Escolar Documentos
Profissional Documentos
Cultura Documentos
Installation Guide
Self-Service Systems
Please contact the following address giving the order number of this manual in your message: Address: WINCOR NIXDORF International GmbH Handbuchredaktion BD PSD 43 D - 33094 Paderborn Germany Fax: +49 (0) 52 51 693-62 09 E-mail: manuals.hardware@wincor-nixdorf.com
... any technical questions or problems? Please contact your local representative.
01750058375 G
Installation Guide
This manual was produced using paper treated with chlorine-free bleach.
01750058375 G
Contents
Introduction............................................................................................... Symbols used in this guide......................................................................... Important safety precautions ...................................................................... Installation notes.................................................................................... General safety precautions ................................................................... 1 2 3 3 3
Planning the Installation .......................................................................... 7 Device dimensions ..................................................................................... 7 ProCash 2000xe / 2000xe USB with 4-cassette dispenser .................. 8 Frontload device with standard lock................................................. 8 Frontload device with customer-specific lock................................... 9 Frontload device with standard lock and barcode reader .............. 10 Frontload device with customer-specific lock and barcode reader ............................................................................................. 11 Rearload device without barcode reader ....................................... 12 Rearload device with barcode reader ............................................ 13 ProCash 2000xe / 2000xe USB with 5-cassette dispenser ................ 14 Rearload device without barcode reader ....................................... 14 Rearload device with barcode reader ............................................ 15 Installation options for the device versions............................................... 16 Installation without frame (free-standing) ............................................ 17 Installation with frame for complete integration................................... 18 View with frame for complete integration ....................................... 18 Wall opening for installation with frame for complete integration....................................................................................... 19 Installation with window frame............................................................. 20 View with window frame ................................................................. 20 Wall opening for installation with window frame ............................ 22 Installation with frame for partial integration with light ........................ 24 View of device with frame partial integration and light box ............ 24 Wall opening for installing the device with a frame for partial integration with light box................................................................. 25 Installation with frame for partial integration without light box............. 26 View of device with frame for partial integration without light box.................................................................................................. 26
01750058375 G
Contents Wall opening for installing the device with a frame for partial integration without light box ............................................................ Vents ......................................................................................................... Storage if construction work is not yet complete ...................................... Space required for operation and maintenance ....................................... Device with standard lock .................................................................... Device with customer-specific lock...................................................... Installation site requirements .................................................................... Load-carrying capacity......................................................................... Protection from removal by force in compliance with EN and VdS guidelines............................................................................................. Installation frame....................................................................................... General ................................................................................................ Securing the installation frame ............................................................ Dimensions of safe attachment points................................................. Dimensions of cable areas .................................................................. Tear-off sensor.......................................................................................... Drilling diagrams ....................................................................................... Drilling diagram (frontload) .................................................................. Drilling diagram (rearload) ................................................................... Power and data cables ............................................................................. General information ............................................................................. Power supply ....................................................................................... Remote status indicator ....................................................................... Camera connection.............................................................................. Dimensions of the frame logo ................................................................... Transport path requirements .................................................................... Installation ............................................................................................... Removing the packaging .......................................................................... Removing the shipping crate .................................................................... General ................................................................................................ Removing the shipping crate ............................................................... Mounting sets............................................................................................ Mounting set for standard frame 01750006706 .................................. Mounting set 01750051579 for CEN frame......................................... Mounting set 01750078516 (for UL/CEN L safe) on installation frame.................................................................................................... Mounting set 01750051578 (for CEN III/CEN IV safe) on installation frame..................................................................................
27 28 28 29 29 32 35 35 36 37 37 37 38 39 40 41 42 43 44 44 46 46 47 47 48 53 53 54 54 55 56 56 57 57 57
II
01750058375 G
Contents Overview of installation types ................................................................... 58 Installation without frame.......................................................................... 59 Installing the installation frame ............................................................ 59 Mounting the device on the installation frame..................................... 64 Lifting the cash media dispenser (CMD-V4) up ............................. 64 Screwing the device on the installation frame................................ 65 Pushing the cash media dispenser (CMD-V4) down ..................... 66 Installing the power and data cables in the device ........................ 67 Further procedure for CEN installation .......................................... 68 General........................................................................................... 68 Installation with frame for complete integration ........................................ 69 Mounting the installation frame ........................................................... 69 Mounting the device on the installation frame..................................... 74 Lifting the cash media dispenser (CMD-V4) up ............................. 75 Screwing the device on the installation frame................................ 76 Pushing the cash media dispenser (CMD-V4) down ..................... 76 Installing the power and data cables in the device ........................ 77 Further procedure for CEN installation .......................................... 78 General........................................................................................... 78 Installing frame for complete integration in wall .................................. 79 View of the frame (completely assembled) .................................... 79 Pre-assembling the frame .............................................................. 80 Mounting the frame ........................................................................ 82 Connecting the light........................................................................ 85 Adjusting the cover......................................................................... 86 Installation with window frame.................................................................. 88 Mounting the installation frame ........................................................... 88 Mounting the device on the installation frame..................................... 94 Lifting the cash media dispenser (CMD-V4) up ............................. 95 Screwing the device on the installation frame................................ 96 Pushing the cash media dispenser (CMD-V4) down ..................... 96 Installing the power and data cables in the device ........................ 97 Further procedure for CEN installation .......................................... 98 General........................................................................................... 98 Installing the window frame ................................................................. 99 View of the frame for up to 50 mm (1.97") thick walls (completely assembled) ................................................................. 99 View of the frame for up to 160 mm (6.3") thick walls (completely assembled) ............................................................... 100 Pre-assembling the frame for up to 50 mm (1.97") and
01750058375 G
III
Contents 160 mm (6.30") thick walls ........................................................... Mounting the frame....................................................................... Connecting the light on frames for up to 50 mm (1.97") and 160 mm (6.30") thick walls ........................................................... Adjusting the cover for frames for up to 50 mm (1.97") and 160 mm (6.30") thick walls ........................................................... Installation with frame for partial integration with light box ..................... Installing the installation frame .......................................................... Mounting the device on the installation frame ................................... Lifting the cash media dispenser (CMD-V4) up ........................... Screwing the device on the installation frame .............................. Pushing the cash media dispenser (CMD-V4) down ................... Installing the power and data cables in the device....................... Further procedure for CEN installation......................................... General ......................................................................................... Installing the frame for partial integration with light box .................... View of the frame (completely assembled) .................................. Pre-assembling the frame ............................................................ Mounting the frame....................................................................... Connecting the light...................................................................... Adjusting the cover ....................................................................... Installation with frame for partial integration without light box ................ Mounting the installation frame.......................................................... Mounting the device on the installation frame ................................... Lifting the cash media dispenser (CMD-V4) up ........................... Screwing the device on the installation frame .............................. Pushing the cash media dispenser (CMD-V4) down ................... Installing the power and data cables in the device....................... Further procedure for CEN installation......................................... General ......................................................................................... Installing the frame for partial integration without light ...................... View of the frame (completely assembled) .................................. Pre-assembling the frame ............................................................ Mounting the frame....................................................................... Start-up ................................................................................................... Installing the Remote Status Indicator ............................................... Remote status indicator - standard......................................................... Delivery package ............................................................................... Installation.......................................................................................... 101 102 105 106 108 108 113 114 115 115 116 117 117 118 118 119 121 124 125 128 128 133 134 135 135 136 137 137 138 138 139 142 144 145 145 145 146
IV
01750058375 G
Contents Connection to the relay panel for external features .......................... Remote status indicator - audio.............................................................. Delivery package ............................................................................... Installation ......................................................................................... Connection to the relay panel for external features .......................... Shortening the cables............................................................................. Adapting the cable length at the relay panel end .............................. Adapting the cable length at the standard remote status indicator end..................................................................................................... Adapting the cable length at the remote status indicator (audio)...... Appendix ............................................................................................... Check list for installation preparations for self-service systems............. General information ........................................................................... Preparations ...................................................................................... Construction work......................................................................... Power and data cables................................................................. Organizational preparations ......................................................... Delivery and installation ............................................................... Flooring materials on the path of transport .................................. Notes concerning installation preparation ......................................... Technical data ........................................................................................ General installation conditions .......................................................... Electrical characteristics of the supply network ........................... Device conditions ......................................................................... Installation specifications ............................................................. Environmental conditions ............................................................. Compliance with standards and certifications ................................... Standards met .............................................................................. Conformity .................................................................................... Notes concerning radio interference suppression and electrical safety............................................................................. FCC Rules and Canadian Standard ICES - 003.......................... UL 291 .......................................................................................... Certification for data transmission................................................ Environmental protection........................................................................ Environmentally and recycling-friendly product development........... Saving energy.................................................................................... Disposing of used consumables ....................................................... Labels on plastic case parts .............................................................. 147 149 149 150 152 154 154 154 157 161 161 162 162 162 163 163 164 164 165 167 167 167 168 169 171 173 173 173 173 174 174 174 175 175 175 175 175
01750058375 G
Contents Returning, recycling and disposing of used units and consumables...................................................................................... 176
VI
01750058375 G
Abbreviations
B BNC C CE Communaut Europenne (European Community) Declaration of Conformity Certification of Electrical Equipment Comit Europen de Normalisation (European Committee for Standardization) Code of Federal Regulation Card Identification Module (security module) Bayonet Nut Connector EMA EMC EN EPP F FCC G GmbH Limited liability company I ICES IEC Interference Causing Equipment Standards International Electrotechnical Commission International Protection International Organization for Standardization Federal Communications Commission EEC European Economic Community Intruder alarm system Electromagnetic Compatibility European standard Encrypted PIN Pad
CEE CEN
CFR CIM
CMD-V4 Cash Media Dispenser Version 4 CSA D DT E EC EDM European Community Encryption / Decryption Module Data Transmission Canadian Standards Association
IP ISO
01750058375 G
VII
Abbreviations M MM Modular Marker of ID card (evaluation by means of security modules like MM box or CIM 86)
R RSI S SELV Safety Extra-Low Voltage T TN network Power supply network in accordance with EN 60950 U UL UPS USB V VdS Association of Property Insurance Companies Underwriters Laboratories Inc. Uninterruptible Power Supply Universal Serial Bus Remote Status Indicator
VIII
01750058375 G
Introduction
This installation guide gives you all the information you need to plan the installation of and to install the ProCash 2000xe or the ProCash 2000xe USB (hereinafter called ProCash 2000xe / ProCash 2000xe USB). The ProCash 2000xe / 2000xe USB is available in the following versions: ProCash 2000xe / 2000xe USB with 4-cassette cash media dispenser in frontload and rearload devices ProCash 2000xe / 2000xe USB with 5-cassette cash media dispenser in rearload devices The following accessories are available: 35 mm (1.38") frames for: Complete integration in the wall Window frame installation Partial integration with and without light box Remote status indicator (RSI): RSI - standard RSI - audio
01750058375 G
Introduction
Paragraphs following this symbol are actions to be performed in the order in which they are specified. Text following this symbol have to be given special attention in order to avoid damage or injury.
