Você está na página 1de 13

Wall Type, 2-18, 2-20, 2-21, 2-40, 3-

A 47, 3-49, 3-59


AASHTO, 2-21, 2-22, 2-25, 2-27, 2-43, 3-2,
Widening, 2-31
3-4, 3-5, 3-10, 3-11, 3-12, 3-
Wingwalls, 2-31, 3-32, 3-42, 3-
14, 3-15, 3-19-23, 3-26, 3-27,
47-50, 4-13
3-32, 3-33, 3-37, 3-41, 3-43,
Abutments, Beam Seats, 3-32
3-51, 3-52, 3-55, 3-62, 3-73,
Abutments, Full Height, 3-45, 3-49
3-81, 3-82, 4-4, 5-2
Abutments, Neoprene Sheeting, 3-47, 3-48
Guide for Pedestrain Bridges, 3-2
Abutments, Spill Thru, 3-46, 3-49
AASHTO; Design of Noise Barriers, 8-6
Abutments, Wall Type, 3-43
AASHTO; Fatigue Guide Specifications, 4-3
Accoustic Design
AASHTO; Standard Design Specifications
Absorptive Noise Barriers, 8-7
for Highway Bridges, 1-1
Reflective Noise Barriers, 8-7
Absorptive Noise Barriers, Acoustic, 8-7
ADTT, 4-3
Abutment, 3-2, 3-32, 3-43, 3-46-48, 3-50, 3-
Aesthetics, 2-21, 2-40, 2-41, 3-44
54, 3-59, 3-60, 3-62, 3-77, 3-
Coloring of Concrete, 2-41
82-84
Concrete Formliners, 2-41
Abutment Footing, 3-48
AISC, 3-16
Abutment Joints in Bituminous Concrete,
Allowable Stresses, 3-21
3-75
Fencing:wind, 3-70, 3-73
Abutment Seat Width, 3-43
Highway Bridges, 3-1, 3-15, 3-55
Abutment Seats, 3-82
Analysis, 1-10, 1-11, 2-6, 2-10, 2-12, 2-17,
Abutment, Distance to Embankment
3-21, 4-2,
Surface, 3-46
Anchors, Soil or Rock, 2-36
Abutments, 2-3, 2-4, 2-6, 2-11, 2-16-18, 2-
Angles, 2-35, 3-24, 4-5
20, 2-25, 2-29, 2-30, 2-33-35,
Crossframes, 2-37
2-39, 2-40, 3-12, 3-35, 3-43,
Fasteners for Crossframes, 4-6
3-44, 3-47-50, 3-55, 3-59, 3-
Approach Slab, 3-43, 3-47, 3-48, 3-77
62, 4-5, 4-15-17
Approach Slabs, 2-3, 2-4, 2-31, 2-39, 2-40,
Backfill, 3-48
3-5, 4-13
Bearing Seat, 3-43
Pressure Relief, 2-31, 2-40, 3-43
Benches, 2-17
AREMA, 2-3
Capped Pile, 2-14, 2-29, 3-46, 3-55,
Asphalt, 2-27, 2-43, 3-9, 3-32, 3-34, 3-75,
3-59
4-8
Drainage, 2-17, 2-23, 2-38, 3-49,
Dead Load, 2-16
4-13
Waterproofing, 3-9
Integral, 2-18, 2-29-31, 3-32, 3-43,
Waterproofing, Type , 3-34
3-46, 3-47, 3-50, 4-15
Asphalt Overlays; Deck Condition Survey,
MSE Walls, 2-18, 2-21
4-18
Rigid, 3-45, 3-51
Asphaltic Concrete Wearing Surface, 3-9
Semi-Integral, 2-30, 3-43, 3-47, 3-
Average Daily Truck Traffic, 2-3, 2-27, 3-66
48, 4-5, 4-12, 4-15
Spill-thru Slopes, 2-17
Spread Footing, 3-46
Spread Footing Type, 3-47
Stub, 2-18, 3-46, 3-59
Bearings, Elastomeric Load Plates, 3-81
B Bearings, Steel Shims, 4-13
Backfill, 3-43, 3-58
Bench marks, 2-5
Backwater, 2-6, 2-9, 2-10
Bicycle Bridges, 2-42
BARS-PC
Design Guidelines, 2-42
Analysis - General, 9-5
Railings, 2-42
Capabilities & Requirements, 9-4
Timber Deck, 2-43
System Requirements, 9-5
Bicycle Railings, 2-42
Types of Materials and Methods of
Bikeway Bridge, 3-2
Construction, 9-4
Bolted Splices, 3-16, 3-22, 3-23,
Types of Structures, 9-5
Galvanized, 3-21, 3-23
Beams, 2-5, 2-25-32, 2-40, 3-5, 3-7, 3-10, 3-
Bolts, 3-22, 3-24, 3-30, 4-6
13, 3-15, 3-20, 3-22, 3-25, 3-
Edge Distance, 3-22
31-36, 3-40, 3-47, 3-51, 3-55,
Holes, 4-6
3-76, 4-5, 4-14
Holes, Structural Steel, 3-23, 3-25,
I-Beams, 3-40, 3-51
3-29
Length, 3-14-16, 3-47, 3-66, 3-69
Oversize, 4-6
Outside Beams, 3-10
Bolts, Erection
Prestressed, 2-26, 2-27, 2-29
Diameter, 3-30
Prestressed Concrete, 2-5, 3-10, 3-
Bolts,diameter, 3-22
32, 3-36, 3-85-87
Borings, Noise Barriers, 8-2
Steel:doglegged, 3-25
Borings, Structure, 2-12
Beams, Composite, 3-36
Bracing, 3-15
Beams, Dog Legged, 3-25
Temporary, 3-16
Beams, Noncomposite, 3-36
Bridge Number
Bearing Load Plate Thickness, 3-57, 3-82
Straight Line Kilometer, 1-8
Bearing Seats, 3-2, 3-3, 3-81
Bridge Plans
Reinforcing, 3-44
Deck Replacement Projects, 1-12
Seismic, 3-43
