Scheduling/Leveling Report - 05-Jun-11 - PM.exe =============================================== Default Project..................................................ZADCOR0 1 Projects: ZADCOR01........................................................ .

ZADCO HOUSING COMPLEX - Construction Programme UPDATE Scheduling/Leveling Settings: ----------------------------General ------Scheduling ......................................................Yes Leveling ........................................................No Ignore relationships to and from other projects .................No Make open-ended activities critical .............................No Use Expected Finish Dates .......................................Yes Schedule automatically when a change affects dates ..............No Level resources during scheduling ...............................No Recalculate assignment costs after scheduling ...................No When scheduling progressed activities use .......................Retaine d Logic Calculate start-to-start lag from ...............................Early S tart Define critical activities as Total Float less than or equal to .0 Compute Total Float As ..........................................Finish Float Calculate float based on finish date of .........................Each pr oject Calendar for scheduling Relationship Lag ........................Predece ssor Activity Calendar Advanced -------Calculate multiple float paths...................................No Statistics: ----------# Projects.......................................................1 # Activities.....................................................2548 # Not Started....................................................2034 # In Progress....................................................138 # Completed......................................................376 # Relationships..................................................6037 # Activities with Constraint.....................................17 Project: ZADCOR01 Activity: ENSBDEL010 Load Schedule Project: ZADCOR01 Activity: ENSBDEL030 Typical Floor(1St To 11Th Fl)- Lighting Layout Project: ZADCOR01 Activity: ENSBDEL050 Typical Floor(1St To 11Th Fl)- Power Layout Project: ZADCOR01 Activity: ENSBDPL010 Mezzanine Floor - Drainage Layout Project: ZADCOR01 Activity: ENSBDPL020 1St Floor - Drainage Layout Project: ZADCOR01 Activity: ENSBDPL030 Typical Floor(2Nd To 10Th) - Drainage Layout Project: ZADCOR01 Activity: ENSBDPL040

1St Floor - Water Supply Layout Project: ZADCOR01 Activity: Typical Floor(2Nd To 10Th) -Water Supply Layout Project: ZADCOR01 Activity: Penthouse Floor- Water Supply Layout Project: ZADCOR01 Activity: Cat 6 Cable For Structured Cabling Project: ZADCOR01 Activity: Cables Project: ZADCOR01 Activity: Wires Project: ZADCOR01 Activity: Pvc Conduits & Accessories Project: ZADCOR01 Activity: GI Switch And Socket Boxes Project: ZADCOR01 Activity: GI Cable Trays, Trunking & Accessories Project: ZADCOR01 Activity: FAHU Project: ZADCOR01 Activity: Upvc Pipes & Fittings

ENSBDPL050 ENSBDPL060 ENSBMEL010 ENSBMEL020 ENSBMEL030 ENSBMEL040 ENSBMEL050 ENSBMEL060 ENSBMHV060 ENSBMPL020

Errors: ------Warnings: --------Activities without predecessors..................................1 Project: ZADCOR01 Activity: ZHCMS00010 Project Start Date Activities without successors....................................1 Project: ZADCOR01 Activity: ZHCMS00030 Project Finish Out-of-sequence activities.......................................150 Project: ZADCOR01 Activity: RISEEL0010 Riser Clerence (Tel,Intercom) Project: ZADCOR01 Activity: ZA01CW0030 Chases Filling Project: ZADCOR01 Activity: ZA01CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZA01EL0040 Wall & Ceiling Conducting Project: ZADCOR01 Activity: ZA01PL0020 Wall Marking For Pex Piping Project: ZADCOR01 Activity: ZA01PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA01PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZA02CW0030 Chases Filling Project: ZADCOR01 Activity: ZA02CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZA02EL0040 Wall & Ceiling Conducting Project: ZADCOR01 Activity: ZA02PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA02PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZA03CW0030

Chases Filling Project: Sub-Surface Preparation for Project: Wall & Ceiling Conducting Project: Laying Of Pex Pipe Project: High Level Drainage Works Project: Chases Filling Project: Sub-Surface Preparation for Project: Wall & Ceiling Conducting Project: High Level Drainage Works Project: Chases Filling Project: Sub-Surface Preparation for Project: Wall & Ceiling Conducting Project: Chases Filling Project: Sub-Surface Preparation for Project: Wall & Ceiling Conducting Project: Chases Filling Project: Sub-Surface Preparation for Project: Wall & Ceiling Conducting Project: Chases Filling Project: Sub-Surface Preparation for Project: Wall & Ceiling Conducting Project: Chases Filling Project: Sub-Surface Preparation for Project: Wall & Ceiling Conducting Project: Chases Filling Project: Sub-Surface Preparation for Project: Wall & Ceiling Conducting Project: Sub-Surface Preparation for Project: Wall & Ceiling Conducting Project: Ppr Pipe Installation Project: ZADCOR01 waterproofing ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 waterproofing ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 waterproofing ZADCOR01 ZADCOR01 ZADCOR01 waterproofing ZADCOR01 ZADCOR01 ZADCOR01 waterproofing ZADCOR01 ZADCOR01 ZADCOR01 waterproofing ZADCOR01 ZADCOR01 ZADCOR01 waterproofing ZADCOR01 ZADCOR01 ZADCOR01 waterproofing ZADCOR01 ZADCOR01 waterproofing ZADCOR01 ZADCOR01 ZADCOR01 Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: ZA03CW0060 ZA03EL0040 ZA03PL0040 ZA03PL0070 ZA04CW0030 ZA04CW0060 ZA04EL0040 ZA04PL0070 ZA05CW0030 ZA05CW0060 ZA05EL0040 ZA06CW0030 ZA06CW0060 ZA06EL0040 ZA07CW0030 ZA07CW0060 ZA07EL0040 ZA08CW0030 ZA08CW0060 ZA08EL0040 ZA09CW0030 ZA09CW0060 ZA09EL0040 ZA10CW0030 ZA10CW0060 ZA10EL0040 ZA11CW0060 ZA11EL0040 ZA11PL0030 ZAPHCW0020