This symbol identifies paragraphs which contain general notes to facilitate use of the device and help avoid operating errors.
01750058375 G
Introduction
Installation notes
When installing the device and/or doing any work on it, make sure that it is disconnected from power.
01750058375 G
Introduction
Switching off the automatic circuit-breaker or removing the fuse inset from the fuse holder in the distribution box of the building installation; Disconnecting the plug connectors of the power supply cables from the grounded sockets in the building installation; Switching off the ON/OFF switch on the power distributor; Inform the customer service responsible for you. During a thunderstorm, data transmission lines must not be connected or disconnected. Always keep the device's vents free from obstruction to ensure proper air circulation and to prevent malfunctions resulting from overheating. Only use accessories and extension components that have been approved by us. Nonobservance can result in damage to the device or violations of regulations concerning safety, radio interference and ergonomical requirements. Note that there are only safety extra-low voltage circuits (SELV circuits) if you want to feed voltage from an external source into prepared cables to install additional electronics (e.g. connection for an intruder alarm system). To clean the device only use cleaning agents approved by WINCOR NIXDORF International GmbH(see chapter "Appendix", section "Approved cleaning materials" in the operating manual).
01750058375 G
Introduction Repairs
Repair work may only be carried out by authorized personnel. Unauthorized opening of the device or repair work carried out improperly could result in considerable danger to the user. In case of noncompliance, WINCOR NIXDORF International GmbH excludes all liability.
Lithium batteries There is danger of fire or explosion if the batteries are handled improperly. It is therefore important to note the following points: Avoid short circuits. Never recharge the battery. Avoid temperatures above + 100 C (+ 212 F). Do not try to open the battery by force. Do not allow the battery to come into contact with water or fire. Only replace it by the same or an equivalent type recommended by WINCOR NIXDORF International GmbH (see chapter "Appendix", section "Consumables" in the operating manual). Dispose of used batteries in compliance with national regulations and the manufacturer's specifications.
01750058375 G
Introduction
01750058375 G
Device dimensions
i
All dimensions are specified in millimeters (inches). The views of the device are not drawn to scale. All device edges have a radius of 3 mm (0.12").
01750058375 G
Device dimensions
1472 (57.95")
1445 (56.89")
25 (0.98")
Installation frame
01750058375 G
870 (34.25")
Device dimensions
1472 (57.95")
1445 (56.89")
25 (0.98")
Installation frame
870 (34.25")
9
01750058375 G
Device dimensions
1472 (57.95")
1445 (56.89")
25 (0.98")
Installation frame
10
01750058375 G
Device dimensions
1472 (57.95")
1445 (56.89")
25 (0.98")
Installation frame
01750058375 G
Device dimensions
1835 (72.24")
1472 (57.95")
1445 (56.89")
72/43* (2.84"/1.69"*)
25 (0.98")
1 *
12
01750058375 G
870 (34.25")
Device dimensions
1835 (72.24")
1472 (57.95")
1445 (56.89")
72/43* (2.84"/1.69"*)
25 (0.98")
1 *
01750058375 G
Device dimensions
1612 (63.47")
72/43* (2.84"/1.69"*)
25 (0.98")
1 *
14
01750058375 G
1010 (39.76")
Device dimensions
1975 (77.76")
1612 (63.47")
1585 (62.4")
72/43* (2.84"/1.69"*)
25 (0.98")
1 *
01750058375 G
Installation without frame (free-standing) Installation with frame for complete integration Installation with window frame Installation with frame for partial integration with light box Installation with frame for partial integration without light box
yes
yes
no
yes
yes
no
Observe the necessary operation and maintenance space for the various types of installation (see section "Space required for operation and maintenance"). The area specified for the installation of the frame requires a short tool (see section "Space required for operation and maintenance").
16
01750058375 G
01750058375 G
17
If the ProCash 2000xe / 2000xe USB is installed with a frame for integration in the wall, the unit will not be flush with the wall. This must be taken into account when laying the flooring (see chapter "Installation", section "Installation with frame for complete integration").
To open the light box, there must be at least a clearance of 150 mm (5.91") at the front between light box and ceiling.
18
01750058375 G
01750058375 G
19
1 *
Outside wall
To open the light box, there must be at least a clearance of 150 mm (5.91") at the front between light box and ceiling.
20
01750058375 G
1 *
Outside wall
To open the light box, there must be at least a clearance of 150 mm (5.91") at the front between light box and ceiling.
01750058375 G
21
1 *
Outside wall
22
01750058375 G
1 *
Outside wall
01750058375 G
23
Both the device with the standard lock as well as the device with a customer-specific lock (deeper front door) can be installed with a frame and partly integrated in the wall. The dimensions of the frame for partial integration of the device in a wall are shown here for the rearload version with standard lock as an example. The frame for the frontload version with standard lock has the same dimensions.
To open the light box, there must be at least a clearance of 150 mm (5.91") at the front between light box and ceiling.
24
01750058375 G
Wall opening for installing the device with a frame for partial integration with light box
If a ProCash 2000xe / 2000xe USB is to be installed with a frame for partial integration with light box in the wall, a wall opening must be provided as shown in the figure below.
01750058375 G
25
Both the device with the standard lock as well as the device with a customer-specific lock (deeper front door) can be installed with a frame and partly integrated in the wall. The dimensions of the frame for partial integration of the device in a wall are shown here for the rearload version with standard lock as an example. The frame for the frontload version with standard lock has the same dimensions.
26
01750058375 G
Wall opening for installing the device with a frame for partial integration without light box
If a ProCash 2000xe / 2000xe USB is to be installed with a frame for partial integration without light box in the wall, a wall opening must be provided as shown in the figure below.
01750058375 G
27
Vents
Vents
The device features forced air ventilation on the rear side by means of a builtin fan. Additionally, there are vents on either side of the top part. Make sure that the distance between these vents and the wall is always at least 50 mm (1.97").
Vents
28
01750058375 G
The area specified for the installation of the frame requires a short tool.
01750058375 G
29
840 (33.07")
750 (29.53")
210 (8.27")
50 (1.97") 120 (4.72") 50 (1.97") 400 (15.75") 120 (4.72") 50 (1.97") 300 (11.81") 1800 (70.87") 180 (7.09") 600 (23.62") 1300 (51.18") 300 (11.81") 835 (32.87")
01750058375 G
30
900 (35.43")
555 (21.85")
530 (20.87")
848 (33.39")
280 (11.02")
400 (15.75")
1680 (66.14")
1030 (40.55")
01750058375 G
31
The area specified for the installation of the frame requires a short tool.
32
01750058375 G
840 (33.07")
750 (29.53")
210 (8.27")
50 (1.97") 120 (4.72") 50 (1.97") 400 (15.75") 120 (4.72") 50 (1.97") 330 (12.99") 1800 (70.87") 600 (23.62") 1330 (52.36") 330 (12.99") 180 (7.09") 835 (32.87")
900 (35.43")
01750058375 G
33
555 (21.85")
530 (20.87")
848 (33.39")
305 (12.01")
400 (15.75")
34
1680 (66.14")
01750058375 G
1030 (40.55")
When selecting the installation site, noise emission should be taken into account. Fans in operation or the noise produced during a transaction could disturb people in the immediate vicinity of the device and may therefore need to be diminished with soundproofing (e.g. soundproof cabinets, etc.). They must comply with the environmental conditions that apply to the specific device (see chapter "Appendix", section "Technical data") and the maintenance areas (see section "Space required for operation and maintenance").
Load-carrying capacity
Ensure that the installation site has the required load-carrying capacity. You will find the relevant device weight in the section "Installation specifications" in the chapter "Appendix".
01750058375 G
35
The device must be screwed to the load-bearing substructure of the installation site or mounted on a suitable base. Using the prescribed mounting materials, the following values relating to resistance to removal of the safe from the installation frame are reached: Resistance grade III IV Minimum force required 50 kN 100 kN
The operator must provide a suitable base to protect it from removal by force. We recommend reinforced concrete B25 (EN206 C20/25) or a higher-quality concrete.
Installation on raised or cavity flooring as well as on a floating floor is not permissible according to the CEN standard. In case of a mounting structure other than the one specified in the respective sections "Mounting the installation frame" in the chapter "Installation", always contact your insurance company beforehand.
36
01750058375 G
Installation frame
Installation frame
General
A ProCash 2000xe / 2000xe USB cannot be installed without the installation frame. The installation frame is secured to the floor at the respective attachment points (see sections "Drilling diagram (frontload)" and "Drilling diagram (rearload)"). Then the device (safe) is screwed to the installation frame. How the safe is secured on the installation frame depends on the safe construction type (UL, CEN L or CEN III, CEN IV). For CEN safes, the safe construction types are distinguished in resistance grades. The label showing the resistance level is located on the inside of the safe door. Openings which are not used have to be closed by putting in the filling pieces.
For mounting material see section "Mounting sets" in the chapter "Installation".
