Você está na página 1de 54

Bangladesh Power Sector Data Book

Power Cell
June, 2006

Table of Contents
Sl. No.
01. 02. 03. 04. 05. 06. 07. 08. 09. 10. 11. 12. 13. 14. 15. 16. 17. 18.

Description
Power Sector At A Glance .............................................................................................................. Power Sector Key Statistics for FY 1996-2001................................................................................ Power Sector Key Statistics for FY 2001-2006 ............................................................................... Operational Data of Genaration, Trans. & Dist. for FY 2004-2005.................................................. System Loss of the utilities at different voltage level for FY 2004-05 .............................................. Operational Data of Genaration, Trans. & Dist. for FY 2005-06 (upto March, 2006) ...................... System Loss of the utilities at different voltage level for FY 2005-06 (upto March, 2006)............... Category wise Consumer Number for FY 2004-05.......................................................................... Energy Consumption for FY 2004-05............................................................................................... Distribution System Loss: Year wise (1999-2005) .......................................................................... Standard Loss of a Utility Sys. & Tech. dist. loss of PDB, DESA & REB ........................................ List of Power Stations .................................................................................................................... List of IPPs installed during FY 1996-2001..................................................................................... List of IPPs installed during FY 2001-2006..................................................................................... Salient features of contract for different IPPs.................................................................................. List of Small Power Plants (SPPs) .................................................................................................. Salient features regarding Rental Power Plant in BPDB.................................................................. Installation of capacity banks and its benefits.................................................................................. 18.1 PGCB 18.2 DESA 18.3 REB 18.4 DESCO Year wise Power Generation & Load Shedding.............................................................................. Load Management System using GIS technology........................................................................... Reduction of Load Shedding through management......................................................................... Installation of pre-paid metering....................................................................................................... 22.1 BPDB 22.2 DESCO 22.3 DESA Information regarding Captive Power Plant..................................................................................... Tariff Rationalization........................................................................................................................ Electricity Retail Tariff of BPDB/DESA/DESCO/WZPDCO ............................................................. Bulk Supply Tariff for the Distribution Entities.................................................................................. Account Receivable & Exemption of surcharge............................................................................... Year wise Revenue Collection & Collection/Import Ratio................................................................ Short term Investment Plan from Jan, 2006 to Dec, 2008 .............................................................. Status of Renewable Energy in Bangladesh.................................................................................... Renewable Energy activities and establishment of SEDA...............................................................

Page No.
01 02 03 04 05 06 07 08 09 10 11 12 14 15 16 21 22 23

19. 20. 21. 22.

27 28 32 34

23. 24. 25. 26. 27. 28. 29. 30. 31.

37 38 39 40 41 43 44 51 52

Power Sector At A Glance


Upto June, 2005
Present Installed Capacity Public Sector Private Sector Generation Capability (Inc. IPP) Peak Demand Total Transmission Lines 230 kV 132 kV Grid sub-station Capacity 230/ 132 kV 132/33 kV : : : : : : : : : : 5025 MW 3735 MW 1290 MW 4030 MW 3751 MW 6758 Circuit KM 1466 Circuit KM 5292 Circuit KM 4375 MVA 7676 MVA 21408 mkWh 16685 mkWh 22.79% 6.16% 3.63% 10.44% 20.00% 21.94% : : : : : : : : : : : : :

Upto March, 2006 5275 MW 3985 MW 1290 MW 4385 MW 3812 MW

Net Energy Generated (FY 2004-05) : Energy Sold (FY 2004-05) : System Loss (Transmission & Dist.) :

Transmission Loss PGCB DESA Distribution Loss PDB DESA

: : : : :

16894 mkWh 13484 mkWh 20.97% 5.63% 3.68% 8.36% 19.16% 20.19% 12.53% 16.32% 15.90% 16.33% 87.44% 81.07% 84.89% 84.05% 81.53% 254263 Km 9.53 million N/A N/A For Mar06 86% 3% 8% 3%
Page 3 of 54

REB : DESCO : WZPDCo ; National : Collection/Import Ratio PDB : DESA : REB : DESCO : WZPDCL : Distribution Line (Total) : Consumer Number : Access to Electricity of Population : Per Capita Generation : Generation Mix

13.78% 16.64% 19.66% 17.83% 84.16% 71.09% 84.44% 80.92% 89..05% 244104 Km 8.80 million 38% 158 kWh 91% 2% 7% -

: : : : : : : : : : : : : : : : :

Gas Hydro Liquid Fuel Coal

: : : :

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Engr. Shazibul Hoque.

Power Sector Key Statistics (FY 1996 to FY 2001)

Achievement

Item Installed Capacity (MW) Generation Capacity (derated) (MW) Maximum Demand Served (MW) Net Energy Generation (MkWh) (a) BPDB (b) IPP & mixed Total Transmission Line (KM) Distribution Line (KM) Total Number of Consumer (lacs) Agriculture Consumer (lacs) Number of Village Electrified Access to Electricity (%) Per Capita Generation (kWh) System Loss (Tr & Dist) (%)

FY 1995-96

FY 1996-97

FY 1997-98

FY 1998-99

FY

19992000

FY 2000-2001

quantity

2908

2908

3091

3603

3711

4005 3115

1097

38%

2087

2114

2136

2449

2665

3033

946

45%

11474

11858

12882

13872 578

14319 1244 15563 3438 156777 48.83 0.94 31388 23 120 31.60

14062 2193 16255 3738 176179 55.30 1.1 35797 25 129 28.43

2588 2193 4781 616 63957 24.33 0.35 14956 10 32 -2.77 42% 20% 57% 79% 48% 72% 64% 33% -9%

11474 3122 112222 30.97 0.75 20841 15 97 31.20

11858 3159 125325 34.51 0.79 22488 17 99 30.40

12882 3159 135051 39.24 0.84 25986 19 102 31.30

14450 3287 147102 43.33 0.90 29332 20 113 31.80

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 4 of 54

Power Sector Key Statistics (FY 2001 to FY 2006)


Item Installed Capacity (MW) Generation Capacity (derated) (MW) Maximum Demand Served (MW) Net Energy Generation (MkWh) (a) BPDB (b) IPP & mixed (c) REB Total Transmission Line (KM) Distribution Line (KM) Total Number of Consumer (lacs) Agriculture Consumer (lacs) Number of Village Electrified Access to Electricity (%) Per Capita Generation (kWh) System Loss (Tr & Dist) (%) 16255
3738 176179 55.3

FY 20002001
4005

FY 20012002
4260

FY 20022003
4710

FY 20032004
4710

FY 2004-2005
5025

FY 2005-2006 (upto March'06)


5275

Achievement quantity
1270

%
32%

3115

3332

3780

3780

4030

4385

1270

41%

3033

3248

3458

3622

3751

3812

779

26%

14062 2193

13674 3771

12159 6299

12584 7478 240

13223 7939 246

17445
3750 192140 63.33

18458
3859 209932 70.64

20302
3919 226232 79.6

21408
4038 244104 88.47 254263 95.3

5153
300 78084 40

32%
8% 44% 72%

1.1

1.21

1.35

1.53

1.78

2.15

1.05

95%

35797

39028

41814

44,546

47612

48925

13128

37%

25

30

32

35

38

13

52%

129 28.43

136 27.97

144 25.69

155 24.49

158 22.79 20.97

29 -7.5

22% -26%

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 5 of 54

OPERATIONAL DATA OF GENERATION, TRANSMISSION & DISTRIBUTION SYSTEM FOR THE FISCAL YEAR, 2004 - 2005

Generation
Source of Generation Public(BPDB) IPP's IPP's(REB) Total Gross Energy Generated MKWh
14066.997

Station Use MKWh


843.719

Station Use %
6.00%

Net Energy Generated MKWh


13223.278 7939.195 246 21408.473

Remarks

Note: IPP- Independent Power Producer

Transmission
Name of Organization PGCB DESA Global Net Generation in GWh
21162.47 5134.77 21162.47

Energy Import in GWh


20394.28 4598.89 19858.40

Transmission Loss in GWh


768.19 535.88 1304.08

Transmission Loss in %
3.63 10.44% 6.16

Remarks

BPDB Sales to
BPDB Zones DESA DESCo WZPDCO REB/PBS's Total
Sales (MKWh) 5993.05 5134.774 1843.133 388.572 7034.752

DESA Sales to
Sales (MKWh) DESA Zones DESCo WZPDCO REB/PBS's 4598.89 0 0 0

20394.281

Total

4598.89

DISTRIBUTION LOSSES OF THE UTILITIES


Name of Organization PDB DESA REB(Inc. IPP) DESCO WZPDCO GLOBAL (Dist.) GLOBAL Trans. & Dist. Energy Import in GWh
5993.05 4598.89 7489.15 1842.89 388.57 20312.55 21616.87

Energy Sales in GWh


4794.64 3589.69 6457.14 1536.31 312.20 16689.97 16689.97

Distribution Loss in GWh


1198.41 1009.20 1032.01 306.58 76.38 3622.58 4926.90

Distribution Loss in %
20.00 21.94 13.78 16.64 19.66 17.83 22.79

Remarks

Figure Next Page Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque. Page 6 of 54

System Loss of the Utilities at Different Voltage Level (FY 2004-05)

IMPORT PDB 5993 GWh

DISTRIBUTION LOSS PDB 1198 GWh 20.00%

SOLD PDB 4795 GWh

IPP 8185 Gwh

Net Generation 21408 GWh Transmission Loss 535.88 GWh (10.44%)

~
Gross Generation 14067 GWh

Transmission Loss 768 GWh (3.63%)


O

Import 20394 GWh

DESA 4599 GWh DESCO 1843 GWh

DESA 1009 GWh 21.94% DESCO 307 GWh 16.64% REB 1032 GWh 13.78%

DESA 3590 GWh

Auxiliary Use 844 GWh 6.00%

Import DESA 5135 GWh

DESCO 1536 GWh

REB 7489 GWh

REB 6457 GWh

(Data in the previous page)

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 7 of 54

OPERATIONAL DATE OF GENERATION, TRANSMISSION & DISTRIBUTION SYSTEM FOR THE FISCAL YEAR, 2005 - 2006( Upto March,06)

Generation
Source of Generation Gross Energy Generated MKWh 11284.875 Station Use MKWh Station Use % Net Energy Generated MKWh Remarks

Public(BPDB) IPP's IPP's(REB) Total

699.416

6.20%

10585.459 6108.641 200

16894.1
Net Generation in GWh 16694.10 3896.05 16694.10 Energy Import in GWh 16079.66 3570.29 15753.90 Transmission Loss in GWh 614.44 325.76 940.20 Transmission Loss in % 3.68 8.36% 5.63 Remarks

Transmission
Name of Organization

PGCB DESA Global

BPDB sales to
Sales to Sales (MKWh) 3773.536 3896.047 1452.282 1009.765 5948.032

DESA Sales to
Sales to DESA Zones DESCo WZPDCO REB/PBS's Sales (MKWh) 3570.29 0 0 0

BPDB Zones DESA DESCo WZPDCO REB/PBS's Total

16079.662

Total

3570.288

DISTRIBUTION LOSSES OF THE UTILITIES


Name of Organization Energy Import in GWh 3773.54 3570.29 6314.16 1447.49 1009.77 16115.24 17060.23 Energy Sales in GWh 3050.57 2849.39 5523.17 1211.22 849.19 13483.54 13483.54 Distribution Loss in GWh 722.97 720.90 790.99 236.26 160.58 2631.70 3576.69 Distribution Loss in % 19.16 20.19 12.53 16.32 15.90 16.33 Remarks

BPDB DESA REB(Inc. IPP) DESCO WZPDCO GLOBAL (Dist.) GLOBAL Trans. & Dist.

