JOB :IMPROVEMENT/UPGRADATION OF GAYA-FATEHPUR-SIRDALLA-RAJAULI ROAD,SH-70,PKG-03

JOB No. :8719

DATE: 01.09.2011
DAILY PROGRESS REPORT FOR Sept-2011 (Amount in lacks)
Day to Day
Date
1-Sep-2011
2-Sep-2011
3-Sep-2011
4-Sep-2011
5-Sep-2011
6-Sep-2011
7-Sep-2011
8-Sep-2011
9-Sep-2011
10-Sep-2011
11-Sep-2011
12-Sep-2011
13-Sep-2011
14-Sep-2011
15-Sep-2011
16-Sep-2011
17-Sep-2011
18-Sep-2011
19-Sep-2011
20-Sep-2011
21-Sep-2011
22-Sep-2011
23-Sep-2011

Target (L)

Achieved

5.00
6.00
7.00
SUNDAY
11.00
12.00
12.00
16.00
18.00
20.00
SUNDAY
25.00
30.00
30.00
30.00
37.00
39.00
SUNDAY
44.00
48.00
48.00
48.00
52.00

3.00

24-Sep-2011

54.00

25-Sep-2011
26-Sep-2011

SUNDAY
55.00

27-Sep-2011
28-Sep-2011
29-Sep-2011
30-Sep-2011

56.00
56.00
56.00
57.00

872.00

3.00

Activities

Monthly Qty.

Unit

C
hectare

T .O.

C&G

Cum.
Target

Cum.
Achieved

Cum %
Achieved

5.00
11.00
18.00
18.00
29.00
41.00
41.00
57.00
75.00
95.00
95.00
120.00
150.00
150.00
180.00
217.00
256.00
256.00
300.00
348.00
348.00
396.00
448.00

3.00

60.00%

Daily
Expenses
(Planned)

Planned
Cum Daily
Expenses

4.59
5.51
6.43
SUNDAY
10.10
11.02
11.02
14.69
16.52
18.36
SUNDAY
22.95
27.54
27.54
27.54
33.97
35.80
SUNDAY

4.59
10.10
16.52
16.52
26.62
37.64
0.00
14.69
14.69
33.05
33.05
56.00
83.54
0.00
27.54
27.54
63.34
63.34
63.34
107.41
0.00
44.06
44.06

0.00
44.06
44.06
44.06
47.74

502.00
502.00

49.57
SUNDAY

557.00
613.00
613.00
613.00
613.00

0.00
51.41
51.41
51.41
52.33

Daily
cum
Achivement Achivement

EXP

709.61

Rate

Amount

F
29000.00

H.P upto 600dia


Flexible Pavement

93.64
93.64
145.04
0.00
51.41
51.41

2.75
Cum Amount

BxF

600-900 mm girth
900-1800 mm girth
>1800 mm girth

cum
cum

145.00
290.00

0
0

0
0
0
0

cum
Metre

290.00
435.00

0
0

0
0

Cum

145.00

each
each

650
1300

0
0
0

each
each

2900
3625

0
0

0
0

cum

100.00

0
0
0

cum

165.00

90.00
170.00

0
1714960

0
0

EARTHWORK
Excavation/shoulder cutting
Embankment from borrow area
Embankment from roadway Exc.

Cum Daily
Expenses

ExF
0

Cutting of Tree
300-600 mm girth

2.75

93.64

Dismantling of Structure
KM stone
concrete & Masonry
Masonry

Daily Expenses
(Actual)

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Sub-grade

10088

cum
cum

Compacting Ground

5000
5000

cum
Sqm

30.00
25.00

150000
125000

0
0

2168
5636

cum
cum

1100.00
1350.00

2384800
7608600

0
0
299700

0
0
275125

Primer coat

36666
86666
5616
4150

Sqm
Sqm
cum

25.00
10.00
7200.00

916650
866660
40435200

0
0
0

0
0

Tack coat
DBM
Bituminous concrete

cum
cum

8350.00
1603.00

34652500
0

0
0

cum

3207.00

cum
cum
cum
cum

110
210
1200
3950

110000

0
0
0

cum
cum
T
cum
cum
cum
metre
Nos
metre

5500
6500
69000
3500
1200
870
112
210
4900

420000
600000
592500
0
1430000
1035000
175000
180000
0
0
42000
1960000

0
0
0
0
0
0
0
0
0
0
0
0

metre
Each
cum
cum
Sq.m

3500
1400
3300
3100.00

0
140000
0
620000
60000

cum
cum
cum
cum
cum

110.00
4010.00
4450.00
69000.00

55000
401000
890000
1035000
0

1333

Sq.m
Sq.m
Nos
Nos

450.00
450.00
900.00
700.00

4.00
0.00

Month
Lm

39500.00
1500.00

225000
90000
51300
933100
0
158000
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

100057270

299700

275125

Turfing with sods

GRANULAR BASE COURSE AND SUB-BASE


GSB

WMM

222.00

222.00

BITUMEN

Dry Lean Cement Concrete


Cement Concrete Pavement
CULVERTS
Excavation

Backfilling behind abutment


Filter media
PCC grade M-15 in open foundation
PCC grade M-20 in Substructure
RCC/PSC in superstructure M-25 Grade
HYSD bar
Boulder apron laid in wire crates
Filter media
Pitching over filter media
20mm fibre board
Weep hole
NP-4 Pipe ( 1000mm dia )
RCC Railing of M-30 Grade
Drainage Spouts
Brick masonry work in sub structure
Brick masonry work in Foundation
Plastering

1000
2000
500
150
220
15
50
150

200
400
100
200
500

120

DRAINAGE
Excavation

500

P/L PCC M-15 for lined drain


P/L PCC M-20 for drain cover
HYSD

100
200
15

TRAFFIC SIGN MARKING & OTHER ROAD APPERTUNENCES

Road Marking
Painting lines,dashes
S/I of delineators
RCC M15 boundary pillars

500
200
57

MISCELLANEOUS
Vehicle supply
Laying 300 mm Dia NP4 pipe for Utility Ducts

Reasons for shortfall: