SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Pre-pour Inspection for SSD/1 Fence SAIC-O-1004 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Reinforcement bars for drive gate sill shall be a prefabricated cage of
AA-036754
A1 four steel 16mm diameter bars secured by steel stirrups of not less than
Sht. NO.1
12 mm diameter at 300mm maximum spacing.
The cover of the concrete to the reinforcing bars shall not be less than AA-036754
A2
50mm for drive gate sill. Sht. NO. 1
Formwork when used shall be constructed so that they remain rigid
SAES-Q-001
A3 during the placing and compaction of the concrete to prevent the loss of
Sec. 3.2
water, grout or mortar from the concrete. (ACI 318, Sec. 6.1.2 & 6.1.3)
Intermediate posts shall be 150mm x 125mm; Straining posts 180mm x AA-036754
A4
180mm and struts 125mm x 125mm. Sht. NO. 2
All posts shall be set to have a vertical height above grade of 2.900m to AA-036754
A5
their top row of barbed wire. Sht. NO. 1
All posts shall have 3 parallel rows of 10mm diameter holes for stirrup AA-036754
A6
wires spaced at 750mm's from grade and on center. Sht. NO. 2
Straining posts and Struts shall have 18mm diameter holes for fixing AA-036754
A7
eyebolts, extension arms and provide a firm bearing for connections. Sht. NO. 2
The struts shall meet the straining posts at a point 1955mm above grade AA-036754
A8
elevation to the center line of the connection bolts. Sht. NO. 1
Posts shall be set plumb at not more than 3 meters center to center; AA-036754
A9
straining posts shall occur at least every 66 meters along the fence. Sht. NO.1
All posts shall be extend at least 760mm into concrete footings and have
AA-036754
A10 50mm concrete footing cast below their ends making post holes a
Sht. NO.1
minimum of 810mm deep.
The minimum cover on all side within the foundations shall be 75mm and AA-036754
A11
50mm at the bottom. Sht. NO.1

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-Q-001 -- Criteria for Design and Construction of Concrete Structures, 29 October 2003
2- AA-036754, Sht. No. 1 -- SSD/1 Security Fence; Plan, Elevation And Foundations, 02 October 1992
3- AA-036754, Sht. No. 2 -- SSD/1 Security Fence; Concrete Post Details, 03 March 1994

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1