Escolar Documentos
Profissional Documentos
Cultura Documentos
Page 1 of 34
Is project in Qualified Census Tract & Difficult to Develop area? Yes Does a community revitalization plan exist? Yes Political Jurisdiction: Jurisdiction Address: Jurisdiction City: Jurisdiction Phone: CIty of Raleigh Last: Meeker Title: Mayor PO Box 590 Raleigh (919)890-3050 Zip: 27602
35.7747 -78.6328
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 2 of 34
Project Description
Project Type:* New Construction Rehab Adaptive Reuse
Is this project a follow-on (Phase II, etc) to a previously-awarded tax credit development project? No If yes, list names of previous phase(s): Will the project be receiving project based federal rental assistance? No If yes, provide the subsidy source: and number of units:
Target Population: Family Indicate below any additional targeting for special populations proposed for this project: Mobility impaired handicapped: 5% of units comply with QAP Section IV(F)(3) (in addition to the units required by other federal and state codes.) Persons with disabilities or homeless populations: the greater of 5 units or 10% of the total units Remarks: Wake County Human Services will be the local lead agency for the special populations units.
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 3 of 34
Applicant Information
Applicant Name: Address: City: Contact: Telephone: DHIC, Inc. 113 S. Wilmington Street Raleigh First: Natalie (919)832-4345 State: NC Zip: 27601 Last: Connell Title: Vice President
Alt Phone:
Fax:
(919)832-2206
Email Address:
natalie@dhic.org
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 4 of 34
Site Description
Total Site Acreage: 2.07 Total Buildable Acreage: 2.07 If buildable acreage is less than total acreage, please explain:
Identify utilities and services currently available (and with adequate capacity) for this site: Storm Sewer Water Sanitary Sewer Electric
Is the demolition of any buildings required or planned? Yes If yes, please describe: The City of Raleigh has acquired the remaining existing buildings on the site and will demolish them before selling the property to Carlton Place Development, LLC.
Are existing buildings on the site currently occupied? No If yes: (a) Briefly describe the situation:
(b) Will tenant displacement be temporary? (c) Will tenant displacement be permanent? Is the site directly accessed by an existing, paved, publicly maintained road? Yes If no, please explain:
Is any portion of the site located inside the 100 year floodplain? No If yes: (a) Describe placement of project buildings in relation to this area:
(b) Describe flood mitigation if the project will have improvements within the 100 year floodplain:
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 5 of 34
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 6 of 34
Site Control
Does the owner have fee simple ownership of the property (site/buildings)? No If yes provide: Purchase Date: If no: (a) Does the owner/principal or ownership entity have vaild option/contract to purchase the property? Yes (b) Does an identity of interest (direct or indirect) exist between the owner/principal or ownership entity with the option/contract for purchase of the property and the seller of the property? No If yes, specify the relationship:
Purchase Price:
(c) Enter the current expiration date of the option/contract to purchase: 9/30/2004 (D) Enter Purchase Price: 625,000
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 7 of 34
Zoning
PDD Master Plan & Downtown Housing Overlay Present zoning classification of the site: Disctrict Is mutifamily use permitted? Yes Are variances, special or conditional use permits or any other item requiring a public hearing needed to develop this proposal? No If yes, have the hearings been completed and permits been obtained? If yes, specify permit or variance required and date obtained. If no, describe permits/variances required and schedule for obtaining them:
Are there any existing conditions of historical significance located on the project site that will require State Historic Preservation office review? Yes If yes, describe below: The site is located adjacent to the East Raleigh-South Park National Historic District and all plans must be reviewed by the City of Raleigh Historic Preservation Office.
Are there any existing conditions of environmental significance located on the project site? No If yes, describe below:
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 8 of 34
Ownership Entity
Owner Name: Carlton Place Development, LLC Address: City: 113 S. Wilmington Street Raleigh State: NC Zip: 27601 80-0086448 80-0086447 (If assigned) (If Not Assigned)
Federal Tax ID Number of Ownership Entity: Federal Tax ID Number of Managing GP or Member:
Entity Type: Limited Liability Company Entity Status: Already Formed Is the applicant requesting that the Agency treat the application as Non-Profit sponsored? Is the applicant requesting that the Agency treat the application as CHDO sponsored?