Cutting & Chasing Project: ZADCOR01 Chases Filling Project: ZADCOR01 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Marking ( Tel,Tv ,Bell,Twin Socket Cp) Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 Wall Marking For Pex Piping Project: ZADCOR01 Wall / Floor Surface Chipping Project: ZADCOR01 Cutting & Chasing Project: ZADCOR01 Chases Filling Project: ZADCOR01 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 High Level Drainage Works Project: ZADCOR01 Wall / Floor Surface Chipping Project: ZADCOR01 Cutting & Chasing Project: ZADCOR01 Chases Filling Project: ZADCOR01 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 Laying Of Pex Pipe Project: ZADCOR01 High Level Drainage Works Project: ZADCOR01 Wall / Floor Surface Chipping Project: ZADCOR01 Cutting & Chasing Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 High Level Drainage Works Project: ZADCOR01 Wall / Floor Surface Chipping Project: ZADCOR01 Cutting & Chasing Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 High Level Drainage Works Project: ZADCOR01 Wall / Floor Surface Chipping Project: ZADCOR01

Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity:

ZAPHCW0030 ZAPHCW0060 ZAPHEL0030 ZAPHEL0040 ZAPHPL0020 ZB01CW0010 ZB01CW0020 ZB01CW0030 ZB01CW0060 ZB01EL0040 ZB01PL0070 ZB02CW0010 ZB02CW0020 ZB02CW0030 ZB02CW0060 ZB02EL0040 ZB02PL0040 ZB02PL0070 ZB03CW0010 ZB03CW0020 ZB03CW0030 ZB03EL0040 ZB03PL0070 ZB04CW0010 ZB04CW0020 ZB04CW0030 ZB04EL0040 ZB04PL0070 ZB05CW0010 ZB05CW0020

Cutting & Chasing Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 Cutting & Chasing Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall & Ceiling Conducting Project: ZADCOR01 Wall / Floor Surface Chipping Project: ZADCOR01 Cutting & Chasing Project: ZADCOR01 Chases Filling Project: ZADCOR01 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Water Proofing & Leak Testing Project: ZADCOR01 Ppr Pipe Installation Project: ZADCOR01 Laying Of Pex Pipe Project: ZADCOR01 High Level Drainage Works Project: ZADCOR01 Wall / Floor Surface Chipping Project: ZADCOR01 Cutting & Chasing Project: ZADCOR01 Chases Filling Project: ZADCOR01 Wall / Floor Surface Chipping Project: ZADCOR01

Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity:

ZB05CW0030 ZB05EL0040 ZB06CW0020 ZB06CW0030 ZB06EL0040 ZB07CW0030 ZB07EL0040 ZB08CW0030 ZB08EL0040 ZB09CW0030 ZB09EL0040 ZB10CW0030 ZB10EL0040 ZB11CW0030 ZB11EL0040 ZBPHCW0030 ZBPHEL0040 ZC01CW0010 ZC01CW0020 ZC01CW0030 ZC01CW0060 ZC01CW0070 ZC01PL0030 ZC01PL0040 ZC01PL0070 ZC02CW0010 ZC02CW0020 ZC02CW0030 ZC03CW0010 ZC03CW0020

Cutting & Chasing Project: Chases Filling Project: Wall / Floor Surface Chipping Project: Cutting & Chasing Project: Chases Filling Project: Wall / Floor Surface Chipping Project: Cutting & Chasing Project: Chases Filling Project: Wall / Floor Surface Chipping Project: Cutting & Chasing Project: Chases Filling Project: Wall & Ceiling Conducting Project: Wall / Floor Surface Chipping Project: Cutting & Chasing Project: Chases Filling Project: Wall & Ceiling Conducting Project: Wall / Floor Surface Chipping Project: Cutting & Chasing Project: Chases Filling Project: Wall & Ceiling Conducting Project: Wall / Floor Surface Chipping Project: Cutting & Chasing Project: Chases Filling Project: Wall & Ceiling Conducting Project: Wall / Floor Surface Chipping Project: Cutting & Chasing Project: Chases Filling Project: Wall & Ceiling Conducting Project: Wall / Floor Surface Chipping Project: Cutting & Chasing Project:

ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01

Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity:

ZC03CW0030 ZC04CW0010 ZC04CW0020 ZC04CW0030 ZC05CW0010 ZC05CW0020 ZC05CW0030 ZC06CW0010 ZC06CW0020 ZC06CW0030 ZC06EL0040 ZC07CW0010 ZC07CW0020 ZC07CW0030 ZC07EL0040 ZC08CW0010 ZC08CW0020 ZC08CW0030 ZC08EL0040 ZC09CW0010 ZC09CW0020 ZC09CW0030 ZC09EL0040 ZC10CW0010 ZC10CW0020 ZC10CW0030 ZC10EL0040 ZC11CW0010 ZC11CW0020 ZC11CW0030

Chases Filling Project: Wall & Ceiling Conducting Project: Cutting & Chasing Project: Chases Filling Project: Wall & Ceiling Conducting Project: Cutting & Chasing Project: High Level Drainage Works Project: Cutting & Chasing Project: Cutting & Chasing Project: Cutting & Chasing Project: Cutting & Chasing Project: Cutting & Chasing Project: Cutting & Chasing Project: Cutting & Chasing Project: Cutting & Chasing Project: Cutting & Chasing Project: Cutting & Chasing Project: Cutting & Chasing ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 ZADCOR01 Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: ZC11EL0040 ZCPHCW0020 ZCPHCW0030 ZCPHEL0040 ZD01CW0020 ZD01PL0070 ZD02CW0020 ZD03CW0020 ZD04CW0020 ZD05CW0020 ZD06CW0020 ZD07CW0020 ZD08CW0020 ZD09CW0020 ZD10CW0020 ZD11CW0020 ZDPHCW0020

Activities with Actual Dates > Data Date.........................1 Project: ZADCOR01 Activity: ENSBMPL010 Pipe Supports (Water Supply & Drainage Piping) Milestone Activities with invalid relationships..................1 Project: ZADCOR01 Activity: ZHCMS00040 Completion of Shop Drawing Approvals Scheduling/Leveling Results: ---------------------------# Projects Scheduled/Leveled.....................................1 # Activities Scheduled/Leveled...................................2548 # Relationships with other projects..............................0 Data Date........................................................31-May11 Earliest Early Start Date........................................31-May11 Latest Early Finish Date.........................................31-Oct11 Exceptions: ----------Critical Activities..............................................992 Project: ZADCOR01 Activity: ENAPDCW010 Typical Floor (1St To 11Th) - Reflected False Ceiling Layout

Project: ZADCOR01 Activity: ENAPDCW020 Penthouse Floor- Reflected False Ceiling Layout Project: ZADCOR01 Activity: ENAPDCW030 Typical Floor(1St To 11Th) - Typical Floor Tile Layout (Wall/Floor) Project: ZADCOR01 Activity: ENAPDCW040 Penthouse Floor- Tile Layout Project: ZADCOR01 Activity: ENAPDCW060 Mezzanine Floor -Tile Lay Out Only In Toilets Project: ZADCOR01 Activity: ENAPDEL110 Kwh Meter Location Project: ZADCOR01 Activity: ENAPDHV040 Roof Floor- Ac & Ventilation Layout Project: ZADCOR01 Activity: ENAPDHV060 Ground Floor - Ac & Ventilation Layout Project: ZADCOR01 Activity: ENAPDHV070 Chilled Water Piping Schematic Layout Project: ZADCOR01 Activity: ENAPDPL010 Mezzanine Floor - Drainage Layout Project: ZADCOR01 Activity: ENAPDPL030 Typical Floor(2Nd To 10Th) - Drainage Layout Project: ZADCOR01 Activity: ENAPDPL080 Penthouse Floor- Drainage Layout Project: ZADCOR01 Activity: ENAPMCW070 False Ceiling Project: ZADCOR01 Activity: ENAPMCW090 Aluminum Kitchen Cabinet Project: ZADCOR01 Activity: ENAPMEL070 Light Fittings Project: ZADCOR01 Activity: ENAPMEL080 Fire Alram System Project: ZADCOR01 Activity: ENAPMEL110 Control Panels, Smdb, Db, & Vfd Project: ZADCOR01 Activity: ENAPMEL150 Switches & Sockets Project: ZADCOR01 Activity: ENAPMHV020 Chillers Project: ZADCOR01 Activity: ENAPMHV040 Chilled Water Pipe Fittings Project: ZADCOR01 Activity: ENAPMHV060 FAHU Project: ZADCOR01 Activity: ENAPMHV120 Chilled Water Valves & Accessories Project: ZADCOR01 Activity: ENSBDCW010 Typical Floor (1St To 11Th) - Reflected False Ceiling Layout Project: ZADCOR01 Activity: ENSBDCW020 Penthouse Floor- Reflected False Ceiling Layout Project: ZADCOR01 Activity: ENSBDCW030 Typical Floor(1St To 11Th) - Typical Floor Tile Layout (Wall/Floor) Project: ZADCOR01 Activity: ENSBDCW040 Penthouse Floor- Tile Layout Project: ZADCOR01 Activity: ENSBDCW060 Mezzanine Floor -Tile Lay Out Only In Toilets Project: ZADCOR01 Activity: ENSBDEL110 Kwh Meter Location Project: ZADCOR01 Activity: ENSBDHV040 Roof Floor- Ac & Ventilation Layout Project: ZADCOR01 Activity: ENSBDHV060 Ground Floor - Ac & Ventilation Layout Project: ZADCOR01 Activity: ENSBDPL010 Mezzanine Floor - Drainage Layout

Project: ZADCOR01 Penthouse Floor- Drainage Layout Project: ZADCOR01 Aluminum Kitchen Cabinet Project: ZADCOR01 Fire Alram System Project: ZADCOR01 Control Panels, Smdb, Db, & Vfd Project: ZADCOR01 Switches & Sockets Project: ZADCOR01 Chillers Project: ZADCOR01 FAHU Project: ZADCOR01 All Door Painting Project: ZADCOR01 Scaffolding For External Painting Works Project: ZADCOR01 External Painting Works Project: ZADCOR01 Fire Staircase Wall Paint Project: ZADCOR01 Dx Split Unit Project: ZADCOR01 Chilled Water Flushing Project: ZADCOR01 Water & Air Balancing Project: ZADCOR01 Fire Alarm - Testing and Comissioning Project: ZADCOR01 Smatv - Testing and Comissioning Project: ZADCOR01 Core Cutting / Pore Bagging Project: ZADCOR01 Wall Tiling ( Above I Tile) Project: ZADCOR01 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Water Proofing & Leak Testing Project: ZADCOR01 Kitchen Cabinet Fixing Project: ZADCOR01 Floor Tiling Project: ZADCOR01 False Ceiling Project: ZADCOR01 Bath Tub Fixing Project: ZADCOR01 Bath Tub Support Wall B/W Project: ZADCOR01 Bath Tub Support Wall Plaster Project: ZADCOR01 Ceiling Painting Project: ZADCOR01 Wall Tile (1 Tile) Project: ZADCOR01 Wall Painting Project: ZADCOR01 Floor Polishing

Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity:

ENSBDPL080 ENSBMCW090 ENSBMEL080 ENSBMEL110 ENSBMEL150 ENSBMHV020 ENSBMHV060 EXWKCW0010 EXWKCW0020 EXWKCW0030 EXWKCW0080 EXWKHV0010 MEPCMM0010 MEPCMM0020 MEPCMM0030 MEPCMM0050 MEZZCW0040 MEZZCW0050 MEZZCW0060 MEZZCW0070 MEZZCW0080 MEZZCW0090 MEZZCW0100 MEZZCW0110 MEZZCW0120 MEZZCW0130 MEZZCW0140 MEZZCW0150 MEZZCW0161 MEZZCW0170

