Restoration/Remodelling of Sudha nallah/Spill channel RD. 158-290 Mt.

of SHP Stage-III at
Mashka.
(Work
No.14)
BO Particulars of item
Q UNIT NOS Length Breadth Height QTY Rate
1 Earth work in excavation over areas
(exceeding 30 cm in depth, 1.5m in
width as well as 10 sqm on plan)
including disposal of excavated earth,
and lift upto 1.5m disposed earth to be
leveled and neatly dressed

R.D 158-290 Mt. cum 1 x 1 132.8 6.5 0.8 690.56


cum 2 x 0.5 132.8 2.9 3 1155.36
1845.92
a) All kind of soil 80% 1476.74 150
b) Ordinary rock 20% 369.18 250
2 d) Dismantling concrete grouted stone
pitching in aprons drains etc including
stacking of serviceable material and
disposal of unserviceable material,
stacking/ disposal lead upto 100 meters

cum 1 x 1 132.8 15 0.25 498.00 350


3 P/L in cement concrete in kerbs, steps
and the live at or new grown level
excluding the cost of centering and
shuttering all works upto plinth level
1:3:6 nallah aggregate (1 cement: 3
coarse sand: 6 aggregate stone
aggregate 20mm nominal size)

cum 1 x 1 132.8 11.7 0.15 233.06 3000


4 Providing and laying in position cement
concrete of specified grade excluding
the cost of centering and shuttering –
all works upto plinth level:
b) 1:2:4( 1 cement: 2 coarse sand: 4
graded stone aggregate 20mm nominal
size) Nallah
Flair cum 2 x 2 10 0.85 2.8 95.20
Taking 80% Qty 76.16 3200
5 Providing and laying in position
specified grade of reinforced cement
concrete excluding the cost of
centering, shuttering, finishing and
reinforcement – all works upto plinth
level.

b) 1:1.5:3 (1 cement: 1.5 coarse sand:


3 graded stone aggregate 20mm
nominal size)
Bed cum 1 x 1 132.8 11.2 0.35 520.58
Walls cum 1 x 2 112.8 0.28 2.5 155.10
Haunch cum 2 x 0.5 112.8 0.2 0.2 4.51
680.19 7200
8 Add extra over items of reinforcement
cement concrete (Beams/ columns/
slabs/ tank) for supply and application
of synthetic fibre (Polyester 12mm
Recron 3.5 or equivalent) properly
mixed with sand/ cement/ aggregates
including casting of slab (with does of
125gms per 50 kg of cement i.e. 0.25%
by weight of cement or in ratio as
specified by manufacture’s specification Per
or as directed by the Engineer-in- pack
charge of
125g
ms
qty vide item no 5 No 1 x 1 680.19 8.2 5578 40
9 Reinforcement for RCC work including
strengthening, cutting , bending,
placing in position and binding all
complete
Mild steel and medium tensile steel
bars
LENG
TH OF TOTAL
BAR LENGTH OF
DESCRIPTION NOS IN BAR IN MTRS
DIA MTRS 10Ф 12Ф
Reinforcement for R.C.C. work
including straightening, cutting,
bending, placing in position and binding
all complete
Bottam & Top Raft 10Ф 885 X 2 X 1 11.80 20886
10Ф 96 X 2 X 1 132.7 25478.4
Walls Horizantal bars 10Ф 17 X 2 X 2 132.7 9023.6
Walls Vertical upto 1.50m ht. 10Ф 564 X 2 X 2 2.35 5301.6
Walls Vertical upto 2.50m ht. 10Ф 564 X 2 X 2 3.35 7557.6
Flair Walls R.D.158-168M(Horz) 10Ф 19 X 2 X 1 10.00 380
Flair Walls R.D.158-168M(Ver.)) 10Ф 67 X 2 X 1 3.4 455.6
Flair Walls R.D.280-290M(Horz) 10Ф 17 X 2 X 1 10 340
Flair Walls R.D.280-290M(Ver.)) 10Ф 67 X 2 X 1 3.15 422.1
overlaps in walls 10Ф 8 X 67 X 1 0.6 321.6
overlaps in walls 10Ф 2 X 78 X 9 0.6 842.4
overlaps in bed 10Ф 2 X 885 X 1 0.6 1062
Haunch 10Ф 2 X 410 X 1 1.2 984
Chairs 12Ф 1300 X 1 X 1 1.25 1625
73054.9 1625

0.62 0.89

45294.0 1443
46737 52
10 Centering and shuttering including
strutting, propping etc and removal of
form work for R/wall, return walls.
a) Walls (any thickness) including
attached pilasters, buttresses, plinth
and string courses etc.
Foundation Sqm 1 x 2 132.8 0.5 132.80 150
Walls Sqm 2 x 2 112.8 2.5 1128.00 200
22 a) Clearing jungle including uprooting of
rank vegetation, grass brush wood,
trees and saplings of girth upto 30cms
measured at the height of 1M upto
ground level and removal of rubbish
upto a distance of 50m outside the
periphery of the area cleared

