Você está na página 1de 9

CODE COMPLIANCE CHECKLIST

Office of Facilities Planning, Room 1060 Education Building Annex Tel. (518) 474-3906 Fax (518) 486-5918 www.emsc.nysed.gov/facplan/

FP-CCC 12/2006

THE STATE EDUCATION DEPARTMENT / THE UNIVERSITY OF THE STATE OF NEW YORK / Albany, NY 12234

General Information

PAGES 1, 2, AND 3 ARE REQUIRED FOR ALL PROJECTS SUBMITTED FOR REVIEW.
Note: The Excel version of this form has comments embedded for guidance in filling out many areas of the form. Comments are accessible by placing the cursor over the red triangle, right click and hit edit to read or copy the comment.

Note: Fill in every line.

SED Project Number


8 digit district BEDS Code 4 digit building number 3 digit project number

SED Control Number

District / Building Name: Project Type: Project Description:


New Building Existing Building Site Work Only Other

Architect / Engineer firm:


name phone number & e-mail

Project Contact Person:


name title phone number & e-mail

District Contact Person:


name title phone number & e-mail Yes

SED Project Control Number located on all Contract Documents, forms, and correspondence.

Required Bidding information is located in the contract documents on page or drawing numbers and are paperclipped: Non-Collusion Certification Equivalency Clause Wage Rates Required Uniform Safety Standards and TEM information is located on page or drawing numbers and are paperclipped: Exiting Plan C of O statement Off-Gassing Ventilation Separation Safety & Security Asbestos Isolation Noise Control Separation of Const. Testing Lead & Asb. Fume Control Cleaning Occupied Area TEM & Code Rule 56

Required 155.7 items on the Evaluation of Existing Building Form. Non-conformances are addressed in the documents:
Yes No, District addressing separately No non-conformances exist No, Addressed in SED project # list SED project number NA (Big 5 only)

Per 155.8 (e) (3) A certificate of Occupancy, a temporary certificate or a building permit may be denied or revoked for violation of health or safety standards, imposed by law or regulation, which indicate that a building is not suitable for occupancy or intended use. Page 2 CODE REVIEW CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3 STRUCTURAL RESPONSIBILITY CHECKLIST and CERTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 4 ARCHITECTURAL REVIEW CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 5 STRUCTURAL DESIGN CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 6 ENERGY CONSERVATION CODE CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 7 FIRE & ELECTRIC CODE REVIEW CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 8 MECHANICAL REVIEW CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 9 PLUMBING & GAS REVIEW CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA NA NA NA

It is not necessary to provide pages noted as "NA". If the page does apply and is erroneously not provided, the project will not be reviewed until the page is provided with an addendum.

FP-CCC 12/2006

CODE REVIEW CHECKLIST


0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
District BEDS Code Building Identification # Project number

page 2 of 9
SED Control Number

SED Project Number

0
District Name Building Name

Building Information:
Use and Occupancy Classifications: (check all that apply)

E A-

I-4 M Relocation Alteration*

S-1 S-2

R-2 Other -

For Existing Buildings check all that apply:


( * check the definitions in Appendix K)

NA

Change of Occupancy Repair* Renovation*

Historic-K10 report required Reconstruction* Addition*

* Provide Key Plans demonstrating distinct work areas


list drawing numbers

Type of Construction: (check all that apply) Existing bldg: New building(s):

I-A I-A

I-B I-B

II-A II-A

II-B II-B

III-A III-A

III-B III-B

IV IV

V-A V-A

V-B V-B NA

Building Height and Area for New Buildings and Additions: (If additional space needed, provide on Code Compliance Drawings.) Permitted: Height in feet: Number of stories: Square feet / floor* Actual: Height in feet:
Parapet

Number of stories:
Mezzanine Stage

Square feet / floor*


Catwalk Courtyard

Provide calculations on a Code Compliance Drawing.

Special Features: (check all that apply)

For All Projects* Provide Code Compliance Drawings:


(*excludes site, roof, district-wide and energy performance projects) list drawing numbers Yes, full Yes, partial Yes, in new construction only

NA*

Is a Sprinkler System provided? Building Information: Occupancy Classification Construction Classification - Existing Construction Classification - New Key Plan with building sides accessible Building Areas

No

Yes Yes Yes Yes

NA NA NA NA

Yes NA (Provide numbered Building Areas (existing and new), construction types, number of stories, number of sides accessible, allowable fire areas and actual fire areas with calculations. Show locations of fire walls and fire barriers.)

Egress Information: Room Use Designations Room Square Footages Room Occupancy Loads Room Exit & Corridor exit width Calculations Exit Travel Distances incl. Common Path Stair & Exit Door exit width Calculations Accessibility for Exist and New Smoke only Corridor/Exit Enclosures
NA

Yes Yes Yes Yes Yes Yes Yes Fire rated

NA NA NA NA NA NA NA

Accessory Assembly Areas: Code requirements: Gymnasium: Auditorium: Cafeteria: Library: Other: area in sq. ft. area in sq. ft. area in sq. ft. area in sq. ft. area in sq. ft.

(If additional space needed, provide on Code Compliance Drawings.)

Occupant load Occupant load Occupant load Occupant load Occupant load

Required E.W. Required E.W. Required E.W. Required E.W. Required E.W.

Provided E.W. Provided E.W. Provided E.W. Provided E.W. Provided E.W.

SED (MPS) requirements: Gymnasium: area in sq. ft. Gymnasium: bleacher sq. ft. Auditorium: area in sq. ft. Stage/Platform area in sq. ft. Cafeteria: area in sq. ft. Natatorium: bleacher sq. ft remaining area including the pool in sq. ft.

Reminder: Exit unit = 22", half units are permitted at 12" per half unit. / 600 sq. ft / 250 sq. ft / 600 sq. ft / 1200 sq. ft / 600 sq. ft / 250 sq. ft / 1500 sq. ft. added equals equals equals equals added equals Req'd exit units Req'd exit units Req'd exit units Req'd exit units Req'd exit units Provided exit units Provided exit units Provided exit units Provided exit units Provided exit units

FP-CCC 12/2006

STRUCTURAL RESPONSIBILITY CHECKLIST and CERTIFICATION


0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
District BEDS Code Building Identification Number Project number

page 3 of 9
SED Control Number

SED Project Number

0
District Name Building Name

The architect/engineer for each project which requires approval by the Commissioner, shall complete and sign this form and submit it together with the final plans and specifications for the project.

A. STRUCTURAL ELEMENTS Are there any structural elements involved with this project a. If no, go to Section D and sign the Certification. b. If yes, complete Sections B, C, and D, seal and sign the Certification

Yes

No

B. STRUCTURAL LOADING Structural loading shall meet at least the requirements of the Uniform Fire Prevention Yes and Building Code. Page 5, the Structural Design Checklist, is appropriately filled in and attached C. STRUCTURAL DESIGN IMPORTANT:
Check who is responsible for the design of each element

No

IMPORTANT:
Check applicable for each element

ARCH

ENGR STRUCTURAL ELEMENT 1. Foundation a. Footings b. Walls c. Piles (type) 2. Floor Framing Systems a. Mechanical/Special Framing 3. Columns 4. Walls a. Exterior Bearing 1. lintels 2. veneer attachment 3. reinforcing b. Exterior Nonbearing 1. lintels 2. veneer attachment 3. reinforcing c. Interior Bearing 1. lintels 2. reinforcing d. Interior Nonbearing 1. lintels 2. reinforcing 5. Roof Framing Systems a. Mechanical/Special Framing 6. Stairs and Stairways 7. Bridges 8. Catwalks 9. Railings 10. Bleachers/Grandstands 11. Retaining Walls 12. Chimney Stacks 13. Parapet Walls 14. Other

Present In Work

Not Present In Work

D. CERTIFICATION I, the undersigned, do hereby certify that: (Check appropriate box) There are no structural elements involved in the project, or I have designed the structural elements of this project, as noted above, in accordance with at least the criteria listed in the New York State Uniform Fire Prevention and Building Code.
Seal of R. A. licensed in New York State Seal of P. E. licensed in New York State

Signature - Architect

Date

Signature - Engineer

Date

FP-CCC 12/2006

ARCHITECTURAL REVIEW CHECKLIST


0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
District BEDS Code Building Identification Number Project number

page 4 of 9
SED Control Number

SED Project Number

0
District Name Building Name

LOCATION in Documents

Dead End Corridors less than 1 1/2 times the width, max 20 ft. . Smoke Zone Exiting all student spaces over 500 sq. ft. . . . Rescue Windows located on Construction Documents . . . Rescue Window Clear Opening Size on Construction Document(s) . Class A finishes in Corridors and Assembly Spaces . . . Assembly Area Maximum Occupancy Sign . . . . . Electrically Powered Moveable Partition Sign . . . . . Fire Extinguishers . . . . . Safety Glazing in Doors, Exterior Corridor Windows, and Stair Windows Partition/Wall Fireproofing Design Number of Rated Partitions/Assemblies Corridor enclosure . . . . . . . . . Rated interior Corridor Windows . . . . . . . . Elevator Equipment Room enclosure 2 hour . . . . . Stairways, riser and tread sizes are indicated . . Classroom Ceiling height 9'-0" . . . . . Secure Exam Storage . . . . . . Fire Blankets in Laboratory Rooms . . . . Door Schedules . . . . . . Hardware Schedule . . . . . . Window Schedules . . . . . . Roof System UL Class A or FM Class 1 . . . Carpet, Radiant Floor Panel Test Class 1 . . . Assembly Area Seating meets NFPA 701 . . . Truss/Joist Identification Signs . . . Site and floor plans showing separations during construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable not applicable

Accessibility Parking . . . . . Exterior Accessible Route . . . . Signage . . . . . Accessible Exits / Entrances . . . . Accessible Toilets . . . . Accessible Work Stations in all classrooms . Door Approach Clearances . . . . Interior Accessible Route to major spaces . . Door Hardware . . . . . Wheelchair Viewing Spaces in assembly spaces Auditorium ambulatory seats . . . . Assistive Listening Devices . . . . Public Telephones . . . . . Elevator . . . . . Elevator Signage . . . . . Interior Accessibility Signage . . . . All Program Spaces are Accessible . . . There is an Accessible Toilet Room on Every Floor

Yes

NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA No No

PENC PENC PENC PENC PENC PENC PENC PENC PENC PENC PENC PENC PENC PENC PENC PENC PENC

. . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . .

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

FP-CCC 12/2006

STRUCTURAL DESIGN CHECKLIST


0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
District BEDS Code Building Identification Number Project number

page 5 of 9
SED Control Number

SED Project Number

0
District Name Building Name

1604.5 Prior to structural design, the District / BOCES has been consulted to determine if this facility is currently or will be considered for use as an emergency shelter facility? Will this building be used as an emergency Shelter? Yes

Yes

The New York State Uniform Fire Prevention and Building Code Section 1603 requires, "The design loads and other information pertinent to the structural design required by Sections 1603.1.1 through 1603.1.8 shall be clearly indicated on the construction documents for parts of the building or structure." Conventional light-frame construction: Floor and roof live loads Ground snow load
list drawing numbers NA list drawing numbers

Basic wind speed (3-second gust), miles per hour and wind exposure
list drawing numbers

Seismic Design Category and Site Class


list drawing numbers

1603.1.1 Floor live load


list drawing numbers

1603.1.2 Roof live load 1603.1.3 Roof snow load

Exceeds 10 pounds / sq. ft. list drawing numbers

list drawing numbers

1603.1.4 Wind load


list drawing numbers

1603.1.5 Earthquake design data


list drawing numbers

1603.1.6 Flood load

Not in flood hazard area per Section 1612.3 Flood certification provided per Section 1612.5 Not applicable applicable code sections

list drawing numbers

1603.1.7 Special loads

list drawing numbers

1603.1.8 System and components requiring special Not applicable inspections for seismic resistance
list drawing numbers

Soils 1802.6 Soil classification & design load bearing capacity


list drawing numbers list specification numbers

Soil investigation report

Available

Not applicable

1621.2 and 1621.3 have been reviewed and coordinated with architect and engineers 1704 Special Inspection requirements, where are they located in the documents?

Yes

list drawing or specification numbers

Print name:

Signature:

Date:
Seal of P. E. or R. A. licensed in New York State

Telephone:

FP-CCC 12/2006

ENERGY CONSERVATION CODE CHECKLIST


0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
District BEDS Code Building Identification Number Project number

page 6 of 9
SED Control Number

SED Project Number

0
District Name Building Name

The 2002 Energy Conservation Code of New York State Section 104.2 states "Compliance with specific provisions of this code shall be determined through the use of computer software, worksheets, compliance manuals and other similar materials when they have met the intent of this code." (www.eren.doe.gov/buildings/tools_directory/software/comcheckez.htm) Section 104.3 requires " Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in sufficient detail pertinent data and features of the building and the equipment and the systems as herein governed, including, but not limited to, design criteria, exterior envelope component materials, U-factors of the envelope systems, Ufactors of fenestration products, R-values of insulating materials, size and type of apparatus and equipment, equipment and systems controls and other pertinent data to indicate conformance with the requirements of this code and relevant laws, ordinances, rules and regulations." Applicability:
(check the definitions) New Building Additions Low Energy Usage Building Substantial alterations Historic Building Unconditioned Building Change in occupancy

Exempt Building: Thermal Design Parameters: Outdoor design temperature Degree days (heating / cooling) Climate Zone:

Per ASHRAE Handbook of Fundamentals Per ASHRAE Handbook of Fundamentals 10B 15 10% or less 11B 16 12B 13A 14A

Glazing percentage: Design Approach:

between 10% and 25%

between 25% and 40% Chapter 8 - Acceptable Practice

between 40% and 50% DOE software used

Chapter 7 - Prescriptive Chapter 7 - System Chapter 7 - Energy Cost Budget

802 Building Envelope Requirements: U-factors of the envelope systems

In compliance

Worksheets available

Not applicable

or
list drawing numbers list specification sections

U-factors of fenestration products


list drawing numbers

or
list specification sections

R-values of insulating materials


list drawing numbers

or
list specification sections

803 Building Mechanical Systems: Design Load 804 Service Water Heating: 805 Lighting and Power Systems: Interior lighting power

803.2 Applicable list drawing number Applicable Applicable Entire building method

803.3 Applicable

Not applicable

Not applicable Not applicable Portion of building method Not applicable list drawing number or specification section

806 Design By Total Building Performance: Applicable Provide a full detailed analysis of the entire building and all systems.

FP-CCC 12/2006

FIRE & ELECTRIC CODE REVIEW CHECKLIST


0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
District BEDS Code Building Identification Number Project number

page 7 of 9

SED Control Number

SED Project Number

0
District Name Building Name

NA = Not Applicable

= LOCATION in Construction Documents NA

FIRE SERVICE Access Roads Access Openings Stairway Identification Premises ID Hazards Firefighters Water Supplies Fire Hydrants Fire Command Center

. . . . . . . .

. . . . . . . .

Yes Yes Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA NA NA NA

MEANS OF EGRESS New Buildings Corridor Plenum . Exit Enclosure Ventilation Exit Signs . . . Egress Illumination . Emergency Power . Area of Refuge . . Boiler/Furnace/Refrig. Rms Fire Code Section 1010

NA

. . . . . .

Yes Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA NA NA

BUILDING SYSTEMS Emergency Power . . Electrical Eqpt, Wiring & Hazards. Mechanical Refrigeration . . Elevator Recall . . Battery Systems . . FIRE PROTECTION SYSTEMS . Automatic Sprinkler System . Alternative System . . Hood Fire Suppression . . . . Standpipe System . . Fire Extinguishers Fire Alarm . . Automatic Detection System . Emergency Alarm System . Smoke Control System . . Smoke & Heat Vent . . Municipal FA Station . . Explosion Control . . . . Fire Dept. Connections Fire Pumps . . AH Units & Fans shutdown w/ FA

Yes Yes Yes Yes Yes

NA NA NA NA NA NA

Renovations, alterations, reconstructions, additions, and changes of occupancy

Exit Signs . . Egress Illumination Emergency power

. . .

. . .

Yes Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA NA

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

. Combustible Dust . Fire Safety During Construction Flammable Finishes . Service Stn. & Repair Garage

GENERAL - FIRE Acceptance Testing/Inspection Training . . . . Equipment Listed/Labeled . Fire Stopping . . . Identification . . . Equipment Location . .

Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA

ELECTRICAL Telephone . . NEC (NFPA 70) Electric Work . Panel/Circuits Identified . . Artificial Light . . Explosion Proof Equipment . Shop Emergency Shunts . . Dust Proof Shop Outlets . . Shielded Shop Light Fixtures . Closed Elec. Htg. Elements & UL Underground Electric Service . Elevator Code A17.1 . . Electric Operated Partition . . . Plenum Cable HID Self Extinguishing . . . Other ________________

NA Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

GENERAL - ELECTRIC Acceptance Testing/Inspection Training . . . . Equipment Listed/Labeled . Fire Stopping . . . Equipment Location . . Access/Clearances . . Identification Lines/Mtl./Eqpt. Instruction Manual / Video Material/Eqpt Reuse . Unsafe System Rehab/Rmvl. .

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA NA NA NA NA

FP-CCC 12/2006

MECHANICAL REVIEW CHECKLIST


0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
District BEDS Code Building Identification Number Project number

page 8 of 9
SED Control Number

SED Project Number

0
District Name Building Name

NA = Not Applicable

= LOCATION in Construction Documents NA

BOILER ROOM Fuel: Oil

Gas . . . . . . . . . . . .