Project: ZADCOR01 Activity: MEZZHV0010 Chilled Water Piping Project: ZADCOR01 Activity: MEZZHV0020 Chilled Water Piping Insulation Project: ZADCOR01 Activity: MEZZHV0030 Fahu Installation Project: ZADCOR01 Activity: MEZZPL0020 Drainage Piping Project: ZADCOR01 Activity: PRCCW00010 Waterproofing Works Project: ZADCOR01 Activity: PRCCW00020 Fire Staircase Wall Paint Project: ZADCOR01 Activity: PRCCW00040 False Ceiling Work Project: ZADCOR01 Activity: PRCCW00080 Kitchen Cabinet Project: ZADCOR01 Activity: PRCCW00090 Flooring & Wall Tiles Project: ZADCOR01 Activity: PRCEL00070 Light Fittings Project: ZADCOR01 Activity: PRCEL00080 Fire Alram System Project: ZADCOR01 Activity: PRCEL00090 Control Panels, Smdb, Db, & Vfd Project: ZADCOR01 Activity: PRCEL00150 Switches & Sockets Project: ZADCOR01 Activity: PRCHV00010 Chilled Water Pipes Project: ZADCOR01 Activity: PRCHV00020 Chillers Project: ZADCOR01 Activity: PRCHV00040 FAHU Project: ZADCOR01 Activity: PRCHV00060 Chilled Water Pipe Fittings Project: ZADCOR01 Activity: PRCHV00110 Chilled Water Valves & Accessories Project: ZADCOR01 Activity: PRCHV00130 Chilled Water Pipe Insulation Project: ZADCOR01 Activity: PRCPL00010 Upvc Pipes & Fittings for AC drain works Project: ZADCOR01 Activity: PRCPL00030 Ppr Pipes & Fittings Project: ZADCOR01 Activity: PRCPL00050 Pex Pipes & Fittings Project: ZADCOR01 Activity: PRCPL00060 Sanitary Wares Project: ZADCOR01 Activity: RISEEL0020 Riser Cable Tray/GI Trunking Installation (Tel,T V,Audio Intercom & Fire Alram) Project: ZADCOR01 Activity: RISEEL0030 Installation Of Kwh Meter Project: ZADCOR01 Activity: RISEHV0010 Chilled Water Piping Project: ZADCOR01 Activity: RISEHV0020 Chilled Water Piping Insulation Project: ZADCOR01 Activity: RISEPL0010 Drainage Piping Project: ZADCOR01 Activity: ROOFEL0010 Meggering Project: ZADCOR01 Activity: ROOFEL0020 Light Fix.Removing & Installation Roof

Project: ZADCOR01 Activity: ROOFEL0030 Cable Tray , Cableing For Chiller , Fans Roof Floor (Removing) Project: ZADCOR01 Activity: ROOFEL0040 Cable Tray , Cableing For Chiller , Fans Roof Floor (Installation) Project: ZADCOR01 Activity: ROOFEL0050 Smatv Installation Project: ZADCOR01 Activity: ROOFHV0010 Chilled Water Piping Project: ZADCOR01 Activity: ROOFHV0020 Chilled Water Piping Insulation Project: ZADCOR01 Activity: ROOFHV0050 Pressurisation Unit Project: ZADCOR01 Activity: ROOFHV0060 Chemical Dosing System Project: ZADCOR01 Activity: ROOFHV0070 Chiller Installation Project: ZADCOR01 Activity: ROOFPL0010 Floor Drain & Access. Project: ZADCOR01 Activity: ROOFPL0020 Water Supply Piping Project: ZADCOR01 Activity: ROOFPL0030 Drainage Piping Project: ZADCOR01 Activity: SNAGHO0010 Final Snags & Handing Over Project: ZADCOR01 Activity: SNAGHO0020 Clean and Snag - Block A Project: ZADCOR01 Activity: SNAGHO0030 Clean and Snag - Block B Project: ZADCOR01 Activity: SNAGHO0040 Clean and Snag - Block C Project: ZADCOR01 Activity: SNAGHO0050 Clean and Snag - Block D Project: ZADCOR01 Activity: ZA01CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA01CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA01CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA01CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZA01CW0090 Floor Tiling Project: ZADCOR01 Activity: ZA01CW0100 False Ceiling Project: ZADCOR01 Activity: ZA01CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZA01CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA01CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA01CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA01CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA01CW0160 Wall Painting Project: ZADCOR01 Activity: ZA01CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA01EL0110 Light Fix.Installation

Project: ZADCOR01 Activity: ZA01EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZA01EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZA01HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA01PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA01PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA01PL0050 Pressure Testing Project: ZADCOR01 Activity: ZA01PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZA01PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZA02CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA02CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA02CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA02CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZA02CW0090 Floor Tiling Project: ZADCOR01 Activity: ZA02CW0100 False Ceiling Project: ZADCOR01 Activity: ZA02CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZA02CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA02CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA02CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA02CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA02CW0160 Wall Painting Project: ZADCOR01 Activity: ZA02CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA02EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZA02EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZA02EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZA02HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA02PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA02PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA02PL0050 Pressure Testing Project: ZADCOR01 Activity: ZA02PL0070 High Level Drainage Works

Project: ZADCOR01 Activity: ZA02PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZA03CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA03CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA03CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA03CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZA03CW0090 Floor Tiling Project: ZADCOR01 Activity: ZA03CW0100 False Ceiling Project: ZADCOR01 Activity: ZA03CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZA03CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA03CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA03CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA03CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA03CW0160 Wall Painting Project: ZADCOR01 Activity: ZA03CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA03EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZA03EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZA03EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZA03HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA03PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA03PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA03PL0050 Pressure Testing Project: ZADCOR01 Activity: ZA03PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZA03PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZA04CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA04CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA04CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA04CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZA04CW0090 Floor Tiling Project: ZADCOR01 Activity: ZA04CW0100 False Ceiling Project: ZADCOR01 Activity: ZA04CW0110

Bath Tub Fixing Project: ZADCOR01 Activity: ZA04CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA04CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA04CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA04CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA04CW0160 Wall Painting Project: ZADCOR01 Activity: ZA04CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA04EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZA04EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZA04EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZA04HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA04PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA04PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA04PL0050 Pressure Testing Project: ZADCOR01 Activity: ZA04PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZA04PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZA05CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA05CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA05CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA05CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZA05CW0090 Floor Tiling Project: ZADCOR01 Activity: ZA05CW0100 False Ceiling Project: ZADCOR01 Activity: ZA05CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZA05CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA05CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA05CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA05CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA05CW0160 Wall Painting Project: ZADCOR01 Activity: ZA05CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA05EL0110 Light Fix.Installation

Project: ZADCOR01 Activity: ZA05EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZA05EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZA05HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA05PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA05PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA05PL0050 Pressure Testing Project: ZADCOR01 Activity: ZA05PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZA05PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZA06CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA06CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA06CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA06CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZA06CW0090 Floor Tiling Project: ZADCOR01 Activity: ZA06CW0100 False Ceiling Project: ZADCOR01 Activity: ZA06CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZA06CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA06CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA06CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA06CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA06CW0160 Wall Painting Project: ZADCOR01 Activity: ZA06CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA06EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZA06EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZA06EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZA06HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA06PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA06PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA06PL0050 Pressure Testing Project: ZADCOR01 Activity: ZA06PL0070 High Level Drainage Works

Project: ZADCOR01 Activity: ZA06PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZA07CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA07CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA07CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA07CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZA07CW0090 Floor Tiling Project: ZADCOR01 Activity: ZA07CW0100 False Ceiling Project: ZADCOR01 Activity: ZA07CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZA07CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA07CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA07CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA07CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA07CW0160 Wall Painting Project: ZADCOR01 Activity: ZA07CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA07EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZA07EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZA07EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZA07HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA07PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA07PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA07PL0050 Pressure Testing Project: ZADCOR01 Activity: ZA07PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZA07PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZA08CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA08CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA08CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA08CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZA08CW0090 Floor Tiling Project: ZADCOR01 Activity: ZA08CW0100 False Ceiling Project: ZADCOR01 Activity: ZA08CW0110

Bath Tub Fixing Project: ZADCOR01 Activity: ZA08CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA08CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA08CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA08CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA08CW0160 Wall Painting Project: ZADCOR01 Activity: ZA08CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA08EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZA08EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZA08EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZA08HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA08PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA08PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA08PL0050 Pressure Testing Project: ZADCOR01 Activity: ZA08PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZA09CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA09CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA09CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA09CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZA09CW0090 Floor Tiling Project: ZADCOR01 Activity: ZA09CW0100 False Ceiling Project: ZADCOR01 Activity: ZA09CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZA09CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA09CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA09CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA09CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA09CW0160 Wall Painting Project: ZADCOR01 Activity: ZA09CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA09EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZA09EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete

ctor) Project: ZADCOR01 Activity: ZA09EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZA09HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA09PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA09PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA09PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZA10CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA10CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA10CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA10CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZA10CW0090 Floor Tiling Project: ZADCOR01 Activity: ZA10CW0100 False Ceiling Project: ZADCOR01 Activity: ZA10CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZA10CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA10CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA10CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA10CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA10CW0160 Wall Painting Project: ZADCOR01 Activity: ZA10CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA10EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZA10EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZA10EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZA10HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA10PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA10PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA10PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZA11CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZA11CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZA11CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZA11CW0080 Kitchen Cabinet Fixing

Project: Floor Tiling Project: False Ceiling Project: Bath Tub Fixing

ZADCOR01 ZADCOR01 ZADCOR01

Activity: Activity: Activity:

ZA11CW0090 ZA11CW0100 ZA11CW0110

Project: ZADCOR01 Activity: ZA11CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZA11CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZA11CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZA11CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZA11CW0160 Wall Painting Project: ZADCOR01 Activity: ZA11CW0170 Floor Polishing Project: ZADCOR01 Activity: ZA11EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZA11EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZA11HV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZA11PL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZA11PL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZA11PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZAPHCW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZAPHCW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZAPHCW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZAPHCW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZAPHCW0090 Floor Tiling Project: ZADCOR01 Activity: ZAPHCW0100 False Ceiling Project: ZADCOR01 Activity: ZAPHCW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZAPHCW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZAPHCW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZAPHCW0140 Ceiling Painting Project: ZADCOR01 Activity: ZAPHCW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZAPHCW0160 Wall Painting Project: ZADCOR01 Activity: ZAPHCW0170 Floor Polishing Project: ZADCOR01 Activity: ZAPHEL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZAPHEL0120

Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZAPHHV0030 Insulation Of Chilled Water Pipe Project: ZADCOR01 Activity: ZAPHPL0030 Ppr Pipe Installation Project: ZADCOR01 Activity: ZAPHPL0040 Laying Of Pex Pipe Project: ZADCOR01 Activity: ZAPHPL0060 Concealed Drainage Works Project: ZADCOR01 Activity: ZAPHPL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB01CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB01CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB01CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZB01CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB01CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZB01CW0090 Floor Tiling Project: ZADCOR01 Activity: ZB01CW0100 False Ceiling Project: ZADCOR01 Activity: ZB01CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZB01CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB01CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZB01CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB01CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB01CW0160 Wall Painting Project: ZADCOR01 Activity: ZB01CW0170 Floor Polishing Project: ZADCOR01 Activity: ZB01EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZB01EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB01EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZB01PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZB01PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB02CW0041 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB02CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB02CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZB02CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB02CW0080

Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZB02CW0090 Floor Tiling Project: ZADCOR01 Activity: ZB02CW0100 False Ceiling Project: ZADCOR01 Activity: ZB02CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZB02CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB02CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZB02CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB02CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB02CW0160 Wall Painting Project: ZADCOR01 Activity: ZB02CW0170 Floor Polishing Project: ZADCOR01 Activity: ZB02EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZB02EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB02EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZB02PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZB02PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB03CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB03CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB03CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZB03CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB03CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZB03CW0090 Floor Tiling Project: ZADCOR01 Activity: ZB03CW0100 False Ceiling Project: ZADCOR01 Activity: ZB03CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZB03CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB03CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZB03CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB03CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB03CW0160 Wall Painting Project: ZADCOR01 Activity: ZB03CW0170 Floor Polishing Project: ZADCOR01 Activity: ZB03EL0110 Light Fix.Installation

Project: ZADCOR01 Activity: ZB03EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB03EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZB03PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB04CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB04CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB04CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB04CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZB04CW0090 Floor Tiling Project: ZADCOR01 Activity: ZB04CW0100 False Ceiling Project: ZADCOR01 Activity: ZB04CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZB04CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB04CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZB04CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB04CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB04CW0160 Wall Painting Project: ZADCOR01 Activity: ZB04CW0170 Floor Polishing Project: ZADCOR01 Activity: ZB04EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZB04EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB04EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZB04PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB05CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB05CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB05CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB05CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZB05CW0090 Floor Tiling Project: ZADCOR01 Activity: ZB05CW0100 False Ceiling Project: ZADCOR01 Activity: ZB05CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZB05CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB05CW0130 Bath Tub Support Wall Plaster

Project: ZADCOR01 Activity: ZB05CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB05CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB05CW0160 Wall Painting Project: ZADCOR01 Activity: ZB05CW0170 Floor Polishing Project: ZADCOR01 Activity: ZB05EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZB05EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB05EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZB05PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB06CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB06CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB06CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB06CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZB06CW0090 Floor Tiling Project: ZADCOR01 Activity: ZB06CW0100 False Ceiling Project: ZADCOR01 Activity: ZB06CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZB06CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB06CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZB06CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB06CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB06CW0160 Wall Painting Project: ZADCOR01 Activity: ZB06CW0170 Floor Polishing Project: ZADCOR01 Activity: ZB06EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZB06EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB06EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZB06PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB07CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB07CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB07CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB07CW0080 Kitchen Cabinet Fixing

Project: Floor Tiling Project: False Ceiling Project: Bath Tub Fixing

ZADCOR01 ZADCOR01 ZADCOR01

Activity: Activity: Activity:

ZB07CW0090 ZB07CW0100 ZB07CW0110

Project: ZADCOR01 Activity: ZB07CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB07CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZB07CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB07CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB07CW0160 Wall Painting Project: ZADCOR01 Activity: ZB07CW0170 Floor Polishing Project: ZADCOR01 Activity: ZB07EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZB07EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB07EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZB07PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB08CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB08CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB08CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB08CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZB08CW0090 Floor Tiling Project: ZADCOR01 Activity: ZB08CW0100 False Ceiling Project: ZADCOR01 Activity: ZB08CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZB08CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB08CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZB08CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB08CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB08CW0160 Wall Painting Project: ZADCOR01 Activity: ZB08CW0170 Floor Polishing Project: ZADCOR01 Activity: ZB08EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZB08EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB08EL0130 Testing & Commisioning

Project: ZADCOR01 Activity: ZB08PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB09CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB09CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB09CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB09CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZB09CW0090 Floor Tiling Project: ZADCOR01 Activity: ZB09CW0100 False Ceiling Project: ZADCOR01 Activity: ZB09CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZB09CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB09CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZB09CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB09CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB09CW0160 Wall Painting Project: ZADCOR01 Activity: ZB09CW0170 Floor Polishing Project: ZADCOR01 Activity: ZB09EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZB09EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB09EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZB09PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB10CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB10CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB10CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB10CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZB10CW0090 Floor Tiling Project: ZADCOR01 Activity: ZB10CW0100 False Ceiling Project: ZADCOR01 Activity: ZB10CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZB10CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB10CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZB10CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB10CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB10CW0160

Wall Painting Project: Floor Polishing Project: ZADCOR01 Activity: ZB10EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZB10EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB10EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZB10PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZB11CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZB11CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZB11CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZB11CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZB11CW0090 Floor Tiling Project: ZADCOR01 Activity: ZB11CW0100 False Ceiling Project: ZADCOR01 Activity: ZB11CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZB11CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZB11CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZB11CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZB11CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZB11CW0160 Wall Painting Project: ZADCOR01 Activity: ZB11CW0170 Floor Polishing Project: ZADCOR01 Activity: ZB11EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZB11EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZB11EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZBPHCW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZBPHCW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZBPHCW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZBPHCW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZBPHCW0090 Floor Tiling Project: ZADCOR01 Activity: ZBPHCW0100 False Ceiling Project: ZADCOR01 Activity: ZBPHCW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZBPHCW0120 ZADCOR01 Activity: ZB10CW0170

Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZBPHCW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZBPHCW0140 Ceiling Painting Project: ZADCOR01 Activity: ZBPHCW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZBPHCW0160 Wall Painting Project: ZADCOR01 Activity: ZBPHCW0170 Floor Polishing Project: ZADCOR01 Activity: ZBPHEL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZBPHEL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZBPHEL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC01CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZC01CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC01CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZC01CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC01CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC01CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC01CW0100 False Ceiling Project: ZADCOR01 Activity: ZC01CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZC01CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC01CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC01CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC01CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZC01CW0160 Wall Painting Project: ZADCOR01 Activity: ZC01CW0170 Floor Polishing Project: ZADCOR01 Activity: ZC01EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZC01EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC01EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC01PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZC01PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZC02CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZC02CW0050

Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC02CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZC02CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC02CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC02CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC02CW0100 False Ceiling Project: ZADCOR01 Activity: ZC02CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZC02CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC02CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC02CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC02CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZC02CW0160 Wall Painting Project: ZADCOR01 Activity: ZC02CW0170 Floor Polishing Project: ZADCOR01 Activity: ZC02EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZC02EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC02EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC02PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZC02PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZC03CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZC03CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC03CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZC03CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC03CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC03CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC03CW0100 False Ceiling Project: ZADCOR01 Activity: ZC03CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZC03CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC03CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC03CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC03CW0150 Wall Tile (1 Tile)

Project: Wall Painting Project: Floor Polishing

ZADCOR01 ZADCOR01

Activity: Activity:

ZC03CW0160 ZC03CW0170

Project: ZADCOR01 Activity: ZC03EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZC03EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC03EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC03PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZC04CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZC04CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC04CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC04CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC04CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC04CW0100 False Ceiling Project: ZADCOR01 Activity: ZC04CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZC04CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC04CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC04CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC04CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZC04CW0160 Wall Painting Project: ZADCOR01 Activity: ZC04CW0170 Floor Polishing Project: ZADCOR01 Activity: ZC04EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZC04EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC04EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC04PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZC05CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZC05CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC05CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC05CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC05CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC05CW0100 False Ceiling

Project: Bath Tub Fixing

ZADCOR01

Activity:

ZC05CW0110

Project: ZADCOR01 Activity: ZC05CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC05CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC05CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC05CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZC05CW0160 Wall Painting Project: ZADCOR01 Activity: ZC05CW0170 Floor Polishing Project: ZADCOR01 Activity: ZC05EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZC05EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC05EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC05PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZC06CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZC06CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC06CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC06CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC06CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC06CW0100 False Ceiling Project: ZADCOR01 Activity: ZC06CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZC06CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC06CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC06CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC06CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZC06CW0160 Wall Painting Project: ZADCOR01 Activity: ZC06CW0170 Floor Polishing Project: ZADCOR01 Activity: ZC06EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZC06EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC06EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC06PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZC07CW0040 Core Cutting / Pore Bagging

Project: ZADCOR01 Activity: ZC07CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC07CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC07CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC07CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC07CW0100 False Ceiling Project: ZADCOR01 Activity: ZC07CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZC07CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC07CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC07CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC07CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZC07CW0160 Wall Painting Project: ZADCOR01 Activity: ZC07CW0170 Floor Polishing Project: ZADCOR01 Activity: ZC07EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZC07EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC07EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC07PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZC08CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZC08CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC08CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC08CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC08CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC08CW0100 False Ceiling Project: ZADCOR01 Activity: ZC08CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZC08CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC08CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC08CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC08CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZC08CW0160 Wall Painting Project: ZADCOR01 Activity: ZC08CW0170 Floor Polishing Project: ZADCOR01 Activity: ZC08EL0110

Light Fix.Installation Project: ZADCOR01 Activity: ZC08EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC08EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC08PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZC09CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZC09CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC09CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC09CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC09CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC09CW0100 False Ceiling Project: ZADCOR01 Activity: ZC09CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZC09CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC09CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC09CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC09CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZC09CW0160 Wall Painting Project: ZADCOR01 Activity: ZC09CW0170 Floor Polishing Project: ZADCOR01 Activity: ZC09EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZC09EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC09EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC09PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZC10CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZC10CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC10CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC10CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC10CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC10CW0100 False Ceiling Project: ZADCOR01 Activity: ZC10CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZC10CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC10CW0130

Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC10CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC10CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZC10CW0160 Wall Painting Project: ZADCOR01 Activity: ZC10CW0170 Floor Polishing Project: ZADCOR01 Activity: ZC10EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZC10EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC10EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZC10PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZC11CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZC11CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZC11CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZC11CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZC11CW0090 Floor Tiling Project: ZADCOR01 Activity: ZC11CW0100 False Ceiling Project: ZADCOR01 Activity: ZC11CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZC11CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZC11CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZC11CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZC11CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZC11CW0160 Wall Painting Project: ZADCOR01 Activity: ZC11CW0170 Floor Polishing Project: ZADCOR01 Activity: ZC11EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZC11EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZC11EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZCPHCW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZCPHCW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZCPHCW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZCPHCW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZCPHCW0090

Floor Tiling Project: False Ceiling Project: Bath Tub Fixing Project: ZADCOR01 Activity: ZCPHCW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZCPHCW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZCPHCW0140 Ceiling Painting Project: ZADCOR01 Activity: ZCPHCW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZCPHCW0160 Wall Painting Project: ZADCOR01 Activity: ZCPHCW0170 Floor Polishing Project: ZADCOR01 Activity: ZCPHEL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZCPHEL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZCPHEL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZCPHPL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD01CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD01CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD01CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZD01CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD01CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD01CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD01CW0100 False Ceiling Project: ZADCOR01 Activity: ZD01CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZD01CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD01CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD01CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZD01CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZD01CW0160 Wall Painting Project: ZADCOR01 Activity: ZD01CW0170 Floor Polishing Project: ZADCOR01 Activity: ZD01EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD01EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD01EL0130 ZADCOR01 Activity: ZCPHCW0110 ZADCOR01 Activity: ZCPHCW0100

Testing & Commisioning Project: ZADCOR01 Activity: ZD01PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZD01PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD02CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD02CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD02CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZD02CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD02CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD02CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD02CW0100 False Ceiling Project: ZADCOR01 Activity: ZD02CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZD02CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD02CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD02CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZD02CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZD02CW0160 Wall Painting Project: ZADCOR01 Activity: ZD02CW0170 Floor Polishing Project: ZADCOR01 Activity: ZD02EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD02EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD02EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZD02PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZD02PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD03CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD03CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD03CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZD03CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD03CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD03CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD03CW0100 False Ceiling Project: ZADCOR01 Activity: ZD03CW0110 Bath Tub Fixing

