Djamshid Abdusalamov Head of the Department of foreign economic relations and investment, State Joint-Stock Company Uzbekenergo
General information
Estimated total cost of the project: 1050 mln. USD Sources of financing the project: Credit funds of ADB (350 mln. USD); Japanese International Cooperation Agency (300 mln. USD); Fund of Reconstruction and Development of the Republic Uzbekistan (250 mln. USD); Own funds of SJSC Uzbekenergo (150 mln. UDS); Contribution of Government of Republic Uzbekistan (230 mln. USD) such as tax-free measures. Construction period: 2010-2014 year. Capacity: 2400 MW. Generation: 5,8 TWh/year.
Challenges
There is little time left for validation and verification of the project.
Contacts
Djamshid Abdusalamov, Head of the Department of foreign economic relations and investment, State JointStock Company Uzbekenergo e-mail: sjsc@uzpak.uz Iskandar Basidov, Head of Unitary Enterprise Talimarjan Thermal Power Plant e-mail: grp_tal_tes@mail.ru