HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

CONTENT
Part I:
Chapter I: System Introduction
1.1 Scenario.........................................................................................................4
1.2 The reason for choosing tools......................................................................6
1.3 Project schedule............................................................................................8
Chapter II: System Analysis
2.1 Function diagram (FD)................................................................................9
2.2 Data Flow Diagram (DFD)........................................................................11
2.2.1 Context diagram...................................................................................12
2.2.2 DFD level 0 for Function Diagram......................................................14
2.2.3 DFD level 1 for System........................................................................15
2.2.4 DFD level 1 for Management...............................................................16
2.2.5 DFD level 1 for Search.........................................................................17
2.2.6 DFD level 1 for View...........................................................................18
2.2.7 DFD level 2 for Report.........................................................................19
2.2.8 DFD level 2 for Account Management................................................20
2.2.9 DFD level 2 for Pupil...........................................................................21
2.2.10 DFD level 2 for Class.........................................................................22
2.2.11 DFD level 2 for Subject.....................................................................23
2.2.12 DFD level 2 for Pupil Subject............................................................24
Chapter III: System Design
3.1 Entity Relationship Diagram (ERD).........................................................25
3.2 Input Design (Record specification)..........................................................29
3.3 Output Design (List of output)..................................................................38
3.4 Program Design (Flow Chart)...................................................................40
3.4.1 Flow chart for Login............................................................................41
3.4.2 Flow chart for Add New Pupil’s information.....................................42

1 Emerald Primary School Management System


HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

3.4.3 Flow chart for Add New Class’s information......................................43


3.4.4 Flow chart for Add New Subject’s information...................................44
3.4.5 Flow chart for Add New Pupil Subject................................................45
3.4.6 Flow chart for Delete Pupil’s information.......................................... 46
3.4.7 Flow chart for Delete Subject...............................................................47
3.4.8 Flow chart for Delete Class..................................................................48
3.4.9 Flow chart for Pupil Mark....................................................................49
3.4.10 Flow chart Edit Pupil’s information.................................................. 50
3.4.11 Flow chart for Edit Subject................................................................51
3.4.12 Flow chart for Edit Class....................................................................52
3.4.13 Flow chart for Pupil Mark..................................................................53
3.4.14 Flow chart Search Pupil’s information...............................................54
3.4.15 Flow chart for Search Pupil’s Mark...................................................55
3.4.16 Flowchart for Report..........................................................................56
3.4.17 Flow chart for View ..........................................................................57
Chapter IV: Program Testing
4.1 Test Plan......................................................................................................58
4.2 Test Data......................................................................................................59
Chapter V: Operating Introductions
5.1 Operating introduction..............................................................................60
5.2 Hardware Requirement.............................................................................60
5.3 Software Requirement...............................................................................60
5.4 How to install..............................................................................................60
Chapter VI: Conclusion
6.1 Scope and limitations.................................................................................61
6.2 Future development tendency...................................................................61

Part II:…………………………………………...……………………….. 62

2 Emerald Primary School Management System


HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Project Part I:
Emerald Primary School Management System

3 Emerald Primary School Management System


HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Chapter I: System Introduction

1.1 Scenario:
Nowadays, information technology has an important role in our

life. The more society develops, the more need of management

increase, such as when we want to develop or enlarge an organization

or a company, and we need efficient management system that helps us

to attain our desirable goal. To meet the need of management, many

computer programs is developed in many high level language that use

full for supplier to manage and customer to access. But also, we’re

student Genetic _ Ha Noi University of Technology join center with

almost different way to other Universities in Viet Nam. There’re a few

subjects buts they’re useful for our job in the future. And we can

approach to the new way in studying, the new technology of the world

Information Technology. To graduate, in the five year at the

university, we have to study and finish two projects two periods. It

will check your ability in the IT field. With the 3rd year student as us,

we have to finish the project with the following situation:

Emerald Primary School, located in the Dampening Ranges (50km

from Melbourne), Victoria, Australia. The school has offered an

unique place for the education of the children of the area for more

than 100 years, is the largest primary school and has an enrolment of

460+ pupils each year so to manage student’s mark and document is a

problem. Directors decide to develop an information system for

solving this.