Yes Yes
List all general partners, members,and principals. Specify nonprofit corporate general partners or members. Click [Add] to add additional partners, members, and principals.
Org:
Org:
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 9 of 34
Unit Mix
The Median Income for Wake county is $71,300. Low Income Units Type Gdn Apt Gdn Apt Gdn Apt Gdn Apt Twn Hse Gdn Apt Gdn Apt Gdn Apt Gdn Apt Gdn Apt Gdn Apt Total # BRs Net Sq.Ft. # Units 1 1 1 2 2 2 3 3 1 2 3 786 786 858 1039 1270 1039 1216 1216 786 1039 1216 14 5 7 18 3 2 6 1 3 4 1 # Units 0 1 0 3 0 1 1 1 1 0 0 Monthly Rent 550 106 570 600 600 158 670 162 340 395 455 Electric Utility Allowance 60 60 60 82 82 82 96 96 60 82 82 Gas Other Mandatory Serv. Fees **Total Housing Exp. 610 166 630 682 682 240 766 258 400 477 537
Water/Sewer
Employee Units (will add to Low Income Unit total) Type # BRs Net Sq.Ft. Total # Units # Units Monthly Rent Electric Utility Allowance Gas Other Mandatory Serv. Fees **Total Housing Exp.
Water/Sewer
Market Rate Units Type Gdn Apt Gdn Apt Gdn Apt Total # BRs Net Sq.Ft. # Units 1 1 2 786 858 1039 1270 1216 2 5 6 1 2 # Units 0 0 0 0 0 Monthly Rent 600 625 700 700 850 Electric Utility Allowance 60 60 82 82 96 Gas Other Mandatory Serv. Fees **Total Housing Exp. 660 685 782 782 946
Water/Sewer
Statistics All Units Low Income....... Market Rate....... Totals............... 64 16 80 Gross Monthly Rental Income 32373 10925 43298
Units 8 0 8
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 10 of 34
Separate community building - Sq. Ft. (Floor Area): Community space within residential bulding(s) - Sq. Ft. (Floor Area): 2,232 Elevators - Number of Elevators: Square Footage Information Gross Floor Square Footage: 106,359
Notes ** Please refer to the Income Limits and Maximum Housing Expense Table to ensure that Total Monthly Tenant Expenses for low income units are within established thresholds.
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 11 of 34
Targeting
Specify Low Income Unit Targeting in table below. List each applicable targeting combination in a separate row below. Click [Add] to create another row. Click "X" (at the left of each row) to delete a row. Add as many rows as needed.
# BRs 3 1 1 2 2 2 3 3 3 12 9 8 3 18 6 1 5 2
Units targeted at 60 targeted at 50 targeted at 30 targeted at 60 targeted at 50 targeted at 30 targeted at 60 targeted at 50 targeted at 30
% percent of median income. percent of median income. percent of median income. percent of median income. percent of median income. percent of median income. percent of median income. percent of median income. percent of median income.
64
Note: This number should match the total number of low income units in the Unit Mix section.
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 12 of 34
Funding Sources
NonAmortizing* Rate (%) 7.25 Term (Years) 30 Amort. Period (Years) 30 Annual Debt Service 99,870
Source Bank Loan RPP Loan Local Gov. Loan - Specify: City of Raleigh RD 515 Loan RD 538 Loan - Specify: AHP Loan Other Loan 1 - Specify: Wake County Other Loan 2 - Specify: Other Loan 3 - Specify: Tax Exempt Bonds State Tax Credit(Loan) State Tax Credit(Direct Refund) Equity: Federal LIHTC Non-Repayable Grant Equity: Historic Tax Credits Deferred Developer Fees Owner Investment Other - Specify: Total Sources**
Amount 1,220,000
1,000,000
2.00
30
30
478,987 250,000
1.00 2.00
20 20
20 20
706,418
30
30
4,469,766
267,479
8,392,650
* "Non-amortizing" indicates that the loan does not have a fixed annual debt service. For these items, you must fill in 20-year debt service below. ** Total Sources must equal total replacement cost in Project Development Cost (PDC) section. Estimated pricing on sale of Federal Tax Credits: $0. 80 Remarks concerning project funding sources: (Please be sure to include the name of the funding source(s)) AHP funds have been awarded. Raleigh City Council approved the loan and a commitment letter has been issued. The Wake County commitment letter will be issued in June.