Bridge, Deck Width, 2-32
Bearings, 2-3, 3-32, 3-47, 3-49, 3-51, 3-60,
Bridges, 2-2-7, 2-11, 2-12, 2-15, 2-17, 2-18,
3-76, 3-80-88, 4-9, 4-17
2-21, 2-25-29, 2-35, 2-39, 2-
Bolster, 3-83-85
40, 2-43, 3-2, 3-6, 3-9, 3-
Cost Comparison, 4-17
12-15, 3-20, 3-25, 3-29-32, 3-
Disc, 3-80, 3-83, 3-88
34, 3-51, 3-54, 3-55, 3-65, 3-
Elastomeric, 3-32, 4-9, 4-17
70-72, 3-75, 3-81, 3-82, 3-
Expansion, 2-4, 2-29-31
85-88, 4-1, 4-4, 4-9-13, 4-15,
Fixed, 2-4, 3-35, 3-39, 3-47, 3-58, 3-
4-21
82, 3-85, 3-86
Polytetrafluoroethylene(PTFE), 3-
83-85 C
Pot, 3-80, 3-82-84, 3-88 CADD Standards, 1-4
Rocker, 3-82-84, 3-86 Cells, 1-7
Sliding, 3-76, 3-82-86 Color Table, 1-7
Spherical, 3-80, 3-83, 3-84, 3-88 Directory Structure, 1-4
Bearings for Concrete Slab Bridges on Rigid Element Attributes, 1-6
Abutments, 3-45 File Naming Convention, 1-4
Bearings, Elastomeric, 3-81 Text, 1-5
Working Units, 1-5 3-41, 3-53
Camber, 3-13, 3-19, 3-39, 3-87 Class S, 3-7, 3-9, 3-36
Prestressed Box Beam, 3-35 Closure Pour, 3-47, 3-48
Cantilever, 2-42, 3-52, 3-55, 3-58, 3-59, Closure Pours, Deck, 3-13, 4-10
4-11 Decks, 2-19, 2-27, 2-29-32, 2-37, 2-
Cast in Place, 3-14 38, 2-43
Catch Basin, 2-39 Expansion Joints, 3-50
Chemical Analysis, 4-2 High Performance Concrete, 3-9
Clearances, 2-2-4, 2-26, 2-34, 2-41, 2-42 Prestressed, 2-5, 2-18, 2-25-27, 2-29
Horizontal, 2-2-4, 2-25-27, 2-41, 2- Repair, 4-1, 4-6-9
42, 3-6 Sealing, 3-9, 3-14
Lateral, 2-3, 2-4, 2-33 Waterproofing, 3-9, 3-34, 3-45
Lateral , 2-33 Wearing Surface, 2-3, 2-27, 3-5, 3-9,
Lateral, Minimum , 2-33 4-4
Railroad, 2-4, 2-7, 2-8 Concrete Cover, Reinforcing Steel, 3-5, 3-6,
Vertical, 2-2-4, 2-26, 2-27, 2-32, 2- 3-45
33, 2-41-43 Concrete Overlay, 4-8
Closure Pour Epoxy Waterproofing, 4-8
Deck, 3-25, 3-29 Latex Modified, 4-8
Decks, 4-10 Superplasticized Dense, 4-8
Integral, 3-47, 4-10 Variable Thickness, 4-20
Integral Abutment, 4-15 Concrete Overlay Thickness, 4-8, 4-20
Minimum Width, 4-15 Concrete Overlay, Existing, 4-8, 4-20
Semi-integral, 3-48, 4-10 Concrete Overlay, Microsilica, 4-8
Semi-integral Abutment, 4-15 Concrete Repair Areas, Detail Plans, 4-7
Code of Federal Regulations, 2-10 Concrete Sealing, 3-10, 3-42
Coefficient of Friction, 3-56, 3-57, 3-82 Concrete Slab, 2-18
Cofferdams, 2-16 Concrete Slab Bridge, 3-45
Cohesive Strength, 2-13 Concrete, Cast in Place, 3-14
Columns, 2-19, 2-42, 3-3, 3-51-53, 3-63, Concrete, Depth of Deterioration, 4-6
4-16 Concrete, Prestressed; Noise Barrier, 8-6
Diameter, 3-52 Concrete; Class C, 3-7, 8-6
Splices, 3-4, 3-22, 3-23, 3-63 Concrete; Class S, 3-8
Columns; Free Standing, 3-51, 4-16 Concrete; Patching, 4-7
Composite, 2-27-29, 2-32, 3-7-9, 3-19, 3-34, Concrete; Formliners, 3-44
3-36, 3-41, 4-11 Connections, 3-22, 3-24, 3-25, 3-29, 3-30, 3-
Concrete Prestressed, 2-5, 2-25-27, 67-69, 3-76, 4-6
2-29 Bolted Splices, Steel, 3-21-23
Steel Beams, 2-25, 2-29, 3-20 Crossframe, 2-37
Steel Girders, 3-28 Prestressed Tie Rods, 3-32, 3-36
Compression, 3-4, 3-22, 3-26, 3-31, 3-55, 3- Shear Studs, 3-23
74-77, 4-2, 4-4 Strength, 3-22, 3-27, 4-6
Computer Programs, 1-10, 2-16, 2-24 Welded, 3-15, 3-20, 3-23-26, 3-28,
Conceptual Review Process, 2-7 3-31, 3-74, 3-76
Concrete Connectors, 3-15, 4-4
Cast-In-Place, 2-19-21, 2-24, 2-26, Anchors, 3-32, 3-39, 3-40, 3-44, 3-
2-27, 2-29, 3-14, 3-36, 3-40, 57, 3-83, 3-84
Bolts, 4-6 Deck Condition Survey, 4-18
Conservancy District, 2-9 Estimated Quantities, 4-20
Construction Joints, 3-7 Existing Overlays, 4-20
Construction Procedures, 3-72 Deck Condition Survey; Asphalt Overlays,
Deck Placement Sequence, 3-13 4-18
Phases, 3-29 Deck Condition Survey; Bridges over 150