01750058375 G
37
Installation frame
62 (2.44")
4 5
3 C 2 1 6
1 2 3 4 5 6 Attachment points of safe Attachment points of installation frame Alternative attachment points of installation frame Attachment point of tear-off sensor rearload Attachment point of tear-off sensor frontload This side must always point towards the customer panel
38
01750058375 G
Installation frame
1 3 3 3
3 2
3 1
4
1 2 3 4 Cable lead-ins in the installation frame Cable feed openings underneath the installation frame Area for cables This side must always point towards the customer panel
232 25 (0.98") (9.13") 262 (10.32") 391 (15.39") 451 (17.76") 580 (22.84") 610 (24.03") 842 (33.15") 2 2
39
594 (23.39") 569 (22.4") 532 (20.95") 482 (18.98") 477 (18.78") 397 (15.63")
01750058375 G
Tear-off sensor
Tear-off sensor
i
All safes and installation frames have holes for mounting a tear-off sensor.
To ensure that the tear-off sensor can be mounted after the device has been installed, a hole for the tear-off sensor has to be drilled at the time the installation frame is mounted. To be able to mount the tear-off sensor, the hole has to be cleaned with a vacuum cleaner and a resin cartridge (e.g. UPAT multicone, Fischer resin cartridge R M) has to be inserted. Thus the alarm technician will be able to mount the tear-off sensor in the safe easily after the device is installed (see also illustration "Mounting structure" in the respective sections of the chapter "Installation"). Ask your alarm technician about the size of the hole and the cartridge. The maximum diameter for the hole to take the fixing is 16 mm (0.63") in the installation frames 22 mm (0.87") in safe The mounting material (threaded rod, cartridge) is to be provided by the alarm technician. The length of the threaded rod depends on the installation frame you use (see chapter "Installation").
40
01750058375 G
Drilling diagrams
Drilling diagrams
The following figures specify the distance from the edge of the different device versions of the drill holes that are used to secure the ProCash 2000xe / 2000xe USB with installation frame. The position of the installation frame and thus of the bore diagram also depends on the frame version that is used. You will find more information on this in the chapter "Installation".
01750058375 G
41
Drilling diagrams
Drilling depth: Holes for installation frame: Hole for tear-off sensor:
at least 180 mm (7.09") with 125 mm (4.92") in concrete. For the hole diameter please refer to the mounting instructions of the caulking cartridge. at least 40 mm (1.57") in concrete; Consult your alarm technician about the size of the hole and the cartridge.
42
598 (23.54")
01750058375 G
Drilling diagrams
500 (19.69") 440 (17.32") 160 (6.3") 114 (4.49") 250 (9.84")
Drilling depth: Holes for installation frame: Hole for tear-off sensor:
at least 180 mm (7.09") with 125 mm (4.92") in concrete. For the hole diameter please refer to the mounting instructions of the caulking cartridge. at least 40 mm (1.57") in concrete; Consult your alarm technician about the size of the hole and the cartridge.
01750058375 G
43
Make sure that the cables provided on-site are long enough to be laid through the installation frame into the safe. Avoid excess lengths of cable by shortening them where necessary. You must ensure that connecting cables do not impede or actually damage any moving components.
44
01750058375 G
No power or data cables may be installed below the CMD-V4. You will also find the position of the cable feed opening for the device in the section "Installation frame".
01750058375 G
45
Power supply
The device must only be connected to a TN system. In addition to the power supply for the device, grounding outlets must be provided by the customer for supplementary equipment such as a modem.
3 4 L N PE
1 2 3 4
Fuse or automatic circuit-breaker Connection for ProCash 2000xe / 2000xe USB Modem connection Connection of miscellaneous equipment
46
01750058375 G
Camera connection
If, on devices with a portrait camera and/or cash slot camera integrated in the factory, the images supplied are to be processed outside the device, the following cables must be planned on the construction side in addition to the requisite power and data cable connections: 1 video cable 75 with BNC connector per deployed camera 1 V.24 control cable for camera surveillance The interfaces for the camera connection are located in the safe. The cable is fed in through the cable feed opening of the safe.
If the ProCash 2000xe / 2000xe USB was ordered without a logo, the logo has to be provided by the customer. The illustration shows the visible outer surface (554 mm x 170 mm - 21.81" x 6.69"). The actual dimensions are 565 mm x 176 mm (22.24" x 6.93"). For the dimensions of the device logo please refer to the operating manual of the device.
01750058375 G
47
48
01750058375 G
600 (23.62")
1420 (55.91")
690 (27.17")
1 Shipping crate * Height of a device with 5-cassette dispenser ** On the rearload device the standard lock measures 43 mm (1.69") instead of max. 72 mm (2.83") of the customer-specific lock. *** Frontload devices with a customer-specific lock have a depth of 1075 mm (42.32").
845 (33.27")
49
01750058375 G
Check beforehand if there is enough space to move the device through doors and hallways. The following illustration should help you determine if the space is sufficient. It shows the device on a standard lift truck. With the help of the grid (100 mm x 100 mm (3.94" x 3.94")) you can draw the actual dimensions of the door and the hallway to find out if there is enough space for transportation. Refer to the next page for an example.
50
01750058375 G
710 (27.95")
1900 (74.8")
01750058375 G
51
52
01750058375 G
Installation
This chapter describes the individual steps to be taken to install the device.
All dimensions are specified in millimeters (inches). The figures are not drawn to scale. Contact the person in charge of planning the installation to verify that all preparatory work has been done completely and correctly and that none of the required power and data cables are missing.
01750058375 G
53
Installation
To move the device push against the sides of its body only as shown in the illustration below.
54
01750058375 G
Installation
Dispose of the shipping crate which is no longer needed according to the regulations of your country.
01750058375 G
55
Mounting sets
Installation
Mounting sets
i
The mounting sets are supplied with the installation frame of the ProCash 2000xe / 2000xe USB. The mounting set for the tear-off sensor is not supplied with the device.
Item Caulking cartridge A caulking gun is not included in the delivery package. Threaded rod M16 x 200 (5.51") (DIN 976, property class 8.8) Hexagon nut M16 (DIN 934-8) Washer A 17 DIN 125-St
4 4 4
56
01750058375 G
Installation
Mounting sets
Quantity required 1
A caulking gun is not included in the delivery package. Threaded rod M16 x 200 (DIN 976, property class 10.9) Hexagon nut M16 (DIN 934-10.9) Washer A 17 DIN 125-St
4 4 4
Quantity required 4 4
Quantity required 4 4
01750058375 G
57
Installation
Installation without frame (see p. 59) Installation with frame for complete integration (see p. 69) Installation with window frame (see p. 88) Installation with frame for partial integration with light box (see p. 108) Installation with frame for partial integration without light box (see p. 128)
no no
yes yes
no yes
yes
yes
no
yes
yes
no
Observe the space required for operation and maintenance for the different installation options (see chapter "Planning the Installation", section "Space required for operation and maintenance "). For installation with a frame the device must have been prepared for this type of installation in the factory when it is shipped.
58
01750058375 G
Installation
Align the installation frame and mark the holes to be drilled for mounting the installation frame (see illustration below).
If a tear-off sensor is to be installed as agreed with the financial institution or the alarm technician, also mark the holes for the tear-off sensor (see illustrations below).
Securing the installation frame The installation frame needs to be anchored in the floor at four attachment points regardless of the safe construction type (UL, CEN L, CEN III, CEN IV). These attachment points are at position (2) and the alternative attachment points are at position (3) (see illustration below). The supplied installation frame can be used for the frontload and rearload versions.
01750058375 G
59
Installation
The installation frame must be secured using one threaded rod per group of holes A to D. The installation frame is secured with four threaded rods.
1 2 A 3 B
4 7 5 8 3
C
D 2 1
9
1 2 3 4 5 6 7 8 9
Attachment points of safe Attachment points of installation frame Alternative attachment points of installation frame Attachment point of tear-off sensor Rearload Attachment point of tear-off sensor Frontload Cable lead-ins into the installation frame Area for cables Cable feed openings underneath the installation frame This side must always point towards the customer panel
60
01750058375 G
Installation
Drill the required four holes and the hole for the tear-off sensor, if necessary (see following figure).
Installation on raised or cavity flooring as well as on a floating floor is not permissible according to the CEN standard. If the mounting structure differs from the one described below (see illustration below), it must be approved by the insurer. To ensure that the safe does not become detached, the threaded rods of the installation frame must be fastened in the concrete foundation. The drilled holes in the concrete foundation must have a depth of at least 125 mm (4.92") for the installation frame (see illustration below). For the hole diameter please refer to the mounting instructions of the caulking cartridge. The drilled hole in the concrete foundation must have a depth of at least 40 mm (1.57") for the tear-off sensor (see illustration below). Consult your alarm technician about the size of the hole and the fixing.
01750058375 G
61
Installation
min. 40 (1.57")
1 2 3 4
5 6 7 8
Screed Concrete Mounting set for installation frame Top surface of finished floor
Clean the drill holes as specified in the mounting instructions of the caulking cartridge. Secure the threaded rods in the concrete foundation as specified in the mounting instructions of the caulking cartridge.
The threaded rods must protrude at a minimum 24 mm (0.94") and at a maximum 25 mm (0.98").
62
01750058375 G
25 (0.98")
UL CEN
Installation
Remove the filling piece 6b (rearload) or 6a (frontload) and possibly the filling piece 6a (rearload) or 6b (frontload) from the cable lead-ins in the upper part of the installation rack (see positions 6a and 6b in the following illustration (example shows rearload version)).
The space inside the installation frame allows cable lead-in through cable ducts in the floor. If the connecting cables on the site are not located on the safe door side: Insert the data lines, the connecting cable of the remote status indicator (optional) and the power cord through the cable lead-ins and if necessary through the cable feed openings behind the safe door side (11) of the installation frame, as in the example shown here. Make sure that the connecting cables are laid loosely and are not crushed by the installation frame.
11
6b
6a
Screw the installation frame to the floor (for material see section "Mounting sets"). If applicable, note the hardening times of the mounting material.
The threaded rods must not protrude beyond the installation frame. If necessary, level the threaded rods.
