Você está na página 1de 3

5316 Hirsch Cir.

Elk Grove, CA 95757


bsc1db8c@westpost.net
(916) 803-7133 - Cell
Brandon S. Schilling
PROJECT EXPERIENCE
July 2008 - Present Performance Mechanical, Inc.(PMI) - Sacramento, CA
Planner / Scheduler / Field Engineer / Estimating - Sacramento Area / North Bay
Area
Valero Benicia Refinery - Flue Gas Scrubber Project, Benicia, CA - Scheduler / F
ield Engineer - Assisted in building and maintaining mechanical piping, duct, st
ructural steel & equipment schedule loaded with man-hour & commodity resources.
Procured material for mass re-fabrication from vendor and all hydrotest / restor
e material. Used P&IDs to establish hydrotest boundaries for over 70,000 ft of p
ipe. Also, developed and wrote procedure on how to save an immense amount of tim
e when generating drawing lists for hydrotest packages. Managed hydrotest packag
e tracking matrix in Excel. Walked down mechanical systems in preparation for hy
dro & restoration verification.
Valero Benicia Refinery - Butamer Project, Benicia, CA - Scheduler / Field Engin
eer - Built and maintained mechanical piping, civil, structural steel & equipmen
t schedule loaded with man-hour & commodity resources. Tracked progress in field
and managed budgeted man-hours & quantities between tracking system & schedule.
Developed & managed hydrotest package tracking matrix in Excel. This included t
racking the status of all hydrotests from initial generation to turnover package
to client.
Sacramento Office, Sacramento - Scheduler / Field Engineer / Estimating - Build
and manage construction schedules from office with visits to sites as needed for
assistance. This includes schedule updates, maintenance and analysis of current
schedules and generation of reports for preemptive resolutions to critical path
issues. Also uses standard company estimating procedures and practices to assis
t Project Managers in preparation of change order estimates or other project spe
cific estimating needs. Also stripped drawings and prepared estimates for bids.
McDonald Island PG&E Gas Compressor Station, Holt, CA - Scheduler / Project Engi
neer
Roseville Energy Park, Roseville, CA - Scheduler / Project Engineer - Siemens /
Vogt Power warranty outage project
Procter & Gamble, Sacramento, CA - Scheduler / Field Engineer - Annual Shutdown
Anheuser-Busch, Fairfield, CA - Scheduler / Field Engineer - Can Line Replacemen
t
2003 - July 2008 Calpine Corporation - Folsom, CA
Scheduler
Otay Mesa Energy Center - San Diego, CA. Calpine Corporations Lead scheduler ove
r the Otay Mesa Energy Center construction project located in San Diego, CA. Pro
ject was a 500 mega watt Combined Cycle Power Plant with construction management
contracted to Calpine. Managed the construction schedule from office in Folsom
with compliance visits to site as needed. This includes analysis of the general
contractors schedule and generation of reports for preemptive resolutions to cri
tical path issues. Was onsite regularly and involved in impact, recovery and cla
ims analysis between Calpine and the construction management team.
Folsom Office - Folsom, CA Responsible for Project Controls Department consistin
g with continued support in development and implementation of work procedures an
d ensuring the
scheduling software continues to work efficiently on workstations and servers. C
urrently developing the project controls portion of a Project Execution Manual a
nd training opportunities for P6 (Primavera 6) in order to get all Calpine sched
ulers trained in the P6 program. Currently setting up a P6 test environment for
Calpine's project controls in order to test and train Calpine schedulers on this
program.
Inland Empire Energy Center - Romoland, CA My responsibilities included scheduli
ng and progressing the master schedule forward. This included interfacing with c
ontractors for schedule updates and scheduling of weekly meetings to ensure dail
y workforce reports were completed and entered into Calpine's construction manag
ement intranet database. I generated and published progress curves and manpower
histograms for each subcontractor onsite. This also included analysis of the sch
edule and generation of reports for preemptive resolutions to critical path issu
es. I remained at the Inland Empire Energy Center until the project was 90% comp
lete as required and returned to the Calpine Folsom corporate office.
Valladolid Energy Center - Valladolid, Mexico Worked onsite with project control
s at this site for a short period while maintaining the construction schedule at
Mankato.
Mankato Energy Center - Mankato, MN Worked on site for three months assisting wi
th project scheduling until Inland Empire site was ready for scheduling at which
time I took on scheduling responsibilities at the Inland Empire project.
Pastoria Energy Center - Lebec, CA Worked as a junior scheduler for the 2 year d
uration of this project. My scheduling responsibilities included driving the mas
ter project schedule and managing the coordination of subproject schedules updat
es through contractors' representatives. This included analysis of the schedule
and generation of reports for preemptive resolutions to critical path issues.
Construction superintendent
Pastoria Energy Center - Lebec, CA I attained the position of construction super
intendent for the piping and equipment insulation contract in parallel with main
taining the schedule. Tracked and inspected insulation for quality, managed the
concrete, carpenters, laborers and grout contractors to bring the site to a comp
lete turn key finish by finishing their scope of work and reviewing and correcti
ng Chief Building Official punch lists for tank farm, water treatment and miscel
laneous projects and corrections that were needed for project completion.
2001 - 2003 SAIC Corporation & CALPINE Corporation - Folsom, CA
Desktop Support Analyst
Implemented software and hardware upgrades to insure the IS operations ran at an
optimal level for business. I delivered exemplary customer service with expedie
nt IT work requests while maintaining regular duties.
Data gathering and downloading information into inventory tracking system called
DataSplice system bar-coding, scanning software. Implemented wireless networkin
g with Intermec access points and handheld PDA label scanner computers in conjun
ction with Calpine's inventory/surplus program department. Managed jobs utilizin
g many different software tools including the following types of software: print
er /scanner, drivers, OCR, DRT, spreadsheets, databases, presentations, imaging,
viewing, virus protection, backups, diagrams, PDF editing, computer system imag
ing, Avaya and Lucent technologies, wireless networking, Intermec, and DataSplic
e technologies.
Education Educational Goals
2004 - 2008 University of Phoenix
Currently 9 classes (27 units) away from a Bachelor of Science in Business/Manag
ement (BSB/M) program that concentrates on managing human and fiscal resources w
ithin the structure, culture, and missions of any organization.
Educational Certifications
October 2007 2007 Primavera Conference - Orlando, FL
Primavera P6 "Training Courses Certificate Achieved"