4 Emerald Primary School Management System


HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

The information system must have the following requirement:

Teacher must log on to use the program. Accounts of teacher are


1.
stored in the database.

The information system must have the following requirement:

Teacher can Input data, Edit data for pupil’s mark and information.
2.
Teacher can search information of pupil’s mark and ….
3.
Search pupil by pupil’s code
a)
Search pupil by pupil’s name
b)
Search pupil by pupil’s birthday
c)
Search pupil by pupil’s mark
d)
Teacher can view information of pupil:
4.
List all pupils’ information.
a)
List all pupils’ mark according to each subject.
b)
List all pupils’ information according each class.
c)
5. Teacher can generate the reports as following:

Generate report about pupil’s information. The report must


a)
display all information of pupil.

Generate subject’s report. The report must display all


b)
information of subjects and mark for each subject.

Generate report for marks of each pupil and calculate average


c)
mark.

User can backup and recovery the database.


6.
5 Emerald Primary School Management System
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Group 73. D12 - I6

Participants: Regno:

Nguyen Duy Thanh 0701-013-0445

Nguyen Minh Thanh 0701-011-0633

Dau Thi Thanh Toan 0701-012-0396

Nguyen Thi Quynh Trang 0701-011-0648

So, with a program like this, we has to build this information system

with any programming language such as: VB.Net, C#, Visual Basic,

Java….and the database has been normalized in 3NF as the following, a

database such as: Microsoft Access, Structured Query Language (SQL

server), Oracle.…..After a long time we have made the decision the use

VB.Net as for programming language and Microsoft Access for database.

1.2 Reason for choosing the tool

Database:

There are a lot of tools manage such as: Microsoft Access, SQL

server, Oracle …. We choose Management System Access 2003 the

following reasons:

Easy to used Relation Database Management System.



It helps us to manage locate our records in a faster manner.

Data organization: involve creating and manipulating table that

contain data in conventional tabular.

Table linking and data extraction: link multiple tables by data



Relationships to create temporary tables.

Data entry and editing: require design and implementation of data



viewing, entry, and editing forms as an alternative to tabular presentation.

6 Emerald Primary School Management System


HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Data presentation: require the creation of reports that can



summarize the information in record set.

Macros: are sequences of action that automate repetitive database



operations.

Modules: are function and procedures written in the VBA



programming language.

Printing: lets us print virtually anything.


Programming language:

Besides, we use the programming language VB.Net 2005 because it’s

the programming language that widely used in Vietnam and it’s the first

GUI programming language that we study in the university. Moreover, it’s

compatible with Windows OS; it has hundreds of tools to help the

programmer easily to use it for programming, its GUI is nearly similar to

the Windows interface will make the user feel more familiar so they can

easily use it, too. And another reason that makes us choose it is because of

its features:

The “Visual” part refers to the method used to create the graphical

user interface (GUI).

The “Basic” part refers to the BASIC (Beginners All – Purpose

Symbolic Instruction Code) language, a language used by more

programmers than any other language in the history of computing. Visual

Basic has evolved from the original BASIC language and now contains

7 Emerald Primary School Management System


HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

several hundred statements, functions, and keywords, many of which relate

directly to the Windows GUI.

The Visual Basic programming language is not unique to Visual Basic.

The Visual Basic programming system, Applications Edition included in

Microsoft Excel, Microsoft Access, and many other Windows applications

uses the same language.

Visual Basic developers need to get ready for the biggest transition

they have ever had to make. The next edition of VB, called Visual

Basic.Net, is designed to make web development as different languages.

8 Emerald Primary School Management System


HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

1.3: Project Schedule

Figure 1.1: Table of Project Schedule

Task Time to
Planned Task Contents
# Accomplish
Complete Chapter 1(Introduction to
the system) included :
System + Scenario
February 23th -
requirements
1 February 28th + Reason for choosing tools.
analysis
(analyses user needs and user
requirements)
Complete Chapter 2(System analysis
and design part 1)included:
+ Context Diagram
System analysis March 1st - April
2
and design - Part 1 15th + Function hierarchy diagram
+ D.F.D
+ E.R.D
Complete Chapter 2(System analysis
h
System analysis April 16 - April and design part 2)included:
3 and design - Part 2 23th
+ Flow Chart
Converts the designs into the
complete information system
System includes acquiring and installing
April 24h - May 16th
4 Development system's environment; creating and
testing databases (test files, coding,
compiling....)
Demonstrates that developed system
conforms to requirements as
Integration and specified in the Functional
5 May 17th - May 22th
Test Requirements Document (includes
implementation preparation and
resolution of identified problems)
+ Complete all problems, print
Complete Project documents and Burn disks.
6 May 23th - May 26rd
and Submit
+ Prepare for presentation.

