high scope for will require
SQA warehouse. They have also previous data upgradation upgradatio alteast 2
M029 integrated the CRM sy m cost m nm years m 2
3, To
2, To ensure ensure
that each unit that the
1, To test functions developed
each correctly system
individual unit across can 4, To ensure
of software to different handle the validity of
SQA detect errors versions of additional the software
M030 What is unit testing used for? m in its code. m browsers. m load. m application. m 1
3,
1, Identifying Identifying
the risks the tasks
Which of the following is not an related to the 2, Developing to be 4, Computing
SQA activity performed in test effort testing phase a test plan performed the size of the
M031 estimation? m of SDLC m strategy m m application m 1
3, 4, Setting up
Which of the following is the 1, Assigning Assigning the system
first activity performed as part test scripts to 2, Establishing test cases test
SQA of the Test Execution process? testers for the test bed. to test environment.
M032 m execution. m m cycles. m m 4
In which of the following 3,
phases of acceptance testing, Executing
a customer must understand 1, Defining the 4, Developing
the consequences of adding the 2, Developing acceptanc an
SQA new functions to enhance the acceptance an acceptance e test plan acceptance
M033 software? m test criteria m test plan m m decision m 1

3,
Gathering
statistics 4, To identify
to develop the critical
1, Further defect mistakes
Which of the following is not an improving the 2, Reporting resolutions made as part
objective of defect recording software the status of for future of the
SQA phase of the defect development the application application development
M034 management process? m process m m sm process. m 4
3, It is the
average
time from
one defect
to the next
1, It is the defect
measure of all occurrenc
the found e during a
defects per 2, It is the test 4, It is the
size of measure of operation measure of
software defects before on a defects after
SQA entity being the delivery of software the delivery of
M035 What is Defect Density? m measured. m software. m project. m software. m 1
3, To track
the
1, To plan a defects
test found
SQA What is the use of a test environment 2, To identify during 4,To fix the
M036 reporting tool? m m risks m testing. m defects m 3
2, Providing
technical 4, Preparing
leadership for 3, Creating test
SQA Which of the following is a 1, Creating a the test test data documentatio
M037 responsibility of a test lead? m test plan m process m m nm 2
3, Test
Which of the following is not 2, Test entrance/e
SQA specified as part of test 1, Test assumptions xit criteria 4, Test effort
M038 specification? m objectives m m m m 4
In which of the following
software testing methods,
checking the availability of
SQA physical data elements is an 1, Unit testing 2, Integration 3, System 4, Acceptance
M039 entry criteria? m m testing m testing m testing m 1
2, 3,
Identification Estimating
of interim and the time 4, Scheduling
1, final products and effort adequate time
Development for that to examine
of software acceptance, should be the product
Which of the following is not a requirements along with spent on before the
responsibility of customer in a and their the final
SQA software development acceptance acceptance software. acceptance
M040 process? m criteria. m criteria. m m review. m 3

In which of the following


integration testing approaches,
all the modules that have been 3, Big
SQA unit tested for a system are put 1, Top-Down 2, Bottom-Up Bang 4, Hybrid
M041 together and tested? m testing m testing m testing m testing m 3
2, Code 3,
SQA Which of the following is not a 1, Analysis coverage tools Database 4, Test report
M042 test reporting tool? m tools m m tools m formats m 2

Which test reporting tool is 1, Defect


SQA used to represent the results of tracking tool 2, Graphic tool 3, Drawing 4, Analysis
M043 a software test statistically? m m m tool m tool m 4
Trivia Ltd. is developing a
software application whose
production cost might exceed
the planned budget. Also, the
application will be competing
with similar applications already 3,
available in the market. The Premature
SQA application is likely to face 1, Software 2, Testing risk release 4, Business
M044 which of the follo risk m m risk m risk m 4
Who among the following is
responsible for establishing test 3,
objectives and goals that define Developm
SQA the scope of the testing effort? 1, Project 2, Test ent team 4, Customer
M045 m manager m manager m m m 2
Identify the phase in the life
cycle of a test process in which
test cases are stored for any 1, Design test 3, 4, System
SQA future regression testing cases phase. 2, Wind-up Execution study phase.
M046 requirements. m m phase. m phase. m m 2
2, Reviewing
the
requirements
document to
ensure that
the software
requirements
1, Assuring are complete
that the and 4, Assuring
approved expressed as 3, that the
design is functional, Conductin allocated
placed under performance, g Formal modules are
Which SQA activity do you configuration and interface Technical included in
SQA need to perform in the software management requirements Review of the detailed
M047 construction phase? m m m code m design m 3
Which type of testing uses the
SQA black box method for testing 1, System 2, Unit testing 3, Stress 4, Recovery
M048 the software? m testing m m testing m testing m 1

In which of the following


integration testing approaches,
the terminal modules are tested
SQA first followed by all the lower 1,Top-Down 2, Bottom-Up 3, Hybrid 4, Big Bang
M049 level modules? m testing m testing m testing m testing m 2

3, It
verifies
2, It verifies whether
whether the the system 4, It verifies
authorization is able to whether a
rules have recover system can
1, It verifies been properly from manage high
the integrity of implemented varying volume of test
SQA Identify the purpose of data during in the degrees of plan
M050 compliance testing? m testing. m application. m failure. m execution. m 2
Which of the following
requirements given by the
customer are related to the 2, 3, Non-
business procedures and 1, Interface Performance functional 4, Functional
SQA standards that the software requirements requirements requireme requirements
M051 must execute? m m m nts m m 4

