GTL has clearly come of age and Our significant contribution to the
some of the engineering challenges ORYX GTL plant in Qatar started with
that have faced the experts over the development of a feasibility study
recent years have been overcome. and a high quality FEED and
In certain regions of the world GTL is continues with provision of our
considered economically viable and expertise as members of the Project
the first in the next generation of GTL Management Team.
plants is taking shape in Qatar.
GTL projects require the 'top team'.
Foster Wheeler has led the way in The challenges to be faced even at
developing complete GTL the feasibility stage go well beyond
solutions, working with different the process engineering that
technologies, for a number of typifies most feasibility studies, into
clients, in difficult locations. We've solutions for utilities and offsites
helped major international and integration, some 40-50% of Foster Wheeler
national oil companies develop their project costs, construction leads the way in
GTL strategies. philosophy, risk management and
environmental impact. gas-to-liquids
solutions. No other
contractor has the
same breadth and
depth of experience
or talented GTL
engineering
resource.
1
Why
2
gas-to-liquids?
GTL processes offer There are a number of reasons for Technology used in GTL projects
using GTL technology to convert includes syngas production,
attractive alternatives for
natural gas into liquid products: Fischer-Tropsch (FT) synthesis,
monetizing gas. There is methanol synthesis and dimethyl
a significant potential · Many of the world's gas reserves ether (DME) conversion.
are considered 'stranded', being Foster Wheeler has expertise in
market for high quality, too far from consumers and
all of these technologies and is
low impurity synthetic difficult or expensive to transport
able to provide a complete project
hydrocarbon transportation · Associated gas (with oil service to deliver exceptional
production) in quantities too
fuels and chemical great to utilize at the site
engineering solutions.
feedstocks, which meet • The need to end flaring
high environmental · Diversifying market risks,
standards. converting natural gas into
something other than LNG
· Legislation driving demand
for high quality, cleaner
transport fuels
3
Commitment
We have the right We add value for our clients throughout the project lifecycle:
people with the · Technology selection and We work closely with our clients to
right expertise, optimization turn ideas and concepts into safe,
· Feasibility studies successful, high quality facilities.
commitment and
· Front-end engineering design
experience to deliver (FEED) We understand the drivers and
challenges of GTL projects and have
high quality complete · Utility and offsite system definition worked with our clients through the
and integration
GTL solutions. various project phase stages to
· Project management overcome these challenges and
· Detailed engineering develop cost-effective, optimized
· Environmental engineering solutions. We are particularly skilled
at integrating GTL process units with
· Procurement
offsites and utilities.
· Construction management
· Commissioning
· Operations and maintenance
management
· Training
4
to deliver
5
Front-end
6
excellence
"At this defining stage of the project, We have a reputation for We can provide advice to technology
we note to our satisfaction a developers to enable them to
delivering high quality
remarkably low level of design operate their pilot plants, to gain
changes and cost increases conceptual, feasibility and useful data and thus improve the
associated with the P&ID and front-end packages, which lay engineering definition of a project.
HAZOP reviews to date. This is a the foundations for a
significant achievement, particularly Linking our process expertise and
successful project. We have
for a new technology project such our project execution/estimating
as this. We directly associate this executed well over 150 major skills and IT tools, we apply value
achievement to the high quality and FEEDs in the last 15 years. improvement practices during the
completeness of the front-end early phases of a project, where they
engineering design package deliver the greatest benefit.
developed by Foster Wheeler.”
7
Taking
Methanol conversion
We have worked with a number of
methanol conversion technologies
for production of fuel and chemical
grade methanol. We can offer
oxygen-blown, air-blown or enriched
air schemes.
Floating GTL
We have experience in
barge-mounted and floating
production storage offloading
(FPSO) facilities for the
development of integrated GTL
offshore facilities, via the Seagas
Joint Industry Project,
of which we are one of the
founder members.