9 Emerald Primary School Management System


HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Chapter II: System Analysis

2.1 Function diagram (FD)


A functional diagram is used to show system’s functions that will be
constructed and the implementation process of data diagram. Function diagram will
also be used to determine the appearance frequency of smaller processes in the data
flow chart. A functional diagram only shows what to do know how to do. In a
functional diagram, a function is divided into many smaller functions and each
smaller function contains even smaller ones. Constructing diagram is a process of
division, from a higher function to appropriate smaller functions. Diagrams need to
be presented clearly, simply, exactly, fully and well-balanced. Function of the same
level has the same level of difficulty need to be on the same page.

Emerald Primary School Management System


10
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Emerald Primary School Management System

1. System 2. Management 3. Search 4. View 5. Report

1.1 Account
Management
2.1 Pupil 3.1 Pupil’s 4.1 Pupil’s 5.1 Pupil’s
Mark Information Information
Add
Add 3.2 Pupil by 4.2 Pupil’s 5.2 Subject &
Edit Pupil’s code Mark Mark
Edit
Delete 4.3 Pupil’s 5.3 Marks of
3.3 Pupil by
Delete Info according each pupil &
Pupil’s name average mark
2.2 Class to each class
3.4 Pupil by
1.2 Backup
Add Pupil’s b-day

1.3 Recovery Edit 3.5 Pupil by


Pupil’s mark
Delete

2.3 Subject

Add

Edit

Delete

2.4 Pupil
Subject

Add

Edit

Delete

Figure 2.1: Function Diagram

Emerald Primary School Management System


11
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

2.2 Data flow diagram: (DFD)


DFD is one of the most important tools in a structured system
analysis. It presents method of establishing relationship between functions or
processes of the system with information it use.DFD is a key component of the
system requirement specification, because it determines what information is needed
for the process before it is implemented.

DFD is used to provide special description of requirement and system design.


It provides an overview of key functional components of the system but it does
not provide any detail on these components

There are 4 main components of data flow diagram. These include:

Process

Data Flow

Data Store

External Factor

Figure 2.2: Main components of Data Flow Diagram

Emerald Primary School Management System


12
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Introduction about tool to draw diagram:

The process: The process shows a part of the system that



transforms inputs into outputs; that shows how one or more inputs are
changed into outputs.

The data flow: The flow is used to describe the movement of



information from one part of the system to another.

The data store: the store is used to model a collection of data



packets at rest

External factors: External factor can be a person, a group of



persons or an organization that are not under the studying field of the
system.

2.2.1 Context Diagram

A context diagram is a data flow diagram that shows the boundaries of the
information system. The context diagram is a top-level view of the information
system.

The first step in constructing a set of data flow diagrams for an

information system is to draw a DFD (Data Flow Diagram) called the

context diagram. A context diagram is a data flow diagram that shows the

boundaries of the information system. The context diagram is a top level

view of the information system.

Emerald Primary School Management System


13
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Admin
Require

Emerald Primary Feedback


School Management
Require
System

Feedback
User

Fig

ure2.2: Context Diagram for “Emerald Primary School Management

System”.

Figure2.2: Is context diagram for “Emerald Primary School

Management System” (PSMS). The “PSMS” process and an external

entity is “Management”.

