Project : Tang-city Mall - Tangerang Subject : Trane Proposal Evaluation Prepared by : NAI Indonesia Date : 21 September 2010 No.

Description Country of Origin Refrigerant Compressor Type Capacity (TR) Technical Specification CH-M01 - CH-M04 CH-CR01

R123/R134a Centrifugal 4 x 920

R123/R134a Centrifugal 1 x 494

Compressor Quantity per Unit Power Input (kW) Evaporator - Temperature Supply/Return(F/F) - Flow rate (gpm) - Max. Pressure Loss (Ft Wg) Condenser - Temperature Supply/Return(F/F) - Flow rate (gpm) - Max. Pressure Loss (Ft Wg) Effisiensi kW/TR (100% Beban) IPLV (100%, 75%, 50%, 25%) kW/TR Starter Type (Unit Mounted) Foulig Factor (Eva/Cond) Shock absorber DDC Panel and computer set Field service : Valves, sensors, flow meters and field wiring

1 552 44.0/54.0 2,209 30 86.0/95.0 2,873 30 Max. 0.600 Electronic soft starter 0.0001/0.00025 Spring Vibr. Mounting

1 297 44.0/54.0 1,186 30 86.0/95.0 1,543 30 Max. 0.600 Electronic soft starter Spring Vibr. Mounting

CH-M01 - CH-M04 USA R123 Centrifugal 4 x 920 CVHG-1100 1 483.3 44.0/54.0 2,197 14.42 86.0/95.0 2,854 22.44 0,525 0.559 Solid state 0.0001/0.00025 Include Exclude

Alt 1 CH-CR01 USA R123 Centrifugal 1 x 494 CVHG-565 1 266.3 44.0/54.0 1,180 11.29 86.0/95.0 1,538 25.46 0,539 0.576 Solid state 0.0001/0.00025 Include Exclude

Comments

CH-M01 - CH-M04 USA R123 Centrifugal 4 x 1060 CVHG-1100 1 592.0 42.8/55.08 2,060 13,90

Alt 2 CH-CR01 China R134a Screw 1 x 400 CRTHDE3G2G1 1 240.5 44.0/54.0 955.4 20.10

Comments

Comply Comply Comply

Comply Not Comply Not Comply

Comply Comply Comply Comply Comply Comply Comply Comply Comply Comply Comply Include Exclude

Comply Not Comply Not Comply Not Comply Comply Not Comply Not Comply Comply Comply Not Comply Comply Comply Include Exclude

89.6/98.9 86.0/95.0 3,170 1,256.7 53.1 kPa 19.00 0,558 0,601 0.593 0.665 Solid state Solid state 0.0001/0.00025 0.0001/0.00025 Include Exclude Include Exclude

Perhitungan IPLV Alt 1 US CVHG-1100 920 0.5250 0.3238 0.5235 0.74499 0.5720 0.5769 0.7635 0.14407 1.7898 0.559 1,096,000 CVHG-565 494 0.5390 0.3154 0.5465 0.7136322 0.5890 0.5603 0.7542 0.14584991 1.7352 0.576 Alt 2 US CVHG-1100 1060 0.5580 0.3047 0.551 0.707804 0.6135 0.5379 0.817 0.1346389 1.6850 0.593 1,000,000 CRTHD-E3 400 0.6010 0.2829 0.6115 0.637776 0.6760 0.4882 1.1485 0.095777 1.5046 0.665

EER 100% EER 75% EER 50% EER 25% Denominator IPLV

Propose for Plant Room & Air conditioning System Services: A) Value added services during DLP (Defect Liability Period) US 45,688 B) One year Service Agreement after DLP (Defect Liability Period) US 82,000 C) Total water treatment system proposal. US 76,800 Delivery time 8 weeks ex-factory time after receive Down Payment + 6 weeks for shipping and clearance time. Extended warranty for 2nd year and 3rd year (Extended warranty must tie up with service maintenance contract) Squence control : DDC Panel, exclude filed devices (valves, sensors, flow meters and field wiring)

Condition terms: - Chillers unit include for testing, commissioning, and start-up; fully refrigerant charge; unit mounted solid state starter, spring is ( vitaulic coupling are excluded ) and field insulation. - Standard warranty for parts only, for a period 12 months from the date of commissioning or 18 months from the date of shipm

solid state starter, spring isolator; vitaulic connection pipe

ths from the date of shipment, whichever is earlier.

Project : Tang-city Mall - Tangerang Subject : Trane Proposal Evaluation Prepared by : NAI Indonesia Date : 21 September 2010 No. Technical Specifications

01 - LCD Unit mounted control panel provided with soft-keys, adaptable with BAS without addition interface unit, all electronic switch and accessories required included in this panel, operating program shall be stored in non volatile memory (EPROM), min. 8 menu system, Evaporator, Condensor, Compressor, Oil sump, motor, set points, history, log-in, log-out and print. 02 - Chiller control panel wiring shall be factory assemble, c/w control fuse, 3 position selector switch (on, off,pump down), high & low pressure cut out, low chilled water temperature safety, low oil pressure protection for each refrigerant unit, recycling pump down circuit, low and high voltage control ground current protection, onoff switch, easy regulating multi stage solid state thermostat for supply and return chilled water. 03 - Squence Control Chiller included 04 - Compressor motor - hermetically, squirel cage, induction type motor rotation maximum 2,950 rpm, gear drive/direct drive 05 - Centrifugal compressor with variable inlet guide vanes at inlet suction 10% -100% modulating variable inlet guide vanes. Centrifugal compressor, semi hermetic, seal type (service able), provided with auto reversible oil pump, crankase heater, operating oil charge, suction & discharge stop valve and vibration isolator. 06 - Shell and tube evaporator provided with water box and nozzle with nozzle connection min. 150 Psig working pressure. 07 - Shell and tube condensor provided with water box and nozzle with grooved nozzle connection min. 150 Psig working pressure. 08

- Liquid refrigerant-cooled compressor motor provide with manual restart in case of thermal and pressure overload - Complete set of spring isolator provided with earthquake bumper - Shell evaporator shall be insulated by Elastomeric Nitrile rubber 1.5" thick, thermal conductivity 0.0374 W(m.K)at 20C

Chiller had been tested and prove with Test Performance Certificate accordance with ARI 550-92 before shipment.

Alternative 1 : CVHG-100 & CVHG - 565 Model : CVHG-1100, CVHG - 565 Country of Origin : USA Capacity : 920 TR, 494 TR & 1060 TR Scope of Supply - Unit mounted Solid State Starter

- Squence Control Chiller as optional price - Compressor motor - hermetically, sealed two-pole, low slip squirel cage, induction type - Guide vanes, fully modulating variable inlet guide vanes provided capacity control.

- Shell and tube evaporator and 150 Psig working pressure with vitaulic connection (Vitaulic Coupling are excluded) - Shell and tube condensor and 150 Psig working pressure with vitaulic connection (Vitaulic Coupling are excluded) - Two stage economizer is a series of interstage pressure chambers with utilized a multiple orifice system - Purge system, the pump out system consist of a pump out compressor, pump out solenoid valve and exhaust solenoid valve - Chiller controller, the microcomputer control panel is a factory installed and tasted on the centravac unit - Gas refrigerant-cooled compressor motor with advanced motor protection package - Complete set of spring isolator - A full charge of refrigerant (R-123) and oil - Field insulation - Include unit testing, commissioning and start-up - Standard warranty for parts only (consumable material are exclude) for a period 12 month from the date of commissioning or 18 month from the date of shipment whichever is come earlier.

- Extended warranty from 2nd year to 3rd year for whole parts & labor

Alternative 2 : CVHG-100 & CRTHD - E3G2G1 Model : CRTHD- E3G2G1 Country of Origin: China Capacity: 400 TR

Wye State Starter

- Semi-hermetic Helirotor, direct driven at 3,000 rpm - Continuous capacity control using slide valve in the rotor section of the compressor

- Shell and tube evaporator and 150 Psig working pressure with vitaulic connection - Shell and tube condensor and 150 Psig working pressure with vitaulic connection - Watercooled condensor with integral sub coller - Electronic expansion valve and liquid vapor separator - Oil separator and low-watt density oil heater - Under/over voltage protection - Factory mounted microprocessor-based control panel provides all necessary safety and operating control - Gas refrigerant-cooled compressor motor with advanced motor protection package - Complete set of isolator pad - Complete oil and R-134a charge

- Include unit testing, commissioning and start-up - Standard warranty for parts only (consumable material are exclude) for a period 12 month from the date of commissioning or 18 month from the date of shipment whichever is come earlier.