9
Quality ideas into
10
quality solutions
11
Adding
We have the Here are just a few examples of how we helped our clients solve
problems or do things differently:
expertise to provide
Utility integration Water treatment
innovative solutions GTL plants are large consumers and Water is by far the largest process
to complex producers of utilities. We have stream of a GTL plant. We have
problems, optimizing investigated and created solutions developed solutions for simple
for the reuse of available utilities in disposal and upgrading for irrigation,
project execution order to improve availability and cooling water and boiler feedwater
and reducing reduce capital costs. quality using reverse osmosis and
chemical/biological treatment.
capital costs. Fuel and tail gas
management Project implementation
For unreacted syngas, light We have reduced schedules by
hydrocarbons and CO2, we have developing construction
assessed their use as a stable methodologies and sequencing,
heating resource and developed improving the EPC bidding
solutions for hydrocarbon and process, making technology
hydrogen recovery, recycling selection during FEED phase,
hydrogen and CO2, and using CO2 and optimizing commissioning
for syngas ratio adjustment. and start-up procedures.
12
value
13
Project highlights
New 34,000 bpd gas-to-liquids New 34,000 bpd gas-to-liquids Project Management Consultant
plant processing 330 mmscfd plant, producing premium quality (PMC), assisting Marathon in
lean natural gas, producing: GTL fuels and naphtha products. completing pre-FEED feasibility
· 24,000 bpd fuel studies for design optimization and
· 9,000 bpd naphtha Pre-feasibility and feasibility studies, cost reduction.
· 1,000 bpd LPG single point licensing on behalf of
Sasol Technology comprising basic The study included assessment of
Pre-feasibility and feasibility engineering of licensor units, the application of Fischer-Tropsch
studies, fast-track FEED, long lead process facilities, steam systems gas-to-liquids technology, operability
procurement, preparation of bid and licensor co-ordination. Also and hazards evaluation, water
documents for EPC bidders and awarded FEED, long lead handling and disposal, plant layout
assistance with EPC evaluation procurement, preparation of bid optimization, contract strategy
and project award. Contributing to documents for EPC bidders and development, operating and
driving EPC progress as part of assistance with EPC evaluation maintenance philosophy, and
the Project Management Team. and project award. preparation of a total installed
With unrivalled experience in cost estimate.
technology transfer, we work with
leading international process
licensors both in technology
evaluation and project execution.
14
Seagas JIP
Offshore GTL
15
16
100%
commitment
to meeting your
Engineering Centers
France
92 Quai de Bercy, 75597 Paris Cedex 12, France
T +33 1 43 46 40 00 F +33 1 43 46 47 00
Italy
Via Sebastiano Caboto 1, 20094 Corsico, Milan, Italy
T +39 02 44861 F +39 02 4486 3131
Singapore
991E Alexandra Road, Block 7 #01-25, Singapore 119973
T +65 6501 8888 F +65 6273 1015
South Africa
(Location) 2nd Road, Halfway House, Midrand, 1685, South Africa
(Correspondence) PO Box 76, Halfway House, Midrand, 1685, South Africa
T +27 11 690 0400 F +27 11 315 0243
Spain
Edificio Foster Wheeler, Calle Gabriel Garcia Marquez, 2, 28230 Las Rozas, Madrid, Spain
T +349 1 336 2500 F +349 1 336 2555
Thailand
217 Moo 12, Sukhapiban 8 Road, Tungsukhla, Sriracha, Cholburi 20230, Thailand
T +66 38 352 200/6, 768 400/3 F +66 38 352 226/444
Turkey
Kozyatagi-Sari Kanarya Sokak 22, Yolbulan Plaza, B-Blok, 34742, Istanbul, Turkey
T +90 216 445 1335 F +90 216 445 1336
UK
Shinfield Park, Reading, Berkshire, RG2 9FW, UK
T +44 (0)118 913 1234 F +44 (0)118 913 2333
USA
585 Dairy Ashford, Houston, Texas 77079
T +1 713 929 5000 F +1 713 929 5170