Contraction Joint, Spacing, 3-50 M, 4-19
Contraction Joints, 3-4, 3-50 Deck Condition Survey; Core Chloride
Lap Splices, 3-4 Analysis, 4-19
Corps of Engineers, 2-8 Deck Condition Survey; Coring
Corrosion, 3-36, 4-11, 4-21 Requirements, 4-18
Cost Analysis, 2-1, 2-21 Deck Condition Survey; Estimating Factors,
Counterforts, 3-45 4-20
Cover, 3-63 Deck Condition Survey; Plan Sketch, 4-18
Cover Plates, 3-74, 4-4, 4-5 Deck Drainage
Crash Walls, 2-42 Collection off Bridge, 2-38
Crash Walls, Pier, 2-33 Longitudinal Grade, 2-38
Cross Frame Deck Joint, 4-9
Bolted, 3-23, 3-24 Deck Overhangs, 2-28
Closure Pour, 3-29 Deck Placement Sequence
Galvanized, 3-23 Prestressed Concrete I-beams, 3-13
Cross Frame, Position, 3-24 Prestressed I-beam, 3-41
Fabricator Adjusted, 3-24 Steel Beams/girders, 3-13
Crossframes, Spacing, 3-24, 3-29 Deck Slab Depth, Curved Bridges, 3-13
Curb Height, 2-43 Deck Thickness
Curbs, 3-10, 3-19, 3-71, 4-13 Prestressed Concrete I-beams, 3-11
Curve, 2-3 Steel Beams/Girders, 3-11
Curved Bridges, 2-4, 3-13 Deep Beam Railing, Temporary, 3-68
Curves, 3-47 Deflection, 2-21, 3-19, 3-21, 3-25, 3-29,
4-14
Department, 8-1
Design, 2-36
D Design Agency, 2-36, 2-12, 2-17, 2-21
Dead Load, 3-81
Design Data Drawings; Use, 1-9
Dead Loads, 3-11, 3-19
Diaphragm, Prestressed, Spacing, 3-14, 3-
Deadmen, 2-36
15, 3-36, 3-40
Deck, 2-3, 2-19, 2-27-32, 2-37, 2-38, 2-43,
Disc Bearings, 3-83, 3-88
3-6-13, 3-15, 3-19, 3-29, 3-
Justification Analysis, 3-83
34, 3-40, 3-47, 3-67, 3-71, 3-
District Administrator, 3-8
74, 3-76, 3-85-87, 4-4, 4-
District Engineer
8-14, 4-16, 4-17
Bridge Inspection, 2-2
Closure Pour, 3-13, 3-14, 3-25, 3-29,
District Production Administrator, 2-9, 8-2
4-10, 4-14
District Production Office, Plan Quantity
Drainage, 2-28
Calculations, 1-8
Haunch, 3-13, 3-23, 3-43, 4-10
Dowels, 2-40, 3-35, 3-59, 3-85, 4-16, 4-17
Sequence, 3-13
Downspouts, 2-38
Timber, 2-43
Drafting Lettering, 1-3
Manual, 1-3 Environmental Document; Noise Barrier,
Drafting; Lettering Cadd, 1-6 8-1
Drafting; Lines Manual, 1-4 Epoxy, 2-15, 3-5, 3-9, 3-10, 3-36, 4-8, 4-17
Drainage, 2-3, 2-5, 2-7, 2-8, 2-17, 2-23, 2- Coated Reinforcing, 3-5, 3-9, 3-36
27, 2-28, 2-38, 2-39, 2-41, 2- Grout, 3-35, 4-16, 4-17
42, 3-9, 3-10, 3-19, 3-49, 3- Sealing, 3-9, 3-14
56, 3-77, 4-13 Epoxy Injection, 4-9
Backfill, 3-48 Excavation, 2-4, 2-11, 2-20, 2-42, 3-48, 3-58
Bridge Deck, 2-43 Existing Structure Block, 2-5
Pipe, 2-38, 3-48, 3-49 Expansion Bearings, 3-32, 3-85, 3-86
Drainage Pipe, 3-49 PTFE, 3-83-85
Drawings, 1-1, 1-2 Rockers, 3-82
Drill Shafts; Plan Numbering Requirements, Expansion Devices, 3-21, 3-43, 3-51, 3-73,
3-63 3-74, 3-76
Drilled Shaft, 3-53 Expansion Joints, 3-16, 3-45, 3-74, 4-11
Drilled Shafts, 2-12, 2-16-18, 3-46, 3-51, 3- Alternate to Retrofit, 4-12
62, 3-63, 4-15 Compression, 3-77
Casing, 2-17 Concrete, 3-50
Diameter, 2-16, 3-5, 3-62 Modular, 3-76, 3-77
Friction, 2-16, 2-17, 3-63 Problems with Retrofit, 4-12
Reinforcement, 3-62, 3-63 SD169, 4-17
Reinforcing, 3-4 Strip Seal, 3-75
Drip Strip, 2-39, 3-9 Tooth, 3-77

E F
Earth Benches, 2-17 Falsework, 2-26, 4-15
Earth Pressure, 3-43 Fasteners, 4-6
Earthquake, 3-51 Holes, 4-6
Elastomeric Bearing; Low Temperature Fatigue, 3-20, 3-26, 3-28, 3-54, 3-76, 3-77,
Elastomer Grade, 3-81 4-2-5, 4-21
Elastomeric Bearings, 3-76, 3-80-88, 4-17 Analysis, 3-58, 3-85, 4-2
Height, 3-81 Requirements, 4-6
Sliding Surfaces, 3-81 Retrofit, 4-4
Elastomeric Bearings, Beveled Load Plates, Fatigue Life; Remaining, 4-3
3-81 Fatigue Loads, Retrofit Cover Plate, 4-4
Fatigue Truck, 4-3
Elastomeric Bearings, Welding Fatigue, AASHTO, 4-3