The data interactions between the information system and the external

entity occur through two deferent data flows. The “ Admin” external entity

supplies data through the “Requirement Info” data flow (which requires

information about: User, information of Pupils, Class, Subject) and

receives data through the “Feedback “

Emerald Primary School Management System


14
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

2.2.2 DFD level 0 for function diagram

tblPupil
tblClass
tblSubject
tblPupilSubject
tblUser

Feedback Require

System
User Feedback User

Require Feedback Require Feedback Require

Require Require Require


Require
Management Admin Report
Feedback
Feedback Feedback
Feedback

tblPupilSubject
tblPupil

tblSubject
tblPupil
tblClass
tblSubject
Feedback Feedback
tblPupilSubject

Require Require Require


Require
Search View
Feedback

Feedback

Require
Require
tblPupilSubject
tblPupilSubject

tblSubject
tblClass

tblClass
tblPupil

tblPupil

Feedback Feedback
User

Figure 2.3: DFD level 0 for function diagram

2.2.3 DFD level 1 for function System

Emerald Primary School Management System


15
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Require
1.1
Account Tbl User
Management

Feedback

Feedback
Require
Feedback Feedback

Admin

1.3
1.2 Require Require
Recovery
Backup

tblUser
tblPupil
Require Require
tblClass
tblSubject
Feedback Feedback
tblSubject

Figure 2.4: DFD level 1 for function System

2.2.4 DFD level 1 for Management

Emerald Primary School Management System


16
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Require Require

2.1 2.2
tblPupil tblClass
Pupil Require Require Class
Feedback Feedback

Feedback Feedback

Admin
Feedback Feedback

Require

tblPupil
Require
2.4 tblPupilSubject
tblSubject 2.3 Require Require
Pupil_ tblSubject
Subject Subject
Feedback Feedback

2.5: DFD level 1 for Management

2.2.5 DFD level 1 for Search

Emerald Primary School Management System


17
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Require Require

Feedback

3.4
tblPupil
User Search pupil
Feedback by birthday

Feedback
Require
Require
Feedback

Require

Feedback

Feedback Require
3.3
3.2 Search
pupil by code
Admin Search pupil
Require Feedback
by name
Feedback

Require

Feedback

Require
tblPupil
Feedback
Require

User

Require Require
3.1 3.5
Search Pupil’s Search pupil
Feedback mark by mark Feedback

Require
Feedback
tblPupilSubject

tblPupilSubject
tblSubject

tblSubject
tblPupil

Require Feedback
User

Figure 2.6: DFD level 1 for Search

Emerald Primary School Management System


18
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

2.2.6 DFD level 1 for View

Feedback Feedback
User

Require Require

Require Require
4.1 4.2
View pupil’s Admin View pupil’s
Information Feedback Feedback mark
Feedback
Require

Feedback

Feedback
Require

Require
tblPupil
Feedback 4.3
View pupil
tblPupil
tblClass info according
to class
tblPupil tblSubject
Feedback

Require

tblPupilSubject

User

2.7: DFD level 1 for View

2.2.7 DFD level 1 for Report:

Emerald Primary School Management System


19
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Feedback
5.1
Feedback

tblPupil
Generate
User report pupil’s
Require information Require

Feedback

Order
Feedback Feedback

Admin
Require
Require

tblPupil
5.2 Require Require 5.3
Generate report tblSubject Generate report
subject and pupil’s Mark and
mark
Feedback tblPupil_Subject Feedback
average Mark

