PROPOSTA DE PREÇO

VOL. DE VALOR DO VALOR VALOR TOTAL


MÃO DE TOTAL MÃO CONCRETO POR MATERIAL POR VOLUME TOTAL VOLOR TOTAL
UNITARIO DO DOS
DESCRIÇÃO UND/M QUANT. DOCONCRETO CONCRETO
OBRA DE OBRA UNIDADE METRO DISPOSITIVO DISPOSITIVOS
MOBILIZAÇÃO DE COLABORADORES E EQUIPAMENTOS UND 1.00 25,000.00 25,000.00 25,000.00 25,000.00
DESMOBILIZAÇÃO DE COLABORADORES E EQUIPAMENTOS UND 1.00 25,000.00 25,000.00 25,000.00 25,000.00
ESCAVAÇÃO MECANIZADA M³ 2,200.00 21.00 46,200.00 - - - 21.00 46,200.00
ATERRO COMPACTADO M³ 1,900.00 52.00 98,800.00 - - - 52.00 98,800.00
BOCA ALAS DRENAGENS AOC UND 41.00 3,500.00 143,500.00 1.80 1,170.00 73.80 47,970.00 4,670.00 191,470.00
TUBO PEAD 600 mm M 460.00 176.00 80,960.00 - - 176.00 80,960.00
TUBO PEAD 750 mm M 147.00 204.00 29,988.00 - - 204.00 29,988.00
TUBO PEAD 900 mm M 33.00 257.00 8,481.00 - - 257.00 8,481.00
SARJETA DE TERRA STR 03 M 3,479.00 35.00 121,765.00 - - - 35.00 121,765.00
SARJETA DE CONCRETO STC 03 M 9,567.00 41.00 392,247.00 0.10 62.21 915.56 595,115.24 103.21 987,362.24
MEIO FIO COM SARJETA MFC 01-A M 5,605.00 45.00 252,225.00 0.13 81.51 702.87 456,863.55 126.51 709,088.55
VALETA DE PROTEÇÃO DE TERRA VPR 01 - 1,00 x 0,30 m COM M 1,188.00 71.00 84,348.00
PRENCHIMENTO DE PEDRA DE MÃO - - - 71.00 84,348.00
VALETA DE PROTEÇÃO DE TERRA VPR 02 - 0,60 x 0,30 m COM
M 1,784.00 53.00 94,552.00
PRENCHIMENTO DE PEDRA DE MÃO - - - 53.00 94,552.00
VALETA DE PROTEÇÃO CONCRETO VPC 03 - 1,00 x 0,30 m M 2,343.00 92.00 215,556.00 0.16 105.30 379.57 246,717.90 197.30 462,273.90
VALETA DE PROTEÇÃO CONCRETO VPC 03A - 1,00 x 0,50 m M 1,789.00 119.00 212,891.00 0.21 136.89 376.76 244,896.21 255.89 457,787.21
VALETA DE PROTEÇÃO CONCRETO VPC 04 - 0,60 x 0,30 m M 4,064.00 65.00 264,160.00 0.13 82.94 518.57 337,068.16 147.94 601,228.16
SARJETA TRAPEIZOIDAL EM CONCRETO STZ 01 - 1,20 x 0,30 m M 140.00 101.00 14,140.00 0.18 116.55 25.10 16,316.30 217.55 30,456.30
SARJETA TRAPEIZOIDAL EM CONCRETO STZ 02 - 0,80 x 0,25 m M 72.00 73.00 5,256.00 0.13 85.80 9.50 6,177.60 158.80 11,433.60
DISSIPADOR DE ENERGIA DES - 01 UND 28.00 210.00 5,880.00 0.53 343.20 14.78 9,609.60 553.20 15,489.60
DISSIPADOR DE ENERGIA DES - 03 UND 1.00 319.00 319.00 0.75 486.20 0.75 486.20 805.20 805.20
DISSIPADOR DE ENERGIA DES - 04 UND 1.00 407.00 407.00 0.92 600.60 0.92 600.60 1,007.60 1,007.60
DISSIPADOR DE ENERGIA DEB - 01 UND 52.00 267.00 13,884.00 0.40 257.40 20.59 13,384.80 524.40 27,268.80
DISSIPADOR DE ENERGIA DEB - 03 UND 10.00 1,432.00 14,320.00 0.72 464.75 7.15 4,647.50 1,896.75 18,967.50
DISSIPADOR DE ENERGIA DEB - 04 UND 7.00 2,063.00 14,441.00 1.10 715.00 7.70 5,005.00 2,778.00 19,446.00
DISSIPADOR DE ENERGIA DEB - 11 UND 1.00 5,379.00 5,379.00 1.98 1,287.00 1.98 1,287.00 6,666.00 6,666.00
DESCIDA D"AGUA TIPO RAPIDA DAR - 02 M 164.30 122.00 20,044.60 0.15 97.96 24.76 16,094.01 219.96 36,138.61
ENTRADA D"AGUA EDA UND 52.00 145.00 7,540.00 0.15 100.10 8.01 5,205.20 245.10 12,745.20
EQUIPE DE TOPOGRAFIA UND 4.00 28,000.00 28,000.00 112,000.00
CAMINHÃO BETONEIRA COM MOTORISTA UND 4.00 30,000.00 30,000.00 120,000.00
TOTAL 2,205,283.60 TOTAL 3,088.38 2,007,444.86 4,436,728.46

RESUMO
VALOR TOTAL DA MÃO DE OBRA R$ 2,205,283.60
EQUIPE DE TOPOGRAFIA R$ 112,000.00
CAMINHÃO BETONEIRA COM MOTORISTA R$ 120,000.00
VALOR TOTAL DO CONCRETO R$ 2,007,444.86
VOLUME TOTAL DO CONCRETO M³ 3,088.38
VALOR TOTAL DA DRENAGEM R$ 4,436,728.46
PROPOSTA DE PREÇO

DESCRIÇÃO UND/M QUANT. VALOR UNITARIO VALOR TOTAL

MOBILIZAÇÃO UND 1.00 25,000.00 25,000.00


DESMOBILIZAÇÃO UND 1.00 25,000.00 25,000.00
ESCAVAÇÃO MECANIZADA M³ 2,200.00 21.00 46,200.00
ATERRO COMPACTADO M³ 1,900.00 52.00 98,800.00
BOCA ALAS DRENAGENS AOC UND 41.00 3,500.00 143,500.00
TUBO PEAD 600 mm M 460.00 176.00 80,960.00
TUBO PEAD 750 mm M 147.00 204.00 29,988.00
TUBO PEAD 900 mm M 33.00 257.00 8,481.00
SARJETA DE TERRA STR 03 M 3,479.00 35.00 121,765.00
SARJETA DE CONCRETO STC 03 M 9,567.00 41.00 392,247.00
MEIO FIO COM SARJETA MFC 01-A M 5,605.00 45.00 252,225.00
VALETA DE PROTEÇÃO DE TERRA VPR 01 - 1,00 x 0,30 m COM M 1,188.00
PRENCHIMENTO DE PEDRA DE MÃO 71.00 84,348.00
VALETA DE PROTEÇÃO DE TERRA VPR 02 - 0,60 x 0,30 m COM
M 1,784.00
PRENCHIMENTO DE PEDRA DE MÃO 53.00 94,552.00
VALETA DE PROTEÇÃO CONCRETO VPC 03 - 1,00 x 0,30 m M 2,343.00 92.00 215,556.00
VALETA DE PROTEÇÃO CONCRETO VPC 03A - 1,00 x 0,50 m M 1,789.00 119.00 212,891.00
VALETA DE PROTEÇÃO CONCRETO VPC 04 - 0,60 x 0,30 m M 4,064.00 65.00 264,160.00
SARJETA TRAPEIZOIDAL EM CONCRETO STZ 01 - 1,20 x 0,30 m M 140.00 101.00 14,140.00
SARJETA TRAPEIZOIDAL EM CONCRETO STZ 02 - 0,80 x 0,25 m M 72.00 73.00 5,256.00
DISSIPADOR DE ENERGIA DES - 01 UND 28.00 210.00 5,880.00
DISSIPADOR DE ENERGIA DES - 03 UND 1.00 319.00 319.00
DISSIPADOR DE ENERGIA DES - 04 UND 1.00 407.00 407.00
DISSIPADOR DE ENERGIA DEB - 01 UND 52.00 267.00 13,884.00
DISSIPADOR DE ENERGIA DEB - 03 UND 10.00 1,432.00 14,320.00
DISSIPADOR DE ENERGIA DEB - 04 UND 7.00 2,063.00 14,441.00
DISSIPADOR DE ENERGIA DEB - 11 UND 1.00 5,379.00 5,379.00
DESCIDA D"AGUA TIPO RAPIDA DAR - 02 M 164.30 122.00 20,044.60
ENTRADA D"AGUA EDA UND 52.00 145.00 7,540.00
EQUIPE DE TOPOGRAFIA UND 4.00 28,000.00 112,000.00
CAMINHÃO BETOREIRA UND 4.00 30,000.00 120,000.00
VALOR TOTAL 2,429,283.60