- Extended warranty from 2nd year to 3rd year for whole parts & labor

Estimated Energy Consumption for Chiller Combination of: Alternative 1 TRANE - CVHG - 1100 4 x 920 TR, 4 x 483.3 Kw Efficiency Hourly power Load Loading Chiller Time Capacity consumption (RT) (RT) (%) (kW/RT) (kW) Unit
9 10 11 12 13 14 15 16 17 18 19 20 21 1,200 2,200 3,000 3,200 3,275 3,332 3,340 3,300 3,275 3,200 2,900 2,500 1,700 2 3 4 4 4 4 4 4 4 4 4 3 2
920 920 920 920 920 920 920 920 920 920 920 920 920 65.2 79.7 81.5 87.0 89.0 90.5 90.8 89.7 89.0 87.0 78.8 90.6 92.4 0.535 0.522 0.521 0.521 0.520 0.520 0.520 0.520 0.520 0.521 0.522 0.520 0.521 642 1,148 1,563 1,667 1,703 1,733 1,737 1,716 1,703 1,667 1,514 1,300 886 18,979

Charge (Rp)
LWBP 800 513,600 918,720 1,250,400 1,333,760 1,362,400 1,386,112 1,389,440 1,372,800 1,362,400 2,000,640 1,816,560 1,560,000 1,062,840 10,889,632 17,329,672 6,440,040 WBP 1200

TOTAL Daily operation

Estimated Energy Consumption for Chiller Combination of: Alternative 2 TRANE - CVHG - 1100 4 x 1060 TR, 4 x 592 Kw Efficiency Hourly power Load Loading Chiller Time Capacity consumption (RT) (RT) (%) (kW/RT) (kW) Unit
9 10 11 12 13 14 15 16 17 18 19 20 21 1,200 2,200 3,000 3,200 3,275 3,332 3,340 3,300 3,275 3,200 2,900 2,500 1,700 2 3 4 4 4 4 4 4 4 4 4 3 2
920 920 920 920 920 920 920 920 920 920 920 920 65.2 79.7 81.5 87.0 89.0 90.5 90.8 89.7 89.0 87.0 78.8 90.6 0.567 0.548 0.547 0.545 0.547 0.548 0.548 0.546 0.547 0.545 0.548 0.548 0.549 680 1,206 1,641 1,744 1,791 1,826 1,830 1,802 1,791 1,744 1,589 1,370 933 19,948

Charge (Rp)
LWBP 800 544,320 964,480 1,312,800 1,395,200 1,433,140 1,460,749 1,464,256 1,441,440 1,433,140 2,092,800 1,907,040 1,644,000 11,449,525 18,213,325 1,119,960 6,763,800 WBP 1200

920 92.4 TOTAL Daily operation

Annual Energy Consumption for the Chiller Combination* Chiller Combination


Power Input Daily kWh Consumption Annual kWh Consumption Monthly Charge - Subscribe - Consumption Total monthly Annual Charge - Subscribe - Consumption Total annual 12 months x 365 days x 0 = 17,329,672 = = 0 IDR 6,325,330,280 IDR 6,325,330,280 IDR 12 month x 365 days x 0 = 18,213,325 = = 30days x 17,329,672 = = 0 IDR 519,890,160 IDR 519,890,160 IDR 30 days x = 18,213,325 = =

Alternative 1

Alternative 2

4 unit x 483.3 kW

= = =

1,933.2 kW 18,979 kWh 6,927,240 kWh

4 unit x 592 kW

= = =

Note: *) Beban Carrefour dan Chiller Carrefour tidak termasuk dalam perhitungan ini, karena Chiller carrefour merupakan sistem terpisah.

**) Beban Gold Gym yang mulai beroperasi dari jam 06.00 harus dipisah, karena chiller tidak direkomendasikan beroperasi di bawah beb

Alternative 2

Savings

2,368 19,948 7,281,168

kw kWh kWh

= = =

435 970 353,928

kw kWh kWh

0 546,399,744 546,399,744

IDR IDR IDR

= = =

0 26,509,584 26,509,584

IDR IDR IDR

0 6,647,863,552 6,647,863,552

IDR IDR IDR

= = =

0 322,533,272

IDR IDR 322,533,272 IDR

our merupakan sistem terpisah.

endasikan beroperasi di bawah beban 20%.