Feedback Feedback
User
Require Require

2.8: DFD level 1 for Report

2.2.8 DFD level 2 for Account Management

Emerald Primary School Management System


20
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Require

1.1.1
Create new tblUser
account
Feedback

Feedback

Require
Require Require
Admin

1.1.2 Feedback Feedback 1.1.3


Edit Account Delete Account

Feedback Feedback

tblUser
Order Order

2.9: DFD level 2 for Account Management

2.2.9 DFD level 2 for Pupil

Emerald Primary School Management System


21
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Require

2.1.1
tblPupil
Add new Pupil
Feedback

Feedback

Require

Require Require
Admin
Feedback Feedback

Feedback Feedback

2.1.2 2.1.3
tblPupil Delete Pupil
Edit Pupil
Require Require

2.10: DFD level 2 for Pupil

2.2.10 DFD level 2 for Class

Emerald Primary School Management System


22
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Require

2.2.1
Add new Class tblClass

Feedback

Require
Feedback Require
Require
Admin
Feedback Feedback

Feedback Feedback

2.2.2 2.2.3
tblClass Delete Class
Edit Class
Require Require

Figure 2.11: DFD level 2 for Class

2.2.11 DFD level 2 for Subject:

Emerald Primary School Management System


23
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Require

2.3.1
Add new tblSubject
subject
Feedback

Feedback

Require

Require Require
Admin
Feedback Feedback

Feedback Feedback

2.3.2 2.3.3
tblSubject Delete Subject
Edit Subject
Require Require

Figure 2.12: DFD level 2 for Subject

Emerald Primary School Management System


24
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

2.2.12 DFD level 2 for Pupil_Subject

Order

2.4.1
Add new tblPupil_Subject
Pupil_Subject
Feedback Feedback

Order

Order Order
Admin
Feedback Feedback

2.4.2 Feedback Feedback 2.4.3


Edit tblPupil_Subject Delete
Pupil_Subject Order Order
Pupil_Subject

Figure 2.12: DFD level 2 for Pupil_Subject

Emerald Primary School Management System


25
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Chapter III: System Design

3.1 ERD (Entity Relationship Diagram)


When developing a new information system, analyst often has

discussion with users, especially database manager, on the current system.

It’s they who have the responsibilities to collect necessary information

about the system required by system analyst. ERD is one of the most useful

models forming tools to organize this discussion. ERD is network model

that describes stored data of a system at a high level of abstraction.

The main components of an ERD include: Entity, Attribute and

Relationship

Entity is a subject, a duty, or an event that has a significant



meaning to the future system and displayed by a rectangle with round
corners. Each entity has its own name. In some case, entities of the same
port can be merged into one entity type. Entity type of a system is defined
base on the outcome of system function analysis.

Attributes are the characteristic of the entity displayed by fields or



columns of a table.

Relationship shows connections among the system’s entities.



Triangle head arrows display these connections. There are 3 major types of
relationship used in ERDs:

One - one relationship.



One - many relationship.

Many - many relationship.

Emerald Primary School Management System


26
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

. Introduce the function and Relationship of the fields in the database:

In our database, there’re 5 tables that include the entire field for the

information that used for the program. They are: tblPupil, tblClass,

tblSbject, tblPupil_Subject, and tblUser.

a. Table Pupil:

Table tblPupil contains the fields: with each Class ID define one class
name.

PupilID (primary key): define that the student is unique, and avoid
mistake with other students.

PupilName: describe the student name used to search, list, and sort the
result after processed.

ClassID: define the code of the Class.



PupilBirthday: Other detailed information of student.

PupilPhone: Other detailed information of student.

PupilEmail: Other detailed information of student.

PupilAddress: Other detailed information of student

Emerald Primary School Management System


27
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Figure 3.1: Table Pupil Information

b. Table Class:

Table tblClass contains the fields: with each Class ID define one class

name.

ClassID (primary key): define the code of the class.



ClassName: define the class name.

Figure
3.2: Table Class
c. Table Subject:

Table tblSubject contains the fields:

SubjectID (primary key): define the code of the subject.



SubjectName: define the name of the subject.

SubjectHourNum: define the number of hour of subject.

Figure
3.3: Table Subject

Emerald Primary School Management System


28
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

d. Table Pupil and Subject Mark:

Table tblPupil_Subject (Mark) contains the fields: With couple key are

Subject ID and Pupil ID that define link relationship with table Pupil and

table Subject.

SubjectID: define the code of the subject.



PupilID: define the pupil’s code.

SubjectMark: define the mark of subjects of students.

Figure
3.4: Table Pupil_Subject
e.Table User:

Table tblUser contains fields: Username and Password. Define

authority that signs into system.