Electric
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

Other

Other
Low Water Cutoff . Combustion Air . Clearance . Safety Burner Switch . Chimney/Vent . Standards . Electronic Flame Safeguards Safety Valves & Controls . 12NYCRR4 (Ind. Code Rule 4) Remote Burner Shutoff Valves Fuel Train Standards . Scald Protection Domestic HW ASME Vessel . MECHANICAL Ventilation Intake Openings & Protections Ventilation Rate . Common System . Balancing . Uninhabited Spaces . Exhaust . Independent Systems . Toilet/Locker/Janitor Closets Hazardous Areas . Laboratories . Shops . Kitchen Domestic . Kitchen Commercial . Kitchen Commercial Makeup Mechanical Equipment Rooms Elevator Equipment Rooms Other ________________ Subslab . GENERAL Acceptance Testing/Inspection Training . Equipment Listed/Labeled . Fire Stopping . Equipment Location . Access/Clearances . Controls .

. . . . . . . . . . . . . . . . . .

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

Duct Systems Plenum . . . Construction . . Insulation . . . . . Filters Smoke Detection Systems Fire Dampers . Smoke Dampers . Appliances Cooling Towers . Forced Air Furnace . Engine/Turbine . Other ______________ Other ______________ Refrigeration ASHRAE 15 . . Refrigerant type . Machinery Room . . . Piping Hydronic piping . . Material . Insulation . . . Valves . . . Installation requirements Fuel Oil Materials . . . Piping . . . Storage . . . Valves . . . Solar Systems

. . . . . . . . . . . . . . . . . .

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

. . . . .

Yes

NA NA NA NA NA NA NA

. . . . . .

Yes Yes Yes Yes Yes Yes

Sequence of Operations . Identification Lines/Mtl./Eqpt. Instruction Manual / Video Material/Eqpt Reuse . Unsafe System Rehab/Rmvl. Condensate Disposal . No Direct Fired Heaters .

Yes Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA NA

FP-CCC 12/2006

PLUMBING & GAS REVIEW CHECKLIST


0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
District BEDS Code Building Identification Number Project number

page 9 of 9
SED Control Number

SED Project Number

0
District Name Building Name

NA = Not Applicable

= LOCATION in Construction Documents NA Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

PLUMBING Rodent proofing . . Protection plumbing systems . Structural Safety . . Piping Support . . Floodproofing . . Fixtures/Faucets/Fittings Fixture Adequacy . . Accessible Facilities . . Emergency Shower/Eyewash . Drinking Fountains . . Sink - Bubbler Separated . Lavatories . . Showers . . Sinks . . Urinals . . Water Closets . . Water Saving Fixtures . . Water Heaters DHW Heater ASME Tank . Location . . Controls . . Safety Devices . . Insulation . . Water Supply and Distribution Protect Water Quality . . Size/Material Piping . . No Lead Solder . . Disinfection . . Sanitary Drainage Sanitary Discharge Permits . . Storm - Sanitary Separated . . Size/Material Piping Sumps/Ejectors . . Indirect/Special Waste . . Vents . . Traps/Interceptors/Separators Storm Drainage . . Swimming Pool . . GENERAL - PLUMBING Acceptance Testing/Inspection Training . Equipment Listed/Labeled . Fire Stopping . Equipment Location . Access/Clearances .

GAS Low pressure 1/2 psig or < . No gas lines in corridors Master Gas Valve for Outlets Pipe Size/Material . . Valves . . . . Enc. of Pressure Regulation Eq. PSC Distribution Service . Liq. Petroleum Gas NFPA 58 Vent/Chimney . . . Appliances Shown . . Other ______________ . Other ______________ . GENERAL - GAS Acceptance Testing/Inspection Training . . . . Equipment Listed/Labeled . Fire Stopping . . . Equipment Location . . Access/Clearances . . Controls . . . . Sequence of Operations . Identification Lines/Mtl./Eqpt. Instruction Manual / Video . Material/Eqpt Reuse . . Unsafe System Rehab/Rmvl. Condensate Disposal . No Direct Fired Heaters .

NA Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA NA NA NA NA NA NA NA NA NA

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA NA NA NA NA NA NA NA NA

. . . . .

Yes Yes Yes Yes Yes Yes

NA NA NA NA NA NA

Identification Lines/Mtl./Eqpt. Instruction Manual / Video Material/Eqpt Reuse . . Unsafe System Rehab/Rmvl. Condensate Disposal .