Temperature, 3-81 Fatigue, Expansion Joint, 3-76
Elastomeric Seal, 3-74 Fatigue; Impact, 4-3
Elevation, Flow Line, 2-17, 3-56 Fencing, 2-38, 2-43, 3-68, 3-70, 3-72
Elevation, Normal Water, 2-3, 2-11, 3-63, Criteria for Use, 3-70
3-67 FHWA, 2-13
Embankment, Grade, 3-49 Field Verified Dimensions, 2-33, 4-1
Encasement, 2-14, 2-15 Fillet Welds, 3-26, 3-30, 3-31
Encroachment, 2-10 Filter Fabric, Type A, 3-48
Flanges, 3-15, 3-20, 3-24, 3-27, 3-28, 3-53, Girders, 2-25, 2-28, 2-29, 2-32, 2-43, 3-13,
4-5 3-15, 3-20, 3-22, 3-27-29, 3-
Steel, Size, 4-4 31, 3-74, 4-4, 4-5
Flanges, Minimum Thickness, Width, 3-27 Composite, 3-12
Flood Hazard Evaluation, 2-10 Longitudinal Stiffeners, 4-4
Flood Plain Coordinator, 2-9, 2-10 Noncomposite, 3-12
Flood Plain Coordinators, 2-9 Steel:box, 3-54
Footing Dimensions, 2-13 Steel:composite, 3-19
Footing, Concrete, 3-55 Steel:curved, 3-13, 3-15, 3-20, 3-25,
Footing, Reinforcing Steel, 3-59 3-27, 3-29
Footing, Safety Factor, Horizontal Force, Steel:doglegged, 3-25, 3-29
3-56 Steel:erection Bolts, 3-24, 3-30
Footings, 2-11, 2-12, 2-16, 2-17, 2-42, 3-5, Steel:fatigue, 3-20, 3-26, 3-28, 3-54,
3-52, 3-53, 3-56-59 3-76, 4-2, 4-4, 4-5, 4-21
Bearing Capacity, 2-25 Steel:fracture Critical, 3-18, 3-27,
Depth Of, 3-56 3-54
Spread, 2-12, 2-16, 2-30, 3-53 Steel:haunched, 3-27
Footings Reinforcing Steel, Piers,, 3-59 Steel:material, 4-2
Footings, Depth Of, 3-56 Steel:pier Caps, 3-18
Footings, Horizontal & Vertical Force, 3-58 Steel:splices, 3-16, 3-21-23
Footings, Reinforcing Steel, 3-58 Steel:stiffeners, 3-20, 3-24-30, 4-4
Formliners, 3-44 Steel:web Thickness, 3-28
Formliners; Cost, 3-45 Steel:welding, 3-16, 3-25-27, 3-30,
Foundations, 2-4, 2-11, 3-57, 4-12, 4-15 3-76, 3-81
Drilled Shaft, 2-11 Girders, Unstiffened, 3-26
Mse Walls, 2-18 Girder Webs
On Piles:steel H Piles, 2-14, 3-47, Unstiffened, 3-28
3-53 Grout, 3-85, 4-16
Scour, 3-56, 3-58 Guardrail Post Spacing, 3-32
Spread, 2-20, 2-21
Widening, 4-16
Foundations, Passive Resistance, 3-57, 3-58
H
Heat Straightening, 4-5
Fracture Control, 3-16, 3-18, 3-27
High Molecular Weight Methacrylate,
Freeboard, 2-3
(HMWM), 3-14
Friction Factor, 3-83-85
Friction, Angle, 2-13
High Molecular Weight
Friction, Sliding, 3-57
Methacrylate,(HMWM),
4-10, 4-15
G High Performance Concrete, 3-8, 3-40
Galvanizing, 3-22, 3-23 Hinges, 3-3, 4-6
Bolted Splices, 3-21 Holes, 3-23, 3-24, 3-35, 3-72, 4-6
Coating Systems, 3-18 Bolt, 4-6
Galvanizing, Fencing, 3-72 Holes, Bedrock, Predrilled, 2-36
General Plan, 1-1, 2-31, 2-32, 3-6 Horizontal Curve, 3-19
Definition, 1-11 Hydrodemolition, 4-8, 4-20
Material Stresses, 9-4
I Multilane Loading, 9-3
Impact, 3-52, 3-55, 3-74, 3-76
References, 9-7
Integral "Bearings", 2-4
Requirements, 9-2
Integral Construction, 2-29
Specific Requirements, 9-2
Integral Design
Structures with sidewalks, 9-3
Substructure, 2-29
Superload Analysis, 9-3
Bearing Considerations, 2-30
Load Rating Software
Concrete Superstructure, 2-30
BARS-PC, 9-1
Superstructure, 2-29
BRASS, 9-1
Intermediate Hinges
SAP 90 / SAP 2000, 9-1
Partial Deck Pour, 4-11
STAAD - III/Pro, 9-1
Internet Address
Loads, 2-12, 2-13, 2-16, 2-29, 3-19, 3-33, 3-
Office of Contracts, 1-10
37, 3-51, 3-54, 3-61, 3-66, 3-
Office of Structural Engineering, 1-4,
69, 3-73, 3-82-85
1-9
Wearing Surface, 3-2
IZEU, 3-17, 3-22
Location and Design Manual, 2-33, 2-38,
Shop Applied, 3-17
2-1, 2-32, 2-33
Low Temperature Elastomeric Grade, 3-81
J
Jacking, 3-86, 4-5, 4-13, 4-17 M
Bearings, 4-17
Mechanical Connectors, 3-14
Jacking or Raising Bridges, 4-13
Mechanically Stabilized earth (MSE) Walls,
Jacking, Limits, Differential Elevation, 4-13
2-18
