Você está na página 1de 2

SHELL EXPRO

Task Risk Assessment

Printed: 26-Apr-2011 08:51 ARAT v8.20, Dataset v22

PERMIT No: W. P. No:

GEN MTCE OF GAS METERING INSTRUMENTS


1. Activity 22.3 23 37.6 38 Checklist Description

Use of non appropriately rated EX equipment in Hazardous Zones except as in Para 2, Work not Requiring a Permit, (3d) Opening live electrical junction boxes in Hazardous Zones except when all circuits are I.S. Work on computer controlled systems Work breaching systems containing produced hydrocarbons or high energy fluids (FMS to be produced) by Originator

HAZARD ASSESSMENT
2. 21 28 47 HAZARDS IDENTIFIED: Extra Low Voltage (ELV) Hydrocarbon release Slipping hazards

The following Hazards have been identified for the Activities specified 22 46 78 Low voltage (LV) Tripping hazards Failure of small bore pipework
PICWS to confirm by ticking boxes

CONTROLS
7.

PERSONAL PROTECTIVE EQUIPMENT - Use the following items of personal protective equipment in addition to the Standard Mandatory PPE (Hat, Boots, Overalls) PREPARATION AND RECOVERY CONTROLS - The following must be in place before work starts. Type of ELV system to be identified on the permit. (Machinery control, Process control, batteries) Gas testing is to be carried out in hazardous areas immediately before start of Hot Work for each shift. All areas above and below the worksite are to be inspected to minimise the probability of objects falling onto or from the worksite. Check that extraction/ventilation system is operational. If ventilation system fails personnel must stop work and leave the confined space immediately. Check that the Control Room Operator or AA is aware that the executive action of the ESD system is inhibited and the, work party are aware of the actions required to shut the valve in an emergency. Check access and escape routes are clear at all times or alternative routes marked and the work force informed.

8. 21 16, 28 22 30 82

16, 46, 47

9. -78 78

EXECUTION CONTROLS - The following must be observed during the work. Batteries must NOT be installed or removed in hazardous areas and must be disposed of in the correct manner. If in doubt ask. Process equipment is not to be used for hand/foot holds or for supporting lifting gear or scaffolding. Whilst working on or near mechanical equipment, electrical switchgear, instruments and small bore pipework, care must be taken to avoid accidental damage. Any incident which causes damage must be reported to the Control Room/PCF. Portable Gas Detector to be at Worksite at all times. ORIGINATOR'S HAZARD ASSESSMENT COMPLETE Have Individuals Previously Undertaken Task: Asset Operator / Delegate Presence Required At Toolbox Talk: PICWS Handover From Dayshift To Nightshift Required: YES YES YES NO NO NO

16, 28 10.

Name of Originator ....................................................... Signature ...................................................... Date ....................

Task Risk Assessment - GEN MTCE OF GAS METERING INSTRUMENTS

Page 1 of 2

SHELL EXPRO
Task Risk Assessment
11.

Printed: 26-Apr-2011 08:51 ARAT v8.20, Dataset v22

GEN MTCE OF GAS METERING INSTRUMENTS

TOOLBOX TALK / TRIC (Toolbox Talk Risk Identification Card)

Ask Questions / Record Questions: Toolbox Talk given by: Name .............................................................................. Signature ...................................................... Date .................... 12. ADDITIONAL HAZARDS IDENTIFIED AT WORKSITE

Any additional Hazards identified at the worksite or during the Toolbox Talk to be entered below and the Checklist returned to the Originator. ......................................................................................... 13. CONTROLS IN PLACE .........................................................................................

All the above Controls are understood and will be observed. Name of PICWS ............................................................. Signature ...................................................... Date .................... 14. COMPLETION OF WORK YES NO N/A

The equipment and location have been left in a clean, safe condition. All tools, equipment and barriers have been removed and all persons under my supervision have been withdrawn.

Name of last PICWS ...................................................... Signature ...................................................... Date ....................

Task Risk Assessment - GEN MTCE OF GAS METERING INSTRUMENTS

Page 2 of 2