01750058375 G
63
Installation
To facilitate access to the attachment points of the safe you can swing the cash media dispenser (CMD-V4) up.
When lifting the CMD-V4 make sure that the connecting cables on the rear side of the CMD-V4 controller are not damaged and that they are not moved around!
64
01750058375 G
Installation
Installation without frame Swing the CMD-V4 (1) up until the hole (2) above the pull-out tracks is visible. Push the locking axle (3) (to be found in the safe) in until the grooves are in line with the side panels of the CMD-V4 rack. Check the firm fit of the CMD-V4 by moving it slightly back and forth. When mounting the locking axle ensure that no cables are damaged in the process. Check the CMD-V4 for a secure fit. The locking axle must be firmly in place.
01750058375 G
65
Installation
When lowering the CMD-V4 make sure that the connecting cables on the rear side of the CMD-V4 controller are not damaged and that they are not moved around!
Mount both securing screws. Remove the two track locks and push the CMD-V4 back into the device. Replace the cassettes.
66
01750058375 G
Installation
Feed the data cables and the power cable into the safe, if applicable by the area for cables of the installation frame. If necessary, replace the filling piece of the installation frame (position 6b (rearload) or position 6a (frontload)) and the filling piece of the safe.
01750058375 G
67
Installation
Attach the VDS label for the installation frame inside the safe door below the existing VDS label. (The VDS label for the mounted installation frame is included with the installation frame.) After mounting the installation frame and the device, fill out the Confirmation of Installation. (The Confirmation of Installation is included with the installation frame.) Fax the filled out and signed Confirmation of Installation form to the fax number provided on the form.
If there is no fax machine available, the form has to be faxed to this number at a later point in time.
The operator needs the Confirmation of Installation for submitting it to the insurance company.
General
The locking axle and the track stops must remain in the safe for later service operations.
68
01750058375 G
Installation
Align the installation frame and mark the holes to be drilled for mounting the installation frame (see illustration below).
If a tear-off sensor is to be installed as agreed with the financial institution or the alarm technician, also mark the holes for the tear-off sensor (see illustrations below).
Securing the installation frame The installation frame needs to be anchored in the floor at four attachment points regardless of the safe construction type (UL, CEN L, CEN III, CEN IV). These attachment points are at position (2) and the alternative attachment points are at position (3) (see illustration below).
01750058375 G
69
Installation
The installation frame must be secured using one threaded rod per group of holes A to D. The installation frame is secured with four threaded rods.
11 1 2 6
4 7 5 8
B
6 10
D
28 (1.1") 10
1 Attachment points of safe 2 Attachment points of installation frame 3 Alternative attachment points of installation frame 4 Attachment point of tear-off sensor Rearload 5 Not used
6 Cable lead-ins into the installation frame 7 Area for cables 8 Cable feed openings underneath the installation frame 9 Customer panel side 10 Wall 11 Side with safe door
70
01750058375 G
Installation
Drill the required four holes and the hole for the tear-off sensor, if necessary (see following figure).
Installation on raised or cavity flooring as well as on a floating floor is not permissible according to the CEN standard. If the mounting structure differs from the one described below (see illustration below), it must be approved by the insurer. To ensure that the safe does not become detached, the threaded rods of the installation frame must be fastened in the concrete foundation. The drilled holes in the concrete foundation must have a depth of at least 125 mm (4.92") for the installation frame (see illustration below). For the hole diameter please refer to the mounting instructions of the caulking cartridge. The drilled hole in the concrete foundation must have a depth of at least 40 mm (1.57") for the tear-off sensor (see illustration below). Consult your alarm technician about the size of the hole and the fixing.
01750058375 G
71
Installation
min. 40 (1.57")
1 2 3 4
5 6 7 8
Screed Concrete Mounting set for installation frame Top surface of finished floor
Clean the drill holes as specified in the mounting instructions of the caulking cartridge. Secure the threaded rods in the concrete foundation as specified in the mounting instructions of the caulking cartridge.
The threaded rods must protrude at a minimum 24 mm (0.94") and at a maximum 25 mm (0.98").
72
01750058375 G
25 (0.98")
UL CEN
Installation
Remove the filling piece 6b and possibly 6a from the cable lead-ins (see positions 6a and 6b in the following illustration).
The space inside the installation frame allows cable lead-in through cable ducts in the floor. If the connecting cables on the site are not located on the safe door side: Insert the data lines, the connecting cable of the remote status indicator (optional) and the power cord through the cable lead-ins and if necessary through the cable feed openings behind the safe door side (11) of the installation frame, as in the example shown here. Make sure that the connecting cables are laid loosely and are not crushed by the installation frame.
11
6b
6a
Screw the installation frame to the floor (for material see section "Mounting sets"). If applicable, note the hardening times of the mounting material.
The threaded rods must not protrude beyond the installation frame. If necessary, level the threaded rods.
01750058375 G
73
Installation
Push the device on the installation frame. Ensure that no cables are damaged in the process. Open the safe door (see chapter "Basic Operation" in the operating manual). If it is necessary for the installation remove those parts inside the unit which secure its components during transportation (see enclosed information sheet). Pull out the CMD-V4 (see chapter "Basic Operation" in the operating manual).
To facilitate access to the attachment points of the safe you can swing the cash media dispenser (CMD-V4) up.
74
01750058375 G
Installation
When lifting the CMD-V4 make sure that the connecting cables on the rear side of the CMD-V4 controller are not damaged and that they are not moved around! Swing the CMD-V4 (1) up until the hole (2) above the pull-out tracks is visible. Push the locking axle (3) (to be found in the safe) in until the grooves are in line with the side panels of the CMD-V4 rack. Check the firm fit of the CMD-V4 by moving it slightly back and forth. When mounting the locking axle ensure that no cables are damaged in the process. Check the CMD-V4 for a secure fit. The locking axle must be firmly in place.
01750058375 G
75
Installation
When lowering the CMD-V4 make sure that the connecting cables on the rear side of the CMD-V4 controller are not damaged and that they are not moved around!
Mount both securing screws. Remove the two track locks and push the CMD-V4 back into the device. Replace the cassettes.
76
01750058375 G
Installation
Feed the data cables and the power cable into the safe, if applicable by the area for cables of the installation frame. Replace the filling piece of the installation frame (position 6b) and the filling piece of the safe.
01750058375 G
77
Installation
Attach the VDS label for the installation frame inside the safe door below the existing VDS label. (The VDS label for the mounted installation frame is included with the installation frame.) After mounting the installation frame and the device, fill out the Confirmation of Installation. (The Confirmation of Installation is included with the installation frame.) Fax the filled out and signed Confirmation of Installation form to the fax number provided on the form.
If there is no fax machine available, the form has to be faxed to this number at a later point in time.
The operator needs the Confirmation of Installation for submitting it to the insurance company.
General
Close the device. Unpack the parts of the installation frame and install them (see section below "Installing frame for complete integration in wall").
The locking axle and the track stops must remain in the safe for later service operations.
78
01750058375 G
Installation
6 1
7 2
4 5
1 Frame 2 Cover (installed only after frame has been attached to the device) 3 Connecting plate 4 Left frame extension
5 Right frame extension 6 Holes for attaching the frame to the wall 7 Light cable 8 Frame bracket
01750058375 G
79
Installation
Attach the frame extensions (items 4 and 5 in the illustration "View of the frame (completely assembled)") on the left and right side as shown in the illustration below using two ratchet washers M4 (1).
4x
Attach the connecting plates (item 3 in the illustration "View of the frame (completely assembled)") on the left and on the right side using one Taptite round head screw M4x6 each (2).
2x
80
01750058375 G
Installation
Attach the center frame brackets (item 8 in the illustration "View of the frame (completely assembled)") on the left and on the right side using two Taptite round head screws M4x6 each (3).
4x
Attach the bottom frame brackets (item 8 in the illustration "View of the frame (completely assembled)") on the left and on the right side using two Taptite round head screws M4x6 each (4).
4x
01750058375 G
81
Installation
Open the door of the operating unit, release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB).
Feed the connecting cable for the light through the cable opening into the device (1). Push the frame from the front in the direction of the arrow (2) up to the customer panel. Lift the frame a little and slide it carefully over the customer panel and let go.
82
01750058375 G
Installation
4x
Attach the frame brackets (1) on the side to the device using one pan head screw with inner hexagon M6x10 and a washer 6.4x1.6.
If space is restricted use an appropriate tool that is short enough. When tightening the screws of the frame brackets, make sure that the frame is touching the wall. However, if the wall is uneven, you must not use force to press it in, since the frame could distort when you secure the frame tabs. This could cause the customer panel to grate or jam against the inside of the frame when you open it.
Push the customer panel back in until it engages. Close the door of the operating unit.
01750058375 G
83
Installation
Release the locking pins by pushing them slightly sideways with a screwdriver and turning them (1) until they jump out (2).
1
Lower the light box pane (3).
1 3
Drill a 50 mm (1.97") deep hole with a diameter of 8 mm (0.31") through each of the three holes (1). Use the supplied fixings and screws 6x40 to attach the frame to the wall.
Close the light box by following the same steps in reverse order.
84
01750058375 G
Installation
Open the door of the operating unit, release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB).
The connecting cable for the logo light is lying rolled up inside the device next to the PC.
Attach the plugs to the adapter cable. The cable is located on the crossbar of the cover in the device. Affix the cable to the device in such a way that it will not be damaged when the customer panel is pulled out. Push the customer panel back in until it engages. Close the door of the operating unit.
01750058375 G
85
Installation
Open the door of the operating unit, release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB).
2 3 1
Loosen the three screws (1) at the rear of the device. At the positions marked (3) push one screw M4x6 each through the device cover. Loosely attach the wedge-shaped cover to the device cover (2) with the screws from inside. Push the customer panel back in until it engages.
86
01750058375 G
Installation
Installation with frame for complete integration Adjust the wedge-shaped cover (2) from the front of the device. Ideally, the clearance between the cover and the customer panel's top edge should be approx. 2 mm (0.08").
