This is the phase where declaration of cost estimation takes place. During development of
the software¶s was already there. Since cost of software plays a crucial role during the
increment of the software development cost so, on this point the cost reduced with
increment of the software development cost so, on this point the cost reduced with high
rate. Since the to be develop system was not too much big in size and complexities so me
was enough to develop the system so the cost to form the team got reduced very much.
Finally it can be said that the cost to develop this system was on average.
c
c c
c
c
This phase is the second last final phase of the structured system analysis and design.
This is also a crucial phase because this is the time when whole the labor gets deposit for
the final match. After the successful implementation of the system the organization uses
the system for its work. During implementation phase several types of testing takes place.
After passing through all of the testing criteria the system is used for work.
The maintenance of existing software can account for over 60 percent of all effort
software is produced. The ubiquitous nature of change underlies all software work.
Change is inevitable when sheet based systems are built; therefore we must develop
mechanisms for evaluating, controlling, and making modifications. There are four
Corrective maintenance
Adaptive maintenance
Perfective maintenance
Preventive maintenance
c
22
c
c
c
2 c
_nce code has been generated, program testing begins. The testing process focuses on the logical
internals of the software, ensuring that all statements have been tested, and on the functional
externals; that is conduction tests to uncover errors and ensure that defined input will produce
c :- unit testing focuses verification effort on the smallest unit of software
design there software component or module. Using the component level design
description as guide, important control paths are tested to uncover errors within the
c
:- integration testing is a systematic technique for construction the
program structure while at the same time conduction tests to uncover errors associated
with interfacing.
assembled as a package, interfacing error have been uncovered and corrected, and a final
c :- we stressed the fact that software only one element of a larger sheet-
bases system. Ultimately. Software is incorporated with other systems, and a series of
cccccccccccccccccccccc ! "
!c
ccccccccccccccccccccccccccccccccc
ccccccccccccccccccccccccccccccc
c
c
ccccccccccccccccccccccccccccccc c
c
Though the software still contains lot of scope of improvement in it. But its overall look
and feel gives rough picture of a billing software.
I have take MS-Access at backend but it has a limitation of 1 GB size .It over data
size approaches this 1gb some other database the SQL server ,oracle, can be used with
_BBC to break this barrier.
c
c
cccccccccccccccccccccccccccccccc
ccc ccccccccccccccccccccccccccccccccccccccc
#
#"
!$%&'(c
c
cccccccccccccccccccccccccccccccc#)c
completed. It is well known thing that a project con not be completed without help sources.
There is no concept of a single man army during software development. This section mainly
Deitel & Deitel, Nieto, Visual Basic 6.0 How to Program, Pearson Education, 1999.