*2998* (Pages : 3) 2998

Reg. No. : .....................................

Name : ..........................................

Seventh Semester B.Tech. Degree Examination, June 2009


03.703 : Production and Operations Management (P)
(2003 Admissions)

Time : 3 Hours Max. Marks : 100

PART – A

Answer all questions. (10×4=40 Marks)

1. Briefly explain the functional subsystems of an organisation.

2. Briefly explain the history and development of production management.

3. Differentiate between job shop and batch manufacturing systems.

4. Briefly explain different long-term and short-term capacity strategies.

5. List the various pure strategies used in aggregate planning.

6. Write short notes on production and operations standards.

7. List and explain different types of cost in inventory system.

8. What do you mean by Quality Control and Quality Assurance ?

9. Explain Toyota Kantan System.

10. Explain Group Technology.

P.T.O.
2998 -2- *2998*

PART – B

Answer any one full question from each Module.

Module – I

11. a) A business firm has recorded the demand for a particular product during the
past 6 weeks as shown below.

1st week 2nd week 3rd week 4th week 1st week 2nd week
Week
of January of January of January of January of February of February
Demand
in No. 19 17 22 27 29 33
of units

i) Calculate a 3-week moving average for the data to forecast demand for the
next week.
ii) Calculate the weighted average forecast for the data using a weight of 0.6 for
most recent data and weights of 0.3 and 0.1 for the previous weeks. 10
b) Define the terms ‘design capacity’ and ‘system capacity’. What are the different
long term capacity strategies that can be adopted for an Automobile Industry ?
10
12. a) What are the different types of plant layouts ? Explain them with examples. 10
b) Explain the steps in systematic layout planning. 10

Module – II

13. a) Explain the various pure strategies and mixed strategies in aggregate planning. 10
b) Determine the optimum sequence and makespan for the following 6 job
2 machines flow shop problem. Also determine the machine idle time.

Job i 1 2 3 4 5 6
M/c 1 5 2 13 10 8 12
10
M/c 2 4 3 14 1 9 11
*2998* -3- 2998

14. a) Distinguish between P-system and Q-system in Inventory Management. 8

b) The demand for an item is 24,000 per year. Its production rate is 4000 per
month. The carrying cost is Re. 0.50/ unit/month and the set up cost is Rs. 800/-
per set-up. The shortage cost is Rs. 15/- per unit per year. Determine the Economic
Batch Quantity, maximum inventory and maximum stockout. 12

Module – III

15. a) Explain the difference between MRP – I and MRP – II. 10

b) What are the inputs to MRP ? 10

16. a) Explain the concept of JIT manufacturing. 10

b) Explain X -chart and R-chart used in Quality Control. 10

––––––––––––––––