Joint; Crack Control, 3-66, 3-69, 3-70
Corrosion, 2-22
Joints, 2-31, 2-39, 2-40, 2-43, 3-6, 3-14, 3-
Plans, 2-24
31, 3-40, 3-48, 3-66, 3-69, 3-
Metalizing, 3-22
70, 3-74-76, 4-11-13, 4-15
Coating Systems, 3-18
Compression, 3-77
Metalizing, Expansion devices, 3-74
Expansion, 3-50, 4-10-12, 4-16, 4-17
Mortar, 3-35, 4-9
Modular, 3-76, 3-77
Pressure Relief, 2-31, 2-40
Pressure Relief, Type A, 3-43, 4-13 N
National Flood Insurance Program, 2-10
National Highway System, 3-8
L NDT, 3-26, 3-31, 4-2, 4-4
Lagging, 2-19, 2-36
Noise Barrier, 8-1
Lap Splices, 3-4, 3-14
Approval , 8-5
Line Bearing, 2-4
Submittal Requirements, 8-5
Live Load; Distribution Factor, 4-3
Noise Barrier Design, Panels, 8-6
Live Loads, 2-36, 3-2, 3-11, 3-19, 4-4
Noise Barrier Policy, 8-2
Seismic, 3-2
Noise Barrier Posts; Concrete, 8-6
Load Factor Design, 3-7, 8-6
Noise Barrier Posts; Steel, 8-6
Load Rating
Noise Barrier Posts; Timber, 8-6
Fatigue Analysis, 9-3
Noise Barrier Wind Pressures, 8-7
Final Report Submittal, 9-6
Noise Barrier; Detail Design Plans, 8-4
Introduction, 9-1
Noise Barrier; Standard Insert Drawings, Pedestrian Bridges, 2-43
8-1, 8-4 Design Guidelines, 2-43
Noise Barrier; Structural Steel, 8-7 Timber Decks, 2-43
Noise Barriers, 8-6 Permit, 2-9
Noise Barriers; Borings, 8-2 Phase Construction, 3-54
Noise Barriers; Cohesive Soil Tests, 8-2 Phased Construction, 3-46-48, 3-68
Noise Barriers; Detail design, 8-4 Pier Bearing Seat, 3-51
Noise Reduction Coefficient, 8-7 Pier Footings, 2-17
Non Epoxy Sealer, 3-42 Pier Seats, 3-82
Noncomposite, 3-8-10, 3-12, 3-15, 3-19, Pier, Footings, 3-52
3-34 Pier, Width of Footing, 3-51
Noncomposite Design, 2-27, 2-29, 2-32 Pier, Footings, 3-53
Piers, 2-6, 2-14-16, 2-18, 2-19, 2-25, 2-
40-42, 3-3, 3-13, 3-26, 3-32,
O 3-34, 3-35, 3-41, 3-47, 3-
ODOT, Utilities Manual, 3-6
51-53, 3-55, 3-59, 3-62, 3-63,
Office of Environmental Services, 8-1
3-82
Office of Maintenance Administration, 4-21
Cap and Column, 2-18, 2-40, 2-42,
Office of Materials Management
3-51-53, 3-59
Geotechnical Section, 2-20, 2-21
Capped Pile, 2-14, 2-18, 3-54, 3-55,
Office of Structural Engineering, 1-1, 1-8, 2-
3-59
15, 2-20, 2-21, 2-24, 2-25, 2-
Debris Removal, 2-19
26, 2-27, 2-28, 2-41, 3-18, 3-
Height, 3-3, 3-51
26, 3-31, 3-41, 3-50, 3-54, 3-
Impact, 3-52, 3-55
67, 3-76, 3-77, 3-83, 3-84, 4-
Location, 3-53, 3-62
1, 4-2, 4-4, 4-5, 4-6, 4-21, 8-
Sealing, 3-42
1, 8-6
Wall Type, 2-18, 2-40, 2-42, 3-59,
Ohio Department of Natural Resources, 2-9
4-16
Ohio Revised Code, 2-10
Waterways, 3-55
Overpasses, 2-41
Piers, Beam Seats, 3-32
OZEU, 3-18, 3-22
Piers, Crash Walls, 2-18, 2-42
Piers, Seat, 3-32
P Piers, T-Type, 2-42, 3-55
Painting, 2-15, 3-26 Pile Diameters, 3-58
Steel Structures, 3-20, 3-29 Pile Pay Length, 2-13
Parapet, 3-65, 3-66 Piles, 2-12-17, 2-19, 2-20, 2-29, 2-30, 2-33,
Parapets, 3-6, 3-10, 3-19, 3-47, 3-65-70, 4- 2-36, 2-42, 3-44, 3-46-48, 3-
13, 4-16 51-61, 4-12
Patching, Concrete, 4-7 Steel H, 2-14
Patching; Item 519, Patching Concrete Cover, 3-55
Structures, 4-7 Design loads, 3-61
Patching; Item 520, Pneumatically Placed Embedment, 3-54
Mortar, 4-7 Estimation of Capacity, 2-13
Patching; Item Special, Trowelable Mortar, Hammer, 2-16
4-7 Maximum Stress, 2-14, 2-15, 3-60
payment, 2-25, 3-53, 3-63, 4-5, 4-12, 4-17 Static Load Tests, 3-61
Pedestrian Bridge, 3-2
Ultimate Bearing Value, 2-14, 2-15, Porous backfill, 3-48, 3-49
3-60, 3-61 Post-tensioned Pier Caps, 3-55
Wall Thickness, 2-16 Pot Bearings, 3-82-84, 3-88
Piles, Battered, 3-57, 3-59, 3-60 Justification Analysis, 3-82
Piles, Concrete, 3-53 Preliminary, 4-3
Piles, Diameter, 2-15 Preliminary design, 5-1