Tighten the three screws (1) at the rear of the device. Release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB). Fasten the wedge-shaped cover using the three screws (3) from inside. Push the customer panel back in until it engages. Close the door of the operating unit.
01750058375 G
87
Installation
Align the installation frame and mark the holes to be drilled for mounting the installation frame (see illustration below).
If a tear-off sensor is to be installed as agreed with the financial institution or the alarm technician, also mark the holes for the tear-off sensor (see illustrations below).
Securing the installation frame The installation frame needs to be anchored in the floor at four attachment points regardless of the safe construction type (UL, CEN L, CEN III, CEN IV). These attachment points are at position (2) and the alternative attachment points are at position (3) (see illustration below).
88
01750058375 G
Installation
The installation frame must be secured using one threaded rod per group of holes A to D. The installation frame is secured with four threaded rods.
11
1 2
A 3
7 8 60 (2.36") 3 C 1 2 D
4 5
10
10
9
max. 50 (max. 1.97")
23 (0.91")
9 640 (25.2")
23 (0.91")
1 Attachment points of safe 2 Attachment points of installation frame 3 Alternative attachment points of installation frame 4 Attachment point of tear-off sensor Rearload 5 Not used
6 Cable lead-ins into the installation frame 7 Area for cables 8 Cable feed openings underneath installation frame 9 Customer panel side 10 Wall 11 Side with safe door
01750058375 G
Installation
Position of the installation frame with a maximum wall thickness of 160 mm (6.3")
The installation frame must be secured using one threaded rod per group of holes A to D. The installation frame is secured with four threaded rods.
11
1 2
A 3
5 8 170 (6.69") 3 C 1 2 10 D
10
23 (0.91")
640 (25.2")
23 (0.91")
1 Attachment points of safe 2 Attachment points of installation frame 3 Alternative attachment points of installation frame 4 Attachment point of tear-off sensor Rearload 5 Not used
6 Cable lead-ins into the installation frame 7 Area for cables 8 Cable feed openings underneath the installation frame 9 Customer panel side 10 Wall 11 Side with safe door
90
Installation
Drill the required four holes and the hole for the tear-off sensor, if necessary (see following figure).
Installation on raised or cavity flooring as well as on a floating floor is not permissible according to the CEN standard. If the mounting structure differs from the one described below (see illustration below), it must be approved by the insurer. To ensure that the safe does not become detached, the threaded rods of the installation frame must be fastened in the concrete foundation. The drilled holes in the concrete foundation must have a depth of at least 125 mm (4.92") for the installation frame (see illustration below). For the hole diameter please refer to the mounting instructions of the caulking cartridge. The drilled hole in the concrete foundation must have a depth of at least 40 mm (1.57") for the tear-off sensor (see illustration below). Consult your alarm technician about the size of the hole and the fixing.
01750058375 G
91
Installation
min. 40 (1.57")
1 2 3 4
5 6 7 8
Screed Concrete Mounting set for installation frame Top surface of finished floor
Clean the drill holes as specified in the mounting instructions of the caulking cartridge. Secure the threaded rods in the concrete foundation as specified in the mounting instructions of the caulking cartridge.
The threaded rods must protrude at a minimum 24 mm (0.94") and at a maximum 25 mm (0.98").
92
01750058375 G
25 (0.98")
UL CEN
Installation
Remove the filling piece 6b and possibly 6a from the cable lead-ins (see positions 6a and 6b in the following illustration).
The space inside the installation frame allows cable lead-in through cable ducts in the floor. If the connecting cables on the site are not located on the safe door side: Insert the data lines, the connecting cable of the remote status indicator (optional) and the power cord through the cable lead-ins and if necessary through the cable feed openings behind the safe door side (11) of the installation frame, as in the example shown here. Make sure that the connecting cables are laid loosely and are not crushed by the installation frame.
11
6b
6a
Screw the installation frame to the floor (for material see section "Mounting sets"). If applicable, note the hardening times of the mounting material.
The threaded rods must not protrude beyond the installation frame. If necessary, level the threaded rods.
01750058375 G
93
Installation
Push the device on the installation frame. Ensure that no cables are damaged in the process. Open the safe door (see chapter "Basic Operation" in the operating manual). If it is necessary for the installation remove those parts inside the unit which secure its components during transportation (see enclosed information sheet). Pull out the CMD-V4 (see chapter "Basic Operation" in the operating manual).
To facilitate access to the attachment points of the safe you can swing the cash media dispenser (CMD-V4) up.
94
01750058375 G
Installation
When lifting the CMD-V4 make sure that the connecting cables on the rear side of the CMD-V4 controller are not damaged and that they are not moved around! Swing the CMD-V4 (1) up until the hole (2) above the pull-out tracks is visible. Push the locking axle (3) (to be found in the safe) in until the grooves are in line with the side panels of the CMD-V4 rack. Check the firm fit of the CMD-V4 by moving it slightly back and forth. When mounting the locking axle ensure that no cables are damaged in the process. Check the CMD-V4 for a secure fit. The locking axle must be firmly in place.
01750058375 G
95
Installation
When lowering the CMD-V4 make sure that the connecting cables on the rear side of the CMD-V4 controller are not damaged and that they are not moved around!
Mount both securing screws. Remove the two track locks and push the CMD-V4 back into the device. Replace the cassettes.
96
01750058375 G
Installation
Feed the data cables and the power cable into the safe, if applicable by the area for cables of the installation frame. Replace the filling piece of the installation frame (position 6b) and the filling piece of the safe.
01750058375 G
97
Installation
Attach the VDS label for the installation frame inside the safe door below the existing VDS label. (The VDS label for the mounted installation frame is included with the installation frame.) After mounting the installation frame and the device, fill out the Confirmation of Installation. (The Confirmation of Installation is included with the installation frame.) Fax the filled out and signed Confirmation of Installation form to the fax number provided on the form.
If there is no fax machine available, the form has to be faxed to this number at a later point in time.
The operator needs the Confirmation of Installation for submitting it to the insurance company.
General
Close the device. Unpack the parts of the installation frame and install them (see section "Installing the window frame").
The locking axle and the track stops must remain in the safe for later service operations.
98
01750058375 G
Installation
2 3
1 Holes for attaching the frame to the wall 2 Frame 3 Cover (installed only after the frame has been attached to the device)
01750058375 G
99
Installation
View of the frame for up to 160 mm (6.3") thick walls (completely assembled)
1
2 3
1 Holes for attaching the frame to the wall 2 Frame 3 Cover (installed only after the frame has been attached to the device)
100
01750058375 G
Installation
Pre-assembling the frame for up to 50 mm (1.97") and 160 mm (6.30") thick walls
In the following pre-assembly of the frame is described using the window frame for up 160 mm (6.30") thick walls as an example. The procedure for pre-assembling a window frame for up to 50 mm (1.97") thick walls is the same.
Attach the frame brackets (item 6 in the illustration "View of the frame for up to 160 mm (6.30") thick walls (completely assembled)" or "View of the frame for up to 50 mm (1.97") thick walls (completely assembled)") on the left and on the right side using two Taptite round head screws M4x6 (1) each.
4x
01750058375 G
101
Installation
Open the door of the operating unit, release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB).
Feed the connecting cable for the light through the cable opening into the device (1). Push the frame from the front in the direction of the arrow (2) up to the customer panel. Lift the frame a little and slide it carefully over the customer panel and let go.
102
01750058375 G
Installation
2x
Attach the frame brackets (1) to the device using one pan head screw with inner hexagon M6x10 and a washer 6.4x1.6.
If space is restricted use an appropriate tool that is short enough. When tightening the screws of the frame brackets, make sure that the frame is touching the wall. However, if the wall is uneven, you must not use force to press it in, since the frame could distort when you secure the frame tabs. This could cause the customer panel to grate or jam against the inside of the frame when you open it.
Push the customer panel back in until it engages. Close the door of the operating unit.
01750058375 G
103
Installation Release the locking pins by pushing them slightly sideways with a screwdriver and turning them (1) until they jump out (2).
1
Lower the light box pane (3).
1 3
Drill a 50 mm (1.97") deep hole with a diameter of 8 mm (0.31") through each of the three holes (1). Use the supplied fixings and screws 6x40 to attach the frame to the wall.
Close the light box by following the same steps in reverse order.
104
01750058375 G
Installation
Connecting the light on frames for up to 50 mm (1.97") and 160 mm (6.30") thick walls
Open the door of the operating unit, release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB).
The connecting cable for the logo light is lying rolled up inside the device next to the PC.
Attach the plugs to the adapter cable. The cable is located on the crossbar of the cover in the device. Affix the cable to the device in such a way that it will not be damaged when the customer panel is pulled out. Push the customer panel back in until it engages. Close the door of the operating unit.
01750058375 G
105
Installation
Adjusting the cover for frames for up to 50 mm (1.97") and 160 mm (6.30") thick walls
Frame for up to 50 mm (1.97") thick walls Frame for up to 160 mm (6.30") thick walls
2 3 1
1
2 3
Loosen the three screws (1) at the rear of the device. At the positions marked (3) push one screw M4x6 each through the device cover. Loosely attach the wedge-shaped cover to the device cover (2) with the screws from inside. Push the customer panel back in until it engages.
106
01750058375 G
Installation with window frame Frame for up to 160 mm (6.30") thick walls
Adjust the wedge-shaped cover (2) from the front of the device.
Ideally, the clearance between the cover and the customer panel's top edge should be approx. 2 mm (0.08").
Tighten the three screws (1) at the rear of the device. Release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB). Fasten the wedge-shaped cover using the three screws (3) from inside. Push the customer panel back in until it engages. Close the door of the operating unit.
01750058375 G
107
Installation
Align the installation frame and mark the holes to be drilled for mounting the installation frame (see illustration below).
If a tear-off sensor is to be installed as agreed with the financial institution or the alarm technician, also mark the holes for the tear-off sensor (see illustrations below).