2, Implement 3, Develop
codes in the code to 4, Implement
software count the codes to slow
1, Analyze project to find number of down the
Which of the following one report for known and defects in software
SQA processes helps in the defect one type of common a software implementatio
M052 acknowledgment process? m defect. m defects. m m nm 2
1, Deficiency 2, Defect 3, Defect 4, Defect
SQA Removal Removal Regressio Removal
M053 What does DRE stands for? m Efficiency m Effort m n Effort m Efficiency m 4
Which test reporting tool helps
a software tester to determine 3, Error
SQA the source of errors in the 1, Source tool 2, Defect tracking 4, Analysis
M054 process being tested? m m tracking tool m tool m tool m 2
The impact of a security risk on
a project is calculated to be 4.
The risk factor of the same is
calculated to be 2.4. What is
SQA the probability of occurrence of
M055 the risk in the project? m 1, 6 m 2, 0.6 m 3, 0.06 m 4, 6.6 m 2

Which of the following testing


techniques tests whether the
application is developed in
accordance with information 3,
SQA technology standards, 1, Compliance 2, Security Operations 4, Recovery
M056 procedures, and guidelines? m testing m testing m testing m testing m 1
Which review checklist helps 3, Testing
you to check whether the data 1, Coding 2, High level review 4, Detailed
SQA types and data declarations are review design review checklist design review
M057 correct? m checklist m checklist m m checklist m 1
According to the V model,
which of the following types of
testing can be planned by
using the documents created 3,
SQA during the requirements phase. 1, Integration 2, Unit testing Acceptanc 4, System
M058 m testing m m e testing m testing m 3

Consider the following


statements:

Statement A: Test effort 3,


estimation is the responsibility Statement
of a test manager. 1, Both, A is True
Statement B: The test effort Statement A 2, Both, and 4, Statement
estimate helps in determining and Statement A Statement A is False and
SQA the number of testers and time Statement B, and Statement B is False. Statement B
M059 required for software testing. are False. m B, are True. m m is True. m 2
Which of the following Code
Coverage measure reports the
true or false outcome of each 3, 4,
Boolean sub-expression, Statement Condition/Dec
SQA separated by || and && 1,Condition 2, Decision Coverage ision
M060 operators? m Coverage m Coverage m m Coverage m 1
According to the V model,
which of the following types of
testing should be planned in 3,
SQA the requirements stage of an 1, Unit testing 2, Acceptance Integration 4, System
M061 SDLC? m m testing m testing m testing m 2

1, To check 3,To check


that the if the
system works system 4, To check if
efficiently achieves a system
when the performs
subjected to 2, To check if desired correctly over
above-normal adequate level of a continuous
SQA What is the purpose of stress transaction backups have performan period of time.
M062 testing? m volumes. m been made. m ce. m m 1
3, Mean 4, Project
SQA Which of the following is a size 1, Lines of 2, Number of time to development
M063 metric? m code m defects m failure m effort m 1

Which test reporting tool is


used to identify the quantifiable
SQA problems to prioritize work 1, Scatter plot 2, Pareto 3, Control 4, Histogram
M064 based on their severity? m m chart m chart m m 2
Newways Solutions is
developing an online
reservation system. A sister
concern of the company is
currently testing a similar
application. The testing team of
Infinity Solutions wants to
consult the experienced testers 3, 4,
SQA of the sister concern for 2, Observation Brainstorm Questionnaire
M065 identifyin 1, Checklist m m ing m m 2
Which of the following types of 3,
errors become visible when two Compatibil
SQA or more modules are 1, Leakage 2, Integration ity errors 4, Syntax
M066 integrated? m errors m errors m m errors m 3
Which of the following phases
of the testing life cycle involves
SQA documentation of test 1, Test 2, Planning
3, Test 4, Risk
M067 specifications? m execution m process m
design m analysis m 2
3,
1, 2, Boundary Regressio 4, Extreme
SQA Which of the following is not a Equivalence value analysis n analysis input testing
M068 test case design technique? m partitioning m m m m 3
Which of the following
integration test approaches
allows you to test the basic 3, Bottom-
SQA skeleton of the system early in 1, Big Bang 2, Hybrid Up testing 4, Top-Down
M069 the test process? m testing m testing m m testing m 4
In which phase of acceptance 1, Defining 3,
testing, a customer should be the 2, Developing Executing 4, Developing
SQA comfortable with the acceptance acceptance acceptanc acceptance
M070 functionality of the software? m criteria m plan m e plan m decision m 1
4, Test
3, Test metrics are
metrics gathered to
are resolve
2, Test metrics gathered arguments
1,Test metrics are gathered to motivate between the
are gathered to measure the team development
to evaluate the members team and the
the effort of effectiveness of a design team
SQA Why are test metrics gathered? the testing of software software in a software
M071 m team. m testing. m project m project. m 2
3,
Which statistical analysis tool is Regressio
SQA used to maximize insight into a 1, Exploratory 2, Pareto n analysis 4, Run chart
M072 data set? m analysis m chart m m m 1
Trinity Ltd. is testing a position
tracking system. The company
is testing this kind of a system
for the first time. In order to
identify the risks associated
with the Position Tracking
system, the participation of the 2, 3,
SQA entire testing team is desired. Questionnaire Brainstorm
M073 Whic 1, Checklist m m ing m 4, Interview m 3
3, Clark
should
listen to
Tim in the 4, Clark
next team should
2, Clark meeting provide
should provide and constructive
Clark Lewis has recently been 1, Clark constructive analyze criticism to
appointed as the Test Manager should specify criticism to the key Tim on a one-
at ICIS Ltd. ICIS has developed the Tim in the next points to-one basis
a share trading application that expectations team meeting conveyed and think of
enables customers to buy and from Tim in a and suggest by him some
sell shares online, and Clark is clear manner, some regarding possible
responsible for testing the in the next solutions to his solutions to
SQA application. He has formed a team meeting. the problem. performan the problem.
M074 testing tea m m ce. m m 4
Which of the following tools is
used to determine the 2, Code 3, Load
SQA breakdown point in application 1, Regression coverage tool testing tool 4, Traceability
M075 software? m testing tool m m m tool m 3
SQA Which of the following is a QA 1, Inspection 3, Quality 4, Checkpoint
M076 activity? m m 2, Testing m audit m review m 3
3,The
documents
created
during
requireme 4,The
nt, documents
1,The analysis, created
documents 2,The and during
Technology Solutions Inc. is created during documents design requirement,
developing a library requirements, created during phases analysis, and
management system. The analysis, and requirements, should design
acceptance criteria was defined design analysis, and have been phases
early in the development life phases design phases tested should have
cycle using the requirements should have should have using been tested
document. During the analysis been tested been tested static using
phase, the analysis document using white- using black- testing structural
SQA was used to prepare the box testing box testing techniques testing
M077 system t techniques. m techniques. m . m techniques. m 3
Paraways Solutions is
developing an order processing
application using ASP.NET.
The developers of Paraways
have not worked on this
technology before. Due to
budgetary constraints,
Paraways is not conducting any 3,
SQA training on the new technology 1, Market risk 2, Testing risk Managem 4, Software
M078 being used. I m m ent risk m risk m 4