Piles, Dynamic Load Test, 3-61 Preliminary design study, 2-1
Piles, Embedment in Concrete, 3-55 Preliminary Design, Noise Barriers, 8-1
Piles, Reinforced Concrete, 2-15 Pressure, at Rest, 3-43
Piles, Spacing, 3-46, 3-59 Prestress I-beam, 3-86
Piles, Concrete Reinforcing, 3-53 Placement Sequence, 3-13
Piles, Diameter, 3-53 Prestressed Box Beam, Live Load
Piling, 2-11, 2-13, 2-14, 2-18, 2-19, 2-42, 3- Distribution, 3-32
51, 3-58 Prestressed Box Beams, 3-7-9, 3-12, 3-32,
Piling, Sheet, 2-36 3-34, 3-43, 3-51, 3-87
Pin and Hanger Assemblies, 4-6 Bearing Seat Elevations, 3-35
Pipe, 3-72 Camber, 3-35
Plan Dimension, 1-2, 1-9 Deck Thickness, 3-35
Plan Quantities, 1-8 Sealing, 3-42
Plan Scale, 1-4, 2-2, 2-3, 2-6, 2-7 Strength, 3-35, 3-36
Plan Sheet Margins, 1-2 Prestressed Concrete, 3-32, 3-36, 3-85-87
Plan Sheet Numbering, 1-2 Strands, 8-7
Plan Sheet Size, 1-2, 2-5 Grout, 3-35
Plans, 1-8, 2-2, 2-11, 2-13, 2-15, 2-16, 2-19, Span Length, 3-14
2-20, 2-24, 2-33, 2-36, 2-40, Strands, 3-33, 3-37, 3-41
2-42, 3-10, 3-11, 3-15, 3-19, Tie Rods, 3-32, 3-36
3-21, 3-22, 3-26, 3-31-33, 3- Prestressed Concrete Box Beams
35, 3-37, 3-40, 3-44, 3-53, 3- Site Limitations, 2-27
54, 3-63, 3-66, 3-68, 3-70, 3- Weight Limits, 2-27
72, 3-74-76, 3-80, 3-81, 3-83, Prestressed Concrete I-beams, 2-27
3-84, 4-1, 4-2, 4-5-8, 4-11, 4- Prestressed I-Beams
12 Camber, 3-39
Abutments, 1-1 Design, 3-36
Order, 1-11 Diaphragms, 3-40
Concrete Repair Areas, 4-7 Live Load Distribution, 3-37
Preliminary, 3-18, 3-54 Placement Sequence, 3-41
Sealing, 3-42 Strands, 3-37
Plans, Bridge Quantities, 1-8 Strength, 3-41
Plans, Concrete Repair Areas , 4-7 Prestressed I-Beam, 3-12, 3-13
Plans, Sheet Cross Referencing, 1-2 Prestressed I-beam Shapes, 3-36
Plans, Temporary Structure, 5-1-3 Prestressed I-beams, 3-40, 3-87
Plans; Comment Details and Notes, 1-2 Prestressed I-beams, Composite, 3-36
Plans; Initial Block Requirements, 1-8 Prestressed I-beams, Noncomposite, 3-36
Plans; Scale, 1-1 Prestressed Strands, Spacing, 3-33
Plastic, 3-33, 3-54 Proposal Notes
Polymer Modified Ashphalt Expansion Joint Use, 1-10
System, 3-75
Proposed Structure Block, 2-3, 2-5 4-8, 4-13
Proprietary Walls, 2-19, 2-22 Decks, 4-8
Slab Bridges, 4-15, 4-16
Reinforced Concrete Slab, 3-54
R Reinforced Concrete Slab Bridges, Rehab,
Railing, 2-23, 2-34, 2-38, 2-43, 3-11, 3-32,
Reinforcement Criteria, 4-16
3-65-69, 3-72, 4-17
Reinforcement, 3-12, 3-34, 3-52, 3-62, 3-63,
Concrete Barrier, 2-3
4-15, 4-16
Criteria, 2-38
Bearing Seat, 3-44
Deep Beam with Tubular Backup, 2-
Negative Moment, 3-12
3
Reinforcement Longitudinal, 3-52
Twin Steel Tube, 2-3
Reinforcement Longitudinal Deck, 3-34,
BR282M, 3-65, 3-68
3-41
Bridge, 4-13
Reinforcing Steel, 2-15, 2-24, 2-27, 2-29, 2-
Crash Test Levels, 3-63, 3-65, 3-67,
35, 3-3-5, 3-9, 3-12, 3-14, 3-
3-68
34, 3-36, 3-40, 3-45, 3-52, 3-
Deflector parapet type, 3-65
53, 3-55, 3-62, 3-63, 4-6, 4-
Lateral clearance, 2-34
10, 4-12, 4-16, 4-17
Pedestrian, 3-64
Bar Lists, 3-5
Retrofit, Thrie beam, 3-65
Bending, 3-51
Sidewalk, 3-64, 4-12
Decks, 4-8
Stations - First Post, 2-3
Development Length, 3-4, 3-55
Transition, 2-31, 3-47, 4-13, 4-17
Maximum Length, 3-3, 3-16
TST-1-99, 3-65, 3-67
Mechanical Splices, 3-4
Twin Steel Tube, 2-38
Splice Length, 3-4
Splices, 3-45
Railing, Barrier,, Reinforcing Steel
Temperature, 3-52
Horizontal, 3-66, 3-69
Yield Strength, 3-4
Railing, Concrete Caulking, 3-66, 3-69, 3-70
Reinforcing Steel Bar List, 2-25
Railing, Concrete Refacing, 3-67
Reinforcing Steel Bar Marks, 3-3
Railing, Deep Beam Temporary, 3-68
Reinforcing Steel Spirals, 3-52
Railing, Retrofit, 3-67
