SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Ceilings Suspension System Installation Inspection SAIC-M-1053 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Suspended ceiling metal suspension system shall be a standard direct SAES-M-100


A1
hung metal suspension systems. (1997 UBC, Sec. 25.209.1) Sec. D

Hangers shall be mounted using hanger wires, hanger inserts or other SAES-M-100
A2
hanger devices. (1997 UBC, Sec. 25.209.1) Sec. D

Hangers for carrying channels or main runners shall be spaced at 1.2m


SAES-M-100
A3 on center unless indicated otherwise by the IFC Drawings.
Sec. D
(1997 UBC, Sec. 25.209.1)

Hangers formed from galvanized sheet metal stock shall be suitable for
SAES-M-100
A4 suspending carrying channels or main runners from an existing structure.
Sec. D
(1997 UBC, Sec. 25.209.1)

Hanger wires shall not hang more than 1 in 6 out of plumb unless a
SAES-M-100
A5 counter sloping wire or horizontal bracing are provided.
Sec. D
(1997 UBC, Sec. 25.209.1)

Hanger wires shall not press against ductwork or piping. SAES-M-100


A6
(1997 UBC, Sec. 25.209.1) Sec. D

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-M-100 -- Saudi Aramco Building Code, 30 June 2002

2- 1997 UBC -- Uniform Building Code, 1 January 1997

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1