20.97
Figure Next Page

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 8 of 54

System Loss of the Utilities at Different Voltage Level FY 2005-06 (upto March,2006)

IMPORT IPP 6309 Gwh PDB 3774 GWh

Net Generation 16894 GWh Transmission Loss 614 (3.68%) GWh


O

DISTRIBUTION LOSS PDB 723 GWh 19.16%

SOLD PDB 3051 GWh

~
Gross Generation 11285 GWh

Import 1608 GWh 0

Transmission Loss 326 GWh (8.36%)

DESA 3570 GWh

DESA 721 GWh 20.19% DESCO 236 GWh 16.32% REB 791 GWh 12.53%

DESA 2849 GWh

Auxiliary Use 699 GWh 6.20%

Import DESA 3896 GWh

DESCO

DESCO 1211GW h REB 5523 GWh

REB 6314 GWh

(Data in the previous page)

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 9 of 54

CONSUMER NUMBER (CATEGORYWISE) (FY 2004 - 05)


CONSUMER CATEGORY IN NUMBERS DOMESTIC COMMERCIAL IRRIGATION INDUSTRIAL OTHERS TOTAL

NAME OF THE

UPTO THE MONTH

UTILITY PDB REB DESA DESCO TOTAL (% of Total)

1,405,842 5,175,322 470,364 232,338

352,540 674,220 64,778 19,379

14,806 162,891 22 17 177,736

45,345 104,314 18,944 4,187 172,790

27,568 13,070 2,903 3,659 47,200

1,846,101 6,129,817 557,011 259,580 8,792,509

June,05 June,05 June,05 June,05

7,283,866 1,110,917

82.84%

12.63%

2.02%

1.97%

0.54%

100.00%

Note:(1) Others include mosque, church, school, madrasa, street light, pump etc. (2) Consumer of WZPDCo included in PDB's list

70

21

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 10 of 54

ENERGY CONSUMPTION
(FY 2004 - 05)
CONSUMER CATEGORY PDB ENERGY SOLD IN A YEAR (MKWh)

DESA
1430.59 261.67 0.36 1841.68 55.59

REB
2757.54 361.379 594.615 2730.118 13.483

DESCO
741.78 121.36 0.04 618.34 54.79

WZPDCL
123.84 31.36 2.31 133.64 21.06

TOTAL
7070 1274 674 7287 385

Domestic Commercial Irrigation Industrial Others Total


%

2016.19 498.72 76.90 1962.98 239.94

4794.73
29%

3589.89
22%

6457.14
39%

1536.31
9%

312.20
2%

16690
100%

CATERY WISE CONSUMPTION IN %

UTILITY WISE CONSUMPTION IN %

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 11 of 54

Distibution System Loss: Yearwise (1999-2005)

FY 1999-2000 2000-2001 2001-2002 2002-2003 2003-2004 2004-2005

PDB 27.73% 26.11% 24.50% 22.35% 21.33% 20.00%

REB 16.24% 18.08% 16.61% 17.33% 15.60% 13.78%

DESA 26.88% 27.77% 29.71% 27.97% 25.62% 21.94%

DESCO 32.47% 29.86% 26.66% 21.06% 19.24% 16.64%

Total 26.09% 25.34% 23.92% 21.64% 20.04% 17.83%

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 12 of 54

STANDARD LOSS OF A UTILITY SYSTEM


Loss Source Equipment rating Step up 11/132 KV transformer Primary 230 KV line Primary 230/132 KV Grid Secondary 132 KV line Secondary 132/33 KV Grid Sub Total ( Transmission Loss) Primary 33 KV line Primary 33/11 S/S. Secondary 11 KV or 0.4 KV line Secondary 11/0.415 S/S. Distribution line Distribution Substation Distribution line Distribution Substation Service Drop Metering Equipment Sub Total ( Distrubution Loss) Grand Total (Transmission & Distrubution Loss) 6.50 8.75 9.25 12.63 12.00 16.50 Type of Power System Strong Medium Weak % % % 0.25 0.50 0.25 1.00 0.25 2.25 2.00 0.25 3.00 0.25 1.00 0.375 0.750 0.375 1.500 0.375 3.375 3.000 0.375 4.000 0.375 1.500 0.50 1.00 0.50 2.00 0.50 4.50 4.00 0.50 5.00 0.50 2.00

Location At Power Station Transmission line Grid Sub-station Transmission line Grid Sub-station

Reference: Power System in Asia & Pacific with emphasis on Rural Electrification (206), Published by United Nations

STANDARD TECHNICAL LOSS OF THE UTLITIES OF BANGLADESH


Organization Transmission % PDB System DESA System REB/PBS System 3.00 2.00 0.50 Technical Loss Distribution % 7.00 7.50 8.50 Total % 10.00 9.50 9.00

Note: As per study result carried out jointly by PDB, DESA, REB & W/B. on PDB, DESA & REB system.

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 13 of 54

List of Power Stations


Sl. No. Name of Power Station Unit No. Type of Fuel Date of Commissioning Type of plant Installed Capacity (MW) Present Generation Capacity (MW) Peak Hour Generation (MW) Remark

Public Sector 1

Karnafuli Hydro

1 2 3 4 5

Hydro

26-02-1962 8-1-1962 8-1-1982 11-1-1988 11-2-1988

Hydro Hydro Hydro Hydro Hydro 230 ST ST ST ST ST CT CC ST CT CC ST CT CT CT ST ST ST ST ST ST

40 40 50 50 50 242 64 64 150 150 150 56 34 56 724 50 210 33 33 33 99 55 55 210 210 210 210 950 105 96 35 35 166 124 30 30 30 90 90 20 210

46 46 50 50 50 64 64 150 85 80 40 40 20 543 30 210 30 31 32 93 40 40 190 200 200 200 870 80 54 35 35 30 30 30 20 180

40.00 34.00 0.00 0.00 32.00 106.00 60.00 60.00 150.00 80.00 0.00 30.00 32.00 16.00 428.00 30.00 200.00 0.00 0.00 0.00 0.00 0.00 30.00 140.00 180.00 190.00 190.00 730.00 29.00 10.00 30.00 0.00 40.00 27.00 27.00 12.00 66.00 19.50 150.00
#1,3,7 Under maint. since '03,00,01 Under maint. since 01/02/06 Under maint. since 09/02/06 Under maint. since 20/07/03

Sum Ashuganj

1 2 3 4 5 1 2 3

Gas

17-07-1970 8-7-1970 17-12-1986 04-05-1987 21-03-1988 15-11-1982 28-03-1984 23-03-1986

Under maint. since 25/12/05

Sum 3 4 Siddhirganj Siddhirganj Haripur 4 1 2 3 1 2 3 4 5 6 Gas Gas Gas 29-04-1970 Dec, 2004 31-10-1987 15-11-1987 2-12-1987 16-06-1974 13-02-1976 14-09-1986 18-03-1989 15-09-1994 31-01-1999

Sum 5 Ghorasal Gas

6 7

Sum Tongi Power Station Shahjibazar

1 1-7 8 9

Gas Gas

14-03-2005 1968-69 28-03-2000 25-10-2000

GT CT CT CT CT CT CC ST CT ST

Sum Fenchuganj CC

1 2 3 1 1

Gas

24-12-1994 31-01-1995 08-06-1995 13-12-1986 28-03-1993

9 10

Sylhet Raozan

Gas Gas

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 14 of 54

Sl. No.

Name of Power Station

Unit No. 2

Type of Fuel

Date of Commissioning 21-09-1997

Type of Plant ST ST CT CT

11

Sikalbaha

1 1 2

Gas

24-04-1984 13-10-1986 23-10-1986

Sum Sub-Total (East) 1 Khulna 1 2 1 2 1 2 3 1 1 1-4 1-2 1 2 1 1-2 1st 2 2 F. oil/SKO 25-05-1973 7-7-1984 7-6-1980 3-6-1980 28-07-1976 27-04-1976 19-01-1980 25-06-1981 17-09-1987 06-06-1966 1975-1980 05-08-1984 04-10-1987 16-08-1988 08-10-1988 1975-80 04-06-1991 25-11-2001 31-01-2006 15-02-2006 ST ST CT CT CT CT CT D CT D D CT CT CT D D CT CT

Installed Capacity (MW) 210 420 60 28 28 116 3180 60 110 28 28 226 20 20 20 60 3.75 20 23.75 6 2.6 20 20 42.6 20 6 1.5 71 100 250 805.35

Present Generation Capacity (MW) 210 390 50 21 0 71 2763 50 90 14 18 172 18 19 19 56 2 20 22 4 2 16 16 34 20 0 71 100

Peak Hour Generation (MW) 170.00 320.00 42.00 10.00 0.00 52.00 2020.5 47.00 0.00 12.00 14.00 73.00 16.00 17.00 17.00 50.00 2.00 18.00 20.00 3.50 2.00 15.00 15.00 32.00 18.00 0.00 0.00 97.00 209.00 502.5

Remark

Sum Bheramara

HSD

Sum 3 Saidpur Sum Thakurgaon Barisal O/LDO/HSD

4 5

LDO HSD

6 7 8 9 10

Sum Rangpur Bhola Baghabari Baghabari 100 MW

HSD F/ Oil HSD Gas Gas Coal

Under maint. since 17/11/05

Barapukuria Sub Total (West) Mix Sector : Rural Power Company (RPC) 1 (Mymensingh) Sub Total Private Sector : 1 2 3 4 5 6 Haripur BMPP KPCL Haripur , AES, Baghabari BMPP Megnaghat,AES

479

2 2

Gas Gas

1-9-1999 10-10-2000

CT CT 140

70 70 140

70 70

106.00 106.00 106.00 94.00 90.00 350.00

8 18 1 1 1

Gas F. oil Gas Gas Gas Gas

30-06-1999 12-10-1998 23-05-2001 1-12-2001 26-06-1999 26-11-2002 01-09-2003

CT D CC CT CCPP

110 110 360 90 450 30 1150 5275.35 1150 4532

110 110 360 90 450 30

88.00 442.00 30.00 1094.00 3723

#2 Under maint. since 24/01/06

REB 11x3 Sub Total (private) Grant Total

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 15 of 54

List of Independent Power Producer (1996-2001)


Implemented under Private Sector Power Generation Policy of Bangladesh

SI No 1

Name of Power Plant Khulna Power Company Ltd. (KPCL), Engine Generator Baghabari, WESTMONT, GT NEPC, Haripur. Gas Generator Rural Power Co. Ltd. (RPCL), Mymensingh, GT AES, Haripur CC AES, Meghnaghat CC Summit Power Co. Ltd. (Dhaka PBS-1, Narsingdi PBS-1, Comilla PBS-1) Total

Fuel Type F. Oil

Installed Capacity (MW) 110

Generation Capability (MW) 110

Date of Signing Agreements/ Security Package 16/10/1997

Commercial Operation Date (COD) 12/10/1998

Contracted Levelized Tariff (US cents/kWh) 5.83 (For liquid fuel) 4.40 (For Gas)

Plant Factor 80%

Minimum Offtake Payment **OMT charge

2 3 4

Gas Gas Gas

90 110 140

90 110 140

1/6/1998 10/3/1998 1994

26/06/99 30/06/99 14/04/01

4.30 4.41 4.30

80% 80% 80%

**OMT charge **OMT charge Capacity Payment Capacity Payment Capacity Payment Capacity Payment

5 6 7

Gas Gas Gas

240 120 450 3X10=30

360 450 30

17/09/1998 29/07/1999 10/2/2000

03/06/01 (SC) 01/12/01 (CC) 26/11/02 1/10/2003

2.73* 2.79* 1.65 Tk/kWh

85% 85% 75%

1290

1290

* Based on Indicative Gas Price: 2.40 US$/GJ; Present Gas Price: 1.20 US$/GJ **If the plant is operated at less than 50% in any month then payment of the OMT (Operation, Maintenance and Capacity Payment Tariff) for the 50% energy of the plant at 50% OMT rate and FT (only Fuel Tariff) for actual energy.