Figure 3.5: Table User

Emerald Primary School Management System


29
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Relationship Diagram for PSMS:

Figure 3.6: Relationship Diagram for PSMS

3.2 Input Design


3.2.1 Record Specification
1. Table Pupil
Field name Data type Length Allow null Note
PupilID * Text 20 Primary Key
PupilName Text 50 Require
PupilBirthday Date/Time Require
PupilPhone Text 15 Require
PupilEmail Text 50 Require
PupilAdd Text 50 Require
MotherName Text 50 Require
MotherBirthday Date/Time Require
MotherPhone Text 15 Require
FatherName Text 50 Require
FatherBirthday Date/Time Require
FatherPhone Text 15 Require

Emerald Primary School Management System


30
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

ClassID Text 15 Require

2. Table Class
Field name Data type Length Allow null Note
ClassID * Text 15 Primary Key
ClassName Text 50 Require

3. Table Subject
Field name Data type Length Allow null Note
SubjectID * Text 15 Primary Key
SubjectName Text 50 Require
SubjectHourNum Number Require

4. Table Pupil_Subject
Field name Data type Length Allow null Note
SubjectID * Text 15 Primary Key
PupilID * Text 15 Primary Key
SubjectMark Number Require

5. Table User
Field name Data type Length Allow null Note
UserName * Text 10 Primary Key
Password Text 10 Require
Role Text 15 Require

3.2.2 Input Form Design


Login

Emerald Primary School Management System


31
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Figure 3.7: Login form

Main

Emerald Primary School Management System


32
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Figure 3.8: Main form

Account Management

Emerald Primary School Management System


33
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Figure 3.9: Account Management form

Pupil Management

Emerald Primary School Management System


34
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Figure 3.10: Pupil Management form

Class Management

Emerald Primary School Management System


35
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Figure 3.11: Class Management form

Subject Management

Emerald Primary School Management System


36
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Figure 3.12: Subject Management form

Mark Management

Emerald Primary School Management System


37
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Figure 3.13: Mark Management form

3.3 Output Design


3.3.1: Report Pupil’s Information

Emerald Primary School Management System


38
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

3.3.2: Report Subject

3.3.3: Report Mark

Emerald Primary School Management System


39
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

3.4 Program Design (Flow Chart)

Emerald Primary School Management System


40
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

A Flow Chart is defined as a pictorial representation describing a process


being studied of even used to plan stages of a project. Flow Chart tends to provide
people with a common language or reference point when dealing with a project or
process.
The basic Flow Chart symbols:

Decision or
Process
Condition

Terminator
Input/Ouput

Data Flow

Figure 3.14: The Basic Flow Chart symbols

The Terminator: It represents the process to start and end Program.

The Process: Check and process data.

The Data: Store data that entered in program.

The Decision: It represents what users want to do by giving requirement


system.

The Data Flow: It is used to describe the movement information from one
part of system to another.

3.4.1 Flow chart for Login

Emerald Primary School Management System


41
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input
username
and
password

Check Account False Error


message

True

Check admin False


permission

True

Access system with Access system with


Full Control Limit Control

End

Figure 3.15: Flowchart for Login

3.4.2 Flow chart for Add New Pupil’s information

Emerald Primary School Management System


42
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input
Pupil’s data

Check pupil’s No Error


information message

Yes

No
Confirm Add ?

Yes

Stored Pupil’s
Information record
in database

Successful

End

Figure 3.16: Flowchart for add new pupil’s information

3.4.3 Flow chart for Add New Class’s information

Emerald Primary School Management System


43
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input
Class’s
data

Check class’s No Error


information message

Yes

No Confirm Add ?

Yes

Stored Class’s
Information record
in database

Successful

End

Figure 3.17: Flowchart for add new class’s information

3.4.4 Flow chart for Add New Subject’s information

Emerald Primary School Management System


44
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input
Subject’s
data

Check Subject’s No Error


Information message

Yes

No
Confirm Add ?

Yes

Stored Subject’s
Information record
in database

Successful

End

Figure 3.18: Flowchart for add new subject’s information

3.4.5 Flow chart for Add New Pupil_Subject

Emerald Primary School Management System


45
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input Pupil_
Subject
data

Check Pupil_
No Error
Subject’s
message
Information

Yes

No Confirm Add ?

