WAREHOUSE MANAGEMENT – STOCK UPLOAD

PROCEDURE

Document Prepared by

G.V.Shivakkumar

SAP MM/WM/CIN Consultant

Cognizant technology solutions

Chennai

E-mail venkatesansivakumar@yahoo.co.in

Gvshivakkumar2010cts@gmail.com

Document Prepared by G.V.Shivakkumar, Cognizant technology solutions, Chennai, E-


mail:venkatesansivakumar@yahoo.co.in, gvshivakkumar2010cts@gmail.com
Date 14-01-2011
WAREHOUSE MANAGEMENT – STOCK UPLOAD
G.V.Shivakkumar
PROCEDURE
Date 14-01-2011
WAREHOUSE MANAGEMENT – STOCK UPLOAD
G.V.Shivakkumar
PROCEDURE

Table of Contents

Contents

1. SCOPE OF DOCUMENT.............................................................................................5

3. LISTING OF UN-RESTRICTED / QUALITY /BLOCKED STOCK OF RAW


MATERIALS, PACKING MATERIALS AND FINISHED GOODS..........................6

4. EXTENSION OF THE MATERIALS TO “DUMM” STORAGE LOCATION ...6

5. TRANSFER OF MATERIAL FROM RESPECTIVE STORAGE LOCATION TO


“DUMM” STORAGE LOCATION.................................................................................6

6. TRANSFER OF MATERIAL OF QUALITY STOCK FROM RESPECTIVE


STORAGE LOCATION TO “DUMM” STORAGE LOCATION...............................7

7. MOVE THE CONFIGURATION TO THE REQUIRED CLIENT AND PLANT 7

8. CREATION OF BIN MATER.....................................................................................7

9. EXTENSION OF WM VIEWS IN MATERIAL MASTER......................................8

10. TRANSFER OF MATERIAL FROM “DUMM” STORAGE LOCATION TO


RESPECTIVE STORAGE LOCATION........................................................................8

11. CREATION OF TRANSFER ORDER FROM TRANSFER REQUIREMENT


CREATED..........................................................................................................................9

12. TRANSFER ORDER CONFIRMATION.................................................................9


Date 14-01-2011
WAREHOUSE MANAGEMENT – STOCK UPLOAD
G.V.Shivakkumar
PROCEDURE
Date 14-01-2011
WAREHOUSE MANAGEMENT – STOCK UPLOAD
G.V.Shivakkumar
PROCEDURE

1. Scope of document

This document gives detail procedure for uploading the stock from existing storage location to
respective bin level.

2. ABBREVIATIONS:

Following Abbreviation used in this Document

WMS Warehouse Management System

WM Warehouse Management

TR Transfer Requirement

TO Transfer Order
Date 14-01-2011
WAREHOUSE MANAGEMENT – STOCK UPLOAD
G.V.Shivakkumar
PROCEDURE

PROCEDURE TO BE FOLLOWED FOR STOCK UPLOADS FOR WM

3. Listing of Un-restricted / Quality /Blocked stock of Raw materials, Packing materials and
Finished Goods

1. Take the dump of materials from MCHB table and also from MB52 so that we can list material
with batches.
2. Take the dump of the materials whose stock is greater than zero.
3. Take the dump with the data as Material, Plant, Storage location, Batch and Stock quantity.
4. Use required stock type indicators for sale order stock.

4. Extension of the materials to “DUMM” storage location

1. List the materials which have stock.


2. Format the data as shown below.

MATERIAL PLANT STORAGE LOCATION


100019 1070 DUMM

3. Convert the Data into Text format.


4. Upload the data plant wise by using SCAT – ZEXTENSIONOFSTORAGELOC.

5. Transfer of material from respective Storage location to “DUMM” Storage Location

1. List the materials which have stock differently for un-restricted / blocked and sale order.
2. Format the data as shown

Special Receivin Sales Sales


Document Movement Material Quantit Storage Batch
Stock Plant g storage Order Order
Date Type no. y location no.
Indicator location no. Item

3. Now fill the data with necessary movement types based on the stock type.
4. Upload the data by using the BDC - ZWM_MB1B_STOCK_UPLOAD
5. For Sales order stock upload. BDC - ZWM_MB1B_STK_UPLOAD_SALE_ORDER
6. Transfer all the stock from respective storage location to “DUMM” storage location.
Date 14-01-2011
WAREHOUSE MANAGEMENT – STOCK UPLOAD
G.V.Shivakkumar
PROCEDURE

6. Transfer of material of Quality stock from respective Storage location to “DUMM” Storage
Location

1. List the materials Stock which are in quality stock (Under quarantine) from the table MCHB and QALS.
- Using V – lookup find the inspection lot of the materials which are lying in quality.

2. Format the data as shown.

Inspection lot Storage loc


10000025584 DUMM

3. Upload the data by using the BDC - ZWM_QAC2_QLTY_STOCK_TRANSFER


4. Transfer all the stock from respective storage location to “DUMM” storage location

7. Move the configuration to the required Client and plant

8. Creation of Bin Mater.

1. Format the data as shown below


2. Use the LSMW – Transaction code
Select Project – ZWM
Sub project – ZBINMAST2
Object - ZBINMAST2
3. Format the data as shown below

ZWM_NO ZSTR _TYPE ZBINNO ZSTR_SEC ZBINT_YPE


107 C04 10-004 L4 B1
107 C04 11-001 L1 B1

4. Upload the Bin creation file by LSMW.


Date 14-01-2011
WAREHOUSE MANAGEMENT – STOCK UPLOAD
G.V.Shivakkumar
PROCEDURE

9. Extension of WM views in Material Master

1. List the material to which WM has to be activated.


2. Format the data as shown below.

Ware Storage Type Storage Type


Material Storage Section
Plant House Indicator Stock Indicator Stock
Number Indicator
Number removal Strategy Placement
1000019 1060 106 RC1 RC1 T1

3. Convert the data into Text format.


4. Upload the data by using BDC in transaction SE38 using program -
ZWM_MM01_EXTENDING_MATERIAL

10. Transfer of material from “DUMM” Storage location to Respective Storage Location

1 Use the same file which was used for initial transfer from respective Storage location to “DUMM”, in
this change the issuing Storage location as “DUMM” and receiving Storage location as respective Storage
location from where it was transferred, all other data remains same.
2 Format the data as shown

Document Movement Special Plant Receivin Material Quantit Storage Batch Sales Sales
Date Type Stock g storage no. y location no. Order Order
Indicator location no. Item

3. Now fill the data with necessary movement types based on the stock type.
4. Upload the data by using the BDC - ZWM_MB1B_STK_UPLAD_BY_MAT_BATC
5. Transfer all the stock from “DUMM” storage location to respective storage location.
6. For Sales order stock upload. BDC - ZWM_MB1B_STK_UPLOAD_SALE_ORDER
Date 14-01-2011
WAREHOUSE MANAGEMENT – STOCK UPLOAD
G.V.Shivakkumar
PROCEDURE

11. Creation of Transfer order from Transfer Requirement created.

1 Using Table LTBP and LTBK list the material with TR details for which the TO has to created.
2 Using TR details get the Material document from the file extracted from the above table.
3 Format the data as shown

Material WH Storage Destination Destination Storage


Year
document No No unit type storage type section bin

6000063337 2007 107 U2

6000063338 2007 107 U2

1 Upload the data by using the BDC - ZWM_LB12_TRAN_ORDER_CREATE_V3

12. Transfer order Confirmation.

1. Confirm the Transfer Order using SCAT - ZTOCONFIRMATION_LT12