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 16 of 54

List of Independent Power Plant Producer (2001-2006)


Implemented under Private Sector Power Generation Policy of Bangladesh
SI No 1 2 3 Name of Power Plant Fuel Type Gas Gas Gas Installed Capacity (MW) 240 120 450 3X10=30 Generation Capability (MW) 120 450 30 Date of Signing Agreements/ Security Package 17-09-1998 29-07-1999 10-02-2000 Commercial Operation Date (COD) 03-06-01 (SC) 0112-01 (CC) 26/11/02 1/10/2003 Contracted Levelized Tariff (US ents/kWh) 2.73* 2.79* 1.65 Tk/kWh Plant Factor 75% 75% 75% Minimum Offtake Payment Capacity Payment Capacity Payment Capacity Payment **OMT charge Capacity Payment Capacity Payment

AES, Haripur CC AES, Meghnaghat CC Summit Power Co. Ltd. (Dhaka PBS, Narsingdi PBS, Comilla PBS) 2nd Baghabari, WESTMONT, GT Rural Power Co. Ltd. (RPCL), Mymensingh, GT Meghnaghat CC (2nd Phase); BON Consortium Summit Power Co. Ltd. (Narsingdi PBS-1) Summit Power Co. Ltd. (Comilla PBS-1) Summit Power Co. Ltd. (Dhaka PBS-1) Sub-total (4-8) Total

4 5

Gas Gas

40 70

40 70

28-03-2004

August, 2006 September, 2006

2.79 4.30

80% 80%

Gas

450

450

Signing PPA, IA on April, 2006 28-06-2005

2008

2.7865*

75%

Gas

24

24

Gas

13

13

28-06-2005

Gas

25

25

20-03-2006

2006 (After 13 month from agreement) 2006 (After 13 month from agreement) 2007

Less than 3 Paisa from B.S.T of PBS Less than 3 Paisa from B.S.T of PBS Less than 3 Paisa from B.S.T of PBS

622 1222

622 1222

* Based on Indicative Gas Price: 2.40 US$/GJ; Present Gas Price: 1.20 US$/GJ ** If the plant is operated at less than 50% in any month then payment of the OMT (Operation, Maintenance and Capacity Payment Tariff) for the 50% energy of the plant at 50% OMT rate and FT (only Fuel Tariff) for actual energy.

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 17 of 54

Salient Features of Different IPPs


Sl No. Subject Khulna Power Company
15 Years Goalpara, Khulna 110 MW 5.83 U$ cents for liquid fuel 4.40 3us cents at 80% plant factor (PF) at gas Price USD 1.117/MSCF(Plant is being operated by gas)

NEPC Consortium Power Ltd


15 Years Haripur, Narayangonj 110 MW 4.313 US cents at 80% plant factor (PF) at gas price USD 1.117/MSCF (Plant is being operated by gas)

Westmont Power Bangladesh Ltd


15 Years Bgahabari Sirajgonj 130 MW (90 MW in Operation) 4.30 US cents at 80% plant factor (PF) at gas price USD 1.117/ MSCF (Plant is being operated by gas)

Rural Power Company Ltd


15 Years Shambhugonj, Mymenshing 140 MW 4.30 US cents at 80% plant factor (PF) at gas price USD 1.117/ MSCF (Plant is being operated by gas)

AES Haripur Private Ltd


22 years Haripur Narayangonj 360 MW 2.73 US cents at 85 % plant factor (PF) at gas price USD 2.4/GJ (Plant is being operated by gas)

AES Meghnaghat Ltd


22 years Meghnaghat 450 MW 2.79 Us Cents at 85% plant factor (PF) at gas Price USD 2.4/GJ which includes the supply of 1395 Mkwh electricity to BPDB prior to COD free of cost.(Plant is being operated by gas) Capacity+ Energy , capacity for fixed cost, energy for fuel & variable O&M, Fuel Price decreases with

1 2 3 4

Term of the Agreement Site for the Power Plant Contracted Capacity Levelised Tariff

Tariff Structure

FT+OMT (at 50%,60%,70% &80% PF) FT for fuel OMT For Operation & Maintenance FT is same at varying PF, OMT per kwh decreases with increases with increasing PF. Monthly If the Plant is operated at less than 50% in any month then payment of the OMT for the 50% energy of the plant at 50% OMT rate and FT for actual energy.

6 7

Submission of invoice Minimum Guaranteed payment

FT+OMT (at 50%,60%,70% &80% PF) FT for fuel OMT For Operation & Maintenance FT is same at varying PF, OMT per kwh decreases with increases with increasing PF Monthly If the Plant is operated at less than 50% in any month then payment of the OMT for the 50% energy of the plant at 50% OMT rate and FT for actual energy.

FT+OMT (at 50%,60%,70% &80% PF) FT for fuel OMT For Operation & Maintenance FT is same at varying PF, OMT per kwh decreases with increases with increasing PF. Monthly If the Plant is operated at less than 50% in any month then payment of the OMT for the 50% energy of the plant at 50% OMT rate and FT for actual energy.

Capacity+ Energy Capacity for fixed cost energy for fuel & Variable O&M, Fuel price is same at varying PF

Capacity+ Energy , capacity for fixed cost, energy for fuel & variable O&M, Fuel Price decreases with

Monthly If the Plant is operated at less than 50% in any month then payment of the OMT for the 50% energy of the plant at 50% OMT rate and FT for actual energy.

Monthly Capacity payment for the month and energy Payment for actual energy dispatched

Monthly Capacity payment for the month and energy Payment for actual energy dispatched

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 18 of 54

Salient Features of Different IPPs


Sl No. Subject Khulna Power Company
Within 45 days after submission of bill

NEPC Consortium Power Ltd


Within 45 days after submission of bill

Westmont Power Bangladesh Ltd


Within 45 days after submission of bill

Rural Power Company Ltd


Within 35 days after submission of bill (bill is submitted after 7 days of the following month) Bank Rate L/c provided by BPDB of 2 month capacity Payment. The company can collect the amount from PBS who are the share holder of RPC against the electricity bill to be paid by them to BPDB Indexation is made for the foreign currency portion of the tariff with the prevailing exchange rate for dollar to taka Foreign portion of the tariff is indexed with the variation of the US CPl from the reference value (it is limited within 1% increase from the previous quarter) Local portion of the tariff is indexed with local inflation from reference value

AES Haripur Private Ltd


Within 25 days after submission of bill (bill is submitted after 7 days of the following month) Bank Rate+ 4% L/C Provided by BPDB of 2 months Capacity payment and also by GOB Guarantee

AES Meghnaghat Ltd


Within 25 days after submission of bill (bill is submitted after 7 days of the following month) Bank Rate+ 4% L/C Provided by BPDB of 2 months Capacity payment and also by GOB Guarantee

Payment due date

9 10

Late payment interest at the rate of Payment is Guaranteed by

Bank Rate Letter of Credit (L/C) provided by BPDB of 2 months MGP and also by GOB Guarantee

Bank Rate Letter of Credit (L/C) provided by BPDB of 2 months MGP and also by GOB Guarantee

Bank Rate Letter of Credit (L/C) provided by BPDB of 2 months MGP and also by GOB Guarantee

11

Exchange rate indexation

99% of the OMT payment is indexed with prevailing exchange rate for doller to taka

99% of the OMT payment is indexed with prevailing exchange rate for doller to taka

12

Inflation indexation

Built in within the tariff

Built in within the tariff

Indexation is made for the foreign currency portion of the tariff with the prevailing exchange rate for dollar to taka Built in within the tariff

Indexation is made for the foreign currency portion of the tariff with the prevailing exchange rate for dollar to taka Foreign portion of the tariff is indexed with the variation of the US CPl from the reference value (it is limited within 1% increase from the previous quarter) Local portion of the tariff is indexed with local inflation from reference value

Indexation is made for the foreign currency portion of the tariff with the prevailing exchange rate for dollar to taka Foreign portion of the tariff is indexed with the variation of the US CPl from the reference value (it is limited within 1% increase from the previous quarter) Local portion of the tariff is indexed with local inflation from reference value

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 19 of 54

Salient Features of Different IPPs


Sl No. Subject Khulna Power Company
36 days each year except every 5th year having 48 days

NEPC Consortium Power Ltd


36 days each year except every 5th year having 48 days

Westmont Power Bangladesh Ltd


36 days each year except every 5th year having 48 days

Rural Power Company Ltd


36.5 days each year except every 3rd year having 51.5 days

AES Haripur Private Ltd


36.5 days each year except every 3rd year having 51.5 days

AES Meghnaghat Ltd

13

Permitted Outage

36.5 days each year except every 3rd year having 57 days. Company is entitled to get incentives for its saving of outage hours from 36.5 days for each year and 51.5 days for every 3rd year.

