Você está na página 1de 2
CONSTRUCAO CIVIL E PRESTAGAO DONO DA OBRA: BGP GEOPHYSICAL LIMITADA OBRA: INTERVENCAO DA RAVINA NO RIO NHENHE NA ALDEIA DO CHIBULUNGUNGO LOCAL: COMUNA DE TANDO - ZINZE Contribuinte n° 5101161110 ORG: N° 03 /AGN/2023 DATA: 30/01/2023 ADJUDICADO ITEM DESIGNAGAO 7 UN | QT. | UNIT. (AKZ) [TOTAL. (AKZ) 1 |INTERVENCAO DA RAVINA NO RIO NHENHE NA ALDEIA DO CHIBULUNGUNGO 1__|TABALHOS PREPARATORIOS 11 ae Pesmatagio © preparagto do fecal inctuindo] | soy | 4 440.000,00 | 4.110.000,00 |preparagao dos meios. 2__|FUNDACAO 2.1 |Escavagdo Mecanica em caboucos em sapatas le fundagées, incluindo transporte dos produtos| m2 19,64 88.000,00 1.728.320,00 a vazadouros. 3_[BETOES 3.7 |Fomecimento e aplicagaio de Beto armado B30 Jpara estrutura m3 | 28,33 | 180.000,00 4.649.400,00 4 |ATERRO 4.1 |Fomecimento e aplicagaio de pedras argilosas e burgal sujo na sub base da ravina, incluindo| vg | 7,00 | 4.902.280,00| 4.902. 280,00 lcompactagao @ todos trabalhos necessério. |SUB - TOTAL 12.390.000.0t |CUSTO TOTAL DA EMPREITADA 12.390.000,00 [SAO : Doze Milhées Trezentos e Noventa Mil Kwanzas |, CIVIL CONSTRTUCTION AND PROVISION BOSS OF CONSTRUTION: BGP GEOPHYSICAL LIMITADA CONSTRUCTIONS: INTERVNTION OF THE RAVINE IN THE NHENHE RIVER IN THE CHIBULUNGUNGO VILAGE LOCAL: COMUNA DE TANDO - ZINZE budget: N° 03 /AGN/2023 DATE: 30/01/2023 Taxpayer n° 5101161110 AWARDED ITEM DESIGNAGAO UN_| QT. | UNIT. | TOTAL. (AKZ) INTERVNTION OF THE RAVINE IN THE 1 | NHENHE RIVER IN THE CHIBULUNGUNGO VILAGE 1_ [PREPARATORY WORKS 47 Clearing and site preparation, including medial, | 4 49 | 440,000,00| 1.110.000,00 |preparation. 2 [FOUNDATION 21 |Mechanical excavation in gutters on footings land foundations, including transport of products| m2 | 19,64] 88.000,00 | 1.728.320,00 to. dumps. 3_ [CONCRETE 31 |Supply and application of reinforced concrete 230 for Structiire m3 |28,33| 180.000,00 | 4.649.400,00 4 _|LANDFILL 41 |Supply and application of clayey stones and dirty burgal in the sub-base of the ravine,| vg | 1,00 |4.902.280,00| 4.902.280,00 including compaction and all necessary work. [SUB - TOTAL 12.390.000,00. TOTAL COST OF THE CONSTRUCTION 12.390,000,00 [ARE: Twelve Million Three Hundred Ninety ThoWNend Kwanzas

Você também pode gostar