Você está na página 1de 7

Date : 21.12.2010 J.

KUZHAL VENDHAN
33/259,GHB Colony,
Kokhra-Mehmedabad,
Amraiwadi-post,
Ahmedabad
Gujarat
Mobile:9904104620

To
The Manager -HRD

Sub: Application for any suitable position in Power plant


Ref:

Respected Sir,

I would like to take this opportunity to exhibit my skills in this few words and hope it will help
you take comfortable decision to choose me for the above said post. I am very much
confident about my selection and ready take up a new task in your esteemed Organisation.
Please I am sure sir, I will settle down this job very easily and can do well with my best
experience and qualification.
Here with I enclosed my Resume for your perusal.
Thanking you for your kind consideration and expect your favorable reply at earliest.

Yours sincerely,

J.Kuzhal Vendhan.
RESUME
J.KUZHAL VENDHAN
Mobile:09426378818
Office : 09904104620
Employment Details
Field of Experience : Power, Energy, Projects, Boiler and Utilities
Years of Experience : 16 +years
Qualification : B-Tech –Mechanical & 2nd Class Boiler Proficiency
(B.O.E)
Extra qualification : Energy Manager- Certified by Bureau of Energy
Efficiency &NPC
Present Job : Manager –Power plant
Name of Company : Aditya birla nuvo ltd –Veraval-36.5MW CFBC Boilers
Reporting to : VP /Powerplant& Caustic)
Business : Chemical
Current CTC : 7.4 Lacs per annum+perks
Expected CTC : Negotiable
Notice period : 3month
Reason for Change : Better propectus
Personal Details
Name: J.Kuzhal Vendhan
Sex : Male
Age : 36
Marital Status: Married
Nationality : Indian
Contact Details
Mailing Address: C/O Prabhakaran
33/259, GHB colony,
Kokhra-Mehmedabad,
Amraiwadi -post
Ahmedabad.380028
Email Address: kvendan@indiatimes.com, jkvendhan@gmail.com
Education and Professional Qualification
Summary Of Education:
Academic :
1. S.S.L.C Sacred Heart Higher Secondary School, Trichy March 1989 71% First
class
Technical qualification:
1. D.M.E Annamalai Polytechnic, chettinad, Tamilnadu October 1994 63% First
class
2. B-Tech Mechanical – Rajasthan Vidyapeeth University Udaipur July-2004 to
July 2007
Professional qualification:
1. Boiler Proficiency Engineer Exam, Gujarat State April -- 2004
Working Experience:

Organisation Position Period experience capacity

Natarajan Fabrication Aug 1994 to 1year


Enterprises supervisor Oct 1995

Cethar Vessels Commissioning Nov1995 to 3years


ltd Engineer nov 1998
Trichirapally,

U.P.Lime chem. Engineer Jan 1999 to 1.5years 1.5MW


Ltd Bijnor , U.P -powerplant july 2000

Shanti Engineer sep2000 to 4years 2.0MW


Processors ltd -Utility July 2004
Piplaj,
Ahmadabad

Adani wilmar ltd Sr.Engineer july 2004 to 2years 3.8MW


oct 2006
Mundra, Utility
Gujarat

Electrotherm(I)lt Manager - November Dec-2009 30MW Power


d Powerplant 2007 plant
Samakhiyali
Gujarat

Adityabirla nuvo Manager December 36.5MW


ltd /Powerplant -2009 powerplant

Job Responsibilities:
In Cethar vessels ltd
1. Opening of erection site activities after complete introduction
with Customer.
2. Arranging Site engineer and contractor accommodation very nearer
to site.
3. Opening of bank account and arranging of funds for mobilization.
4. Estimate and budgeting the erection and commission activities as per the
site
condition.
5. Mobilize the fabrication and Erection contractor after finalization.
6. Managing the site consumable requirement like welding rod, gas etc by
local purchase.
7. Control the costing as per the budgeting manner
8. Material reconciliation
9. Commissioning
10. Closing of site after commissioning after complete discussion with
customer as per P.O
condition.
In UP Lime chem. Ltd
1. Operation and Maintenance of 1.5MW Power plant and all plant maintenance
activities
In ShantiProcessors ltd
1. O&M of 2.0MW power plant and maintenance of all thermic fluid heaters and
all types of Utility equipments like compressor and chillers
In Adani wilmar ltd
1. As a shift in charge of power plant working under Asst. manager in3.8MW power
plant
Operation in shift duties.
2. Boiler is having 35 TPH and ash handling system and coal handling system and
ESP and
Auxiliaries etc are with our operation.
3. Turbine is condensate cum bleed steam type supplied by TDPS, Bangalore.
4. Handling of shift operators and field operators and 6 labours in every shift.
5. I handled the big projects in Cethar vessels ltd as erection and commissioning
engineer listed
below.
6. I have good knowledge in Utilities like water treatment plant, compressor and
vapor
absorption chiller etc.
Previous job responsibilities:
Electrotherm(I)ltd –Kutch Nov-2006 –Dec 2009
Project:
1. I have executed the 30MWpowerplant project as a lead manager
2. Planning and budgeting
3. Preparation of Tenders and techno-commercial documents.
4. Comparison preparation as per the tender document and study the submitted
offer.
5. Negotiate with the bidder with detailed engineering details
6. Execution of 30MW Power plant Installation work.
7. Work includes planning and execution of all power plant equipment selection
,preparing layout,
civil works, fabrication and erection activities.
8. Coordination with all suppliers including follow-ups, approval of drawings and
execution of Project
9. Cost control as per the budget approvals.
Details of Project:
Turbine -30 MW –Single extraction –condensate Turbine. Make-HTC-China
Condenser- Vaccum type Surface condenser
ACHE- instead of cooling tower
Boiler – 2X65TPH FBC Boiler
1x 28TPH WHRB-1 Boiler from Sponge Iron kiln.
2x36 TPHWHRB-2 Boiler from Sponge Iron kiln