Yes

Stored new Pupil_


Subject Information
record in database

Successful

End

Figure 3.19: Flowchart for add new subject’s information

3.4.6 Flow chart for Delete Pupil’s information

Emerald Primary School Management System


46
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input Pupil
ID

Check exist of No Error


Pupil ID message

Yes

Confirm Delete ?
No

Yes

Update Pupil’s
Information record

Successful

End

Figure 3.20: Flowchart for delete pupil’s information

3.4.7 Flow chart for Delete Subject

Emerald Primary School Management System


47
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input
Subject ID

Check exist of No Error


Subject ID message

Yes

Confirm Delete ?
No

Yes

Update Subject’s
Information record

Successful

End

Figure 3.21: Flowchart for delete subject

3.4.8 Flow chart for Delete Class

Emerald Primary School Management System


48
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input Class
ID

Check exist of No Error


Class ID message

Yes

No
Confirm Delete ?

Yes

Update Class’s
Information record

Successful

End

Figure 3.22: Flowchart for delete class

3.4.9 Flow chart for delete Pupil_Subject

Emerald Primary School Management System


49
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input Pupil
ID &
Subject ID

Check exist of Error


No
Pupil ID & Subject ID
message

Yes

Confirm Delete ?
No

Yes

Update Pupil_Subject’s
Information record

Successful

End

Figure 3.23: Flowchart for delete pupil mark

3.4.10 Flow chart Edit Pupil’s information

Emerald Primary School Management System


50
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input Pupil
ID

Check exist False Error


of Pupil ID message

True

Show
Pupil’s
information

No Confirm Edit ?

Yes

Update Pupil’s
information record

Successful

End

Figure 3.24: Flowchart for edit pupil’s information

3.4.11 Flow chart for Edit Subject

Emerald Primary School Management System


51
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input
Subject ID

Check exist False Error


of Subject ID message

True

Show
Subject’s
information

No Confirm Edit ?

Yes

Update Subject record

Successful

End

Figure 3.25: Flowchart for edit subject

3.4.12 Flow chart for Edit Class

Emerald Primary School Management System


52
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input Class
ID

Check exist False Error


of Class ID message

True

Show
Class’s
information

No Confirm Edit ?

Yes

Update Class record

Successful

End

Figure 3.26: Flowchart for edit Class

3.4.13 Flow chart for Edit Pupil_Subject

Emerald Primary School Management System


53
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input Pupil
ID and
Subject ID

Check exist
of Pupil ID and False Error
Subject ID message

True
Show
Pupil_
Subject’s
information

No Confirm Edit ?

Yes

Update Pupil’s mark


record

Successful

End

Figure 3.27: Flowchart for edit pupil’s mark

3.4.14 Flow chart Search Pupil’s information:

Emerald Primary School Management System


54
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input
keyword to
Search

Search Pupil’s
Information

Check exist of Pupil’s False Error


Information message

True

Show Pupil record

End

Figure 3.29: Flowchart for search pupil’s information

3.4.15 Flow chart for Search Pupil’s Mark


:

Emerald Primary School Management System


55
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Input
keyword to
Search

Search Pupil’s Mark

Check exist of Pupil’s False Error


Mark message

True

Show Pupil’s Mark


record

End

Figure 3.30: Flowchart for search pupil’s mark

3.4.16 Flow chart for Report:

Emerald Primary School Management System


56
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Select type
of Report

Generate Report

Display
Report

End

Figure 3.31: Flowchart for report

3.4.17 Flow chart for View:

Emerald Primary School Management System


57
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Begin

Select type
of View

View information in
database

Display
Result

End

Figure 3.32: Flowchart for View

Chapter IV: Program Testing

4.1 Test Plan


Emerald Primary School Management System
58
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Purpose of Test Test Data Expected Result

Test for open all input and All input and output records are
Valid/Invalid Data
output the records opened

All the records are read and


Test for read the record Valid/Invalid Data displayed the data that the record
contained
Test for adding the record
All new records are saved into
into table in Microsoft Access Valid/Invalid Data
tables in Microsoft Access 2003
2003
All input are written and saved to
Test for modifying the record Valid/Invalid Data
the specific records

Particular record is deleted and


Test for deleting the records Valid/Invalid Data
refresh the table

Test for the limitation of data Valid/Invalid Data To find out the limitation of data

Module Testing Run correctly

Integrate Testing Cooperate correctly

Whole program runs completely


Whole program testing Valid/Invalid Data
with all tested data

Emerald Primary School Management System


59
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

4.2 Test Data

1. tblPupil
Field name Valid data Invalid data
PupilID * 001 Over 15 characters

2. tblClass:
Field name Valid data Valid data
ClassID * 001 15

3. tblSubject:
Field name Valid data Valid data
SubjectID * 001 Over 15 characters