Project: ZADCOR01 Activity: ZD03CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD03CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD03CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZD03CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZD03CW0160 Wall Painting Project: ZADCOR01 Activity: ZD03CW0170 Floor Polishing Project: ZADCOR01 Activity: ZD03EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD03EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD03EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZD03PL0070 High Level Drainage Works Project: ZADCOR01 Activity: ZD03PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD04CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD04CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD04CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZD04CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD04CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD04CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD04CW0100 False Ceiling Project: ZADCOR01 Activity: ZD04CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZD04CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD04CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD04CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZD04CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZD04CW0160 Wall Painting Project: ZADCOR01 Activity: ZD04CW0170 Floor Polishing Project: ZADCOR01 Activity: ZD04EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD04EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD04EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZD04PL0070 High Level Drainage Works

Project: ZADCOR01 Activity: ZD04PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD05CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD05CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD05CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZD05CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD05CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD05CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD05CW0100 False Ceiling Project: ZADCOR01 Activity: ZD05CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZD05CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD05CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD05CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZD05CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZD05CW0160 Wall Painting Project: ZADCOR01 Activity: ZD05CW0170 Floor Polishing Project: ZADCOR01 Activity: ZD05EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD05EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD05EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZD05PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD06CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD06CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD06CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZD06CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD06CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD06CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD06CW0100 False Ceiling Project: ZADCOR01 Activity: ZD06CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZD06CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD06CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD06CW0140

Ceiling Painting Project: ZADCOR01 Activity: ZD06CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZD06CW0160 Wall Painting Project: ZADCOR01 Activity: ZD06CW0170 Floor Polishing Project: ZADCOR01 Activity: ZD06EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD06EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD06EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZD06PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD07CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD07CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD07CW0060 Sub-Surface Preparation for waterproofing Project: ZADCOR01 Activity: ZD07CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD07CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD07CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD07CW0100 False Ceiling Project: ZADCOR01 Activity: ZD07CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZD07CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD07CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD07CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZD07CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZD07CW0160 Wall Painting Project: ZADCOR01 Activity: ZD07CW0170 Floor Polishing Project: ZADCOR01 Activity: ZD07EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD07EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD07EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZD07PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD08CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD08CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD08CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD08CW0080

Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD08CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD08CW0100 False Ceiling Project: ZADCOR01 Activity: ZD08CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZD08CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD08CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD08CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZD08CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZD08CW0160 Wall Painting Project: ZADCOR01 Activity: ZD08CW0170 Floor Polishing Project: ZADCOR01 Activity: ZD08EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD08EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD08EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZD08PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD09CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD09CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD09CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD09CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD09CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD09CW0100 False Ceiling Project: ZADCOR01 Activity: ZD09CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZD09CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD09CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD09CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZD09CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZD09CW0160 Wall Painting Project: ZADCOR01 Activity: ZD09CW0170 Floor Polishing Project: ZADCOR01 Activity: ZD09EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD09EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD09EL0130

Testing & Commisioning Project: ZADCOR01 Activity: ZD09PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD10CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD10CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD10CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD10CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD10CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD10CW0100 False Ceiling Project: ZADCOR01 Activity: ZD10CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZD10CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD10CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD10CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZD10CW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZD10CW0160 Wall Painting Project: ZADCOR01 Activity: ZD10CW0170 Floor Polishing Project: ZADCOR01 Activity: ZD10EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD10EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD10EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZD10PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZD11CW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZD11CW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZD11CW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZD11CW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZD11CW0090 Floor Tiling Project: ZADCOR01 Activity: ZD11CW0100 False Ceiling Project: ZADCOR01 Activity: ZD11CW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZD11CW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZD11CW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZD11CW0140 Ceiling Painting Project: ZADCOR01 Activity: ZD11CW0150 Wall Tile (1 Tile)

Project: Wall Painting Project: Floor Polishing

ZADCOR01 ZADCOR01

Activity: Activity:

ZD11CW0160 ZD11CW0170

Project: ZADCOR01 Activity: ZD11EL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZD11EL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZD11EL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZD11PL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZDPHCW0040 Core Cutting / Pore Bagging Project: ZADCOR01 Activity: ZDPHCW0050 Wall Tiling ( Above I Tile) Project: ZADCOR01 Activity: ZDPHCW0070 Water Proofing & Leak Testing Project: ZADCOR01 Activity: ZDPHCW0080 Kitchen Cabinet Fixing Project: ZADCOR01 Activity: ZDPHCW0090 Floor Tiling Project: ZADCOR01 Activity: ZDPHCW0100 False Ceiling Project: ZADCOR01 Activity: ZDPHCW0110 Bath Tub Fixing Project: ZADCOR01 Activity: ZDPHCW0120 Bath Tub Support Wall B/W Project: ZADCOR01 Activity: ZDPHCW0130 Bath Tub Support Wall Plaster Project: ZADCOR01 Activity: ZDPHCW0140 Ceiling Painting Project: ZADCOR01 Activity: ZDPHCW0150 Wall Tile (1 Tile) Project: ZADCOR01 Activity: ZDPHCW0160 Wall Painting Project: ZADCOR01 Activity: ZDPHCW0170 Floor Polishing Project: ZADCOR01 Activity: ZDPHEL0110 Light Fix.Installation Project: ZADCOR01 Activity: ZDPHEL0120 Switch Plate Fixing ( Kitchen,Toilet,Tel,Tv,Door Phone , Bell Buzzer , Heat Dete ctor) Project: ZADCOR01 Activity: ZDPHEL0130 Testing & Commisioning Project: ZADCOR01 Activity: ZDPHPL0080 Sanitary Fixtures Installation Project: ZADCOR01 Activity: ZHCMS00030 Project Finish Activities with unsatisfied constraints..........................2 Project: ZADCOR01 Activity: ENSBDPL040 1St Floor - Water Supply Layout Project: ZADCOR01 Activity: ENSBDPL050 Typical Floor(2Nd To 10Th) -Water Supply Layout Activities with unsatisfied relationships........................0 Activities with external dates...................................0