Você está na página 1de 3

Diana Huff

121 Buckingham Dr. #65


Santa Clara, CA 95051
huffda01@comcast.net
Tel: (650)224-7566
~~~~~~~~~~~~~
OBJECTIVE
~~~~~~~~~~~~~
Challenging position in manufacturing engineering / scheduling that would best
use my expertise in the production environment. Position would have opportuniti
es for a "can do" individual with leadership abilities.
.
~~~~~~~~~~~~~~~~~~~~~~~~~
MAJOR ACCOMPLISHMENTS
~~~~~~~~~~~~~~~~~~~~~~~~~
PREPLANNING/PRODUCTION PLANNING
.
Spent 25 years in developing 1st time quality planning in various Fortune 500 a
erospace/aviation Corporations. Worked on cutting edge products: F16, 777, 74
7, AEHF satellites, Hybrid microcircuits. Instilled lean manufacturing concepts
and resolved tooling issues. Created viable production plans in the research d
evelopment phase of hybrid microcircuits.
.
MANUFACTURING ENGINEERING
.
Created flowcharts for the fab detail plans improving productivity by 200%. Res
eached and reused scrapped raw material saving Raytheon $200,000.00. Identified
critical variances on major tooling for MD11 and wrote corrective action proced
ures.
.
DEMAND MANAGEMENT
.
Provided leadership and negotiating skills to establish schedules with engineeri
ng and manufacturing in support of program deadlines. Designed and prioritized
material requirement's charts to meet tight schedules at PMP meetings. Obtaine
d commitments with material and manufacturing groups to achieve desired results.
Reduced span time to ordering parts for critical build of program from 6 month
s to 3 months.
.
CONFIGURATION MANAGEMENT:
.
Analyzed and researched electrical /mechanical enginineering drawings for accura
cy and compliance. Coordinated changes with engineering, quality, product suppo
rt and manufacturing. Improved traceability and configuration control of parts
by 30%.
.
TRAINING:
.
Instructed configuration management, quality control and planning department on
the interpretation of engineering changes , manufacturing flow processes, ERP, a
nd "SAP". Instructed and motivated 100 engineers on the importance of concise,
accurate engineering instructions and drawings. Corrected misconceived concepts
of make or buy parts improving engineering rewrites by $ 100,000.00
.
.
~~~~~~~~~~~~~~~~
WORK HISTORY
~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~
EXPERIENCE
~~~~~~~~~~~~~~
3/2008 - 11/2008
Raytheon Corporation El Segundo, CA
ENG/PLNG CONSULTANT
Developed production plans using a new system for the hybrid microcircuit assemb
lies. Scheduled and incorporacted 100 new engineering changes for 20 different
end item products.

10/2007 - 11/2007
Loral Space Systems Palo Alto, CA
PRODUCTION PLANNING
Short term assignment. Worked on microcircuits, electrical sub-assemblies for s
atellites.

9/2003 - 8/2007
Lockheed Martin Space Systems Sunnyvale, CA
PROD-PLNG-SCHD-MAT'L CONTRL SENIOR
Spent 6 years working all facets in project planning. Programs were F16, THAAD
missile program, AEHF & SBIRS satellites,

3/1998 - 3/2001
Raytheon Aircraft Company Wichita, KS
MANUFACTURING ENG/PLNR
Developed manufacturing plans on two new composite programs: Horizon and Premie
r.

1/1991 - 3/1993
Boeing Commercial Airplanes Everett, WA
PROJECT LEAD MANUFACTURING PLANNER
Directed and trained 10 project planners in writing 1st time quality manufacturi
ng plans for the 777 programs.

9/1988 - 12/1990
McDonnel Douglas Aircraft Co. Long Beach, CA
MANUFACTURING ENGINEER
Analyzed and improved work flow processes in manufacturing plans for the MD-11 f
inal assembly.
.

~~~~~~~~~~~~~~~~~~~~~~
SPECIALIZED SKILLS
~~~~~~~~~~~~~~~~~~~~~~
Computer: SAP, ERP, MS Word, MS Project, Excel, Photoshop I
Marketing director for sailing club. Increased membership by 200%
Excellent communication skills in project planning. Two years of formal trainin
g.
.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
PERSONAL DATA AND OTHER FACTS
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
B.A., Spanish with minor in Math, San Francisco State Univ., 1981
9 units in Project Management, 10 units in electronics
.
Dedicated, self-starter, creative persistant problem solver

Você também pode gostar