4. tblPupil_Subject:
Field name Valid data Valid data
SubjectID * 004 Over 15 characters
PupilID * 001 Over 15 characters

5. tblUser
Field name Valid data Valid data
UserName * Admin Over 10 characters
Password admin Over 10 characters

Chapter V: Operating Instructions

Emerald Primary School Management System


60
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

5.1 Operating Instructions


To run program, we firstly need to install the following package:
 Windows XP, Windows 2003, Windows Vista, Windows 7 (Choose one of
these).
 Microsoft .Net Framework 2.0
 Microsoft Jet Data Engine 4.0

5.2 Hardware Requirement


Components Minimum Recommend
Pentium Dual-Core or
CPU Pentium IV 1.8 GHz
higher
Disk Capacity 2 GB 4 GB
RAM 512 MB 1 GB or higher
Resolution 1024 x 768 1024 x 768
VGA 8 MB 8 MB or higher
Keyboard Yes Yes
Mouse Yes Yes
CDROM Yes Yes

5.3 Software Requirement


 Microsoft Access 2003
 Visual Studio 2005

CHAPTER VI: Conclusion

Emerald Primary School Management System


61
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

6.1 Scope and Limitations


6.1.1 Scope
 Interface is simple and easy to understand and use.
 Because we use Access to make database that provide family interface
to design database, it’s easy to change the information of database.
 Be easy to use.
 Have all the function required.
6.1.2: Limitations
 Not support online program.
 Only run on Windows 32bit
 We have not enough experience to design system, design database, so
our system design and database design can not sufficient.
 Our program does not run as smoothly as we expected.
6.2 Future Development Tendency
This program may be supported and upgraded for some new

programs which use for managing and accessing information,
so it can manage a large database and help people to access at
the same time.

Users or programmers can modify some feature of program to



make good some disadvantages as description above and
adding for shortcoming of the system.

This program can be expanded better to meet fully needs of



management along with information technology and human
knowledge or business so on…

Emerald Primary School Management System


62
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Diploma Project - Part II:


Number 2

1.Link List
1.1 Introduction

Emerald Primary School Management System


63
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Linked lists are among the simplest are most common data structures, they
provide an easy implemetation for several important abstract data structures,
including stacks, queues, hash tables, symbolic expressions , and skip lists.

The principal benefit of a linked list over a conventional array is that the order of
the linked items may be different from the order that the data items are stored in
memory or on disk. For that reason, linked list allow insertion and removal of node
at any poin in the list, with a constant number of operations.

On the other hand, linked list by themselves do not allow random access to the
data, or any form of efficient indexing. Thus, many basic operations --- such as
obtaining the last node of the list, or finding a node that contains a given datum, or
locating the place where a new node should be inserted--- many require scanning
most of the list elements.

Linked list can be implemented in most languages. Languages such as Lisp and
Scheme have the data structure built in, along with operations to acces the linked
list. Procedural languages, such as Java, typically reply on mutable references to
create linked lists.

1.2 Flow Chart for Link List

Adding Flow Chart

When you input element into link list,program will question that do you want
to add more elements.If you choose “ Yes”,you can add many othere elements.If
you choose “ No”,program will display all elements which you added into link list.

Begin

Input element for adding


into link list
Emerald Primary School Management System
64
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Do you want to add more ?


No Show input line for adding

Yes

Add those elements into


link list
No

Display those elements on


screen

End

Adding – Link List

Deleting Flow Chart

When program displayed all elements, program will show function menu.You
can choose delete function.If you choose delete function, program will display line
that you must input elements to delete element.When program delete that
elemment,program will display remain elements after deleting.

Begin

Emerald Primary School Management System


65
HUT – GENETIC SINGAPORE JOINT TRAINING PROGRAM Project 2010 – Group 73

Input element for deleting


into link list

Do you want to delete more ?


No
Show input line for deleting
Yes

Yes

Delete inputted
No
element
on screen

Display remain elements


on screen

End

Deleting – Link list

Emerald Primary School Management System


66