Consider the following


statements:

Statement A: For each phase


of testing, the planned tests are 3,
executed and the actual test Statement
results are compared with the 1, Both, A is True
documented expected results. Statement A 2, Both, and 4, Statement
Statement B: A tester while and Statement A Statement A is False and
SQA creating test cases estimates Statement B, and Statement B is False. Statement B
M079 the expecte are False. m
B, are True. m m is True. m 2
3,
Which of the following 2, Non- Performan
acceptance requirements relate 1, Functional Functional ce 4, Interface
SQA to the quality attributes of Requirements Requirements Requireme Requirements
M080 software? m m m nts m m 2
3, Report
1, Raise a a defect, 4, Raise a
defect, report get the defect, report
a defect, get defect a defect, get
the defect acknowled the defects
acknowledged ged by fixed by the
by developer, 2, Raise a developer, developer, get
get the defect, get the get the the defect
defects fixed defects fixed defects acknowledge
by the by the fixed by d by
developer, developer, the developer,
Which of the following displays verify and verify and developer, verify and
SQA a sequence of a defect life close the close the close the close the
M081 cycle? m defect. m defect. m defect. m defect. m 1
The project manager of a
software project needs to know
the average time before the
first defect occurs in the
software. Which metric can
SQA provide this information to the 4, Cyclomatic
M082 project manager? m 1, DRE m 2, MTTF m 3, DD m complexity m 2
Consider the following
statements:

Statement A: Scatter plot is a


statistical analysis tool.
Statement B: Exploratory
analysis is used to analyze
data represented by a scatter 3, Both,
plot. Statement 4, Both,
1, Statement 2, Statement A and Statement A
Which of the following is correct A is True and A is False and Statement and
SQA in context of the preceding Statement B Statement B is B, are Statement B,
M083 statement is False. m True. m True. m are False. m 1
1, Listen to
the team
members in 3, Ask the
the next team team
meeting and members
Adam Martin is the test analyze key in the next
manager of a team responsible points team
for testing an application that conveyed by 2, Provide meeting to
provides information on daily the team constructive provide 4, Provide
login time of the employees. At members criticism to the justificatio constructive
one of the project meetings, regarding team n of their criticism to
Adam realized that the team their individually non the team in
SQA was not performing upto the performance. and in private. performan the next team
M084 standards set at the b m m ce. m meeting. m 2
Consider the following
statements:

Statement A: The selection of


an appropriate tool is a
secondary aspect of the testing 3,
process. Statement
Statement B: The selection of 1, Both, A is True
an appropriate tool leads to an Statement A 2, Both, and 4, Statement
ease in the burden of test and Statement A Statement A is False and
SQA production and test execution. Statement B, and Statement B is False. Statement B
M085 Wh are False. m B, are True. m m is True. m 4

Consider the following


statements:

Statement A: Quality
Assurance is oriented to
prevention of defects. 3,
Statement B: Quality Control is Statement
oriented to detection of defects. 1, Both, A is True
Statement A 2, Both, and 4, Statement
Which of the following is correct and Statement A Statement A is False and
SQA in context of the preceding Statement B, and Statement B is False. Statement B
M086 statements? m are False. m B, are True. m m is True. m 2
Global Infosystems Inc., has
developed a job site for
Manpower Consultants, a
placement company. To
increase the business
generated by the site, Anne
Forsythe, a manager with the
placement company has
decided to launch an 3,
SQA advertisement campaign 1, Operation 2, Stress Regressio 4, Recovery
M087 promoting testing m testing m n testing m testing m 2

Technowave Solutions is
working on a gaming
application. Jim Lewis, a tester
for this project, has written a
code to calculate the perimeter
of a rectangle. The code needs
to be tested for different types 3,
SQA of inputs. Which type of testing 1, Integration 2, System Acceptanc 4, Unit testing
M088 will Jim use to t testing m testing m e testing m m 4
For a test problem, identify
which of the following attributes
gives information on why the
difference between the problem 1, Statement
SQA and the ideal criteria is of Condition 3, Cause
M089 significant? m m 2, Criteria m m 4, Effect m 4
3, To
indicate
whether
2, To indicate the
whether the software
software has has been
been able to 4,4 ,To
1, To indicate accepted or meet the indicate
whether the rejected, critical whether the
Why is it necessary to identify software has based on acceptanc software has
critical success factors of the been customer e been
SQA software during acceptance identified of requirements. requireme corrected of
M090 criteria? m defects. m m nts. m defects. m 3

Consider the following


statements:

Statement A: Regression
testing comprises checking 3,
consistency, completeness, Statement
and correctness of the software 1, Both, A is True
at each stage and between Statement A 2, Both, and 4, Statement
each stage of the SDLC. and Statement A Statement A is False and
SQA Statement B: Verification is an Statement B and Statement B is False. Statement B
M091 activity that provides obje are False. m B are True. m m is True. m 4

