Você está na página 1de 5

RESUME OF DENEAL STAFFORD

413 N. COTTONWOOD DR.


GOLDSBORO, N.C. 27530
919-222-1329 CELL.
919-734-7100 HOME
E-MAIL: ds4b6510@westpost.net
SUMMARY OF QUALIFICATIONS
I have 29 years of experience encompassing: Military base housing,
Utitility pipe installation of water mains, sanitary sewer mains, and
pumping
stations, as a contractor
Road and heavy highway construction
Sanitary sewer collection, rehabilitation, and treatment plant
construction
Water distribution, storage, and treatment plant construction
Nuclear power plant construction
Runway construction
Outside sales in the utility materials industry for public and
private bidding
Residential housing
Commercial Construction
I have more than 29 years of experience in the construction field.
Some of the highlights of my construction experience include:
Miliatry base housing rehabilitation and new construction, nuclear
power, wastewater treatment, public utilities, heavy highway, and
airport runway paving and construction. Residential and commercial
construction. I am a Level III building and mechanical inspector. I
have had training in hazard communication compliance, asphalt
pavement technology and inspection, and bridge maintenance and
inspection, confined space entry, trenching and excavation and soil
classification. I am a licensed General contractor #42076.
EXPERIENCE
Septemenber 2008- March-2009
Wild Building Contracting
Morristown, TN.
Project Manager Cherry point MCAS Havelock, NC
Supervised the daily operations on two housing contracts Cape harts
GL118's (118) single story houses, also on OPQ's Officers Private
Quarters (44) two story units.
Febuary2008- July 2008 (Part-time)
WK Dickson Engineering Co
Wilimington, N.C.
Construction Observer of multiple construction projects dealing with
infrastructure, water, and waste water improvements. Parking areas for
UNC at Wilmington, NC. Storm drainage Improvements for the City of
Wilmington, N.C.
May 2004-present
DRS Construction LLC.
Owner
Utility pipe installation of water mains, sanitary sewer mains and
pumping stations for residential subdivisions and commercial clients.
Also road construction. Clearing and excavation. Storm drainage
installation. Headwalls, culverts. For private and commercial clients
May 2007-December 2007
Green Engineering Company Wilson, NC
Construction Observer (Contract Employee)
Quality control and inspections of utility installation projects.
August 2004- February 2007
Waterworks Supply Company Kinston, NC
Outside Sales Rep
July 2000-July 2004
TRC Triangle, Inc. Raleigh, NC
Construction Services Administrator
Sept. 1998 - July 2000
McKim & Creed Engineers, PA Cary, NC
Construction Observer Military base housing
Sept. 1997 - Sept. 1998
R.D Braswell Construction Co. Smithfield, NC
Vice President
Sept. 1995 - Sept. 1997
Whitfield Enterprises, Inc. Goldsboro, NC
Vice President
March 1985 - Sept. 1995
City of Goldsboro, NC
Construction Inspector
Building Inspector
July 1979-March1985
Construction Inspector
Shearon Harris Nuclear power plant
PROJECT EXPERIENCE
A brief summary of some of my project experience includes the
following:
Responsible for daily coordination of field employees.
Ordered materials according to contracts.
Reviewed submittals for completeness and acceptance.
Prepared monthly estimates for pay requests.
Performed inspections, testing, and staking of projects.
Responsible for construction cost estimating, bidding, and budgeting.
Responsible for inspection in accordance with ASTM and ANSI standards
for nuclear power plants.
Specific project experience includes the following:
Havelock, NC MCAS Cherry point served has project manager on 2
separate (162) unit housing rehabilitation projects for Officers
Private Housing.
Goldsboro, N.C. served as construction inspector for 178 units of
military base
housing for Seymour Johnson Air Force Base. (Berkeley Village)
Kinston, N.C. Project Manager for APAC Corporation for runway
expansion for the
Global
Transpark which included resurfacing, shoulder restoration, new
striping,
estimating, preparation of pay requests.
Selma, N.C. Construction Inspector for the installation of
Cured-in-Place liner
for over 8,000
linear feet of 8-inch, 12-inch and 21-inch sewer line, rehabilitation
of 248
manholes and replacement of 1,600 linear feet of 8-inch sanitary
sewer,
contract administration and construction oversight.
Smithfield, N.C. Street Improvement Project included construction
inspection
for street paving,
Installation of curb and gutter, water and sewer construction, and
review of
pay requests.
Selma, N.C. Construction Inspector for the rehabilitation of four (4)
sanitary
sewer pump stations ranging in size from 150 gallons per minute up to
400
gallons per minute for the Town of Selma.
Butner, N.C. Served as Construction Inspector for the installation of
8,200
linear feet of 36-inch
sanitary sewer and 1.5 mgd sanitary sewer pump station.
Butner, N.C. Construction Inspector of 25,000 linear feet of 36-inch
and 30-inch
sanitary sewer.
City of Goldsboro, N.C. Construction Inspector/ building Inspector
for twelve years with
Engineering department and the Inspections Department. Duties
included project estimating, project inspection, daily monitoring of
construction projects including street paving, utility construction,
sidewalk, water plant upgrade and construction of a new
wastewater treatment plant. Residential and commercial construction.
Nuclear Power Plants - South Texas Project (Houston Power & Light),
Shearon Harris
Nuclear Power Plant (Carolina Power & Light) performed the following
duties as a
Construction Inspector:
Maintained records for verification of materials and quantities.
Inspected construction material for quality and compliance with
specifications. Responsible for inspection of new construction,
alterations, and repairs of public utilities.
Updated drawings and design documents to provide interpretation and
clarification.
Coordinated field crews on projects that included clearing, grading,
draining,
resurfacing, and re-striping runway.
Scheduled work in cooperation with prime and subcontractors.
Inspected work for quality and appearance.
Performed density testing of soil backfill and impervious fill on
cooling pond
dam around a nuclear power plant.
Interacted between the project engineer and the contractor to settle
disputes
over design and deficiencies.
Inspected street construction for line and grade.
EDUCATION
Civil Engineering Technology, Wake Technical College, Raleigh, NC
PROFESSIONAL AFFILIATIONS AND REGISTRATIONS
General Contracting License (Highway & Public Utilities) - #42076
N.C. Building Inspector, N.C. Mechanical Inspector, N.C. Plumbing
Inspector while
working for City of Goldsboro.
Nuclear Certifications while in the nuclear construction field.
REFERENCES

Bill Dixon, PE
O'Brien and Gere
2610 Wycliff Road / Suite 104
Raleigh, NC 27606
(919) 783-7777

Rick Baker, PE
Baker Engineering Inc.
605 Adams Street
Raleigh, NC 27605
1baker@bakerenginc.com
(919)832-1364 or (919)417-3484

Jeff Barnes, Project Manager


Keen Plumbing Company
1209 117 By-Pass South
Goldsboro, NC 27534
(919) 735-1179 or (919) 921-1247

Você também pode gostar