Reinforcing Steel Welding, 3-4
Railing, Temporary, 3-68
Reinforcing Steel, Concrete Cover, 3-5, 3-45
Railing; Crack Control Joints, 3-66, 3-70
Reinforcing Steel, Epoxy, 3-41
Railings, Expansion/Contraction, 3-67-69
Reinforcing Steel, Transverse Spacing, 3-11,
Railroad, 2-1, 2-4, 2-7, 2-8, 2-21, 2-36, 2-42,
3-12
3-2, 3-31, 3-55, 3-66, 3-71
Reinforcing Steel, Concrete Cover, 3-9
Railroad Bridge
Reinforcing Steel; Minimum Area of Steel,
Structural Steel Type, 2-42
3-6
Rebar Splices, 4-14
Reinforcing Steel; Minimum Spacing, 3-6
Reference Line, 2-4, 3-6
Reinforcing, Deck, Transverse, 3-12
Rehabilitation, 2-12, 2-31, 2-32, 3-20, 3-67,
Prestressed Concrete Box Beams, 3-
3-68, 3-81, 3-82, 3-85-87, 4-
12
1, 4-6, 4-21
Prestressed Concrete I-Beams, 3-12
Heat Straightening, 4-5
Steel Beams/Girders, 3-12
Reinforced Concrete, 2-15, 2-19-22, 2-32, 3-
Reinforcing, Epoxy Coated, 3-3
11, 3-12, 3-14, 3-51, 3-53,
Reinforcing, Minimums Wingwalls, 3-50
Semi-Integral Bearings, 2-4
Reinforcing,, Requirements in Contraction Semi-Integral Design
Joints, 3-50 Bearing Considerations, 2-31
Retaining Wall, 3-59 Concrete Superstructure, 2-31
Cast-In-Place, 2-21 Substructure, 2-30
Retaining Walls, 2-19, 2-20, 2-24, 3-42, 3- Superstructure, 2-30
45, 3-48, 3-49, 3-59 Service Load Design, 3-7
Construction, 2-2, 2-13, 2-21 Shafts, 2-12, 2-16, 2-17
Counterforts, 3-45 Shafts, Drilled, 3-44, 3-46-48, 3-51, 3-62, 3-
Proprietary, 2-18-20, 2-23, 2-24 63, 4-15
Retrofit, 3-65, 4-12, 4-17 Sheet Piling, 2-19, 2-42, 3-44, 3-58
Roadway, 2-1, 2-3, 2-4, 2-6, 2-7, 2-11, 2-23, Sheet Piling, Minimum Projection,
2-27, 2-30, 2-32, 2-33, 2-35, Abutments, 3-44
2-37, 2-40, 2-43, 3-2, 3-9, 3- Sheet Piling, Section Modulus, 3-44
10, 3-48, 3-66, 3-69, 3-72, 4- Shoring, Elevation, 2-36
12, 4-13, 4-15 Sidewalk Height, 2-43
Drainage, 4-13 Sidewalk on Bridges, 2-43
Plans, 3-43 Sidewalks, 3-5, 3-10, 3-49, 3-66, 3-71, 3-72,
Rock Channel Protection, 2-11 3-74, 4-13
Spill-thru Slopes, 2-11 Pedestrian, 3-2, 3-70-72
Rolled Beams, 2-28 Single Span, 2-26, 3-3
Composite, 3-12 Site Plan, 1-1, 1-11, 2-1-7, 2-11, 2-13, 2-16,
Moment Plates, 3-13, 3-20, 3-26 2-17, 2-31, 2-33, 2-34, 5-1
Non-composite, 3-12, 3-15, 3-19 Site Visit, 2-1
Spacing, 2-28 Skew, 2-4
Rolled Beams, Moment Plates, 3-26 Skew Angle, 2-3, 2-26, 2-35, 4-16
Rustications, 3-44 Slab, Continuous Concrete, 2-26
Slabs, 2-3, 2-4, 2-25, 2-26, 2-31, 2-39, 2-40,
3-5, 3-12, 3-34, 3-36
S Cantilever, 2-42
Scour, 2-2, 2-6, 2-12, 2-16, 2-17, 2-19, 3-56,
Thickness, 4-9
3-58, 4-15
Slip Critical, 4-6
Screed Elevations, 3-11, 3-19
Slope Protection, 2-11, 2-39, 3-46, 3-49
Prestressed Box Beam, 3-12
Aggregate, 2-39
Scuppers, 2-28, 3-16, 3-19, 4-13
Concrete, 2-39
Sealer, Epoxy-Urethane, 3-42
Span Length, 3-14
Sealer, Urethane, 3-10
Span Lengths, 2-27
Sealing
Span Measurement, 2-4
Pier Caps, 3-42
Specifications for Structure Subsurface
Plans, 3-42
Investigations, 8-2
Seals, 3-76
Specifications for Subsurface Invertigation,
Modular, 3-76, 3-77
2-12
Strip, 3-77
Specifications for Subsurface Investigation,
Section Modulus, Sheet Piles, 2-36
8-2
Seismic
Spherical Bearings
Bearing Seat, 3-43
Justification Analysis, 3-84
Seismic Design, 3-2
Spill thru Slopes, 2-17, 2-18
Spiral Reinforcement, 3-52, 3-62, 3-63 Strands, Prestress, Spacing, 3-37
Splices, 3-14, 3-22, 3-23, 3-28, 3-63, 3-75, Stresses, Welds, 3-31
3-76, 4-4 Structural Steel, 2-29, 2-32, 3-74, 4-1
Bolted, 3-21, 3-22, 4-4 Which Type to Use, 2-29
Tension, 4-4 Attachments To, 3-15, 3-16, 3-20
Spread Footing, 4-15 Coating Systems, 3-17
Spread Footings Coatings, 2-29
Allowable Bearing Pressure , 2-13 Damage, 4-9, 4-13, 4-21