A testing team member needs


to calculate the total number of 3,
tests that need to be conducted Cyclomatic
SQA for a module. Which metric can Complexit
M092 give this information? m 1, DRE m 2, MTTF m ym 4, DD m 3

Paraways Solutions is
developing an online gaming
application for school-going
children. The organization has
recruited highly experienced
developers for this project. The
developers are coming up with 3, 4,
SQA innovative ideas and 1, Market risk 2, Project risk Technical Management
M093 developing excellent features in m m risk m risk m 1
Consider the following
statements:

Statement A: A test bed is


prepared to conduct a test
based on the requirements 3,
stated for a test environment Statement
and the strategy devised to 1, Both, A is True
implement it. Statement A 2, Both, and 4, Statement
Statement B: A test bed only and Statement A Statement A is False and
SQA contains the hardware Statement B, and Statement B is False. Statement B
M094 necessary to co are False. m B, are True. m m is True. m 3
Consider the following
statements:

Statement A: Quality assurance


is product oriented. 3,
Statement B: Testing is a Statement
quality assurance activity. 1, Both, A is True
Statement A 2, Both, and 4, Statement
Which of the following is correct and Statement A Statement A is False and
SQA in context of the preceding Statement B, and Statement B is False. Statement B
M095 statements? m are False. m B, are True. m m is True. m 1

Global Solutions Inc. has


developed a library
management system. After
development, the software was
thoroughly tested using various
testing techniques and finally,
the software was implemented 1, 3,
SQA at the library site. Earlier, the Performance 2,2 ,Parallel Operations 4, Security
M096 library had been using a ma testing m testing m testing m testing m 2
Susan Ward is a software
developer in Supersoft2000
Inc. She has developed an
application that offers e-
commerce services for
transacting business through
the Internet. Which technique
should Susan use to test if the 3,
SQA financial transactions are safe? 1, Security 2, Reliability Regressio 4, Operations
M097 m testing m testing m n testing m testing m 1

Consider the following


statements:

Statement A: Statement
Coverage measure can
distinguish between two
consecutive switch statements. 3,
Statement B: Statement Statement
Coverage measure is sensitive 1, Both, A is True
to logical operators, such as || Statement A 2, Both, and 4, Statement
and &&. and Statement A Statement A is False and
SQA Statement B, and Statement B is False. Statement B
M098 Which of the following is are False. m B, are True. m m is True. m 1
Consider the following
statements:

Statement A: It is the
responsibility of a customer to
perform acceptance testing. 3,
Statement B: It is the Statement
responsibility of a customer to 1, Both, A is True
define the accept and reject Statement A 2, Both, and 4, Statement
criteria for the software. and Statement A Statement A is False and
SQA Statement B, and Statement B is False. Statement B
M099 Which of the following i are False. m B, are True. m m is True. m 2
Consider the following
statements:

Statement A: Inspections are


very effective at finding defects.
Statement B: Inspection is an 3,
example of dynamic technique Statement
for detecting defects. 1, Both, A is True
Statement A 2, Both, and 4, Statement
Which of the following is correct and Statement A Statement A is False and
SQA in context of the preceding Statement B and Statement B is False. Statement B
M100 statements are False. m B are True. m m is True. m 3
Consider the following
statements:

Statement A: Word processing


packages can be used to
prepare test report formats.
Statement B: All organizations
use a standard test report 3,Both,
format. Statement 4,Both,
1,Statement A 2,Statement A A and Statement A
Which of the following is correct is True and is False and Statement and
SQA in context of the preceding Statement B Statement B is B, are Statement B,
M101 statemen is False. m True. m True. m are False. m 1
Consider the following
statements:

Statement A: Software testing


is successful if the test data
tests all aspects of the software
effectively. 3,
Statement B: Test coverage is Statement
a measure of the coverage 1, Both, A is True
goal of a program based on Statement A 2, Both, and 4, Statement
test data. and Statement A Statement A is False and
SQA Statement B, and Statement B is False. Statement B
M102 Which of the fo are False. m B, are True. m m is True. m 1
Software Technologies Inc.,
had developed a library
information system. The
application had been running
successfully for the last nine
months. However, due to a
hard disk failure, all library
records in the database server 3,
SQA have been lost. No backup of 1, Recovery 2, Operations Regressio 4, Integration
M103 th testing m testing m n testing m testing m 1
2, Analyze
test case 4, Develop
coverage new test
1, Measure against 3, cases to test
Which of the following activities the coverage system Evaluate previously
SQA cannot performed by using of a set of test requirements the test untested parts
M104 Code Coverage tools? m cases m m results m of a system m 3
Which of the following activities 2, Scheduling 3,
are included under 1, Identifying resource and Preparing
Responsibilities of Customer, a the end-users facility change
SQA component of a software of the final requirements control 4, Creating a
M105 acceptance plan? m product m m report m project plan m 2
Consider the following
statements:

Statement A: Validation is the


process of evaluating software 3,
at the end of the SDLC to Statement
ensure that the software 1, Both, A is True
product complies with software Statement A 2, Both, and 4, Statement
requirements. and Statement A Statement A is False and
SQA Statement B: Validation testing Statement B and Statement B is False. Statement B
M106 is the determination of how w are False. m B are True. m m is True. m 2
Consider the following
statements:

Statement A: SQA activities in


the software design phase 3,
involve use of the High-level Statement
design review checklist. 1, Both, A is True
Statement B: SQA activities in Statement A 2, Both, and 4, Statement
the software design phase and Statement A Statement A is False and
SQA involve use of the detailed Statement B, and Statement B is False. Statement B
M107 design review checklis are False. m B, are True. m m is True. m 2