14

Number of free start up

No limit

No limit

No limit

15

16

Start up payment for each start up beyond the no of free start up Liquidated Damages for less availability of the plant than required as per agreement

No payment

No payment

No payment

Liquidated damage are to be paid to BPDB by each company for less availability than required as per agreement

Liquidated damage are to be paid to BPDB by each company for less availability than required as per agreement

Liquidated damage are to be paid to BPDB by each company for less availability than required as per agreement

30 for each gas turbine (120 total annually) USD 1120 for each gas turbine Start up Liquidated damage are to be paid to BPDB by each company for less availability than required as per agreement

11 start up annually

20 for each gas turbine (40 total annually) USD 5000 AND payment of gas for 500 GJ for each gas turbine Liquidated damage are to be paid to BPDB by each company for less availability than required as per agreement

USD1380

Liquidated damage are to be paid to BPDB by each company for less availability than required as per agreement

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 20 of 54

Salient Features of Different IPPs


Sl No. Subject Khulna Power Company NEPC Consortium Power Ltd
The Company and contactors shall be entitled to import without restriction and without payment of any taxes including custom duties and VAT all items required for design, construction, completion operation and maintenance of the project as per Implementation Agreement (IA) Signed between the Company and the Govt. Company and its contractors shall be allowed to import plant and equipment prior to commercial operation date and spare parts until 12 the anniversary of commercial operation date of the value of 10% of total equipment cost without paying any tax, custom duties and VAT, as per lA

Westmont Power Bangladesh Ltd

Rural Power Company Ltd

AES Haripur Private Ltd

AES Meghnaghat Ltd

17

Import permit and exemption of tax, custom duties and VAT for the imported items

The Company and contactors shall be entitled to import without restriction and without payment of any taxes including custom duties and VAT all items required for design, construction, completion operation and maintenance of the project as per Implementation Agreement (IA) Signed between the Company and the Govt. Company and its contractors shall be allowed to import plant and equipment prior to commercial operation date and spare parts until 12 the anniversary of commercial operation date of the value of 10% of total equipment cost without paying any tax, custom duties and VAT, as per lA

The Company and contactors shall be entitled to import without restriction and without payment of any taxes including custom duties and VAT all items required for design, construction, completion operation and maintenance of the project as per Implementation Agreement (IA) Signed between the Company and the Govt. Company and its contractors shall be allowed to import plant and equipment prior to commercial operation date and spare parts until 12 the anniversary of commercial operation date of the value of 10% of total equipment cost without paying any tax, custom duties and VAT, as per lA

NO lA signed

The Company and its contractors shall be entitled to import without restriction all items required for the design, construction, completion operation and maintenance of the facility. Company and its contractors shall be allowed to import plant and equipment prior to commercial operation date and spare parts until 12 the anniversary of commercial operation date of the value of 10% of total equipment cost without paying any tax, custom duties and VAT, as per lA

The Company and its contractors shall be entitled to import without restriction all items required for the design, construction, completion operation and maintenance of the facility. Company and its contractors shall be allowed to import plant and equipment prior to commercial operation date and spare parts until 12 the anniversary of commercial operation date of the value of 10% of total equipment cost without paying any tax, custom duties and VAT, as per lA

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 21 of 54

Salient Features of Different IPPs


Sl No. Subject Khulna Power Company NEPC Consortium Power Ltd
In the agreement with each company events of default of the party to the agreement is defined. Each agreement has defined procedure to cure the default BPDB or GOB can terminate the Agreement any party and encash the performance bond due to companys event of default. BPDB and GOB may become the owner of the plant by paying the compensation amount as described in the agreement. Company can terminate the agreement due to events of defaults by BPDB or GOB, in that case, GOB has to pay a compensation amount in exchange of which the company transfers the plant to GOB as per lA.

Westmont Power Bangladesh Ltd

Rural Power Company Ltd

AES Haripur Private Ltd

AES Meghnaghat Ltd

18

Event of default and cure of defaults

In the agreement with each company events of default of the party to the agreement is defined. Each agreement has defined procedure to cure the default BPDB or GOB can terminate the Agreement any party and encash the performance bond due to companys event of default. BPDB and GOB may become the owner of the plant by paying the compensation amount as described in the agreement. Company can terminate the agreement due to events of defaults by BPDB or GOB, in that case, GOB has to pay a compensation amount in exchange of which the company transfers the plant to GOB as per lA.

In the agreement with each company events of default of the party to the agreement is defined. Each agreement has defined procedure to cure the default BPDB or GOB can terminate the Agreement any party and encash the performance bond due to companys event of default. BPDB and GOB may become the owner of the plant by paying the compensation amount as described in the agreement. Company can terminate the agreement due to events of defaults by BPDB or GOB, in that case, GOB has to pay a compensation amount in exchange of which the company transfers the plant to GOB as per lA.

In the agreement with each company events of default of the party to the agreement is defined. Each agreement has defined procedure to cure the default Any party can terminate the agreement due to default of other party.

In the agreement with each company events of default of the party to the agreement is defined. Each agreement has defined procedure to cure the default BPDB or GOB can terminate the agreement due to companys default and encash the proposal security GOB may elect to purchase the plant by paying compensation amount which involves the amount related with debt.

In the agreement with each company events of default of the party to the agreement is defined. Each agreement has defined procedure to cure the default Company can terminate the agreement due to BPDB ir GOB event of default, in that case, GOB has to pay a compensation amount which involves the amount related to debt, equity and other costs

19

Termination agreement

of

the

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 22 of 54

List of Small Power Plants (SPPs)


Under Policy Guideline for small power plant in Private Sector Facilitated by Power Cell
SI. Name of the Plant & Address No. 1. M/S Meghna Energy Ltd. 125/A, Motijheel C/A, Dhaka-1000. Tel: 9568181. 2. M/S Rahim Energy Ltd. 29/10, K, M, Dash Lane, Tikatoli, Dhaka. Tel: 9557621. M/S Surma Energy Ltd. 121/B, Gulshan Avenue, Dhaka-1212. Tel: 8825982, 8817459, 8312014. M/S Amirate Power Co. Ltd. 138, Gulshan Avenue, Suit No.304 (4th floor), Gulshan-2, Dhaka. Tel: 9882438, 9892091. M/S Unique Power Plant Ltd. Suit No. 1003, Sena kalyon Bhaban, 195, Motijheel C/A, Dhaka-1000. Tel: 9552880, 9565451. Total : Capacity (MW) 9.9 MW Date of Issue License 01-02-2001 License Issued by Electrical Advisor & Chief Electrical Inspector Electrical Advisor & Chief Electrical Inspector Electrical Advisor & Chief Electrical Inspector Electrical Advisor & Chief Electrical Inspector Electrical Advisor & Chief Electrical Inspector

30.00 MW

14-12-2002

3.

30.00 MW

20-02-2003

4.

10.00 MW

01-07-2003

5.

10.80 MW

27-07-2003

90.70 MW

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 23 of 54

Salient features regarding Rental Power Plant in BPDB


Sl. No. 1 Name of Power Plant with location Kumargoan (Sylhet) Plant Capacity 20 MW 10% Trailer/Skid Mounted. 80 MW 10% Trailer/Skid Mounted. 20 MW 10% Trailer/Skid Mounted. 20 MW 10% (with Dual fuel Provision) Trailer/Skid Mounted. 50 MW 10% (with Dual fuel Provision) Trailer/Skid Mounted. 20 MW 10% (with Dual fuel Provision) Trailer/Skid Mounted. 100 MW 20% (with Dual fuel Provision) Barge Mounted. Gas Type of Fuel Quotd rate Tk/Kwh 2.799 Responsive Lowest Tenderer Summit Industrial & Mercantile United & Neptune Remarks Proposal sent to Ministry on 17/04/2006 Proposal sent to Ministry on 22/03/2006 Proposal sent to Ministry on 22/03/2006 Proposal sent to Ministry on 22/03/2006 Proposal sent to Ministry on 09/04/2006 Proposal under evaluation Proposal under evaluation

Shahjibazar (Hobigonj)

Gas

2.630

Bogra

Gas

3.016

GBB Ltd

Thakurgaon

HFO

12.230

Consortium Tallu

Fenchugonj (Sylhet)

Plant No. 1: 25 MW on Gas. Plant No. 2: 25 MW on HFO/Gas. HFO for 2 yrs Gas for 13 yrs Option 1: HFO for 2 yrs Gas for 13 yrs Option 2: Oil for 15 yrs

2.830

Ornate Service Ltd

Katakhali (Rajshahi)

8.524 (HFO) 2.538 (Gas) Option 1: 10.526 (HFO) 2.565 (Gas) Option 2: 10.486 (HFO) 11.323 (HFO) 2.737 (Gas)

Consortium Tallu

Siklbaha (Chittagong)

Noorpore Power Co. Ltd

Noapara (Jessore)

50 MW 20% (with Dual fuel Provision) Barge Mounted.

HFO for 5 yrs Gas for 10 yrs

Hosaf-CMEC

Proposal under evaluation

Note: HFO: Heavy Furnasce Oil

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 24 of 54

Installation of Capacitor Bank for Power Factor Improvement


A. Installed by PGCB:
List of Existing Capacitor Bank Connected to 33 kV Bus 1. Rajshahi and
Rangpur Zone: Name of Sub Station Ishurdi Natore Bogra Rajshahi Rangpur Saidpur Thankurgaon Naogaon Installed (MVAR) 6 x 5 = 30 4 x 5 = 20 8 x 5 = 40 4 x 5 = 20 8 x 5 = 40 8 x 5 = 40 7 x 5 = 35 4 x 5 = 20 Remarks Voltage condition and Prower factor has improved after installation

-Do-Do-Do-Do-Do-Do-Do-

2. Chittagong Zone:
Name of Sub Station Madunaghat Halishahar Kulshi Installed (MVAR) 3 x 5 = 15 4 x 5 = 20 3 x 5 = 15 Remarks Voltage condition and Prower factor has improved after installation

-Do-Do-

3. Khulna Zone:
Name of Sub Station Khulna Central Jhenidah Jessore Barisal Faridpur Installed (MVAR) 5 x 5 = 25 2 x 5 = 10 3 x 5 = 15 4 x 5 = 20 2 x 5 = 10 Remarks Voltage condition and Prower factor has improved after installation

-Do-Do-Do-Do-

4. DESA and Central


Name of Sub Station Hasnabad Tongi

Zone
Installed (MVAR) 3 x 5 = 15 2 x 5 = 10 Remarks

-Do-Do-

Installed Total: = 400 MVAR

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 25 of 54

Capacitor Bank at 7 Grid Sub-stations Project


1. Dhaka Zone: Name of Sub Station Tongi Ullon Mirpur Kabirpur Hasnabad Capacity (MVAR) 10 x 4 = 40 10 x 4 = 40 10 x 4 = 40 5 x 4 = 20 5 x 4 = 20 Remarks Voltage condition and Prower factor has improved after installation

-Do-Do-Do-Do-

2. Comilla Zone:
Name of Sub Station Sylhet Capacity (MVAR) 5 x 4 = 20 Remarks Under Installation

3. Northern Zone:
Name of Sub Station Thakurgaon/Palashbari Chapi Nowabganj Capacity (MVAR) 5 x 4 = 20 5 x 4 = 20 Total Capacity: = 220 MVAR Remarks Under Installation Under Installation

Capacitor Banks Under Installation by Greater Chittagong Project


Name of Sub-station Bakulia 132/33 kV Dohazari 132/33 kV Cox's Bazar 132/33 kV Baraulia 132/33 kV Hathazari 230/132 kV Installed (MVAR) 5 x 7 = 35 5 x 6 = 30 5 x 7 = 35 5 x 7 = 35 5 x 7 = 35 Total Capacity: = 170 MVAR

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 26 of 54

Capacitor Banks to be Installed by 2008 Under Shunt Compensation Project of PGCB


1. Dhaka Zone: Name of Sub-station Rampura 230/132 kV Aminbazar 230/132 kV 2. Chittagong Name of Sub-station Hathazari 230/132 kV Dohazari 132/33 kV Bakulia 132/33 kV 3. Khulna Zone: Name of Sub-station Barisal 132/33 kV Jessore 132/33 kV Madaripur 132/33 kV Capacity (MVAR) 2 x 45 = 90 2 x 45 = 90

Capacity (MVAR) 1 x 45 = 45 1 x 45 = 45 1 x 45 = 45

Capacity (MVAR) 1 x 45 = 45 1 x 45 = 45 1 x 45 = 45 Total Capacity: = 450

B.
Sl. No.

Installed by DESA:
Report as on 26-06-2006
Total Demand in DESA System MVAR MVAR 2 309.00 Functioning Capacitor Bank in System Fixed Type MVAR 3 81.00 Switch Type MVAR 4 58.90 Total MVAR 5 139.90 Work under Implementation Fixed Type MVAR 6 15.00 Switch Type MVAR 7 91.10 Add. Requirem ent Total MVAR 8 63.00 Remark

1 1

9 After installation of 139.90 MVAR capacitor bank about 3% of capacity released in system and power factor improved.

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 27 of 54

Installation of Capacitor Bank for Power Factor Improvement


C. Installed by REB: cweev 11 Kwf jvBb BwZga 59wU mwgwZZ 105 gMvfvi KvcvwmUi vcb KiQ| cqvRb Abyhvqx Aviv KvcvwmUi vcbi wbwg gvjvgvj msMn cw qvaxb iwnqvQ|

D.