Elevation Reference Monuments , 2- Deflection, 3-19, 3-21, 3-25, 3-29,
13 4-14
Stage construction, 2-2, 2-21, 2-34, 3-74, 4- Fabrication, 2-37, 3-16, 3-26, 3-28,
10, 4-12, 4-15 3-30, 3-87
Nomenclature, 2-34 Fabricator Qualifications, 3-16
Closure Pour Width, 2-35 Fatigue, 4-2, 4-4, 4-5, 4-21
Semi-Integral Construction Stability, Shear Connectors, 3-15, 4-4
2-35 Shipping Lengths, 3-16
Superelevated Deck , 2-35 Stress, 3-20, 3-26, 4-2, 4-4
staged construction, 3-13, 3-14, 3-59 Stresses, 2-22
Staged Review Process, 2-1, 2-7 Structural Steel, Fabrication Workline, 3-21
Standard Bridge Drawing, 2-40 Structural Steel, Special Material Req., 3-20
Prestressed Concrete I-Beams, 2-27 Structure File Number, 1-8
Standard Bridge Drawings Subsurface Investigation Report, 2-12
Reinforced Concrete Slabs, 2-26 Superelevated Deck
Standard Construction Drawing, 2-39, 2-40 Bridge Deck Surface Profile, 2-37
Standard Drawings, 1-9 Location of Transition, 2-37
Use, 1-9 Superelevation, 2-3, 2-4, 2-26, 2-37, 3-11,
Standard Drawings; Referencing, 1-9 3-19, 3-32
Station Superelevation Transition Diagram, 2-38
Bridges, Definition, 1-8 Superstructure, 2-3-5, 2-25, 2-26, 2-29-32,
Stay in Place Forms, 3-13 2-34, 2-39, 3-2, 3-6, 3-7, 3-9,
Steel 3-25, 3-29, 3-35, 3-36, 3-41,
Girders, 3-31 3-43, 3-47, 3-48, 3-51, 3-52,
Steel A36m, 3-15, 3-21, 3-28 3-54, 3-55, 3-85-87
Steel A572m, 3-15, 3-21, 3-28 Composite, 2-27-29, 2-32
Steel A588m, 3-15, 3-17, 3-21, 3-28, 3-75, Deflections, 4-10, 4-11, 4-15
3-76 Span Arrangements, 2-26
Steel Shims, 4-13 Width, 2-32
Steel Structures, 3-20, 3-24, 3-29 Superstructure Analysis Methods, 2-29
Steel, A588M, 3-42 Existing Superstructure , 2-29
Stiffeners, 3-20, 3-24-30, 4-4 Supplemental Site Plan
Longitudinal, 3-27 Railway Crossings, 2-7
Transverse, 3-26 Waterway Crossings, 2-6
Stirrups, 3-41, 3-55 Supplemental Specifications, 1-9
Stitch Welded, 4-4
Strand, Debonding Length, 3-33, 3-38
Strand, Draped, 3-38
Strands, Low Lax, 3-33, 3-37
T V
Temporary Lane Width, 2-34 Vertical Curve, 3-19
Temporary Shoring, 2-35
Railroad Projects, 2-36
Temporary Structure, Closing, 5-4
W
Walls, Anchored, 2-36
Temporary Structure, Culverts, 5-1
Walls, Proprietary, 2-19, 2-22
Temporary Structure, Guardrail Post
Waterproofing
Spacing, 5-2
Sheet Type 2, 3-45
Temporary Structure, Hydraulics, 5-1
Wearing Surface, 2-3, 2-27, 2-43, 4-4
Temporary Structure, Hyraulic Storm Year,
Web Page, 1-9
5-1
Weep Holes, 3-49
Temporary Structure, Loads, Dead , 5-2
Welded Repairs, 4-2
Temporary Structure, Loads, Ice, 5-2
Welding, 3-16, 3-25, 3-30, 3-76, 4-2, 4-4,
Temporary Structure, Loads, Impact, 5-2
4-5
Temporary Structure, Loads, Live , 5-2
Galvanized, 3-23
Temporary Structure, Loads, Wind , 5-2
Welding Procedures, 4-2
Temporary Structure, Pedestrians, 5-1
Welding, Field, 4-4
Temporary Structure, Roadway , 5-1
Welding, Overhead Position, 4-5
Temporary Structure, Scour, 5-1
Welding, Fillet Weld Size, 3-26, 3-30
Temporary Structure, Waterway, 5-1, 5-3
Widening, 2-31, 3-85, 3-86
Temporary Structures, 2-34, 3-1, 5-1-4
Closure Pour, 3-14, 3-25, 4-10, 4-14
Tension, 4-2
Deflections, 4-10, 4-11, 4-15
Three-sided Structures, 2-26
Foundations, 2-4, 2-11, 4-12
Tiebacks, 2-36
Pier Columns, 4-16
Timber, 5-2
Railing, 4-16
Title Block, 2-7
Railing: Facing, 4-16
Title Blocks
Working Stress Design, 8-6
Straight Line Kilometer, 1-8
Traffic Maintenance, 3-72, 4-1
Lane Width, 3-68
Phased Construction, 3-51
Trimming Beam Ends, 4-5
T-Type Piers, 2-18, 2-19, 3-55, 4-16

U
Underpass, 2-33
Underpass Clearances, 2-8
Urethane, 3-10
Utilities, 2-1, 2-5, 2-8, 2-41, 3-6, 3-7, 4-13

Você também pode gostar