Software Solutions Inc. is


developing a payroll application
for SSTP Corporation. SSTP
Corporation is already using a
leave accounting system that
facilitates the management of 3,
employees' leaves. The Complianc
SQA application has been running 1, Integration 2, Regression e Testing 4, Intersystem
M108 successfully for the last Testing m Testing m m Testing m 4
Consider the following
statements:

Statement A: A tester, while


creating test cases, estimates 3,
the expected test results, Statement
whereas, the actual test results 1, Both, A is True
occur during execution of these Statement A 2, Both, and 4, Statement
test cases. and Statement A Statement A is False and
SQA Statement B: A tester, while Statement B, and Statement B is False. Statement B
M109 executing a test script, n are False. m B, are True. m m is True. m 3
Consider the following
statements:

Statement A: During execution


of acceptance plan, the
objectives of the acceptance 3,
activities are defined along with Statement
procedures for meeting these 1, Both, A is True
objectives. Statement A 2, Both, and 4, Statement
Statement B: Execution of and Statement A Statement A is False and
SQA acceptance plan determines Statement B, and Statement B is False. Statement B
M110 whether are False. m B, are True. m m is True. m 4

3, Provide
informatio
n about
the
defects to
the
2, Identify developme
whether the nt team
software and
developed enable the 4, Provide
1, Identify meets team to information of
defects in all customer reproduce the defects to
SQA Which of the following is an phases of requirements the defect. the customer.
M111 objective of defect reports? m SDLC. m or not. m m m 3
3,
Software
Size=
Total
number of
1, Software unique
Size= log2 operator 4, Software
(Total number 2, Software tokens Size= Total
of operator Size= Total used + number of
The development team knows tokens used) number of Total operator
the number of operators and + log2 (Total operator number of tokens used *
number of operands used in a number of tokens used + unique Total number
software project. How can they operand Total number operand of operand
SQA use this information to calculate tokens used) of operand tokens tokens used
M112 the size of the program? m m tokens used m used m m 2

Consider the following


statements:

Statement A: Structural test


case design techniques are
used when test data is 3,Stateme
developed from documents that 1,Both, nt A is
specify the intended behavior Statement A 2,Both, True and 4,Statement A
of application software. and Statement A Statement is False and
SQA Statement B: Equivalence Statement B, and Statement B is False. Statement B
M113 partitioning, a structural tes are False. m B, are True. m m is True. m 1
Consider the following
statements:

Statement A: Preparing test


documentation is not a
responsibility of a software
tester. 3,
Statement B: Reporting test Statement
results is not a responsibility of 1, Both, A is True
a software tester. Statement A 2, Both, and 4, Statement
and Statement A Statement A is False and
SQA Which of the following is correct Statement B, and Statement B is False. Statement B
M114 in context of are False. m B, are True. m m is True. m 1

3, Jack
should
confirm
that the
different
modules of
1, Jack should the
confirm that application
the 2, Jack should can be
Jack Thomas was assigned the application check for the successfull 4, Jack
task of testing an online share runs standard back y should
trading application. Jack has to successfully up and integrated conduct
create relevant test cases and on all recovery to perform performance
on the basis of these test supported procedures one or and load tests
cases, test plans will be hardware and and special more on individual
executed during each phase of software security application application
SQA the testing life cycle. While environments. requirements. functions. components.
M115 creating the test m m m m 4
3,
Global Solutions Inc., has Identifying
developed HRMS software for the
its customer to provide business 4,
automation solutions for the standards Considering
management of the Human 1, Detecting and customer’s
Resource Department of software procedure requirements
CompuServe. However, during defects early s for early during
acceptance testing, it was during 2, Preparing software software
SQA found that the software was not development appropriate developme development
M116 functioning p m test facilities m nt m m 4

John Allen, a project manager


at Blue IT Systems, has just
delivered a software application
on inventory control for Green
Alley Stores Ltd. Now, the
senior management decides to
analyze the defect removal
SQA processes adopted by John’s
M117 team. The number of 1, 6 m 2, 0.06 m 3, 0.6 m 4, 0.7 m 3
Michelle, a software tester,
uses a run chart to represent
the performance level of a
software application on
different hardware
configurations. There are
around nine data points on the
run chart, which are above the 2, Two or 4, Low
SQA average of the plotted data. more 3, Unusual performance
M118 What does 1, A trend m processes m events m m 3

Assertion: Operations testing is 1, BOTH the


designed to verify that prior to assertion and 2, BOTH the
production, the operating the reason assertion and
procedures and staff can are TRUE, the reason are
properly execute the and the TRUE, but the 3, The 4, The
application software. reason is a reason IS assertion assertion is
Reason: Operations testing correct NOT a correct is TRUE FALSE and
confirms the successful explanation of explanation of and the hence the
SQA execution of the application the assertion. the assertion. reason is reason DOES
M119 software during m m FALSE. m NOT apply. m 1

1,
Determining
Which of the following activity is the probability 2, Identifying 3,
SQA not performed as part of the of occurrence the impact of Monitoring 4, Prioritizing
M120 risk analysis phase? m of risks. m risks. m risks. m risks. m 3

James Cooper, a certified


software tester, has been
asked by CompCord Inc. to test
an application that provides
information about the login and
logout time of the employees.
For this task, James has to
SQA create a record showing the 1, Recovery 2, Security 3, Audit 4, Data
M121 number of users who log o testing m testing m trail m integrity m 3
Web Solutions Corp. has
developed an online
reservation application for a
travel agency. One of the
requirements given by the
client is that the information 3,
provided by the website should Performan
be highly secure. Identify under 1, Functional 2, Non- ce 4, Interface
SQA which of the following requirement functional requireme requirement
M122 categories m requirement m nt m m 2
During the acceptance testing
of a software project, the
customers found 12 defects.
Earlier, the testing team had
found 67 defects while
reviewing the design phase,
and 75 defects while
performing the system testing.
SQA How efficient were the defect
M123 removal 1, 0.87 m 2, 0.922 m 3, 0.75 m 4, 0.94 m 2
The software testing team of 4, Error
Ebiz Solutions is analyzing the during
results of a software test on an development
e-commerce application. The 3, Positive and errors
team uses a scatter plot to 1, Negative 2, No correlation during testing
represent the relationship correlation correlation between are
between the numbers of errors between the between the the tested independent
SQA identified during the tested tested variables of one
M124 development phase and the variables m variables m m another m 3

Newwave Ltd. is developing an


inventory management system.
The project is in its testing
phase. One of the testers has
been asked to document the
different combinations of
conditions and associated 1, Code 3,
SQA results in order to derive unique coverage 2, Test scripts Checklists 4, Decision
M125 test cases for validati tools m m m tables m 4
3,
SQA Which of the following is a 1, Market risk 2, Budget risk Managem 4, Technical
M126 software risk? m m m ent risk m risk m 4
Consider the following
statements:

Statement A: A tester need not


have knowledge of the tools
that aid in software
development.
Statement B: A tester must 3,
have knowledge of the Statement
software development, 1, Both, A is True
operation, and maintenance Statement A 2, Both, and 4, Statement
process. and Statement A Statement A is False and
SQA Statement B, and Statement B is False. Statement B
M127 Which of the follo are False. m B, are True. m m is True. m 4
Web Solutions Corp. has
developed an online
reservation application for a
travel agency. One of the
requirements given by the
client is that the users should
not spend much time on getting 3, 4,
used to the website and finding 1, Functional 2, Non- Interface Performance
SQA the relevant information. requirement functional requireme requirement
M128 Identify m requirement m nt m m 3
A software program has 32
edges and 29 nodes in its
flowchart. The testing team
needs the estimated maximum
number of test cases that need
to applied to the software
program to ensure that all the
statements have been
SQA executed at least once.
M129 Calculate the 1, 2 m 2, 3 m 3, 4 m 4, 5 m 4
Betty, a software tester, uses a
control chart to monitor the 3, Majority
frequency of occurrence of 1, Data points of data
defects in a software project have multiple 2, Majority of points lie 4, Data points
over a period of time. She entries above data points lie above the lie within the
analyzes the chart and and below the below the upper limit upper and
concludes that the frequency of central line of lower limit of of the lower limit of
SQA occurrence of defects is stable. the control the control control the control
M130 What observation on t chart. m chart. m chart. m chart. m 4
Consider the following
statements:

Statement A: The load testing


tool should be evaluated to
determine if the tool supports 3,
the application technology not Statement
only at the Graphical User 1, Both, A is True
Interface (GUI) level but also at Statement A 2, Both, and 4, Statement
the middle tier and database and Statement A Statement A is False and
SQA level. Statement B, and Statement B is False. Statement B
M131 St are False. m B, are True. m m is True. m 3
Which of the following risk
identification techniques is
used when a broad range of 1, 3,
SQA options or ideas are required in Observation 2, Interviews Brainstorm
M132 a short span of time? m m m ing m 4, Checklist m 3

Smart Solutions Corp. has


been assigned a project to
develop an application that
provides information about the
total number of hours for which
an employee logs on to the 1, Non- 2, 3,
system. Which of the following Functional Performance Functional 4, Interface
SQA requirements should the requirements requirements requireme requirements
M133 customer specify, at the begi m m nts m m 2
The development team at
Technology Systems is
developing an application for a
car dealer. The application will
be used to extract the names
and addresses of the car 3, 0.18
owners whose cars need defects
servicing by the 20th of the per 4, 1 defect
SQA month, from a database of cars 1, 0.875 2, 32 defects function per function
M134 sold b defects m m point m point m 3
1, The
number of
erros related 2, The number
to poorly of errors 3, The
Robert, a software tester, is defined related to number of
prioritizing the causes of poor objectives poorly defined errors
quality of a software application developer objectives is related to
using a Pareto chart. He ranks errors is the the maximum poorly
developer errors as the most minimum and and the defined 4, The
significant cause to the poor number of number of objectives number of
quality of the software and developer developer is developer
SQA poorly defined objectives as the errors is the errors is the minimum. errors is the
M135 least si maximum. m minimum. m m maximum. m 2

1, BOTH the
Assertion: Static testing assertion and 2, BOTH the
validates the conformance of a the reason assertion and
software application to the are TRUE, the reason are
specified requirements without and the TRUE, but the 3, The 4, The
executing the code. reason is a reason IS assertion assertion is
Reason: Static testing is correct NOT a correct is TRUE FALSE and
conducted to ascertain whether explanation of explanation of and the hence the
SQA a software application meets all the assertion. the assertion. reason is reason DOES
M136 the requirements specified in m m FALSE. m NOT apply. m 3
Which of the following
information is not specified as 1, Probability 4, Risk
SQA part of the risk analysis table? of occurrence 2, Risk impact 3, Risk mitigation
M137 m m m factor m strategy m 4

Henry Ford was assigned to


test a Java application
developed by Smart Java Co.
While testing a particular Java
code, Henry suggested to his
team that if they want complete 2,
code coverage, all the Boolean 1, Multiple Decision/Cond 3, Path
SQA sub-expressions must be Condition ition Coverage Coverage 4, Condition
M138 separated by logical || and Coverage m m m Coverage m 1

Global Solutions, Inc. has


developed an application for
Super Solutions Corp., which 2,
will provide automated Communicate
solutions for the management the software
of the HR Department of Super 1, Change the problems to
Solutions. The application was software the 3, Reject 4, Review the
SQA developed keeping in mind the specifications development the software
M139 customer requirements. Howe m team m software m again m 3
Perry is analyzing the results of
a software test. She uses a
scatter plot to understand the
relationship between the 4, Tested
complexity of the program and variables are
the number of errors in the 1, Tested 2, Tested 3, Tested closely
program during development. variables are variables have variables related in a
SQA On the scatter plot, the data positively a negative are not positive
M140 points of the tested related. m correlation. m related. m manner. m 2
NewWave Ltd. is developing an
inventory management system.
The project is in its testing
phase. One of the testers has
been asked to specify the order
of actions that should be
performed during a test 3,
SQA session. Identify which of the 1, Test script Decision 4, Traceability
M141 following tools should m 2, Checklist m table m tool m 1

Consider the following


statements:

Statement A: Budget risk is a


type of software risk.
Statement B: Technology 3, Both,
change is a contender for Statement 4, Both,
software risk. 1, Statement 2, Statement A and Statement A
A is True and A is False and Statement and
SQA Which of the following is correct Statement B Statement B is B, are Statement B,
M142 about the above statements? m is False. m True. m True. m are False. m 4

Global Software Solutions Inc.


is a software development
company that provides financial
analysis applications to large
and medium-sized financial
companies. Currently, the 4,
organization is creating an 3, Test Quantitative
SQA online application for one of its 1, Test design 2, Planning execution measurement
M143 clients. The managem m process m m m 2
Web Market Inc. has been
asked to develop a software
that will provide automated
solutions for an electronic
marketplace. The
representative for the market
has specified the acceptance 1, 2, Non- 3,
requirements for the particular Performance Functional Functional 4, Interface
SQA software in the beginning of the requirements requirements requireme requirements
M144 proje m m nts m m 2
John, a Java programmer has
developed a code for a
shopping mall. The code
generates an applet that
displays description of all the
products available in the mall
along with their prices. The
Java applet has to undergo a
SQA process of code review. In 1, Task phase 2, Exit phase 3, Entry 4, Verification
M145 which p m m phase m phase m 4
Consider the following
statements:

Statement A: Premature
release risks arise when
deadline of completion of the
project has exceeded. 3, Both,
Statement B: Premature Statement 4, Both,
release risks arise when an 1, Statement 2, Statement A and Statement A
equally competitive product is A is True and A is False and Statement and
SQA about to be released in the Statement B Statement B is B, are Statement B,
M146 market by is False. m True. m True. m are False. m 3

SmartLabs Inc., is a software


development company that
develops customized software
solutions. Currently, the
organization is developing a
shopping application that would 1, Defect
require shoppers to register tracking and
SQA themselves with the shopping management 2, Planning 3, Test 4, Test
M147 site before placing an ord m process m design m execution m 3
Rob, a test manager in Global
Software Solutions, needs to
create a test evaluation report
for stress testing that was
carried out on the network of
the organization. Suggest the
phase of the test process life 1, System 3, Design
SQA cycle during which Rob should study phase 2, Execution test cases 4, Wind-up
M148 create this rep m phase m phase m phase m 2
Consider the following
statements:

Statement A: A questionnaire
contains a list of questions
related to a particular risk. 3,
Statement B: The list of Statement
questions in a questionnaire is 1, Both, A is True
standard and fixed. Statement A 2, Both, and 4, Statement
and Statement A Statement A is False and
SQA Which of the following is correct Statement B, and Statement B is False. Statement B
M149 in context of the p are False. m B, are True. m m is True. m 3
Countryside Markets is
developing a shopping
application that would require
shoppers to register
themselves before placing an
order. The project is in its
testing phase. During a team
meeting, there was a
SQA disagreement about the phase 1, Test 2, Test 3, Test 4, Planning
M150 of the testing life c reporting m execution m design m process m 4
Web Solutions Corp. has
developed an online
reservation application for a
travel agency. One of the
requirements given by the
client is that the system should 3, Non- 4,
support future expansion of the 1, Functional functional Performance
SQA business. Identify under which requirement 2, Interface requireme requirement
M151 of the following categories will m requirement m nt m m 3
The software development
team in Software Solutions has
developed a code in C++ to
generate an inventory
management software. This
software has to be tested line-
by-line to check whether it
maps to the information 2, 3, 4,
SQA technology standards. Which 1, Operations Performance Recovery Compliance
M152 type of testi testing m testing m testing m testing m 4
To deliver high quality
softwares, Technology
Systems performs quality
planning, formal technical
reviews, and software testing. It
is observed that the 3, Conduct
organization spends a inspection
considerable amount of time in 1, Train 2, Train after each 4, Conduct
SQA testing due to many errors software software phase of checkpoint
M153 being found in the cod developers. m testers. m SDLC. m review. m 1
Soft Solutions Inc., developed
a software that provides
automated solutions for an
electronics shopping mall. After
the software acceptance 4, Time
review, the customer prepared 2, Resources period in
an acceptance plan without 1, Criticality of involved in 3, Size of which the
SQA mentioning the precautions for the software developing the the software was
M154 potential misuse of the sof m software m software m developed m 1
InfoTech Software Solutions
has developed a new payroll
system for its employees. The
old payroll system had some
performance problems. The
proposed application is
currently in its testing phase.
Before phasing out the old
SQA system, the testing team must 1, Parallel 2, Intersystem 3, Control 4, Integration
M155 en testing m testing m testing m testing m 1
NewWays Softwares has
recently started in-house
testing of software applications.
Being a new testing team,
there is a lot of confusion
between the roles and 3,
responsibilities. This confusion Developm
SQA is leading to a lot of differences ent team 4, Test
M156 between the members of the te 1, Test lead m 2, Tester m m manager m 2

Paraways Solutions is
developing an airline
reservation application. One of
the requirements given by the
client is that the website should
be able to cater the visually- 3, 4, Non-
challenged users and should 1, Interface 2, Functional functional
SQA allow them to browse the requirement Performance requireme requirement
M157 website easily. Identify under w m requirement m nt m m 1
The code developing team in
Paraways Solution has
developed software to record
the entry time and exit time of
employees. The employees are
asked to fill a feedback form.
Under which category of 3,
SQA manual tools will this feedback 1, Decision 2, Test scripts Checklists 4, Checkpoint
M158 form be listed? m tables m m m review m 3
Inform Solutions is developing
an Internet banking application
for one of its clients. The
project is currently in its testing
phase. Williams, one of the 1, Williams 2, Williams
testers working on this project, should create should create 3, Williams 4, Williams
has been asked to document a test item a test should should create
SQA the details of the test cases transmittal summary create a a test incident
M159 that have report. m report. m test log. m report. m 3

Net Solutions Ltd has


developed a software to create
HTML pages without coding.
The testing for this application 1, The test 3, The test
needs to be carried out. The manager 2, The test manager 4, The test
test manager wants to use an should select manager should manager
automated testing tool that a code should select select a should select
SQA would avoid the defects from coverage tool. a regression traceability a traceability
M160 cropping up in the test exe m testing tool. m tool. m tool. m 4
3, The
Perfect Solutions is working on testing
an order processing team
application. Now, the testing should
team has been asked to define 2, The testing create a 4, The testing
the sequence of the testing team should test design team should
process. Identify which of the 1, The testing create a test specificati create a
following documents should the team should case on procedure
SQA testing team create for the create a test specification document. specification
M161 same. m plan. m document. m m document. m 1

Solution Shares Ltd. has


developed a software to enable
online trading of shares.
Sandra, one of the testers 3, A test
working on the project, has 2, A test case 4, A test
been asked to document the design specificati procedure
test case design. Presently, 1, A test plan specification on should specification
SQA she has to document the input should be should be be should be
M162 and output values for the tests. created. m created. m created. m created. m 3
Blue Skies School has
engaged a software
organization to create a
software for the school library.
The software will allow the
library staff to keep a record of
all the books issued and
returned. The software is 3, Error-
SQA currently in its testing phase. 1, Operations 2, System handling 4, Control
M163 Identify wh testing m testing m testing m testing m 1

Broadways Ltd. is developing


an online software application.
The development team for this
project includes nine team
members. During the team
meetings, James, the test
manager for this project, 3,
SQA realized that a few members of 1, Software 2, Premature Managem 4, Market risk
M164 the team have grudges against risk m release risk m ent risk m m 1
Broadways Ltd. is developing a
software application that has to
be delivered next month. The
project manager for this project
is pushing the team to
complete the application this
month because another similar
SQA application is being released by 1, Business 2, Premature 3, Testing 4, Software
M165 a competitor risk m release risk m risk m risk m 1
3,
1, Complexit
Significance y of the
of the requireme 4, Business
Which of the following is NOT software for nts risks in
considered to be a critical the 2, Impact of defined in developing
SQA success factor for acceptance organization. failure of the the project the software.
M166 testing? m m software. m plan. m m 4
In which of the following
phases of the testing life cycle 1, Defect
are the actual test results tracking and 2, Quantitative 3,
SQA compared with the expected management measurement Performing 4, Test
M167 results? m m m tests m reporting m 3
1, Providing 2, Creating
technical test 3,
SQA Which of the following is not a leadership for documentatio Executing 4, Creating
M168 responsibility of a tester? m the tests. m n. m tests. m test data. m 1

Technowave Ltd. has just


completed the testing of an
inventory management system
for its client. The application will
be delivered to the client next
week. The client has an 3,
existing inventory system that 1, Intersyste
SQA needs to the be integrated with Requirements 2, Parallel m testing 4, Integration
M169 the new system dev testing m testing m m testing m 3

Technique Solutions has


developed an order processing
application. The testing team
has identified a few defects that
need to be fixed by the
development team. Identify
which of the following types of
SQA testing needs to be performed 1, Recovery 2, Regression 3, Control 4, Parallel
M170 to ensure that the fixes testing m testing m testing m testing m 2
Technique Solutions has
developed an order processing
application. The test manager
wants to confirm that the users
at the client-end are
comfortable using the new
application. Identify which of 1, Manual- 3, 4,
SQA the following types of testing support 2, Recovery Regressio Requirements
M171 needs to be performed in the testing m testing m n testing m testing m 1
Technique Solutions has
developed an online auction
application . The software is
currently in its testing phase.
Joseph, one of the testers, has
been asked to test the
performance of the application 3, 4,
SQA when a large number of users 1, Stress 2, Recovery Regressio Compliance
M172 access it simultaneously, testing m testing m n testing m testing m 1
Paraways Corp. has created an
online shopping application for
a leading chain of super stores.
Now, the test manager for this
project wants the application to 3,
be tested by the users at the Requireme
SQA client site. Identify which of the 1, Alpha 2, Beta testing nts testing 4, Regression
M173 following types of testing need testing m m m testing m 2
3, The
developme
nt team
should
have done 4, The
Newwave Solutions is 1, The client beta development
developing a payroll should have testing team should
management system for a been involved before have done
client. The testing phase of the because then 2, The testing giving the regression
project has just been the team should application testing before
completed. The defects development have done the for giving the
identified are intimated to the team would fixes verification application for
development team for fixes. have done the themselves to to the verification to
SQA The development team fixed fixes properly. shorten the testing the testing
M174 the defects quickly and m process. m team. m team. m 4

3, The
developme
nt team
should
2, The perform a 4, The
1, The development thorough development
development team should beta team should
team should perform testing perform a
Newwave Solutions is perform a thorough because thorough
developing a payroll thorough regression this will error-handling
management system for a alpha testing testing ensure testing
client. The testing phase of the because this because this that all the because this
project has just been will ensure will ensure defects will ensure
completed. The testing team that all the that all the are that all the
has identified certain defects defects are defects are addressed defects are
that need to be fixed by the addressed addressed and closed addressed
SQA development team. The project and closed and closed effectively. and closed
M175 manager wants th effectively. m effectively. m m effectively. m 2

Você também pode gostar