Installed by DESCO WmKv GjvKvi vcbKZ KvcvwmUi evsK Gi Z_ evwiaviv - 7,200 KVAR Kvdij - 11,800 KVAR cjex - 7,950 KVAR KjvYcyi - 7,200 KVAR jkvb - 18,300 KVAR Div - 12,900 KVAR

AvMvgx GK gvmi ga WmKvi 6 (Qq) wU we q I weZiY wefvM cwZwU 300 KVAR gZv mb 8 (AvU) wU KvcvwmUi evsK vcb Kiv ne hvi gZv megvU 14,400 KVAR | WmKv GwiqvZ 0.95 Gi Dci cvIqvi di gBbUBb Kiv nQ hvi dj jvBb fvR I jvBb KvcvwmwU ew cqQ|

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 28 of 54

YEARWISE POWER GENERATION & LOAD SHEDDING

Period-1 Actual Generation (MW) 2087 2114 2136 2449 2665 3033 Load Shedding (MW) 545 674 711 774 536 663

(1996-2001)

Financial Year

System Loss (%)

1996 1997 1998 1999 2000 2001

31.20% 30.40% 31.30% 31.80% 31.60% 28.47%

Period-2 Actual Generation (MW) 3033 3248 3458 3622 3751 3812 Load Shedding (MW) 663 367 468 694 770 891

(2001-2006)

Financial Year 2001 2002 2003 2004 2005 2006 (upto Mar, 2006)

System Loss (%) 28.47% 27.97% 25.69% 24.49% 22.79% 20.97%

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 29 of 54

Load Management System using GIS technology

Background and Rational


The supply of electricity and access to it has great impact national economy. Only about one third of the countrys has access to electricity. The demand of electricity is also at about 8% per year. The average generation of electricity 3000 MW compared to average demand of 4400 MW. operational failure of power stations add to the shortage the situation more difficult. The crisis of electricity become critical at dry season during the irrigation season. At the of next irrigation season, the Government of Bangladesh use the generated electricity for the most betterment of the meeting was held chaired by the Secretary, power division agencies involved in power generation and distribution to up coming crisis period in a planned way. CEGIS was to provide assistance for preparing the plan by analysis demand and irrigation data and develop a decision support optimal allocation of power to fulfill the Government on the population increasing is about Temporary and make most beginning wanted to country. A with all the address the instructed historical system for objectives.

The major constraints of the Bangladesh power sector improvement is high accounts receivable, high nontechnical and commercial loss, inability to service debt, lack of resources for expansion and major maintenance, lack of commercial orientation and inefficient management. Inadequate supply, poor maintenance and poor planning because of weak finances have resulted in low availability of state-owned power plants, serious transmission and distribution bottlenecks and equipment failures. In order to understand and visualize the issues concerning load management an its distribution, it is felt necessary to use GIS based Load Management System. The demand of Electricity is not constant. It varies over time and location based on the peoples activity. Demand also varies over the year for irrigation and summer. Irrigation activity does not start simultaneously in all part of the country. Similarly commercial demand varies over the period of the day. If such factors are not included in the allocation of electricity it cannot be rationalized. Since the resource is limited, a rational approach has to be established to priorities between demands to address the most critical needs that would have more contribution to the national growth. Power Cell initiated a program called GIS based Load Management System to improve the total system for efficient and optimal allocation of the available power supply. GIS integrated different levels of information on supply and demand form concerned departments, which will enable to address management issues within the power sector and visualize the improvement against the measures taken up by the management.

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 30 of 54

Irrigation Demand and Allocation


In early February, an analysis was carried out to estimate the irrigation demand and its distribution over Bangladesh using Remote Sensing and DAE data as a example shown bellow (18 April 2006 scenario). Peak irrigation demand varies zone to zone depending on climate and land use characteristics.

The irrigation demand by zones are shown bellow but total demand of all the zones never come same time. Even the total demand is about 1260 MW but actually supply is about 760 MW as the load diversion is much less than the total demand. REB and PDB ensure minimum 8 hours electric supply during irrigation period.
Area Dhaka Mymemsingh Sylhet Comilla Chittagong Khulna Barisal Rajshahi Rangpur Irrigation Demand (MW) 42 128 0 76 18 220 14 311 230

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 31 of 54

Demand and Supply


Base on daily data from PGCB and other organization, the Load Management Software produce set of outputs for the efficient management. Load shed was computed for each zone and by distribution agencies as well as for the day and evening peak time as shown bellow.

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 32 of 54

Load Management in Dhaka City


Both DESA and DESCO prepared a schedule for load shed for each feeder/distribution system under different load availability scenarios. The program has following objectives: 1. To provide Daily Load Schedule to the public user. 2. Generate customize report on the basis of different query on Load Schedule and public reply 3 Integrate web base GIS to make better understanding to the user. 4. Store Public feed back on load Schedule to make interaction between power division of Bangladesh and the End User.

Based on the planned load shed schedule and predicted load availability a web based load management software were developed as in the following page.

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 33 of 54

Dhaka Electric Supply Company Limited (DESCO)


Load Shedding on 11kV Feeders
Allocation of Dhaka City - 1300 MW Allocation of Substation -19 MW Load Sheding Time (Hourly) Area under the Feeders 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 Sec-6 Block#Ka, Barobag, Monipur, Shapla Housing, First Housing * 3.83 3.66 4.3 4.33 4.5 4.66 4.25 3.91 3.16 3 2.83 2.83 2.83 2.83 2.83 3.33 3.5 3.58 11:00 2.83 12:00 3.5 13:00 3.5 14:00 3.66 15:00 16:00 3.75 4 Substation:- Kafrul 33/11kV

Feeder Name & User Division Monipur (S & D Kallyanpur)

* 3.16 Muktizoddah 10 no Gollchokkor, Chaurongi Market, (S & D Rokeyasharoni West, West Monipur Kallyanpur) Senpara, 1 no Building, Nam Garden, Senpara (S & D Kafrul) Kazipara Cant Bazar Sec-14 to Old Kachukhet West Side (S & D Kafrul) Ibrahimpur Navy Colony, Ibrahimpur (S & D Kafrul) * 3.83

3.16

3.33

3.33

3.33

2.75

2.33

2.25

1.66 1.66 1.66 1.66 1.66 1.66 2.75

2.33

2.75

3.16

3.16

3.66

4.33

4.33

4.33

4.66

4.25

3.91 3.16

2.83 2.83 2.83 2.83 2.83 3.33

3.5

3.58

2.83

3.5

3.5

3.66

3.75

* 3.55

3.5

4.5

4.33

4.33

4.33

3.75

3.75 2.91 2.83 2.66 2.66 2.66 2.66 2.66 3.25 3.25

3.58

3.41

3.33

3.25

3.33

3.33

* 1.66

1.66

2.33

2.41

2.33

2.33

2.25

1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66

1.66

1.66

1.66

1.66

1.66

1.66

1.67

* 4.46 South Kafrul Sec-14 to Rajanigondha Market(East (S & D Kafrul) Side), South Kafrul Vasantek, Lalasarai, Dhamalcot, Vasantek (S & D Kafrul) Dewanpara * 2.33

4.46

4.33

4.33

3.96

3.96

3.7

2.96

2.9

2.75 2.75 2.75 2.75 2.75 2.75 3.28 3.28

3.16

3.16

3.15

3.11

3.13

3.4

3.4

2.33

3.33

3.5

3.66

3.66

2.75 2.75 2.33 2.33 2.33 2.33 2.33 2.33 1.83 1.83

1.91

1.83

1.83

2.16

* Feeder Load (MW) Load Shedding Period

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 34 of 54

Dhaka Electric Supply Company Limited (DESCO)


Load Shedding on 11kV Feeders
Allocation of Dhaka City 1200 MW Allocation of Substation -18 MW
Load Sheding Time (Hourly) Area under the Feeders Sec-6 Block#Ka, Barobag, Monipur, Shapla Housing, First Housing 10 no Gollchokkor, Chaurongi Market, Rokeyasharoni West, West Monipur Senpara, 1 no Building, Nam Garden, Kazipara Sec-14 to Old Kachukhet West Side Sec-14 to Rajanigondha Market(East Side), South Kafrul Vasantek, Lalasarai, Dhamalcot, Dewanpara 17:0 0 * 3.83 18:0 0 3.66 19:0 0 4.3 20:0 0 4.33 21: 00 4.5 22: 00 4.6 6 23:0 0 4.25 0: 00 3.91 1: 00 3.1 6 2: 00 3 3:0 0 2.8 3 4:0 0 2.8 3 5:0 0 2.8 3 6: 00 2.8 3 7: 00 2.8 3 8: 00 3.3 3 9: 00 3.5 10: 00 3.5 8 11: 00 2.8 3 12: 00 3.5 13: 00 3.5 14: 00 3.6 6 15: 00 3.7 5 16: 00 4

Feeder Name & User Division

Monipur (S & D Kallyanpur)

3.16

3.16

3.33

3.33

3.3 3

2.7 5

2.33

2.25

1.6 6

1.6 6

1.6 6

1.6 6

1.6 6

1.6 6

2.7 5

2.3 3

2.7 5

3.1 6

3.16

Muktizoddah (S & D Kallyanpur)

Senpara (S & D Kafrul) Cant Bazar (S & D Kafrul)

3.83

3.66

4.33

4.33

4.3 3

4.6 6

4.25

3.91

3.1 6

2.8 3

2.8 3

2.8 3

2.8 3

2.8 3

3.3 3

3.5

3.5 8

2.8 3

3.5

3.5

3.6 6

3.7 5

3.55

3.5

4.5

4.33

4.3 3 3.9 6

4.3 3 3.9 6

3.75

3.75

2.9 1 2.9

2.8 3 2.7 5

2.6 6 2.7 5

2.6 6 2.7 5

2.6 6 2.7 5

2.6 6 2.7 5

2.6 6 2.7 5

3.2 5 3.2 8

3.2 5 3.2 8

3.5 8 3.1 6

3.4 1 3.1 6

3.3 3 3.1 5

3 3.1 1

3.2 5 3.1 3

3.3 3 3.4

3.33

4.46

4.46

4.33

4.33

3.7

2.96

3.4

South Kafrul (S & D Kafrul)

Vasantek (S & D Kafrul)

2.33

2.33

3.33

3.5

3.6 6

3.6 6

2.75

2.7 5

2.3 3

2.3 3

2.3 3

2.3 3

2.3 3

2.3 3

1.8 3

1.8 3

1.9 1

1.8 3

1.8 3

2.1 6

* Feeder Load (MW) Load Shedding Period

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 35 of 54

Pre-Paid Metering
A. BPDB
Project of Meter (Nos.) Number of Meter (Nos.) Per Month Collection before Implementatio n of PrePayment Meter (Tk. Lac) Avg. 11.90 Per Month Collection after Implementation of Pre-Payment Meter (Tk. Lac) Increase of revenue collectio n (%) Avg. feeder System loss before Meter Installation (%) Avg. Feeder System Loss at Present (%) Achievement Benefit Remarks Name of the Project Site

Shajalal Upshahar feeder, Sylhet

306.93

2400-1P 203P

Avg. 15.37

38.00%

19.64%

7.41%

Reduces System Loss 12.23%

Town-01 Feeder, Sirajgonj

453.70

3039-1P 763P

Feeder wise collection did not prepare on that time

Avg. 7.60

30.00%

20.26%

18.00%

Reduces System Loss 2.26%

Hospital Feeder, Bogra

414.54

3400-1P 104-3P

Agrabad H-17 Feeder, Chittagong

649.58

5789-1P 204-3P

Feeder wise collection did not prepare on that time Feeder wise collection did not prepare on that time

Avg. 10.00

19.11%

7.75%

Reduces System Loss 11.36%

Avg. 3.00

23.97%

Revenue Collection increases 38% i.e. per month revenue collection increases Tk. Avg. 3.47 lac Revenue Collection increases 30% i.e. per month revenue collection Avg. 7.60 lac Per month revenue collection Avg. 7.60 lac -

Investment will be return within 05 yrs 06 months

Investment will be return within 06

Investment will be return within 07 yrs 06 months Investment of meters on going

Partial Area of Shajalal Upshahar and Supanighal Feeder, Sylhet Sirajgonj ESU

498.57

5500-1P 80-3P

Extension Under Revenue Budget Contract Under Process

1200-1P 300-3P

Tender Under Process

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 36 of 54

Pre-Paid Metering
Name of the Project Site Project of Meter (Nos.) Number of Meter (Nos.) Per Month Collection before Implementati on of PrePayment Meter (Tk. Lac) Per Month Collection after Implementatio n of PrePayment Meter (Tk. Lac) Increas e of revenue collecti on (%) Avg. feeder System loss before Meter Installation (%) Avg. Feeder System Loss at Presen t (%) Achievement Benefit Remarks

Khulshi H-01 Feeder, Chittagong Khulshi H-03 Feeder, Chittagong Stadium H-05 Feeder, Chittagong

Under KW Grant (Euro 4.00 Million) 24.25% 2235.79 8500-1P 450-3P 26.05% 17.34%

Project will be completed within June 2007

DPP for Chittagong Zone Prepayment Metering Project DPP for Rajshahi Zone Prepayment Metering Project DPP for Central Zone Prepayment Metering Project DPP for Comilla Zone Prepayment Metering Project

358000-1P 9800-3P

Country Wide Application Program for Prepayment Metering Project DPP is Submitter in Planning Commission

252000-1P 6075-3P 218000-1P 3250-3P 133000-1P 4050-3P

DPP is Submitter in Planning Commission

DPP is Submitter in Planning Commission

DPP is Submitter in Planning Commission

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 37 of 54

Pre-Paid Metering
B. DESCO GLb ch 2.983 wU wc- cBW wgUvi vcb Kiv nqQ| Gwcj 2005 Ges Gwcj 2006 Gi Z_ chvjvPbv Ki `Lv hvq h, D MvnK`i we`yZi eenvi 14.55 ew cqQ| GQvovI D chvjvPbvq 5-6% wmg jm nvm cqQ D MvnK`i we`yr weZiYi |

C.

DESA

UvYKx wfwZ wc-cBW GbvwR wgUvi mieivn, vcb cwiPvjb I msiY KvR|
Wmv GjvKvq wc-cBW wgUvwis cwZ Pvjy Kivi Dk GKwU cvBjU cRi AvIZvq we q I weZiY wefvM mbevwMPvi iwPZv 11 Kwf wdWvi Ges weRq bMi 11 Kwf wdWvii Aaxb mKj MvnK Avwbvq wc-cBW wgUvwis vcbi cwiKbv Kiv nqQ| iwPZv wdWvi 233 Rb Ges weRqbMi wdWvi 1643 Rb MvnK iqQ| UvYKx wfwZ wc-cBW GbvwR wgUvi mieivn, vcb, cwiPvjb I msiY KvRi `ic 23/02/04 Bs ZvwiL Avnvb Kiv nq| D `ic 2200 wU wmj dR wc-cBW wgUvi Ges 300 wU w_ dR wc-cBW wgUvi mieivni msvb iqQ| G cK A_vqb Wmvi ivR^ LvZ nZ wgUvbvi eev iqQ| wc-cBW wgUvi vcb KvRi AvnvbKZ `icwU MZ 25/07/2005 Bs ZvwiL evwZj Kiv nq| Wmvi wc-cBW wgUvi q ms v welq D `ic AskMnYKvix K.C.J. & Associated Ltd. Gi c nBZ gvbbxq we`yr cwZgx gnv`qi `i GKwU AwfhvMc `vwLj Kiv nq| miKvix q Kvh gi ^QZv I Revew`wnZv cwZvi j welqwUi Z` Kivi Rb cwZgx gnv`q wb`k c`vb Kib| m~ bsweRvLm/wetDt-1/Wmv/wewea 8/2000/488, ZvwiL 07/08/2005 Bs gvZveK we`yr wefvMi (ckvmb-1) kvLvi wmwbqi mnKvix mwPe Rbve gvt b~ij AvgxbK welqwU Z` Ki 7(mvZ) w`bi ga hyM-mwPe (Dt) gnv`qi eivei cwZe`b `qvi Rb Abyiva Kiv nq| c~e AvnvbKZ wc-cBW wgUvi mieivn I vcb KvRi `ici Dci gYvjq nBZ Z`i wb`ki cwZ KZc wbgv wmv MnY Ki t c~e AvnvbKZ wc-cBW wgUvi mievivn mieivn I vcb KvRi `ici Dci we`yr, Rvjvbx I LwbR m` gYvjq nZ Kvb wb`kbv bv cvIqv ch bZzb Ki UvYKx wfwZ wc-cBW wgUvi mieivn I vcb KvRi `ic Avnvbi welqwU wMZ _vKe c~e AvnvbKZ wc-cBW wgUvi mieivn I vcb KvRi `ici Dci gYvjq nBZ wmv/wb`kbv cvIqv Mj cieZx Kvh g nvZ bIqv ne|

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 38 of 54

KvcwUf cvIqvi cvU ms v Z_vw`


mviv `k Mvm wfwK I Zij Rvjvbx PvwjZ cvq 1100 gMvIqvU KvcwUf cvIqvi cvU iqQ| eZgvb Mvm wfwK cvq 150 gMvIqvU D KvcwUf cvIqvi iqQ hv AbwZwej^ AeZxKvjxb cvIqvi cviPR GwMgU Pzw ^vi Ki q Kiv hvq| mshvM myweav mwi cqvRb ne weavq A`~i fwelZ Aviv cvq 350 gMvIqvU KvcwUf cvIqvi MxW mshy Kiv hve| KvcwUf cvIqvi cvU _K we`yr qi dj GKw`K we`yZi NvUwZ wKQyUv jvNe ne Ges Abw`K emiKvix gvwjK`i wewbqvMi mevg eenvi (Optimum utilization) ne| D we`yr wew Kivi dj cvU dvi ew cve weavq KvcwUf cvIqvi gvwjK`i cwZ BDwbU we`yZi Drcv`b eq AvMi _K nvm cve Ges RvZxq Drcv`b f~wgKv ivLe| 132 Kwf jfj cwZ BDwbU we`yZi g~j 2.12 UvKv| G g~ji ga 0.23 UvKv Bwjs PvR iqQ| Bwjs PvR ev` Drcv`b eq `vuovq 1.90 UvKv| KvcwUf cvIqvi gvwjK`i wewbqvMK sunk cost wnme weePbv Ki miKvi cwZ BDwbU KvcwUf cvIqvi mevP 1.90 UvKv `i qi welqwU weePbv KiQ, hv _K KvcwUf cvU gvwjK`i cwZ BDwbU _K 30 _K 40 cqmv gybvdv nIqvi K_v|

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 39 of 54

we`yr Gi Uvwid ewi cve


MZ 1 m^i 2003 Bs ZvwiL mekl Uvwid ew Kiv nqwQj| mcwZ we`yr wefvM KZK cYqbKZ Uvwid ewi cve aygv knivji MvnK`i (hviv gvU MvnK msLvi 27 kZvsk) Rb LyPiv Uvwid 5 kZvsk ewi mycvwik Kiv nqQ| GB cve wbg Avqi MvnK`i q gZv weePbvq AvevwmK MvnK kYxi 1g avc (0-100 BDwbU ch) Gi Rb Uvwid AcwiewZZ ivLv nqQ| Gi dj Mvgvji MvnK (hviv gvU MvnK msLvi 73 kZvsk) Ges knivji wbg Avqi AvevwmK MvnK (0-100 BDwbU ch)`i Dci Uvwid ewi Kvb cfve coebv| Wmv, WmKv, IRvcvwWKv, weDev I 9 wU mQj cjx we`yr mwgwZ Gi Rb ev Uvwid 10 kZvsk ewi cve Kiv nqQ; evKx 58wU AmQj I cvwK cjx we`yr mwgwZi ev Uvwid AcwiewZZ ivLv nqQ| knivji we`yr weZiYi `vwqZ wbqvwRZ msvjv A_vr Wmv, WmKv, IRvcvwWKv I weDev 5 kZvsk LyPiv Uvwid ewi dj AwZwi ivR^ Ges wmg jm nvm I `Zvewi gvag 10 kZvsk ev Uvwid ew mg^q Kie| Rvjvbx Zj, Mvm Gi g~j ew Ges e`wkK gy`vi wewbgq nvii ewRwbZ KviY AvB wc wc _K qKZ we`yZi g~j ewi dj weDevi gvMZ jvKmvb KgvZ cvweZ Uvwid mg^q DjLhvM f~wgKv ivLe| AvMvgx 2006-07 A_eQi Single Buyer wnme weDevi jvKmvb 879 KvwU UvKv _K 426 KvwU UvKvq bg Avme|

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 40 of 54

Electricity Retail Tariff (BPDB/DESA/DESCO/WZPDCO)


Sl. No. Category of consumer A. (Residential) from 000 unit to 100 unit from 101 unit to 400 unit above 400 2. 3. B. (Agricultural Pumping) C. (Small Industrial) flat rate off-peak rate peak rate D. (Non Residential Light & Power) E. (Commercial) flat rate off-peak rate peak rate F. (Mid. Voltage Gen. Purpose-11kv) flat rate off-peak rate peak rate G2. (High Volt. Gen. Purpose-132kv) (a) time 23.00 - 06.00 (b) time 06.00 - 13.00 (c) time 13.00 - 17.00 (d) time 17.00 - 23.00 (e) flat rate H. (High Voltage Gen. Purpose-33kv) flat rate off-peak rate peak rate J. (Street Lights & Water Pumps) effective from 1-09-2003
(Tk/KWh)

1.

2.50 3.00 5.00 1.84

3.83 3.05 5.36 3.20

4. 5.

5.04 3.62 7.82

6.

3.62 2.99 6.41

7.

1.42 2.36 1.58 5.25 2.68

8.

3.41 2.89 6.14 3.68

9.

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 41 of 54

Bulk Supply Tariff for the Distribution Entities


(effective from01/04/2004)
Bulk Supply Tariff Electricity Transmission Charge Wheeling for Total Charge to production PGCB to BPDB (Tk/kWh) (Tk/kWh) (Tk/kWh) 1.8932 0.2268 2.12

Sl. No.

Category of Consumer

Ulitity/Voltage Level

G-1

Extra High Voltage - Dhaka Electric Supply Authority (DESA)132kV/Other 132kV Consumers Rural Electrification Board (REB)/Rural Electric Cooperatives (PBS)-33kV a. PBSs out of Dhaka b. PBSs adjacent to DESA area Dhaka Electric Supply Company Ltd. (DESCO) a. 132kV b. 33kV West Zone Power Distribution Company Ltd. (WZPDC) a. 132kV b. 33kV BPDBs Distribution Zones a. 132kV b. 33kV Distribution Companies to be established in future a. 132kV b. 33kV

I-1

1.8209 1.8909

0.2291 0.2291

2.05 2.12

I-2

1.8932 1.9409

0.2268 0.2291

2.12 2.17

I-3

1.8932 1.9409 -

0.2268 0.2291 0.2268 0.2291

2.12 2.17

I-4

I-5

1.8932 1.9409

0.2268 0.2291

2.12 2.17

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 42 of 54

welq t eKqv we`yr wej ms v|


wewfb gYvjq/wefvM Ges Zv`i wbqYvaxb miKvix wewfb `i/msv mg~n wbqwgZfve we`yr wej cwikva bv Kivq wecyj AsKi we`yr wej eKqv co AvQ Ges cyxf~Z eKqv weji cwigvb Divi ew cvQ dj we`yr msvmg~n Avw_K msKU f~MQ| we`yr LvZ gvU eKqvi cwigvb cvq GMvi nvRvi KvwU UvKv| wbg wWm^i, 2005 mvj ch msv wfwK gvU eKqv we`yr weji wnmve `Lvb njv :
Utility Principal PDB REB DESA DESCO Total 44527 4263.89 7236.03 2203.022 58229.942 Account Receivable (MTk.) Surcharge 49265.30 0 6112.9 45.07 55423.27 Total 93792.30 4263.89 13348.93 2248.09 113653.21

Dciv eKqvi ga miKvix/Avav-miKvix/^vqZkvwmZ msvmg~n Ges emiKvix cwZvbi wbKU mviPvRmn gvU eKqvi cwigvb wQj 11365KvwU UvKv Zvi ga ay mviPvRi cwigvb cvq 5542 KvwU UvKv| wbg emiKvix cwZvbi wbKU wWm^i, 2005 ch eKqvi wnmve `Lvb njv :
Utility PDB REB DESA DESCO Total Category wise Account Receivable Unit MTK. MTk. MTk. MTk. MTk. Eq. Month FY 2006 (Up to Dec'2005) Principal 3501.27 3960.8 4605.336 1555.5 13622.906 Surcharge 135.00 0.00 1026.80 31.10 1192.90 Total 3636.27 3960.80 5632.14 1586.60 14815.81 3.09

we`yr LvZ weivRgvb wewfb mgmv mgvavb miKvi evcK cbv`bvg~jK (Incentives) Kvh g MnY KiQ| Avw_K msKU `~ixf~Z KiYi j Abvb Kvh gi cvkvcvwk eKqv Av`vqi Dci iZvivc Ki wewfb c`c MnY Kiv nqQ dj ivR^ Av`vq gv^q ew cvQ| miKvi emiKvix ew I cwZvbmg~ni wbKU we`yr weji eKqv cvIbv Av`vqi j Drmvn cvKR NvlYv KiQ| D cvKRi AvIZvq AvMvgx 31 k RyjvB 2006 ZvwiLi ga nvjbvMv` wejmn mg~`q g~j eKqv cwikva Kiv nj Ryb 2006 ch mgqi 100% mviPvR ev Rwigvbv gIKzd Kivi welq weePbv Kiv ne| H mgqi ga we`yr wej cwikva Kiv bv nj cPwjZ wbqg gvZveK mshvM wewQb Kiv ne Ges chvR `my` Avivc Kiv ne| BwZgaB GZ evcK mvov coQ|

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 43 of 54

D cvKR Nvlbvi dj h mKj mydj cvIqv hve Zv wbg msc DjL Kiv njvt
emiKvix ew I cwZvbmg~ni wbKU we`yr weji cvq 136 KvwU UvKvi eKqv Av`vq ne| MvnK we`yr wej wbqwgZ cwikva DrmvwnZ ne| msvmg~ni cywf~Z eKqvi cwigvb nvm cve| msvi Zvij msKU nvm cve| wbavwiZ mgq eKqv cwikva bv Kij mshvM wewQb Kiv ne dj AbvKvwLZ Pvwn`v nvm cve|

miKvi mviPvR Avivc Kivi cwieZ we`yr LvZi mKj msvi Rb GKwU Awfb wewjs cwZ Pvjy Kivi D`vM Mnb KiQ| G wej Bmyi 30 w`bi ga MvnK KZK wej cwikva KiZ ne| wbavwiZ mgqi ga wej cwikva Kiv bv nj 5% nvi wej^ gvmyjmn cieZx 20 (wek) w`bi ga wej cwikva KiZ ne| 5% wej^ gvmyjmn 20 w`bi ga wej cwikva Kiv bv nj Kvb bvwUk QvovB jvBb wewQb Kiv ne| wej Bmyi 90 w`bi ga wej cwikva Kiv bv nj wgUvi AcmviYmn vqxfve mshvM wewQb Kiv ne| Ze MvnK nqivbx iva msvmg~n KZK MvnK`i wbKU mevwaK 7 (mvZ) w`bi ga wej cuQvbvi Dci iZvivc Kiv nqQ Ges wej c`vbi MvnK RbMbi fvMvw nvmi Rb evsKi msLv ew Kiv nqQ| ^ mgqi gaB Online Banking Gi gvag wej c`vbi myhvM myw mn mvweK KwDUvi wewjs c_v Pvj~ Kiv nQ| ewYZ cwZ AbymiY Kiv nj mviPvRi KviY eKqvi cwigvb cywfyZ nq wecyj AvKvi avib Kie bv| mKj msvq GK Ges Awfb cwZi gvag we`yr wej Kiv ne| wej cYqb I wnmve msiYi RwUjZv wbimY ne| MvnKMY wej cwikva AwaK AvMnx ne| eKqvi cwigvb `vZv msvi FY Pzwi kZvbyhvqx wbqY Kiv me ne| MvnK fvMvw nvm cve|

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 44 of 54

Yearwise Revenue Collection


FY 2004-2005 2003-2004 2002-2003 2001-2002 2000-2001 Unit MTk. MTk. MTk. MTk. MTk. PDB 40384.257 39887.02 36568.41 31807.74 27436.204 REB 21940.66 19634.22 16404.78 12518.23 9686.48 DESA 12530.35 14457.95 15918.57 14273.00 11412.47 DESCO 5305.85 4305.93 1642.67 1308.98 1041.18 Total 80161.117 78285.12 70534.43 59907.95 49576.334

Collection/Import Ratio
FY 2004-2005 2003-2004 2002-2003 2001-2002 2000-2001 Unit % % % % % PDB 84.16 82.41 80.38 78.86 75.07 REB 84.44 82.76 80.94 81.79 78.94 DESA 71.09 82.1 75.11 74.82 65.59 DESCO 80.92 70.93 58.5 65.3 56.00 WZPDCO 89.05

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 45 of 54

Short Tersm Investment Plan (2006-2008)


(As of June 2006) Implementation Plan 2006-2008
Sl. No. Project Name Project Cost (ml US$) Source of Finance Year of Com Comments

Local Local
1. Sylhet (Fenchuganj) 90 MW CCPP 2nd Phase Siddhirganj 2*150 MW Peaking Power Plant Siddhirganj 2X120 MW Peaking Power Plant Chandpur 150 MW CCPP Sylhet 150 MW CCPP Sikalbaha 150 MW GT Meghnaghat 450MW 2nd Phase CCPP Siddhirganj 210 MW Thermal Power Plant (Unit II) Khulna 210 MW Thermal Power Plant Bhola 150 MW CCPP Khulna 100 MW Peaking Power Plant Haripur 150 MW CCPP 39.37

Foreign Foreign
76.33 GOB 2008 Under execution

2.

49.99

110.42

World Bank

2009

Under process 2*150 MW

3.

45.32

71.10

ADB

2008

Tender under approval Contract for 100 MW GT is under process Negotiation going on Under process may be revised as 225 MW CCCP Approved

4. 5. 6.

29.31 23.02 19.34

66.57 45.63 45.01

GOB EDC (Canada) Kuwait Fund

2008 2009 2009

7.

IPP

2008 (GT) 2009 (CC)

8.

64.40

79.67

Russian State Credit Expected Suppliers Credit IDB Expected from ADB Expected from JBIC

2010

Negotiation going on Negotiation going on Negotiation going on Negotiation going on Under revision as 360 MW CCCP

9. 10. 11

73.67 32.99 24.46

90.36 65.54 41.25

2009 2009-10 2009

12.

27.84

63.50

2009-10

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 46 of 54

Sl. No.

Project Name

Project Cost (ml US$) Local Foreign 43.66

Source of Finance

Year of Com

Comments

13. 14. 15.

Bogra 150 MW GT Sirajganj 450 MW 1st Phase Meghnaghat 450 MW 3rd Phase CCPP Kaptai Power Plant Extension 2 X 50 MW ( 6th & 7th Unit) Sikalbaha 450 MW CCPP Meghnaghat 450 MW 4th Phase Sirajganj 450 MW 2nd Phase Bheramara 450 MW CCPP( Including evacuation facilities) 10-30 MW Small Power Plant (395 MW) Barge/Trailor /Skid Mounted Rental basis Power Plant (360 MW) Sirajganj 150 MW Gas Tubine Rehabilitation of power stations (Phase-3) 500 MW Coal based Power Plant (TATA) Ashuganj 450 MW CC Power Plnat Expansion of Barapukuria Power Plant (125 MW) Unit III Rehabilitation of 50 MW Kaptai Hydro Power Plant (Unit III)

18.75

2009 IPP 2009 2009 PQ under evaluation Cadogan Manning Group (Unsolicited)

IPP Kuwait Fund (proposed)

16.

41.60

63.72

2010 Funding is yet to be lined up

17. 18. 19. 20.

121.03 132.82

143.61 158.24 IPP IPP

2010 2011 2012 2012

21.

IPP

2007

PQ Evaluated Tender Dropping going on

22. 23. 24. 25. 26.

28.41 15 107.57

63.68 135 263.36

IPP ADB Expected from WB IPP JBIC Buyers Credit (proposed) GOB / Suppliers Credit

2006 2010 2008-10 2011 2010

Negotiation going on

27.

40.92

99.55

2011-12

Under Discussion Under Discussion

28.

9.40

18.12

Italy

2007-08

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 47 of 54

A. Transmission
Sl. No Projects Name Project Cost (ml US$) Local Foreign 37.88 54.35 Source of Fin Year of Completion

1.

National Load Despatch Center Construction and Extension of Grid Substations including Transmission Line Facilities (Phase-1) Shunt Compensation at Grid Substations by Capacitor Banks Meghnaghat-Aminbazar 400 kV Transmission Line Three Transmission Line

ADB

2008 2009

2.

36.37

57.29

ADB and JBIC

3.

6.53

11.76

Expected from ADB Expected from ADB Expected from ADB

2008

4.