Securing the installation frame The installation frame needs to be anchored in the floor at four attachment points regardless of the safe construction type (UL, CEN L, CEN III, CEN IV). These attachment points are at position (2) and the alternative attachment points are at position (3) (see illustration below). The supplied installation frame can be used for the frontload and rearload versions.
108
01750058375 G
Installation
The installation frame must be secured using one threaded rod per group of holes A to D. The installation frame is secured with four threaded rods.
1 2 4
5 7
max. 360 (max. 14.17") 160 (6.3") 23 (0.91")
6 Cable lead-ins into the installation frame 7 Area for cables 8 Cable feed openings underneath the installation frame 9 This side must always point towards the customer panel 10 Wall 109
12 10
12 10
2 1
23 (0.91") 640 (25.2")
1 Attachment points of safe 2 Attachment points of installation frame 3 Alternative attachment points of installation frame 4 Attachment point of tear-off sensor Rearload 5 Attachment point of tear-off sensor Frontload
01750058375 G
Installation
Drill the required four holes and the hole for the tear-off sensor, if necessary (see following figure).
Installation on raised or cavity flooring as well as on a floating floor is not permissible according to the CEN standard. If the mounting structure differs from the one described below (see illustration below), it must be approved by the insurer. To ensure that the safe does not become detached, the threaded rods of the installation frame must be fastened in the concrete foundation. The drilled holes in the concrete foundation must have a depth of at least 125 mm (4.92") for the installation frame (see illustration below). For the hole diameter please refer to the mounting instructions of the caulking cartridge. The drilled hole in the concrete foundation must have a depth of at least 40 mm (1.57") for the tear-off sensor (see illustration below). Consult your alarm technician about the size of the hole and the fixing.
110
01750058375 G
Installation
Mounting structure
UL CEN
7 25
8 176*
111
min. 40
1 2 3 4
5 6 7 8
Screed Concrete Mounting set for installation frame Top surface of finished floor
Clean the drill holes as specified in the mounting instructions of the caulking cartridge. Secure the threaded rods in the concrete foundation as specified in the mounting instructions of the caulking cartridge.
The threaded rods must protrude at a minimum 24 mm (0.94") and at a maximum 25 mm (0.98").
01750058375 G
min. 125
Installation
Remove the filling piece 6b (rearload) or 6a (frontload) and possibly the filling piece 6a (rearload) or 6b (frontload) from the cable lead-ins in the upper part of the installation rack (see positions 6a and 6b in the following illustration (example shows rearload version)).
The space inside the installation frame allows cable lead-in through cable ducts in the floor. If the connecting cables on the site are not located on the safe door side: Insert the data lines, the connecting cable of the remote status indicator (optional) and the power cord through the cable lead-ins and if necessary through the cable feed openings behind the safe door side (11) of the installation frame, as in the example shown here. Make sure that the connecting cables are laid loosely and are not crushed by the installation frame.
11
6b
6a
Screw the installation frame to the floor (for material see section "Mounting sets"). If applicable, note the hardening times of the mounting material.
The threaded rods must not protrude beyond the installation frame. If necessary, level the threaded rods.
112
01750058375 G
Installation
Push the device on the installation frame. Ensure that no cables are damaged in the process. Open the safe door (see chapter "Basic Operation" in the operating manual). If it is necessary for the installation remove those parts inside the unit which secure its components during transportation (see enclosed information sheet). Pull out the CMD-V4 (see chapter "Basic Operation" in the operating manual).
To facilitate access to the attachment points of the safe you can swing the cash media dispenser (CMD-V4) up.
01750058375 G
113
Installation
When lifting the CMD-V4 make sure that the connecting cables on the rear side of the CMD-V4 controller are not damaged and that they are not moved around! Swing the CMD-V4 (1) up until the hole (2) above the pull-out tracks is visible. Push the locking axle (3) (to be found in the safe) in until the grooves are in line with the side panels of the CMD-V4 rack. Check the firm fit of the CMD-V4 by moving it slightly back and forth. When mounting the locking axle ensure that no cables are damaged in the process. Check the CMD-V4 for a secure fit. The locking axle must be firmly in place.
114
01750058375 G
Installation
When lowering the CMD-V4 make sure that the connecting cables on the rear side of the CMD-V4 controller are not damaged and that they are not moved around!
Mount both securing screws. Remove the two track locks and push the CMD-V4 back into the device. Replace the cassettes.
01750058375 G
115
Installation
Feed the data cables and the power cable into the safe, if applicable by the area for cables of the installation frame. If necessary, replace the filling piece of the installation frame (position 6b (rearload) or position 6a (frontload)) and the filling piece of the safe.
116
01750058375 G
Installation
Attach the VDS label for the installation frame inside the safe door below the existing VDS label. (The VDS label for the mounted installation frame is included with the installation frame.) After mounting the installation frame and the device, fill out the Confirmation of Installation. (The Confirmation of Installation is included with the installation frame.) Fax the filled out and signed Confirmation of Installation form to the fax number provided on the form.
If there is no fax machine available, the form has to be faxed to this number at a later point in time.
The operator needs the Confirmation of Installation for submitting it to the insurance company.
General
Close the device. Unpack the parts of the installation frame and install them (see section below "Installing the frame for partial integration with light box").
The locking axle and the track stops must remain in the safe for later service operations.
01750058375 G
117
Installation
5 6 1 7
3 4
1 Cover (installed only after the frame has been attached to the device) 2 Connecting plate 3 Left frame extension 4 Right frame extension
5 Holes for attaching the frame to the wall 6 Frame 7 Light cable 8 Frame bracket
118
01750058375 G
Installation
Attach the frame extensions (items 3 and 4 in the illustration "View of the frame (completely assembled)") on the left and right side as shown in the illustration below using two ratchet washers M4 (1).
4x
Attach the connecting plates (item 2 in the illustration "View of the frame (completely assembled)") on the left and on the right side using one Taptite round head screw M4x6 each (2).
2x
01750058375 G
119
Installation
Attach the center frame brackets (item 8 in the illustration "View of the frame (completely assembled)") on the left and on the right side using two Taptite round head screws M4x6 each (3).
4x
Attach the bottom frame brackets (item 8 in the illustration "View of the frame (completely assembled)") on the left and on the right side using two Taptite round head screws M4x6 each (4).
4x
120
01750058375 G
Installation
Open the door of the operating unit, release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB).
Push the frame from the front in the direction of the arrow (1) up to the customer panel. Lift the frame a little and slide it carefully over the customer panel and let go.
01750058375 G
121
Installation
4x
Attach the frame brackets (1) on the side to the device using one pan head screw with inner hexagon M6x10 and a washer 6.4x1.6.
If space is restricted use an appropriate tool that is short enough. When tightening the screws of the frame brackets, make sure that the frame is touching the wall. However, if the wall is uneven, you must not use force to press it in, since the frame could distort when you secure the frame tabs. This could cause the customer panel to grate or jam against the inside of the frame when you open it.
Push the customer panel back in until it engages. Close the door of the operating unit.
122
01750058375 G
Installation
Installation with frame for partial integration with light box Release the locking pins by pushing them slightly sideways with a screwdriver and turning them (1) until they jump out (2).
1
Lower the light box pane (3).
1 3
Drill a 50 mm (1.97") deep hole with a diameter of 8 mm (0.31") through each of the three holes (1). Use the supplied fixings and screws 6x40 to attach the frame to the wall.
Close the light box by following the same steps in reverse order.
01750058375 G
123
Installation
Open the door of the operating unit, release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB). Feed the connecting cable for the light through the cable opening into the device (1).
The connecting cable for the logo light is lying rolled up inside the device next to the PC.
Attach the plugs to the adapter cable. The cable is located on the crossbar of the cover in the device. Affix the cable to the device in such a way that it will not be damaged when the customer panel is pulled out. Push the customer panel back in until it engages. Close the door of the operating unit.
124
01750058375 G
Installation
1
Lower the light box pane (3).
1 3
3x
Set the plate in the mounting (1) and fasten it using the three pan head screws M4x6 (2). Close the light box by following the same steps in reverse order.
01750058375 G
125
Installation
Open the door of the operating unit, release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB).
3x
Insert the cover in the opening between device and frame in such a way that the guides of the retaining plate fit in the corresponding slots (3). Push the cover into a vertical position. At the positions marked (4) push one screw M4x6 each through the device cover. Loosely attach the cover to the device cover with the screws from inside. Push the customer panel back in until it engages.
126
01750058375 G
Installation
Installation with frame for partial integration with light box Adjust the cover from the front of the device. Ideally, the clearance between the cover and the customer panel's top edge should be approx. 2 mm (0.08").
Release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB). Fasten the cover using the three screws from inside. Push the customer panel back in until it engages. Close the door of the operating unit.
01750058375 G
127
Installation with frame for partial integration without light box Installation
Align the installation frame and mark the holes to be drilled for mounting the installation frame (see illustration below).
If a tear-off sensor is to be installed as agreed with the financial institution or the alarm technician, also mark the holes for the tear-off sensor (see illustrations below).
Securing the installation frame The installation frame needs to be anchored in the floor at four attachment points regardless of the safe construction type (UL, CEN L, CEN III, CEN IV). These attachment points are at position (2) and the alternative attachment points are at position (3) (see illustration below). The supplied installation frame can be used for the frontload and rearload versions.
128
01750058375 G
Installation Installation with frame for partial integration without light box
The installation frame must be secured using one threaded rod per group of holes A to D. The installation frame is secured with four threaded rods.
1 2 4
12 10
8
10
8 8
3
1 Attachment points of safe 2 Attachment points of installation frame 3 Alternative attachment points of installation frame 4 Attachment point of tear-off sensor Rearload 5 Attachment point of tear-off sensor Frontload
6 Cable lead-ins into the installation frame 7 Area for cables 8 Cable feed openings underneath the installation frame 9 This side must always point towards the customer panel 10 Wall
01750058375 G
259 (10.2")
129
Installation with frame for partial integration without light box Installation
Drill the required four holes and the hole for the tear-off sensor, if necessary (see following figure).
Installation on raised or cavity flooring as well as on a floating floor is not permissible according to the CEN standard. If the mounting structure differs from the one described below (see illustration below), it must be approved by the insurer. To ensure that the safe does not become detached, the threaded rods of the installation frame must be fastened in the concrete foundation. The drilled holes in the concrete foundation must have a depth of at least 125 mm (4.92") for the installation frame (see illustration below). For the hole diameter please refer to the mounting instructions of the caulking cartridge. The drilled hole in the concrete foundation must have a depth of at least 40 mm (1.57") for the tear-off sensor (see illustration below). Consult your alarm technician about the size of the hole and the fixing.
130
01750058375 G
Installation Installation with frame for partial integration without light box Mounting structure
min. 40 (1.57")
1 2 3 4
5 6 7 8
Screed Concrete Mounting set for installation frame Top surface of finished floor
Clean the drill holes as specified in the mounting instructions of the caulking cartridge. Secure the threaded rods in the concrete foundation as specified in the mounting instructions of the caulking cartridge.
The threaded rods must protrude at a minimum 24 mm (0.94") and at a maximum 25 mm (0.98").
01750058375 G
25 (0.98")
UL CEN
Installation with frame for partial integration without light box Installation
Remove the filling piece 6b (rearload) or 6a (frontload) and possibly the filling piece 6a (rearload) or 6b (frontload) from the cable lead-ins in the upper part of the installation rack (see positions 6a and 6b in the following illustration (example shows rearload version)).
The space inside the installation frame allows cable lead-in through cable ducts in the floor. If the connecting cables on the site are not located on the safe door side: Insert the data lines, the connecting cable of the remote status indicator (optional) and the power cord through the cable lead-ins and if necessary through the cable feed openings behind the safe door side (11) of the installation frame, as in the example shown here. Make sure that the connecting cables are laid loosely and are not crushed by the installation frame.
11
6b
6a
Screw the installation frame to the floor (for material see section "Mounting sets"). If applicable, note the hardening times of the mounting material.
The threaded rods must not protrude beyond the installation frame. If necessary, level the threaded rods.
132
01750058375 G
Installation Installation with frame for partial integration without light box
Push the device on the installation frame. Ensure that no cables are damaged in the process. Open the safe door (see chapter "Basic Operation" in the operating manual). If it is necessary for the installation remove those parts inside the unit which secure its components during transportation (see enclosed information sheet). Pull out the CMD-V4 (see chapter "Basic Operation" in the operating manual).
To facilitate access to the attachment points of the safe you can swing the cash media dispenser (CMD-V4) up.
01750058375 G
133
Installation with frame for partial integration without light box Installation
When lifting the CMD-V4 make sure that the connecting cables on the rear side of the CMD-V4 controller are not damaged and that they are not moved around! Swing the CMD-V4 (1) up until the hole (2) above the pull-out tracks is visible. Push the locking axle (3) (to be found in the safe) in until the grooves are in line with the side panels of the CMD-V4 rack. Check the firm fit of the CMD-V4 by moving it slightly back and forth. When mounting the locking axle ensure that no cables are damaged in the process. Check the CMD-V4 for a secure fit. The locking axle must be firmly in place.
134
01750058375 G
Installation Installation with frame for partial integration without light box
When lowering the CMD-V4 make sure that the connecting cables on the rear side of the CMD-V4 controller are not damaged and that they are not moved around!
Mount both securing screws. Remove the two track locks and push the CMD-V4 back into the device. Replace the cassettes.
01750058375 G
135
Installation with frame for partial integration without light box Installation
Feed the data cables and the power cable into the safe, if applicable by the area for cables of the installation frame. If necessary, replace the filling piece of the installation frame (position 6b (rearload) or position 6a (frontload)) and the filling piece of the safe.
136
01750058375 G
Installation Installation with frame for partial integration without light box
Attach the VDS label for the installation frame inside the safe door below the existing VDS label. (The VDS label for the mounted installation frame is included with the installation frame.) After mounting the installation frame and the device, fill out the Confirmation of Installation. (The Confirmation of Installation is included with the installation frame.) Fax the filled out and signed Confirmation of Installation form to the fax number provided on the form.
If there is no fax machine available, the form has to be faxed to this number at a later point in time.
The operator needs the Confirmation of Installation for submitting it to the insurance company.
General
Close the device.
Unpack the parts of the installation frame and install them (see section below "Installing the frame for partial integration without light").
The locking axle and the track stops must remain in the safe for later service operations.
01750058375 G
137
Installation with frame for partial integration without light box Installation
1 2
138
01750058375 G
Installation Installation with frame for partial integration without light box
Attach the top part of the frame and the sides of the frame (items 1, 2 and 3 in the illustration "View of the frame (completely assembled)") on the left and on the right side according to the illustration below using the Taptite round head screws M4x6 (1) and the ratchet washers M5 and the Taptite fillister head screws M5x10 (2).
2x
6x
01750058375 G
139
Installation with frame for partial integration without light box Installation
Attach the upper mounting brackets (item 4 in the illustration "View of frame (completely assembled)") with two Taptite round head screws M4x6 (3).
4x
140
01750058375 G
Installation Installation with frame for partial integration without light box
Attach the center and lower mounting brackets (item 4 in the illustration "View of frame (completely assembled)") with two Taptite round head screws M4x6 (3) each.
8x
01750058375 G
141
Installation with frame for partial integration without light box Installation
Open the door of the operating unit, release the customer panel and pull it out to the front (please refer to the chapter "Basic Operation", in the operating manual of the ProCash 2000xe / 2000xe USB).
Push the frame from the front in the direction of the arrow (1) up to the customer panel. Lift the frame a little and slide it carefully over the customer panel and let go.
142
01750058375 G
Installation Installation with frame for partial integration without light box
2x
4x
Attach the frame brackets on the sides (1) to the device using one pan head screw with inner hexagon M6x10 and a washer 6.4x1.6 and the upper mounting brackets (2) using one Taptite round head screw M4x6 and one washer 4.3 each.
If space is restricted use an appropriate tool that is short enough. When tightening the screws of the frame brackets, make sure that the frame is touching the wall. However, if the wall is uneven, you must not use force to press it in, since the frame could distort when you secure the frame tabs. This could cause the customer panel to grate or jam against the inside of the frame when you open it.
Push the customer panel back in until it engages. Close the door of the operating unit.
01750058375 G
143
Start-up
Installation
Start-up
The service technician will connect the power and data cables.
144
01750058375 G
2 3
Pos. Item 1 Remote Status Indicator - Standard (01750047663) with 50 m (164.1 ft) connecting cable (dimensions: 101.2 x 45.7 x 27 mm (3.98" x 1.8" x 1.06") (W x H x D)) Phillips screws SPAX 2.5 x 20 (countersunk head) Fixings 4 mm (0.16")
Quantity required 1
2 3
2 2
The enclosed mounting material is used to secure the indicator to masonry or wooden paneling.
01750058375 G
145
Installation
1 3 2
Remove the standard remote status indicator from the packaging. Use a screwdriver to press carefully through openings (1) and (2) until the tabs behind them disengage. Remove the front cover (3) forwards.
When drilling the mounting holes, take note of the constructional situation (energy, media line, etc.). Position the lower section and mark the points where it is to be secured.
In masonry only: Drill the necessary bores: drill depth: 20 mm (0.79"), drill diameter: 4 mm (0.16"), and insert the enclosed fixings in the holes. Secure the lower section to the wall with the enclosed screws and press the front cover onto the lower section.
146
01750058375 G
Remote status indicator - standard An adhesive label with the number 1 is applied in the factory.
Remove the required label (1) and apply it to the space provided (2) on the standard remote status indicator.
Lay the connecting cable of the standard remote status indicator to the appropriate device.
Marking on wires
The wires are marked with an adhesive label at the end as follows: - 11 RED LIGHT - 12 YELLOW LIGHT - 13 GREEN LIGHT - 14 GND
01750058375 G
147
Depending on the device configuration the relay panel for external features can be either equipped with a USB or a DSUB plug. The wire connection is the same for both plugs.
Connect the individual wires to the relay panel for external features as follows:
11 12 13 14 2
1 Relay panel for external features with USB plug 2 Relay panel for external features with DSUB plug Pin 11 12 13 14 Name Wire 'RED - 11 RED LIGHT' Wire 'WHITE - 12 YELLOW LIGHT' Wire 'GREEN - 13 GREEN LIGHT' Wire 'BLACK - 14 GND'
148
01750058375 G
2 3
Pos. Item 1 Remote Status Indicator - Audio (01750069332) with 50 m (164.1 ft) connecting cable (dimensions: 118 x 96.5 x 40.5 mm (4.65" x 3.8" x 1.59") (W x H x D)) Phillips screws SPAX 4 x 40 (half-round screws) Fixings 6 mm (0.24") Quantity required 1
2 3
2 2
The enclosed mounting material is used to secure the indicator to masonry or wooden paneling.
01750058375 G
149
Installation
Remove the audio remote status indicator from the packaging. Loosen screw (1). Move the back panel (2) to one side at the bottom and pull the panel downwards out of the front cover.
When drilling the mounting holes, take note of the constructional situation (energy, media line, etc.). Position the back panel and mark the points where it is to be secured.
Allow sufficient space to install the connecting cable on the right (approx. 20 mm (0.79")).
150
01750058375 G
In masonry only: Drill the necessary bores: drill depth: 40 mm (1.57"), drill diameter: 6 mm (0.24"), and insert the enclosed fixings in the holes. Secure the lower part to the wall with the screws supplied and mount the front cover on the back panel as described above under removal.
Remove the required label (1) and apply it to the space provided (2) on the audio remote status indicator.
Lay the connecting cable of the audio Remote Status Indicator to the appropriate device.
01750058375 G
151
Marking on wires
The wires are marked with an adhesive label at the end as follows:
152
01750058375 G
Depending on the device configuration the relay panel for external features can be either equipped with a USB or a DSUB plug. The wire connection is the same for both plugs.