Responsibility on operation& Maintenance:


1. Operation activities of 30MW power plant activities.
2. Day-day operation and maintenance activities
3. Reporting to Head –power plant
4. Making daily, monthly and quarterly reports for generation, coal
consumption, self
power consumption, Water consumption, costing and heat rate of
boiler& Turbine,
efficiency calculation of boiler, turbine&overall plant, etc.
5. Handling all manpower of operation& maintenance
6. Allocating work to all staffs& worker
7. Indenting of spares

Present Job responsilibility:

Aditya birla nuvo ltd –Veraval _Gujarat-since dec-2009


Designation –Manager –Powerplant
O&m of 36.5MW as sectional head –operation of total power plant including 5MW
HFG Turbine with Stoker fired boiler. We have 3 CFBC boiler in operation madeby IJT
& Thermax 2*50TPH &105TPH respectively. Turbines are SKODA make & SNM –
Japan.
All boiler & Turbine opertions with Honeywell DCS System synchronized with DG
sets.
Operating pressure -90bar
SH temperature-505deg C

Current responsibility:
1. Day –Day operation activities of Boiler & Turbine
2. Preparation of daily, monthly report, quarterly report, annual budget, costing,
fuel management , variance report etc
3. ISO ,WCM ,Safety committee member and internal auditor and trainer
4. Preparation of MPR & Review of MPR
5. Manpower management of nearly 80Manpower in daily activities

Computer Knowledge:
MS –Office
Experience in PLC, DCS and SCADA automatic operation with any software.
Exposure in windows office and AutoCAD versions
SAP & ERP updates
All ISO procedures and documentation activities
Other skills : hard working nature, taking any high task to
prove my mettle
And having enthusiastic and Sportive behavior and
adopt to
Change in latest technology.
Languages Known : Tamil, Telugu, English , Gujarati ,Hindi-To speak
Tamil, English, Hindi - To write

Extra curricular activities: Playing Tennis, Carrom, Chess, Reading habits

Other profession: Energy Manager – Certificate awarded by


National
Productivity Council –Bureau of Energy Efficiency .
Current CTC : 6.60LACS PER ANNUM

Expected CTC : Negotiable


Executed Projects :

Sl.no Name of projects Capacity Type PressureTemp Fuel

1 Malar Solvents, Karaikudi 5 TPH FBC 17.5 Saturated Agro waste

2 Pampasar Distilleries, Hospert


12 TPH FBC 18.0 Saturated Agro waste

3 P.J.Margo. ltd, Tumkur 10 TPH FBC 14.5 Saturated Agro waste

4 Bharat Textiles, Chennai 5 TPH FBC 10.5 Saturated Agro waste

5 Century Cement, Raipur 70 TPH 15.5MW 66.0 500 ^C Coal

6 HEG Ltd, Durg 2*11.8 13.5MW 66.0 500 ^C Coal

1* 30 66.0 500 ^C Coal

7 TNPL, Tamilnadu 70 TPH 6.0 MW 44.0 440 ^C Coal, Ligniut

8 Cheema papers, Kashipur 22 TPH 3.0 MW 44.0 440 ^C Coal

9 U.P.Lime chem. Ltd, U.P 15 THPH 1.5 MW 44.0 440 ^C Agrowastare

10 Electrotherm(I) ltd.Gujarat 2x65TPH30MW 66.0 495^C Coal

Hereby I declare that all above said are true to the best of my knowledge.

Date: 15.07.09
Place: Ahmedabad
J.Kuzhal
Vendhan

Você também pode gostar