Loans with Variable Amortization Please fill in the annual debt service as applicable for the first 20 years of the project life.
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 13 of 34
Local Gov. Loan - City of Raleigh Year: Amt: Year: Amt: 1 37500 11 37500 2 37500 12 37500 3 37500 13 37500 4 37500 14 37500 5 37500 15 37500 6 37500 16 37500 7 37500 17 37500 8 37500 18 37500 9 37500 19 37500 10 37500 20 37500
Other Loan 1 - Wake County Year: Amt: Year: Amt: 1 12000 11 12000 2 12000 12 12000 3 12000 13 12000 4 12000 14 12000 5 12000 15 12000 6 12000 16 12000 7 12000 17 12000 8 12000 18 12000 9 12000 19 12000 10 12000 20 12000
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 14 of 34
Development Costs
Item Cost Element 1 Purchase of Buildings (Rehab) 2 Demolition 3 On-site Improvements 4 Rehabilitation 5 Construction of New Building(s) 6 Accessory Building(s) 7 General Requirements 8 Contractor Overhead 9 Contractor Profit 10 Construction Contingency 11 Architect's Fee - Design 12 Architect's Fee - Inspection SUBTOTAL (lines 1 through 12) 13 Construction Insurance (prorate) 14 Construction Loan Orig. Fee (prorate) 15 Construction Loan Interest (prorate) 16 Construction Loan Credit Enhancement (prorate) 17 Construction Period Taxes (prorate) 18 Water, Sewer and Impact Fees 19 Survey 20 Property Appraisal 21 Environmental Report 22 Market Study 23 Bond Costs (specify) 24 Cost of Issuance 25 Placement Fee 26 Permanent Loan Origination Fee 27 Permanent Loan Credit Enhancement 28 Title and Recording SUBTOTAL (lines 13 through 28) 29 Real Estate Attorney 30 Other Attorney's Fees 31 Tax Credit App Fees 32 Cost Certification 33 Tax Opinion 34 Organizational (Partnership) 35 Tax Credit Monitoring Fee SUBTOTAL (lines 29 through 35) 36 Furnishings and Equipment 37 Relocation Expenses 38 Developer's Fee (max 15% lines 2-36, less 8 & 9) 39 40 42 43 Other Basis Expense (COMMERCIAL SPACE) Other Basis Expense (specify) 30,000 50,000 Other Non-basis Expense (off-site improvmnts) Other Non-basis Expense (specify) SUBTOTAL (lines 36 through 43) 44 Rent up Reserve 1,055,000 50,000 740,000 200,000 740,000 100,000 10,000 48,000 162,814 35,000 35,000 12,000 386,180 35,000 20,000 38,814 11,000 35,000 1,500 38,814 11,000 34,400 19,780 116,000 12,000 8,000 35,000 4,000 19,780 116,000 12,000 8,000 35,000 4,000 4,080,252 80,000 286,815 101,341 405,365 167,213 120,000 24,000 5,884,986 20,000 30,000 95,000 20,000 30,000 95,000 4,080,252 80,000 286,815 101,341 405,365 167,213 120,000 24,000 620,000 226,400 TOTAL COST Eligible Basis 30% PV 70% PV 0
41 Rent-up Expenses
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 15 of 34
228,670
48 DEVELOPMENT COST (lines 1-47) 49 Less Federal Financing 50 Less Disproportionate Standard 51 Less Nonqualified Nonrecourse Financing 52 Less Historic Tax Credit (residential) 53 TOTAL ELIGIBLE BASIS 54 Applicable Fraction (percentage of LI Units) 55 Basis Before Boost 56 Boost for QCT/DDA (if applicable, enter 130%) 57 TOTAL QUALIFIED BASIS 58 Tax Credit Rate 59 Federal Tax Credits at Estimated Rate 60 Federal Tax Credits at 8.5% or 3.75% 61 Federal Tax Credits Requested 62 Land Cost 63 TOTAL REPLACEMENT COST
7,767,650
6,792,480
0 6,792,480 80.00% 5,433,984 7,064,179 558,776 600,455 603,313 625,000 8,392,650 0 80% 0 130.00% 0 0.00% 0 0 6,792,480 80% 5,433,984 130.00% 7,064,179 7.91% 558,776 600,455 603,313
Comments: We believe that there are unique downtown circumstance that drive up costs and request that Chart B in the QAP be used to assess this project. Please see Exhibit Y for supporting information.
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 16 of 34
DHIC and its design team are committed to work with neighborhood residents, city staff and other stakeholders to ensure that Carlton Place will be have a signature design that reflects positively on the entire neighborhood. Our design program calls for 5 different buildings with different exterior treatments for each block face. To the maximum extent possible, ground floor apartments will have private entrances facing the street although, because of accessibility requirements, each apartment will have alternative entrances through enclosed and secure group entrances. Not only will exterior treatments vary across the development, but there will be a variety of roof patterns including a mix of flat and pitched roofs. Buildings 4 and 5 will be connected on the second and third floors with a pedestrian walkway through the buildings to the plaza area on the interior of the block. These same buildings will house office and commercial space on East Davie. All apartments in the complex will be one-story flats with the exception of Building 5, which will contain flats on the first floor and two-story apartments or townhouse styles on the second and third floor. The interior of the site will contain 80 parking spaces, 36 of which will be contained under Building 2 in an enclosed parking area. On street parking will be available to commercial visitors and residents.
Have you built other tax credit developments that use the same building design as this project? No If yes, please provide name and address:
Site Amenities (check all that apply): Community Bldg - Sq Ft: Laundry Rm Game/Craft Rm Chapel/Prayer Rm Irrigated Lawns Screened Porch Exercise Rm Picnic Area Security Gate Community Room - Sq Ft: 2,232 Resident Computer Center TV Rm Onsite Leasing Office Car Care Area Garages - Number: 12 Exam Rm Beauty Salon Onsite Mgr Storage Units Reading Rm/Library Vending Rm Onsite Maint. Person Gazebos
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 17 of 34
Playground Shuffleboard
Landscaping Plans:
Interior Apartment Amenities (check all that apply): Range W/D Hookups Flooring: Carpet Hood Mini-blinds Vinyl Central Air Dishwasher Pantry Wood Gas Heat Disposal Ceiling fans Wood Parquet Heat Pump Refrigerator (frost free) Walk-in closets Other Storage interior/exterior
Heating/Cooling:
Do you plan to submit additional market data (market study, etc.) that you want considered? Yes If yes, please make sure to include the additional information in your pre-application packet.
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 18 of 34
Degree of on-site negative features and physical barriers that will impede project construction or adversely affect future tenants; for example: power transmission lines and towers, flood hazards, steep slopes, large boulders, ravines, year-round streams, wetlands, and other similar features. For
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 19 of 34
adaptive re-use projects- suitability for residential use and difficulties posed by the building(s), such as limited parking, environmental problems or the need for excessive demolition. There are two structures that are located on the site owned by the City of Raleigh. The City is responsible for demolishing both properties and relocating the commercial tenants prior to selling the site. Development of the property is constrained by a drainage easement that runs through the property on a north-south axis. The site plan that has been developed avoids placing buildings on this easement. The City and DHIC have done extensive environmental testing on the site and have determined that the site will secure appropriate approvals from state regulatory agencies after modest remediation.
Similarity of scale and aesthetics/architecture between project and surroundings. As property values increase in neighborhoods adjacent to the City of Raleigh, denser, more urban forms of development will occur. The Carlton Place development plan calls for two- and three-story buildings with first floor office and retail space on East Davie Street. The office and retail space will offer an option to small business owners that have been displaced through neighborhood redevelopment efforts. This basic plan is consistent with a development plan and special zoning conditions that the City prepared with neighborhood residents several years ago. The facades of each building will vary and relate to the surrounding uses. On South Bloodworth Street, the buildings will be two stories in height and have ground floor entrances for most of the apartments. Moving to East Davie Street, the form of the buildings will be more contemporary reflecting the design approach taken at the Museums Middle Magnet School. For each applicable neighborhood feature, enter distance from project in miles. 1.3 0.4 0.3 0.1 0.1 0.1 0.3 0.3 0.3 0.8 0.4 0.1 0.3 Grocery Store Mall/Strip Center Outdoor Athletic Fields Day Care/After School Schools 0.3 3.0 0.4 0.1 0.1 Community/Senior Center Hospital Pharmacy Basic Health Care Medical Offices Bank/Credit Union Restaurants Professional Services Movie Theater Video Rental Public Safety (Fire/Police) Post Office
Public Transportation Stop 0.3 Convenience Store Basketball/Tennis Courts Public Parks Gas Station Library Fitness/Nature Trails Public Swimming Pools 0.1 0.1 0.4 1.5 0.3 0.4
Other facilities or services: BTI Performing Arts Center-0.5 Shaw University-0.4 ArtSpace-0.2 Public transportation transfer station-0.5 Amtrak station-0.7 State & local government services & offices-0.5 to 1.0 Exploris Children's Museum-0.4 NC Museums of History & Natural Sciences-0.8
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 20 of 34
Development Team
Provide contact information for development team members below: Management Agent Company: Community Management Corporation Address: City: Phone PO Box 17489 Raleigh (919)981-0060 State: NC Zip: 27619 Email: pwells@cmc-nc.com Last: Wells
JDavis Architects, PA 510 Glenwood Avenue, Suite 201 Raleigh (919)835-1500 State: NC Zip: 27603 Email: jeffd@jdavisarchitects.com Last: Davis
The Law Office of Andrew Foster, PLLC 201 West Main Street, Suite 202D Durham (919)619-3308 State: NC Zip: 27701 Email: Last: Foster
Apollo Housing Capital 6525 Morrison Blvd., Suite 505 Charlotte (704)366-0250 State: NC Zip: 28211 Email: rvest@apollohousing.com Last: Vest
Consultant/Application Preparer (if different from developer) Company: Address: City: Phone Contact Name: First: State: Email: Last: Zip:
Identity of Interest? General Contractor Company: Southern General, Inc. Address: City: Phone PO Box 10372 Greensboro (336)545-1410 State: NC Zip: 27404 Email: paul@southerngeneralinc.com Last: Reiser
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 21 of 34
Management List number of low-income housing tax credit units managed in the past 10 years: North Carolina Other States Projects: Units: 49 2,614 0 0
Has any owner, principal, or management agent been debarred or received a limited denial participation in the past 10 years by any federal or state agency? No Has any owner, principal, or management agent been involved in a bankruptcy, an adverse fair housing settlement, an adverse civil rights settlement, or an adverse federal or state government proceeding and settlement in the past 10 years? No Has any owner or principal been in a mortgage default or delinquency of three months or more within the last 5 years on a FHA-insured project, a Rural Development funded rental project, a tax-exempt funded mortgage, a tax credit project, or any other publicly subsidized project? No Has any owner or principal been involved within the last 10 years in a project which previously received an allocation of tax credits but failed to meet compliance standards of the tax credit allocation, including return of a reservation of tax credits to the Agency after the carryover agreement has been signed? No Has any owner or principal had a Form 8823 filed with the IRS for noncompliance on a project using low-income housing tax credits or received a letter of non-compliance from the Agency? No
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 22 of 34
Financing Commitments
Does the project have a firm commitment for construction financing? Does the project have a letter of intent for private permenant financing? Does the project have a firm commitment for government financing? Does the project have a letter of intent from an investor? Is any portion of the eligible basis of new contruction or rehabilitation financed with federal subsidies other than CDBG funds or funds from the HOME program? If yes, indicate the type and amount below: Tax Exempt Financing: $ RD 515 Financing: Hope VI Financing: Other: $ $ $ No Yes Yes Yes No
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 23 of 34
2,000 8,621 2,400 0 29,142 32,000 0 1,000 4,200 490 3,600 0 3,300 86,753 0 14,900 11,746 0 10,600 37,246 2,400 1,200 2,200 1,500 0 7,200 0 2,400 2,200 10,000 18,000 2,000 4,000 0 2,400 0 0 4,500 750 10,000 600 71,350 45,890 5,464 0
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 24 of 34
Property and Liability Insurance (Hazard) Fidelity Bond Insurance Workmen's Compensation Health Insurance and Other Employee Benefits Other Insurance: SUBTOTAL Supportive Service Expenses Service Coordinator Service Supplies Tenant Association Funds Other Expenses (specify): Local Lead Agency SUBTOTAL Reserves Replacement Reserves SUBTOTAL TOTAL OPERATING EXPENSES ADJUSTED TOTAL OPERATING EXPENSES (Does not include taxes, reserves and resident support services) * TOTAL UNITS (from total units in the Unit Mix section) PER UNIT PER YEAR
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 25 of 34
307,969 177,562
149,370
28,192 1.189
* Net Rental Income escalated at annual rate of 3% and expenses escalated at a rate of 4% after the first year.
Calculations:
1. "Net Rental/Other Income" comes from 1st-year cash flow, then it is escalated by 3% per year. 2. "Total Operating Expenses" comes from 1st-year cash flow, then it is escalated by 4% per year. 3. "Debt Service" is the sum of "regular/amortized loan debt service + non-amortizing annual service" as entered by user from Funding Sources section. 4. "Net Cash Flow" is "Net Rental/Other Income" minus "Total Operating Expenses" minus "Debt Service". 5. "Debt Coverage Ratio" is ("Net Rental/Other Income" minus "Total Operating Expenses") divided by "Debt Service".
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 26 of 34
Design Features
ITEM Foundation/Slab Components Primary Windows DESCRIPTION post tension slab on grade Make: Silverline Model: 2900 series
Type/Construction: vinyl w/ insulated glass Exterior Doors Siding Type: metal insulated Type: hardi-panel, vinyl, brick Frames: wood Grade/Thickness: 1/4"; .044"
Warranty: 50 years on hardi-panel; lifetime limited on vinyl Exterior Trim Shingles Miratec Type: fiberglass;antifungal Weight: 240 lbs.
Warranty: 25 years; will also have EPDM membrane roof or equal Sprinkler System Cabinets Heat Pump NFPA 13R Grandview Products " Entree Maple" or equivalent SEER: 11 SEER Model: varies w/ unit size Air Conditioner SEER: Model: Other Heat Systems SEER: Model: Make: Make: Make: Carrier or equal
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 27 of 34
Costs - Construction
This is a detailed breakdown of rehabilitation or construction costs you summarized in the Development Costs table (Rehabilitation and Construction of New Building(s)). The total should match those roll-up values. ITEM Concrete Footings Backfill-slab, Crawl Slab-concrete/Rebar/Gravel Waterproofing Masonry Foundation Brick Veneer Steel/Structure/Rails Framing/Lumber/Nails Trusses Crane Rental Windows/Grilles/Screen Exterior Doors Roofing Fencing Vinyl Siding/Trim/Box Gutters/Shutters Insulation Drywall Interior Doors Int. & Final/Stair/Trim/Shelves Cabinets & Tops Painting Marble - Tub/Shwr/Tops Plumbing Electrical Heating/Air Conditioning Floor Covering and Underlayment Wall Paper Mailboxes/Special Features/Signage Gypcrete Blinds/Shades/Art Work Light Fixtures/Fans Sprinkler System Security Alarm Hardwood Floors Elevator Ceramic Tiles Acoustical Ceilings 33,156 370 11,231 542 7,036 27,497 7,208 32,354 56,456 110,196 115,355 52,343 19,900 204,650 282,421 223,148 84,835 51,162 16,851 79,886 20,174 1,559 7,163 170,017 19,382 8,832 43,999 144,829 51,151 39,356 106,580 53,257 50,736 222,975 15,044 263,684 124,795 33,485 545,314 78,637 8,426 41,031 140,622 112,927 67,893 151,116 LABOR 7,773 MATERIAL 17,301 TOTAL 25,074 0 219,009 0 0 347,770 48,529 808,998 78,637 8,426 41,031 140,622 163,663 0 39,556 10,391 51,162 314,846 51,151 90,518 123,431 133,143 0 314,846 397,776 275,491 104,735 0 7,406 38,728 7,750 32,354 89,612 0 0 0 0 0
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 28 of 34
Mirror/Shower Door/Encls. Hardware/Bath Access. Appliances Playground Equipment Interior Clean Exterior Clean/Dumpster Rental Other 1 (specify in Remarks) Other 2 (specify in Remarks) Total Cost Remarks: 1,339,729 2,740,523 15,894 5,825 30,580 63,298
Costs for accessory building/community space are included in these numbers. In addition to the above numbers, the development budget also includes $200,000 for commercial space.
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 29 of 34
Costs - General
This is a detailed breakdown of the General Requirements cost element you summarized in the Development Costs table (General Requirements). The total should match that roll-up value. ITEM Supervision Job Site Office/Trailer Rental Office Supplies Security/Watchman Project Signage Tools and Equipment Gas, Oil, and Maintenance Temporary Water, Electric, and Telephone Storage/Hauling Driveway Access Permit Porta-John Rental/Dumping Builders Risk Insurance Re-inspection Fees Extra Plans and Specifications Miscellaneous, Casual Labor Equipment Rental Other 1 (specify in Remarks) Other 2 (specify in Remarks) Total Cost Remarks: Other 1 is project specific insurance Other 2 is clean-up/dumpster rental 2,174 60,622 18,551 21,230 20,582 286,815 1,884 3,019 10,870 12,319 25,605 4,469 TOTAL 102,591 2,174 725
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 30 of 34
Costs - Improvements
This is a detailed breakdown of the Site Improvements cost element you summarized in the Development Costs table (On-site Improvements). The total should match that roll-up value. ITEM Subsurface Exploration/Perk Testing/Site Engineering Clearing/Grading/Final Grading/Excess and Borrow Demolition Earthwork/Excavation/Aerating Soil Treatment Pile Foundations Caissons Shoring/Bracing Site Drainage Site Utilities/Site Lighting Paving and Surfacing/Curb and Gutter Walkways Site Signage Parking Lot Painting Dumpster Pads/Fencing Fencing/Gates Landscaping/Topsoil Rock and Hardpan Excavation Site Supervision Personnel Other (specify in Remarks) Total Cost Remarks: Other is field engineering layout and staking. 32,030 24,906 620,000 136,989 41,097 93,401 60,553 59,341 6,227 4,359 14,275 89,665 6,658 TOTAL 6,227 44,272
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 31 of 34
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 32 of 34
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 33 of 34
Minimum Set-Asides
MINIMUM REQUIRED SET ASIDES (No Points Awarded): Select one of the following two options: 20% of the qualified units are rent restricted and occupied by households with incomes at or below 50% of the median income (Note: No Tax Credit Eligble Units in the the project can exceed 50% of median income) 40% of the qualified units are rent restricted and occupied by households with incomes at or below 60% of the median income (Note: No Tax Credit Eligble Units in the the project can exceed 60% of median income) If requesting RPP funds: 40% of the qualified unit are occupied by households with incomes at or below 50% of median income.
State Tax Credit and QAP Targeting Points: High Income county: At least twenty-five percent (25%) of qualified units will be affordable to households with incomes at or below thirty percent (30%) of county median income. At least twenty-five percent (25%) of qualified units will be affordable to and occupied by households with incomes at or below thirty percent (30%) of county median income.
At least fifty percent (50%) of qualified units will be affordable to households with incomes at or below forty percent (40%) of county median income. At least fifty percent (50%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent (40%) of county median income.
Tax Exempt Bonds Threshold requirement (select one): At least ten percent (10%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent (50%) of county median income. At least five percent (5%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent (40%) of county median income. Eligible for mortgage subsidy points (select one): At least twenty percent (20%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent (50%) of county median income. At least ten percent(10%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent (40%) of county median income.
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005
Print - APP04-0152
Page 34 of 34
J Local Government Letter Confirming Zoning (original on letterhead, no fax or photocopies) K Copy of certificate of occupancy or proof of placed-in-service date (Rehabs Only) L Site plan, floor plans and elevations M Hazard and structural inspection and termite reports (Renovation projects only) N Anticipated budget demonstrating how the project would meet the 10% test by November 14th. O Evidence of Architect's Errors and Omissions insurance (or equivalent). P Description of acquisition for existing/occupied projects or for projects with occupied buildings to be demolished. Q Description of proposed Relocation Plan & Relocation Budget, Etc. If any relocation is anticipated, reference Appendix F. R Targeting Plan and supporting documentation (Required for all projects) S Local Housing Authority Agreement (Reference Model in Appendix I) T Appraisal (for land costs greater than $5,000 and for buildings in rehab projects) U Evidence of Permanent Loan Commitment, other sources of funds, and project-based subsidies. V Statement regarding terms of Deferred Developer Fee and, if nonprofit, resolution of Board approving fee. W Inducement Resolution (Tax-Exempt Bond Financed Projects only) X Documentation to support estimated utility costs.
https://www.nchfa.org/Rental/RTCApp/(drrne0ju0u1kiq555cwyiw55)/site/PrintApp.aspx?... 1/14/2005