100
sqm 1 x 1 132 20 2640.00 2.5
28 a) Providing and fixing of 12mm thick
bituminous mastic felt sheets in joints
between CC or in masonry structure
behind PVC seals including cost and
carriage of mastic felt and connected
charges complete
Sqm 1 x 9 10.35 0.35 32.60
Sqm 2 x 9 2.5 0.28 12.60
45.20 1000
b) Providing and fitting of PVC water
stop with approved material shown in
the drawing as per specification
including cost and carriage of all
material labour , plant, machinery etc
and including vulcanization of joints,
fitting of water face site of the grount

Rmt 1 x 9 15.5 139.5 1000


b) Providing and fixing of GI Sheets 16
guage for construction joints including
all leads & lifts & carriage upto site for
the complete job.
kg 1 x 2 112.8 0.25 10.69 602.92 150
32 Filling of available earth in space
behind RCC wall
Cum 1 x 2 132.9 1.3 3 1036.62 45
36 Carriage of materials by mechanical
transport including loading, unloading
and stacking for an average lead
b) sand, Stone, aggregate below 40mm
nominal size)
i) 3 kims
Qty vide item no.3 Cum 1 x 1 233.06 0.92 214.42
Qty vide item no.4 Cum 1 x 1 76.16 0.92 70.07
Qty vide item no.5 Cum 1 x 1 680.19 0.92 625.77
910.26 80
c) Soling stone
i) 3 kms Cum 1 x 1 95.20 0.2 19.04 90

d) Steel/GI sheet(50 km lead from


Basohli (store) to site MT 46.74 300
e) Cement (50 km lead from Basohli
(store) to site
Qty vide item no.3 MT 1 x 1 233.06 4.4 51.27
Qty vide item no.4 MT 1 x 1 76.16 6.4 24.37
Qty vide item no.5 MT 1 x 1 680.19 8.2 278.88
354.52 250
Total
Restoration/Remodelling of Sudha nallah/Spill channel RD. 158-290 Mt. of SHP Stage-III at
Mashka.
(Work
No.14)
BOQ
Particulars of item UNIT NOS Length Breadth Height QTY Rate
1 Earth work in excavation over areas
(exceeding 30 cm in depth, 1.5m in
width as well as 10 sqm on plan)
including disposal of excavated earth,
and lift upto 1.5m disposed earth to be
leveled and neatly dressed

R.D 158-290 Mt. cum 1 x 1 132.8 6.5 0.8 690.56


cum 2 x 0.5 132.8 2.9 3 1155.36
1845.92
a) All kind of soil 80% 1476.74 150
b) Ordinary rock 20% 369.18 250
2 d) Dismantling concrete grouted stone
pitching in aprons drains etc including
stacking of serviceable material and
disposal of unserviceable material,
stacking/ disposal lead upto 100 meters

cum 1 x 1 132.8 15 0.25 498.00 350


3 P/L in cement concrete in kerbs, steps
and the live at or new grown level
excluding the cost of centering and
shuttering all works upto plinth level
1:3:6 nallah aggregate (1 cement: 3
coarse sand: 6 aggregate stone
aggregate 20mm nominal size)

cum 1 x 1 132.8 11.7 0.1 155.38 3000


4 Providing and laying in position cement
concrete of specified grade excluding
the cost of centering and shuttering –
all works upto plinth level:

b) 1:2:4( 1 cement: 2 coarse sand: 4


graded stone aggregate 20mm nominal
size) Nallah
Flair cum 2 x 2 10 0.85 2.8 95.20
Taking 80% Qty 76.16 3200
5 Providing and laying in position
specified grade of reinforced cement
concrete excluding the cost of
centering, shuttering, finishing and
reinforcement – all works upto plinth
level.
b) 1:1.5:3 (1 cement: 1.5 coarse sand:
3 graded stone aggregate 20mm
nominal size)
Bed cum 1 x 1 132.8 11 0.25 365.20
Walls cum 1 x 2 112.8 0.2 2.5 112.80
Haunch cum 2 x 0.5 112.8 0.2 0.2 4.51
482.51 7200
8 Add extra over items of reinforcement
cement concrete (Beams/ columns/
slabs/ tank) for supply and application
of synthetic fibre (Polyester 12mm
Recron 3.5 or equivalent) properly
mixed with sand/ cement/ aggregates
including casting of slab (with does of
125gms per 50 kg of cement i.e. 0.25%
by weight of cement or in ratio as
specified by manufacture’s specification Per
or as directed by the Engineer-in- pack
charge of
125g
ms
qty vide item no 5 No 1 x 1 482.51 8.2 3957 40
9 Reinforcement for RCC work including
strengthening, cutting , bending,
placing in position and binding all
complete
Mild steel and medium tensile steel LENG
bars TH OF
BAR TOTAL LENGTH OF
DESCRIPTION NOS IN BAR IN MTRS
DIA MTRS 10Ф 12Ф
Reinforcement for R.C.C. work
including straightening, cutting,
bending, placing in position and binding
all complete
Bottam & Top Raft 10Ф 885 X 2 X 1 11.80 20886
10Ф 96 X 2 X 1 132.7 25478.4
Walls Horizantal bars 10Ф 17 X 2 X 2 132.7 9023.6
Walls Vertical upto 1.50m ht. 10Ф 564 X 2 X 2 2.35 5301.6
Walls Vertical upto 2.50m ht. 10Ф 564 X 2 X 2 3.35 7557.6
Flair Walls R.D.158-168M(Horz) 10Ф 19 X 2 X 1 10.00 380
Flair Walls R.D.158-168M(Ver.)) 10Ф 67 X 2 X 1 3.4 455.6
Flair Walls R.D.280-290M(Horz) 10Ф 17 X 2 X 1 10 340
Flair Walls R.D.280-290M(Ver.)) 10Ф 67 X 2 X 1 3.15 422.1
overlaps in walls 10Ф 8 X 67 X 1 0.6 321.6
overlaps in walls 10Ф 2 X 78 X 9 0.6 842.4
overlaps in bed 10Ф 2 X 885 X 1 0.6 1062
Haunch 10Ф 2 X 410 X 1 1.2 984
Chairs 12Ф 1300 X 1 X 1 1.25 1625
73054.9 1625
0.62 0.89

45294.0 1443
46737.0 52
10 Centering and shuttering including
strutting, propping etc and removal of
form work for R/wall, return walls.
a) Walls (any thickness) including
attached pilasters, buttresses, plinth
and string courses etc.
Foundation Sqm 1 x 2 132.8 0.5 132.80 150
Walls Sqm 2 x 2 112.8 2.5 1128.00 200
22 a) Clearing jungle including uprooting of
rank vegetation, grass brush wood,
trees and saplings of girth upto 30cms
measured at the height of 1M upto
ground level and removal of rubbish
upto a distance of 50m outside the
periphery of the area cleared
100
sqm 1 x 1 132 20 2640.00 2.5
28 a) Providing and fixing of 12mm thick
bituminous mastic felt sheets in joints
between CC or in masonry structure
behind PVC seals including cost and
carriage of mastic felt and connected
charges complete
Sqm 1 x 9 10.35 0.35 32.60
Sqm 2 x 9 2.5 0.28 12.60
45.20 1000
b) Providing and fitting of PVC water
stop with approved material shown in
the drawing as per specification
including cost and carriage of all
material labour , plant, machinery etc
and including vulcanization of joints,
fitting of water face site of the grount

Rmt 1 x 9 15.5 139.5 1000


b) Providing and fixing of GI Sheets 16
guage for construction joints including
all leads & lifts & carriage upto site for
the complete job.
kg 1 x 2 112.8 0.25 10.69 602.92 150
32 Filling of available earth in space
behind RCC wall
Cum 1 x 2 132.9 1.3 3 1036.62 45
36 Carriage of materials by mechanical
transport including loading, unloading
and stacking for an average lead
b) sand, Stone, aggregate below 40mm
nominal size)
i) 3 kims
Qty vide item no.3
Cum 1 x 1 155.38 0.92 142.95
Qty vide item no.4 Cum 1 x 1 76.16 0.92 70.07
Qty vide item no.5 Cum 1 x 1 482.51 0.92 443.91
656.92 80
c) Soling stone
i) 3 kms Cum 1 x 1 95.20 0.2 19.04 90

d) Steel/GI sheet(50 km lead from


Basohli (store) to site MT 46.74 300
e) Cement (50 km lead from Basohli
(store) to site
Qty vide item no.3 MT 1 x 1 155.38 4.4 34.18
Qty vide item no.4 MT 1 x 1 76.16 6.4 24.37
Qty vide item no.5 MT 1 x 1 482.51 8.2 197.83
256.38 250
Total
e-III at

Amount

221510.4
92296

174300

699192

243712
###

###

###
19920
225600

6600

45202.5

139500

90437.4

46647.9

72820.72

1713.6

14021.11
88630.59
###
e-III at

Amount

221510.4
92296

174300

466128

243712
###

###
###

19920
225600

6600

45202.5

139500

90437.4

46647.9
52553.93

1713.6

14021.11

64095.96
###