Connect the individual wires to the relay panel for external features as follows:
11 12 13 14 2
1 Relay panel for external features with USB plug 2 Relay panel for external features with DSUB plug Pin 11 12 13 14 Name Wire 'RED - 11 RED LIGHT' Wire 'WHITE - 12 YELLOW LIGHT' Wire 'GREEN - 13 GREEN LIGHT' Wire 'BLACK - 14 GND'
01750058375 G
153
You must strip 60 mm (2.36") of the cable insulation and 7 mm (0.28") of the individual wire insulation. The individual wire ends must be twisted.
Adapting the cable length at the standard remote status indicator end
1 3 2
Use a screwdriver to press carefully through openings (1) and (2) until the tabs behind them disengage. Remove the front cover (3) forwards.
Release the four terminals of the terminal strip (1) and remove the front cover.
154
01750058375 G
Shortening the cables Remove screws (1) and (3) and the strain relief (2). Remove the connecting cable.
Shorten the connecting cable to the desired length. Shorten the cable end as shown in the following diagram.
4.5 (0.18") 60 (23.62")
You must strip 60 mm (2.36") of the cable insulation and 4.5 mm (0.18") of the individual wire insulation. The individual wire ends must be twisted.
Lead the connecting cable through the opening in the lower section and secure it with the strain relief.
Marking on wires
The wires are marked with an adhesive label at the end as follows:
01750058375 G
155
Pin 1 2 3 4
Name Wire 'RED - RED LIGHT' Wire 'WHITE - YELLOW LIGHT' Wire 'GREEN - GREEN LIGHT' Wire 'BLACK - GND'
Press the front cover onto the lower section. Ensure that no wires are damaged in the process.
156
01750058375 G
Remove the two screws (1) and move the board (2) to one side.
01750058375 G
157
Installing the Remote Status Indicator Release the four terminals of the terminal strip and disconnect the cable from the terminal strip (1). Remove the connecting cable with the spacer from cable guide (2).
Remove the spacer from the connecting cable (see arrow). Shorten the connecting cable to the desired length. Push the spacer back on the cable.
You must strip approx. 25 mm (0.98") of the cable insulation and 4.5 mm (0.18") of the individual wire insulation. The individual wire ends must be twisted.
158
01750058375 G
The wires are marked with an adhesive label at the end as follows: - RED LIGHT - YELLOW LIGHT - GREEN LIGHT - GND
Pin 1 2 3 4
Name Wire 'RED - RED LIGHT' Wire 'WHITE - YELLOW LIGHT' Wire 'GREEN - GREEN LIGHT' Wire 'BLACK - GND'
Press the connecting cable with the spacer into the cable guide (2). Mount the board and the back panel as described above under removal.
01750058375 G
159
160
01750058375 G
Appendix
Check list for installation preparations for self-service systems
KS number * Device type Customer address Name Street Town Telephone Contact * Order number Delivery address/location
This check list has been created for all self-service systems. Most questions can be answered yes or no. Some empty space is provided in the section "Notes concerning installation preparation" for your convenience if you want to note any questions or drafts. After checking off all items, copy this list, send it to your head of operations and make arrangements for an installation date. Name: Telephone number: Fax number:
01750058375 G
161
General information
Installation in front of a wall through a wall freestanding yes Is the load carrying capacity of the floor sufficient according to the installation documentation? Is there floor heating in the installation area? Are there cavities in the installation area (cable duct, raised floor)? Is the operation and maintenance space sufficient? Is the equipment screened from external light (sunlight)? Is a video surveillance system to be installed? Is a door opener system to be installed? no encased
OK
Preparations
Construction work
yes Is the securing of cash-dispensers in the raw concrete ensured (CEN standard)? Is the frame aligned and fastened in accordance with the installation instructions? Has a wall cutout that may be required been completed? Are the ambient conditions met? no OK
162
01750058375 G
Organizational preparations
yes Is the generation prepared on the host? Has the MM module or CIM86 been ordered and is it available? Have the encryption/decryption or EPP keys been prepared? Is the paper and money ready for start-up? Have you discussed the diameter of the hole that is to be drilled and the fixing to be used for the tear-off sensor with the local alarm provider? Diameter? Fixing to be used? no OK
01750058375 G
163
Are there steps or obstacles inside the building? If so, how many?
Checked by customer:
164
01750058375 G
01750058375 G
165
166
01750058375 G
Appendix
Technical data
Technical data
General installation conditions
Electrical characteristics of the supply network
Line voltage range: Rated frequency: Network type: Permissible tolerance for voltage range: Permissible tolerance for rated frequency: 110 - 120 V 50/60 Hz TN (network with PE conductor) - 10 % to + 6 % 1% 220 - 240 V 50/60 Hz TN (network with PE conductor) - 10 % to + 6 % 1%
01750058375 G
167
Technical data
Appendix
Device conditions
110 - 120 V 220 - 240 V Idle Operation Idle Operation mode (maximum) mode (maximum) Device without UPS Rated current consumption: Apparent power consumption: Active power: Power factor: Leakage current (max.): Device with UPS Rated current consumption: Apparent power consumption: Active power: Leakage current (max.):
Country-specific safety plug CEE plug in acc. with IEC 309 10 A slow-blow fuse or 16 A circuit-breaker IP 20
Country-specific safety plug CEE plug in acc. with IEC 309 10 A slow-blow fuse or 16 A circuit-breaker IP 20
168
01750058375 G
Appendix
Technical data
Installation specifications
ProCash 2000xe / 2000xe USB Frontload with 4-cassette dispenser Dimensions: Height: Width: Depth: 1472 (57.95 600 (23.62 900 (35.43 mm ) mm ) mm ) ProCash 2000xe / 2000xe USB Rearload with 4-cassette dispenser 1472 (57.95 600 (23.62 900 (35.43 mm ) mm ) mm ) ProCash 2000xe / 2000xe USB Rearload with 5-cassette dispenser 1612 (63.46 600 (23.62 900 (35.43 mm ) mm ) mm )
Operation and maintenance space: Device weight: UL safe: CEN L safe: CEN III safe: CEN IV safe:
Surface load: UL safe: CEN L safe: CEN III safe: CEN IV safe:
01750058375 G
169
Technical data ProCash 2000xe / 2000xe USB Frontload with 4-cassette dispenser Fan capacity: 60 m/h (2118.6 ft/h) ProCash 2000xe / 2000xe USB Rearload with 4-cassette dispenser 60 m/h (2118.6 ft/h)
Appendix ProCash 2000xe / 2000xe USB Rearload with 5-cassette dispenser 60 m/h (2118.6 ft/h)
Detailed information concerning the dimensions is provided in the chapter "Planning the Installation", section "Device dimensions".
170
01750058375 G
Appendix
Technical data
Environmental conditions
Climatic environmental conditions in acc. with EN 60721 Class Operation:* (indoors) Limit range of operation: (indoors)** Transport: Storage: * Ambient temperature C 3K2 + 5 to + 35 * F (+ 41 to + 95) Relative humidity % r.h. 5 to 85
+ 5 to + 40 - 25 to + 60 + 5 to + 40
The temperature value of + 35 C (+ 95 F) deviates from the value of the standard (+ 40 C (+ 104 F)).
** In the limit range the device may only be operated for a short period of time.
Mechanical environmental conditions in acc. with EN 60721 Class 3M2 2M2 1M3 Remarks Building with minimal external vibration All types of commercial vehicles and trailers as well as rail and air transport Noticeable vibration and bumps caused for example by machines or passing vehicles
01750058375 G
171
Technical data Noise emission in accordance with EN 27779 Noise rating according to ISO 9296 Sound power level LWAd Workplace-related sound pressure level LpAm (at adjacent workplace) * typical operating cycle Idle mode 5.5 B 43 dB
Appendix
Operation * 7.0 B 57 dB
When selecting the installation site, noise emission should be taken into account. Fans in operation or the noise produced during a transaction could disturb people in the immediate vicinity of the device and may therefore need to be diminished with soundproofing (e.g. soundproof cabinets, etc.). They must comply with the environmental conditions that apply to the specific device (see above) and the maintenance areas (see chapter "Planning the Installation", section "Space required for operation and maintenance").
172
01750058375 G
Appendix
Technical data
EMC standards: EN 55022 / B EN 55024 ICES-003 (CSA 108.8) FCC CFR 47, part 15, subpart B, class A
Conformity
The CE mark of conformity attached to the product or its package indicates that the product complies with the requirements of the following EC directives: EMC Directive 2004/108/EC Low Voltage Directive 2006/95/EC The corresponding statement of compliance has been issued by WINCOR NIXDORF International GmbH Heinz-Nixdorf-Ring 1 33106 Paderborn Germany
01750058375 G
173
Technical data
Appendix
UL 291
In order to meet guideline UL 291, ensure the following during installation: The unit must be connected to a grounded receptacle. For a free-standing installation the security container of the ATM shall be anchored in accordance with this instruction, either using the listed anchoring devices or using similar devices. Each anchoring device shall withstand a 22,000 pound (97,861 N) vertical or horizontal force applied in an attempt to remove the security container from its location. If the free-standing installation is inside a building and the anchoring devices cannot be secured to the building structure, the unit shall be attached to a steel plate at least 4 feet by 8 feet by inch thick (1.22 m by 2.44 m by 12.7 mm thick) or an equivalent structure so as to restrict the removal of the teller machine from the building. The release mechanism of the attachment devices shall only be accessible when the door of the security container is open.
174
01750058375 G
Appendix
Environmental protection
Environmental protection
Environmentally and recycling-friendly product development
This product has been designed according to our corporate guideline 'Environmentally and recycling-friendly product development'. This means that crucial criteria such as long life, choice of material and its labeling, emissions, packaging, ease of disassembly and recyclability have been taken into account. This saves resources and relieves the strain on the environment.
Saving energy
Please switch on devices that need not be constantly running only when they are actually needed. They should also be turned off when they are not needed for longer periods of time.
01750058375 G
175
Environmental protection
Appendix
E-Mail: mailto:referat.umweltschutz@wincor-nixdorf.com
176
01750058375 G
Notes
01750058375 G
Order No.:
01750058375 G
GB