17.39

22.86

2009

5. Aminbazar-Old Airport 230 kV Transmission Line and Assiciated Substations SiddhirganjManiknagar 230 kV Transmission Line

22.40

28.21

2009

6.

52.99

70.26

Expected from ADB

2009

7.

28.63

35.0

2009

8. 9.

10.

11.

Bhola-Barishal 132 kV Transmission Line Aminbazar-Savar Kabirpur 132 kV Transmission Line Sylhet- Shahjibazar Brahmanbaria 230 kV Transmission Line with associated substation Raojan-MadunaghatShikalbaha 230 kV Transmission Line

13.51 5.00

16.89 7.00

Kuwait Fund (proposed)

2009 2008

26.50

40.0

2009

23.47

31.11

2010

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 48 of 54

Sl. No

Projects Name

12.

13.

14.

15.

Construction of 132/33 kV Substation at Cantonment and Associated U/G Cable Line Construction of 230/132 kV Substation at Shyampur, Bheramara and Sripur Chandraghona-RangamatiKhagrachari 132 kV Transmission Line Enhancement of Capacity of Grid Substations and Transmission Line (Phase-I)

Project Cost (ml US$) Local Foreign 9.00 14.00

Source of Fin

Year of Completion

2010

22.00

30.00

2010

10.00

13.20

2010

65.00

90.00

2012

C. Distribution (i) BPDB


Sl. No. Project Name Project Cost (ml US$) Local Foreign Source of Fin Year of Completion

1. 2.

3.

4. 5. 6. 7. 8. 9.

Renovation, Rehabilitation & Extension of 33/11 KV Sub-station 6 Town Power Distribution Project (Mymensing area) South Zone Power Distribution Project (12 Town Power Distribution Project) Pre-paid Metering project(phase-1) Emergency rehabilitation & expansion of urban area power distribution system. Installation of Capacitor Bank at 11 KV level. Electrification of Chittagong Hill tract area ph-3(Rev.) Electrification of Chittagong Hill tract project (KaptaiBilaichhari) (Revised.) Electrification works of Chittagong Hill Tracts

19.63 31.44

40.05 24.80 EDCF, Korea

2009 2010

590.30

100.61

Expected from WB

2012

23.54 99.29 6.98 6.94 1.89 44.43

51.60 ------

GOB GOB GOB GOB GOB GOB

2008 2008 2007 2009 2009 2009

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 49 of 54

(ii) DESA
Sl. No. No.. Projects Name Project Cost (ml US$) Local 1. Emergency Rehabilitation and Augmentation of 33/11 kV Sub-station Project New SS to meet existing and new demand including two 132/33 kV SS, five 33/11 kV SS and 132 and 33 kV O/H lines and U/G cables Upgrade transformers at Shyampur, Maghbazar and Maniknagar 132/33 kV SS to 50/75 MVA Upgradation of Shyampur BSCIC 11 kV Switching Station to a regular 33/11 kV Sub-station Extension and Rehabilitation of Distribution Network of DESA Procurement of Spare parts & Testing Equipments for SubTransmission and Distribution system of DESA Construction of 132/33 kV & 33/11 kV Substation at Adamjee Industrial Park Project Construction of 132/33 kV Switching Station at Siddhirganj Project 8.568 Foreign 7.010 Expected from ADB 2009 Source of Finance Year of Completion

2.

26.8

33.1

Expected from ADB

2010

3.

2.2

3.0

Expected from ADB

2008

4.

1.019

1.085

Expected from ADB Expected from ADB Expected from ADB

2008

5.

8.516

9.226

2008

6.

4.356

3.530

2008

7.

6.210

8.900

2008

8.

0.960

1.174

2007

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 50 of 54

(iii) DESCO
No. Projects Name Project Cost (ml US$) Local Foreign Source of Finance Year of Completion

1.

2.

3. 4.

Gulshan distribution system upgrade: 4 new 33/11 kV SS at Badda, Basundhara, DOHS Mahakhali and Zia Int Airport, rehab of 3 existing 33/11 kV SS at Kafrul, Uttara and ADA; 33 & 11 kV underground cables, 11 kV switchgears, 11 & 0.4 kV aerial conductors & O/H lines, 11/0.4 kV distribution transformers, voltage regulators etc. Mirpur distribution system upgrade: 2 new 33/11 kV SS at Baunia and Mirpur, rehab of existing Mirpur 33/11 kV SS; 33 & 11 kV underground cables, 11 kV switchgears, 11 & 0.4 kV aerial conductors & O/H lines, 11/0.4 kV distribution transformers, voltage regulators etc. Planning & Upgrading of Power Feeding and Distribution System Planning & Renovation of Distribution Network, Phase-I

21.8

42.0

Expected from ADB

2009

15.1

30.7

Expected from ADB

2008

27.21 6.76

39.48 14.57

2010 2011

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 51 of 54

(iv) WZPDCO
No. Projects Name Project Cost (ml US$) Local Foreign 43.12 Source of Fin Year of Completion

1.

Procurement and Installation of Electrical Equipment and Spares for the Distribution System Development Project

23.88

2009

(v) REB
No. Projects Name Project Cost (ml US$) Local Foreign 1.17 4.86 Source of Finance Year of Completion

1. 2.

Diffusion of Renewable Energy Technologies, 2nd Phase Construction of 33 kV Lines for PBS Substations Area Coverage Rural Electrification, Phase-VC Ten Lakh New Consumers Connections under Existing Distribution System Intensification & Expansion of Distribution System of 13 PBS Intensification & Expansion of Distribution System of 45 PBS Rural Electrification of Chittagong Hill Tracts Districts Diffusion of Renewable Energy Technologies, 3rd Phase

2007

41.42

3.32

2007

3.

97.44

40.79

2008

4.

41.49

14.72

DFID

2010

5.

184.58

58.29

2010

6.

204.27

144.29

2010

7.

6.24

4.62

2010

8.

31.28

36.00

2010

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 52 of 54

Status of Renewable Energy in Bangladesh


bevqb hvM Rvjvbx m` Dbqb Avgv`i cvkeZx `k fviZ, Pxb, bcvj, kxjsKvmn Dbqbkxj I DbZ `k evcK Kvh g MnY Kiv njI evsjv`k bevqbhvM Rvjvbx mn Sustainable Energy LvZ DjLhvM AMMwZ mvwaZ nqwb| G ch cvq 80,000 Solar Home System (SHS) hv cvq 4 gMvIqvUi mggvbi, Zv vcb mn AwZ mcwZ evq~ PvwjZ UvievBbi gvag 1.9 gMvIqvU we`yr Drcv`b K` vcb Kiv nqQ Ges wewQb fve 40,000 evqvgvm cvU vcb Kiv nqQ| evsjv`k bevqbhvM Rvjvbx nZ we`yr Drcv`bi eZgvb Aev Ges Future Prospect wbg `qv njv :Resources Present Status ( M W)
4.00 (80,000 SHS) 2.00 1.00 25.00

Future Prospect (2020) (MW)


300 1000 600 300

Solar Wind Bio-mas/Hydro Co-generation

Show details

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 53 of 54

Renewable Energy Kvh g evevqbi Rb Sustaible Eenrgy Development Agency (SEDA) bvg Trust MVbi Rb MnxZ c`cmg~n
miKvi we`yrLvZ weivRgvb we`yr msKUi vqx mgvavbi j bevqbhvM Rvjvbx nZ we`yr Drcv`b Ges we`yZi ` eenvi wbwZ Kibi c`c wnmve G ms v hveZxq Kvh g we`yr wefvMi AvIZvaxb GKwU c_K cwZvbi gvag evevqbi wbwg SEDA bvg GKwU c_K cwZvb mwi cqvRbxqZv Dcjw Ki Sustainable Energy Development Agency (SEDA) bvg Trust MVbi D`vM MnY KiQ| bevqbhvM Rvjvbx m` Dbqb Kvh g `Z mcmviY, G chyw eenvi RbMYK DrmvwnZKiY, emiKvix wewbqvM AvKKiYmn G LvZ A_vqb `vZv msvi wbfikxjZv ewi Rb cwjwm Abygv`bmn Riix wfwZ SEDA bvg cvweZ Trust MVbi Rb SEU KZK UNDP Gi mnvqZvq Lmov Deed of Trust cYqb c~eK Zv Abygv`bi Rb we`yr wefvM ciY Kiv nqQ, hv we`yr wefvM nZ fwUs Gi Rb AvBb gYvjq ciY Kiv nqQ| Uv MVbi Dk wbg `qv njv t
Rvjvbx mvkqmn bevqbhvM Rvjvbx UKbvjvwR Rbwcq I DrmvwnZKiY; cwiek `~lY wbqbKiY Ges bevqbhvM Rvjvbx evwYwRKfve mqi weK Rvjvbx wk wnmve Dbqb; Rvjvbx mvkqx Kvh g I bevqbhvM Rvjvbx Kvh gi Rb Capacity Buildup Kiv Ges bevqbhvM Rvjvbx Dbqb I mcmviY Kvh g DrmvwnZ (Promote) KiY; Millinium Development Goal (MDG), Poverty Reduction Strategy Paper (PRSP) Gi Dk evevqbi j Rvjvbx LvZK Drcv`b LvZi mv_ m Kiv Ges mviv `k mgw^Z fve Sustainable Energy Kvh g evevqb, mg^q, Z`viwKKiY; G LvZ ^, ga Ges `xN gqv`x Policy Ges Program cYqb I evevqb Ges Sustainable Energy Kvh g mwKZ wewfb Z_i Rb Kw`q fve GKwU WvUveR MVb; Sustainable Energy LvZi Technical know how/HRD welq `Zv ew Ges Sustainable Energy eenvi hcvwZ Standarised KiY; Sustainable Energy cK mbvKiY, evevqb I g~jvqb Ges evemZ R & D Kvh g cwiPvjbvKiY; Sustainable Energy LvZ miKvix I emiKvix wewbqvM AvKKiY Ges D`vv Ges RvZxq I Av RvwZK `vZv msv`i ga mg^q mvab; wekl/ Dc`v wbwZKiY BZvw`| msvmg~ni `Zv ew, jm nvmKiY, ` hcvwZ I MvnK cv ` appliance eenvi Ki jm nvmKiY|

we`yr LvZi weivRgvb msKUi vqx mgvavbi j SEDA Gi gvag bevqbhvM Rvjvbx nZ we`yr Drcv`b Ges we`yZi ` eenvi wbwZKiY Acwinvh nq `uvwoqQ| bevqbhvM Rvjvbx m` Dbqb Kvh g `Z mcmviY, RbMYK DrmvwnZKiY, emiKvix wewbqvM AvKKiY, Rvjvbx wbivcv ewi j evsjv`k bevqbhvM Rvjvbx m`i Dbqb gvbbxq cavbgx SEDA MVb Zivw^Z Kivi Rb c`c wbZ wb`k w`qQb| BZvgaB SEDA MVbi Rb bxwZMZ Abygv`b c`vb KiQb Ges Power Cell Gi gnvcwiPvjKK SEDA Gi AwZwi vwqZ c`vb c~eK w`K wb`kbv evevqbi j SEDA bvg Trust MVbi c`cmn Riix wfwZ Gi Kvh g i Kiv nqQ|

Prepared by: Engr. Abdur Rouf, Engr. KM Nayeem Khan, Eng. Shazibul Hoque.

Page 54 of 54