ESTRUCTURA DE PRESUPUESTO

PROYECTO: CONSTRUCCION DE ALCANTARILLAS : LOS ALAMOS - CAMPAMENTO NUEVA FUERBAMBA


UND

CANTIDAD

P.U.

SUB TOTAL

01.01.00 MOVILIZACION Y DESMOVILIZACION

GLB

1.00

1,943.98

1,943.98

01.02.0

GLB

1.00

6,146.78

6,146.78

02.01.00 TRAZO Y REPLANTEO

M2

961.38

5.37

5,158.67

02.02.00 EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS

M3

487.37

24.29

11,839.98

02.03.00 CAMA DE ARENA (0.10M DE ESPESOR)

M3

14.29

46.70

667.21

02.04.00 RELLENO COMPACTADO PARA ESTRUCTURAS

M3

305.24

39.88

12,172.34

02.05.01 ARMADO E INSTALACIONALCANTARILLA TMC D=0.90 ( 36")

ML

68.04

47.32

3,219.52

02.06.00 ENCOFRADO Y DESENCOFRADO CARAVISTA DE ESTRUCTURAS

M2

330.45

38.81

12,826.15

02.07.00 CONCRETO EN SOLADOS F'C= 100 KG/CM2

M3

3.38

193.53

653.67

02.08.00 CONCRETO SIMPLE F'C = 210 KG/CM2

M3

54.31

289.92

15,745.11

02.09.00 MAMPOSTERIA

M3

21.58

139.87

3,018.98

03.01.00 CUNETAS LONGITUDINALES NO REVESTIDAS

ML

6,000.00

0.74

4,423.70

03.02.00 ZANJAS DE CORONACION

ML

2,400.00

3.38

8,121.43

GLB

1.00

2,374.91

2,374.91

01.00.00 OBRAS PRELIMINARES

TRANSPORTE DE MATERIALES (FLETE)

02.00.00 CONSTRUCCION DE ALCANTARILLAS

03.00.00 CUNETAS

04.00.00 CONTROL SEGUIMIENTO DE SEGURIDAD


04.01.00 ACTIVIDADES HSEC

C.D.

COSTO DIRECTO

G.G.

88,312.42

GASTOS GENERALES (% C.D.)

42.61%

UTILIDAD (% C.D.)

10.00%

ST

SUB TOTAL(C.D.+G.G.+U)

IGV

IGV (19% ST)

25,606.57

TOTAL(ST+IGV)

160,377.99

TOTAL

NOTA:

37,627.77
8,831.24
134,771.42

EL ABASTECIMIENTO DEL MATERIAL AGREGADO PARA CONCRETO Y PIEDRA PARA EL EMBOQUILLADO ESTA A CARGO DEL CLIENTE PUESTA EN OBRA.
EL ABASTECIMIENTO DE LAS ALCANTARILLAS DE TMC DE d=36" ESTA A CARGO DEL CLIENTE.

ANALISIS DE PRECIOS UNITARIOS


Partida

1.01.00

Rendimiento

GLB/DIA

Cdigo

Descripcin Recurso

MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS


1.0000

EQ. 1.0000
Unidad

Costo unitario directo por : glb


Cuadrilla

1,943.98

Cantidad

Precio U$

Parcial U$

Mano de Obra
CAPATAZ

hh

8.000

13.56

108.47

PEON

hh

48.000

7.74

371.52
479.98

5.000

479.98

24.00

0.000
0.000
40.000
0.000
0.000

0.00
0.00
36.00
0.00
0.00

0.00
0.00
1,440.00
0.00
0.00
1,464.00

Costo unitario directo por : glb

6,146.78

Equipos
HERRAMIENTAS MANUALES

%MO

MOTONIVELADORA
RETROEXCAVADORA
CAMION UTILITARIOS DE DIESEL
CAMION CISTERNA DE 4500 GLN
MEZCLADORA DE CONCRETO DE 9 - 11 P3

hm
hm
hm
hm
m

Partida

1.02.00

Rendimiento

GLB/DIA

Cdigo

Descripcin Recurso

1.0000
1.0000
1.0000
1.0000
1.0000

TRANSPORTE DE MATERIALES (FLETE)


1.0000

EQ. 1.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

Mano de Obra
CAPATAZ

hh

16.000

13.56

216.94

OPERARIO

hh

32.000

11.87

379.88

PEON

hh

64.000

7.74

495.35
1,092.17

Equipos
HERRAMIENTAS MANUALES
CAMION PLATAFORMA DE 24 TN/ALCANTARILLAS

%MO
mes

5.000
0.000

1,092.17
0.00

54.61
0.00

CAMION PLATAFORMA DE 38TN/CEMENTO

viaje

2.000

2,500.00

5,000.00
5,054.61

Costo unitario directo por : m2

5.37

Partida

3.01.00

Rendimiento

M2/DIA

Cdigo

Descripcin Recurso

TRAZO Y REPLANTEO
120.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

Mano de Obra
TOPOGRAFO

HH

2.000

0.133

13.56

1.81

AYUDANTE DE CAMPO

HH

2.000

0.133

7.74

1.03
2.84

Materiales
CAL HIDRATADA

Kg

0.050

3.00

0.15

MADERA TORNILLO
PINTURA

p2
Gln

0.200
0.021

2.50
3.10

0.50
0.07

CLAVOS

Kg

0.010

0.90

0.01
0.72

Equipos
HERRAMIENTAS MANUALES
NIVEL OPTICO

%MO
hm

3.0000

5.000
0.200

2.84
3.50

0.14
0.70

ESTACION TOTAL

hm

3.0000

0.200

4.80

0.96
1.80

Costo unitario directo por : m3

24.29

Partida

3.02.00

Rendimiento

M3/DIA

Cdigo

Descripcin Recurso

EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS


15.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

Mano de Obra
CAPATAZ

hh

0.1000

0.053

13.56

0.72

PEON

hh

1.0000

0.533

7.74

4.13
4.85

%MO
hm

1.0000

5.000
0.533

4.85
36.00

0.24
19.20
19.44

Costo unitario directo por : m3

46.70

Equipos
HERRAMIENTAS MANUALES
RETROEXCAVADORA

Partida

3.03.00

Rendimiento

M3/DIA

Cdigo

Descripcin Recurso

CAMA DE ARENA (0.10M DE ESPESOR)


10.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$
1.08

Mano de Obra
CAPATAZ

hh

0.1000

0.080

13.56

OFICIAL

hh

1.0000

0.800

10.18

8.15

PEON

hh

2.0000

1.600

7.74

12.38
21.62

Materiales
MATERIAL SELECCIONADO

M3

1.000

24.00

24.00
24.00

%MO

5.000

21.62

1.08
1.08

Costo unitario directo por : m3

39.88

Equipos
HERRAMIENTAS MANUALES

Partida

3.04.00

Rendimiento

M3/DIA

Cdigo

Descripcin Recurso

RELLENO COMPACTADO PARA ESTRUCTURAS


15.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

Mano de Obra
CAPATAZ

hh

0.1000

0.053

13.56

0.72

OFICIAL

hh

1.0000

0.533

10.18

5.43

PEON

hh

2.0000

1.067

7.74

8.26
14.41

HERRAMIENTAS MANUALES
VIBROAPISONADORES

%MO
hm

2.0000

5.000
1.067

14.41
5.20

0.72
5.55

RETROEXCAVADORA

hm

1.0000

0.533

36.00

19.20
25.47

Costo unitario directo por : m3

47.32

Equipos

Partida

3.05.00

Rendimiento

ML/DIA

Cdigo

Descripcin Recurso

ARMADO E INSTALACIONALCANTARILLA TMC D=0.90 ( 36")


12.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

Mano de Obra
CAPATAZ

hh

0.2000

0.133

13.56

1.81

OPERARIO

hh

2.0000

1.333

11.87

15.83

OFICIAL

hh

1.0000

0.667

10.18

6.79

PEON

hh

4.0000

2.667

7.74

20.64
45.06

5.000

45.06

2.25
2.25

Costo unitario directo por : m3

38.81

Equipos
HERRAMIENTAS MANUALES

Partida

3.06.00

Rendimiento

M2/DIA

Cdigo

Descripcin Recurso

%MO

ENCOFRADO Y DESENCOFRADO CARAVISTA DE ESTRUCTURAS


12.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

Mano de Obra
CAPATAZ

hh

0.1000

0.067

13.56

0.90

OPERARIO

hh

1.0000

0.667

11.87

7.91

OFICIAL

hh

1.0000

0.667

10.18

6.79

PEON

hh

2.0000

1.333

7.74

10.32
25.93

Materiales
ALAMBRE NEGRO 08
CLAVOS
MADERA NACIONAL P/ENCOFRADO

Kg
Kg
P2

0.260
0.200
5.100

2.10
2.10
2.00

0.55
0.42
10.20

ADITIVO LAC PARA MADERA

Gln

0.050

8.50

0.43
11.59

%MO

5.000

25.93

1.30
1.30

Costo unitario directo por : m3

193.53

Equipos
HERRAMIENTAS MANUALES

Partida

3.08.00

Rendimiento

M3/DIA

Cdigo

Descripcin Recurso

CONCRETO EN SOLADOS F'C= 100 KG/CM2


15.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$
1.45

Mano de Obra
CAPATAZ

hh

0.2000

0.107

13.56

OPERARIO

hh

1.0000

0.533

11.87

6.33

OFICIAL

hh

2.0000

1.067

10.18

10.86

PEON

hh

10.0000

5.333

7.74

41.28
59.92

Materiales
PIEDRA DE RIO (*)
ARENA GRUESA SELECCIONADA DE RIO (*)

M3
M3

0.000
0.000

39.00
39.00

0.00
0.00

CEMENTO PORTLAND TIPO I


AGUA PARA MEZCLA
ADITIVO ACELERADOR ANTICONGELAN. ADIKRET ANTI FREEZ
ADITIVO ACELERANTE FRAGUA
ADITIVO ACELERANTE PLASTIFICANTE SIKACRETE
ADITIVO CURADOR ANTISOL

Bls
M3
Kg
Kg
Gln
Gln

7.000
0.030
1.000
0.500
0.200
0.900

9.90
5.00
4.50
12.00
9.80
23.00

69.30
0.15
4.50
6.00
1.96
20.70

102.61
Equipos
HERRAMIENTAS MANUALES
CISTERNA DE AGUA
VIBRADOR DE CONCRETO 4 HP 1.35"

%MO
hm
hm

MEZCLADORA DE CONCRETO TAMBOR 09 - 11 p3

hm

Partida

3.09.00

Rendimiento

M3/DIA

Cdigo

Descripcin Recurso

5.000
0.533
0.533

59.92
37.50
3.00

3.00
20.00
1.60

0.533

12.00

6.40
31.00

Costo unitario directo por : m3

289.92

1.0000
1.0000
1.0000

CONCRETO SIMPLE F'C = 210 KG/CM2


9.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

Mano de Obra
CAPATAZ

hh

0.5000

0.444

13.56

6.03

OPERARIO

hh

2.0000

1.778

11.87

21.10

OFICIAL

hh

2.0000

1.778

10.18

18.10

PEON

hh

10.0000

8.889

7.74

68.80
114.03

Materiales
PIEDRA DE RIO (*)
ARENA GRUESA SELECCIONADA DE RIO (*)
CEMENTO PORTLAND TIPO I
AGUA PARA MEZCLA
ADITIVO ACELERADOR ANTICONGELAN. ADIKRET ANTI FREEZ
ADITIVO ACELERANTE FRAGUA

M3
M3
Bls
M3
Kg
Kg

0.000
0.000
10.000
0.004
1.000
0.500

39.00
39.00
9.90
5.00
4.50
12.00

0.00
0.00
99.00
0.02
4.50
6.00

ADITIVO ACELERANTE PLASTIFICANTE SIKACRETE

Gln

0.200

9.80

1.96

ADITIVO CURADOR ANTISOL

Gln

0.900

23.00

20.70
132.18

Equipos
HERRAMIENTAS MANUALES
CISTERNA DE AGUA

%MO
hm

0.500

5.000
0.444

114.03
37.50

5.70
16.67

VIBRADOR DE CONCRETO 4 HP 1.35"


MEZCLADORA DE CONCRETO TAMBOR 09 - 11 p3

hm
hm

1.000
1.000

0.889
0.889

12.00
12.00

10.67
10.67
43.70

Costo unitario directo por : m3

139.87

Partida

3.10.00

Rendimiento

M3/DIA

Cdigo

Descripcin Recurso

MAMPOSTERIA
7.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

Mano de Obra
CAPATAZ

hh

0.1000

0.114

13.56

1.55

OFICIAL

hh

2.0000

2.286

10.18

23.28

PEON

hh

6.0000

6.857

7.74

53.07
77.90

Materiales
CONCRETO FABRICADO IN SITU
PIEDRA GRNDE > 8"

M3
M3

0.300
0.000

193.53
34.00

58.06
0.00

AGUA PARA MEZCLA

M3

0.003

5.00

0.02
58.07

%MO

5.000

77.90

3.90
3.90

Costo unitario directo por : ml

0.74

Equipos
HERRAMIENTAS MANUALES
Partida

4.01.00

Rendimiento

ML/DIA

Cdigo

Descripcin Recurso

CUNETAS LONGITUDINALES NO REVESTIDAS


1,500.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

Mano de Obra
CAPATAZ
OPERARIO
VIGIAS

hh
hh
hh

0.5000
1.0000
2.0000

0.003
0.005
0.011

13.56
11.87
7.74

0.04
0.06
0.08

PEON

hh

2.0000

0.011

7.74

0.08
0.26

%MO
hm
hm

0.5000
1.0000

5.000
0.003
0.005

0.26
37.50
67.40

0.01
0.10
0.36
0.47

Costo unitario directo por : glb

3.38

Equipos
HERRAMIENTAS MANUALES
CISTERNA DE AGUA
MOTONIVELADORA DE 125 HP

Partida

4.02.00

Rendimiento

ML/DIA

Cdigo

Descripcin Recurso

ZANJAS DE CORONACION
200.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

Mano de Obra
CAPATAZ

hh

0.5000

0.020

13.56

0.27

OPERARIO
PEON

hh
hh

1.0000
8.0000

0.040
0.320

11.87
7.74

0.47
2.48
3.22

5.000

3.22

0.16
0.16

Equipos
HERRAMIENTAS MANUALES

%MO

Partida

5.02.00

Rendimiento

GLB/DIA

ACTIVIDADES HSEC
1.0000

Costo unitario directo por : glb

2,374.91

Materiales
SEALIZACION DE VIA

Glb

880.000

880.00

880.00

MATERIAL DE CONTINGENCIA
MATERIALES SEGURIDAD

Glb
Glb

1
1

898.545
596.364

898.55
596.36

898.55
596.36
2,374.91

1
1
1
1

CAPATAZ
OPERARIOS
PEONES
OFICIALES
OPERADOR
MOTO
RASCA
cisterna agua
camionsito
VIGIAS
VIGILANTE

1
1
5
15
2
1
1
1
1
6
1

SUSTENTO ANALISIS DE GASTOS GENERALES


Item Descripcin
I

Cant. Und.

Duracin

Costo

Participacin

Parcial

GASTOS GENERALES VARIABLES


a) Personal de Limpieza

Limpieza
Leyes Sociales

Mes

0.5

300.00

100% $

150.00

49%

72.75

100% $

72.75

Mes

0.5

400.00

100% $

200.00

49%

97.00

100% $

97.00

Mes

0.5

$ 1,090.91

100% $

545.45

Mes

0.5

$ 1,090.91

100% $

545.45

Mes

0.5

100% $

363.64

Glb.

$ 15,000.00

15% $ 2,250.00

Glb.

$ 9,000.00

20% $ 1,800.00

Glb.

$ 4,000.00

25% $ 1,000.00

Mes

0.5

$ 3,450.00

100% $ 3,450.00

Mes

0.5

$ 3,177.27

100% $ 1,588.64

Mes

0.5

$ 1,039.50

100% $ 2,079.00

Mes

0.5

$ 2,618.18

100% $ 2,618.18

Mes

0.5

100% $

Mes

0.5

$ 1,687.08

100% $ 1,687.08

Mes

0.5

$ 1,579.28

100% $ 1,579.28

b) Personal de Apoyo

Guardianes en Obra.
Leyes Sociales

c) Oficinas y Talleres

Oficinas
Talleres y Almacenes
Campamentos Empleados

727.27

c) Gastos equip. de oficina en campo

Equipos de computo, mobiliario, etc.


Papelera, impresoras,toner, tintas, etc.
Equipos de de comunicacin
d) Equipos de Transporte ( incluye diesel )

Movilidades en Obra - Camionetas


Movilizacin del personal (Minu Bus de transporte interno)
Chofer de movilizaciones
Cisterna Combustible
e) Gastos de personal empleado

Alimentacin
Viticos
Equipo proteccion personal empleado
Equipo proteccion personal mantenimiento

872.73

g) Oficina Central
Gastos Oficina Central

10

Glb.

295.00

Glb.

329.00

50% $

164.50

Glb.

400.00

100% $

800.00

Glb.

$ 2,500.00

100% $ 2,500.00

Glb.

100% $

Mes

7/15

0.5

909.09

$ 40,000.00

222.75

297.00

1,454.54

5,050.00

7,117.64

6,757.27

5,848.59

2,000.00

872.73

f) Equipos de comunicacin y Otros

Radios de comunicacin (Motorola)


Detector de tormentas
Bao Quimico
Recoleccion y Disposicion de Residuos
Carpa para comedor (6 x 4m)

Total

50% $ 1,475.00

909.09

10% $ 2,000.00

SUSTENTO ANALISIS DE COSTOS DE SUPERVISIN

Item Descripcin

Cant.

Und.

Duracin

Costo

a) Personal Directivo
Ing. Residente de Obra

1.0

Mes

0.5

$ 3,636.36

100% $ 1,818.18

b) Seguridad y Medio Ambiente


Ing. De Seguridad y Medio ambiente

1.0

Mes

0.5

$ 2,545.45

100% $ 1,272.73

c) Oficina Tecnica
Control de Costos y Planeamiento

1.0

Mes

0.5

$ 1,818.18

100% $

909.09

d) Personal Administrativo y Auxiliar


Administrador
Almacen

1.0
1.0

Mes
Mes

0.5
0.5

$ 1,818.18
$ 900.00

100% $
100% $

909.09
450.00

e) Mantenimiento de Equipo y Maquinaria


Tecnico Mecnico
Ayudante - Mantenimiento

1.0
2.0

Mes
Mes

0.5
0.5

$
$

100% $
100% $

454.55
581.82

48.5%

f) Leyes Sociales
Leyes Sociales

909.09
581.82

$ 2,484.52

Participacin

Parcial

Total
$

1,818.18

1,272.73

909.09

1,359.09

1,036.36

2,484.52

100% $ 2,484.52
$ 8,879.97

8/15

ANALISIS DEL COSTO DE LA MANO DE OBRA

Sueldo bruto
Asig. Familiar
Cargas sociales
Alimentacin
Vivienda
Viaticos de descanso
EPP
Examenes medicos ingreso

Operador de Equipos Capataz Operario


2,200.00 2,800.00 2,300.00
60.00
60.00
60.00
1,096.10 1,387.10 1,144.60
900.00
900.00
900.00
400.00
400.00
400.00
250.00
250.00
250.00
111.98
168.71
168.71
0.00
0.00
0.00

Oficial
1,800.00
60.00
902.10
900.00
400.00
250.00
168.71
0.00

Obrero
1,150.00
60.00
586.85
900.00
300.00
168.71
240.00

Vigias
Guardian Conductores
1,150.00 1,150.00 1,600.00
60.00
60.00
60.00
586.85
586.85
805.10
900.00
900.00
900.00
300.00
300.00
400.00
200.00
168.71
168.71
111.98
240.00
240.00
0.00

Costo mensual en S/.

5,018.08

5,965.81

5,223.31

4,480.81

3,405.56

3,405.56

3,405.56

4,077.08

Costo mensual en US$

1,824.75

2,169.38

1,899.38

1,629.38

1,238.38

1,238.38

1,238.38

1,482.57

20.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00

Costo x da

91.24

108.47

94.97

81.47

61.92

61.92

61.92

74.13

Costo x hora (US$)

11.40

13.56

11.87

10.18

7.74

7.74

7.74

9.27

Nro. de dias que permacen en obra

NOTA:

Se esta considerando un porcentaje de insidencia de un 50% a los EPPs


solo en el personal se la Zona se esta considerando el examen medico por ser requisito solicitarlo a RRCC

Anexo 8
COSTO DE LOS EPP DE OPERADORES

Construccin de Plataformas para la Instalacin del Camapamento Pumamarca


Item

Descripcin

1
CASCO
2
BARBIQUEJO
3
LENTES CLAROS
4
LENTES OSCUROS
5
TAPONES AUDITIVOS (no incluye orejeras)
6
UNIFORMES DRILL COMPLETOS PANTALON Y CAMISAS
7
ZAPATO SEGURIDAD (punta de acero)
8
GUANTES DE BADANA
9
CAPOTINES
10
CORTAVIENTOS
11
CHOMPA JORGE CHAVEZ
12
CHALECOS
13
BLOQUEADOR SOLAR
TOTAL DEL COSTO DE LOS EPPs DE LOS OPERADORES

Costo
Unitario
(S/.)
32.14
4.00
22.00
22.00
2.54
75.39
54.00
13.23
28.00
13.29
25.00
35.00
1.00

Vida Util
(meses)
2.00
2.00
1.00
1.00
0.50
2.00
2.00
0.50
2.00
2.00
2.00
2.00
0.07

Importe
Mensual x
trabajador
16.07
2.00
22.00
22.00
5.08
37.70
27.00
26.46
14.00
6.65
12.50
17.50
15.00
223.95

COSTO DE LOS EPP DEL PERSONAL DE PISO


Item

Descripcin

1
CASCO
2
BARBIQUEJO
3
LENTES CLAROS
4
LENTES OSCUROS
5
TAPONES AUDITIVOS (no incluye orejeras)
6
OREJERAS
7
RESPIRADOR MEDIA CARA
8
FILTRO POLVO 3M
9
UNIFORMES DRILL COMPLETOS PANTALON Y CAMISAS
10
ZAPATO SEGURIDAD (punta de acero)
11
BOTA JEBE
12
GUANTES DE CUERO
13
CAPOTINES
14
CORTAVIENTOS
15
CHALECOS
16
BLOQUEADOR SOLAR
TOTAL DEL COSTO DE LOS EPPs DEL PERSONAL DE PISO

Costo
Unitario
(S/.)
32.14
4.00
22.00
22.00
2.54
37.00
59.91
22.67
75.39
54.00
49.00
13.23
28.00
13.29
35.00
1.00

Vida Util
(meses)
2.00
2.00
1.00
1.00
0.50
2.00
2.00
0.33
2.00
2.00
2.00
0.50
2.00
2.00
2.00
0.07

Importe
Mensual x
trabajador
16.07
2.00
22.00
22.00
5.08
18.50
29.96
68.01
37.70
27.00
24.50
26.46
14.00
6.65
17.50
15.00
337.42

COSTO DE LOS EPP DEL PERSONAL MANTENIMIENTO


|

Descripcin

1
2
3
4
5
6
7
8
9
10

CASCO
BARBIQUEJO
LENTES CLAROS
LENTES OSCUROS
TAPONES AUDITIVOS (no incluye orejeras)
OREJERAS
RESPIRADOR MEDIA CARA
FILTRO PARA VAPORES ORGANICOS
UNIFORMES DRILL COMPLETOS PANTALON Y CAMISAS
ZAPATO SEGURIDAD (punta de acero)

Costo
Unitario
(S/.)
32.14
4.00
22.00
22.00
2.54
37.00
59.91
25.00
75.39
54.00

Vida Util
(meses)
2.00
2.00
1.00
1.00
0.50
2.00
2.00
0.33
2.00
2.00

Importe
Mensual x
trabajador
16.07
2.00
22.00
22.00
5.08
18.50
29.96
75.00
37.70
27.00

11
GUANTES DE NEOPRENO
12
GUANTES DE CUERO
13
CAPOTINES
14
CORTAVIENTOS
15
TRAJE TIBEK
16
CHALECOS
17
BLOQUEADOR SOLAR
18
COLIRIO PARA OJOS
TOTAL DEL COSTO DE LOS EPPs DEL PERSONAL DE PISO

28.26
13.23
28.00
13.29
15.00
35.00
1.00
5.00

0.50
0.50
2.00
2.00
0.10
2.00
0.07
1.00

56.52
26.46
14.00
6.65
150.00
17.50
15.00
5.00
526.43

ANLISIS DE COSTOS DE SEGURIDAD


Item

Descripcin

Cant.

Und.

Costo
US$

Duracin

Participacin

Parcial
US$

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

$ 60.00
$ 30.00
$ 100.00
$ 60.00
$ 60.00
$ 30.00
$ 30.00
$ 240.00
$ 120.00
$ 30.00
$ 30.00
$ 30.00
$ 60.00

SEALIZACION DE VIA
USO OBLIGATORIO DE EPPs

USO DE BASURERO

HOMBRES TRABAJANDO

PELIGRO EQUIPOS EN MOVIMIENTO

SEALES DE PARE

DESVIO A LA DERECHA

DESVIO A LA IZQUIERDA

PALETAS PARE PASE

REDUZCA LA VELOCIDAD

PASO RESTRINGIDO

EXTINTOR

BOTIQUIN

KIT ANTIDERRAME

$
$
$
$
$
$
$
$
$
$
$
$
$

und
und
und
und
und
und
und
und
und
und
und
und
und

30.00
30.00
50.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00

TOTAL DEL COSTO POR SEALIZACION DE VIA

Item

Descripcin
II

$ 880.00

Cant.

Und.

Costo
US$

Duracin

Participacin

Parcial
US$

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

$ 127.27
$ 254.55
$ 120.00
$ 100.00
$ 78.55
$ 218.18

MATERIALES - CONTINGENCIA
PANOS ABSORVENTES

50

SALCHICHAS

10

BANDEJAS DE CONTINGENCIA para equipos

GEOMEMBRANA

20

PANOS INDUSTRIALES

12

CONO SEGURIDAD

10

$
$
$
$
$
$

und
und
und
mt
kg
und

2.55
25.45
20.00
5.00
6.55
21.82

TOTAL DEL COSTO POR MATERIALES DE CONTINGENCIA

Item

Descripcin
III

Total
US$
$ 880.00

$ 898.55

Cant.

Und.

Duracin
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

Costo
US$

Participacin

Parcial
US$

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

$ 72.73
$ 21.82
$ 29.09
$ 72.73
$ 36.36
$ 36.36
$ 18.18
$ 18.18
$ 163.64
$ 18.18
$ 18.18
$ 18.18
$ 18.18
$ 18.18
$ 18.18
$ 18.18

MATERIALES - SEGURIDAD
SOGAS

20

metros

EXTINTOR DE 9 Kg

unidad

TABLILLAS

unidad

BOTIQUIN PRIMIEROS AUXILIOS

unidad

PORTA EXTINTOR

unidad

PORTA HERRAMIENTAS

unidad

CINTA ROJA

50

metros

CINTA AMARILLA

50

Metros

CINTAS REFLECTIVAS

30

metros

CONTENEDORES RESIDUOS VERDE

unidad

CONTENEDORES RESIDUOS ROJO

unidad

CONTENEDORES RESIDUOS AZUL

unidad

CONTENEDOR RESIDUOS AMARILLO

unidad

CONTENEDORES RESIDUOS NEGROS

unidad

CONTENEDEDORES RESIDUOS BLANCO

unidad

CONTENEDORES RESIDUOS MARRON

unidad

TOTAL DEL COSTO POR MATERIALES DE SEGURIDAD

Total
US$
$ 898.55

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

3.64
21.82
7.27
36.36
36.36
36.36
0.36
0.36
5.45
18.18
18.18
18.18
18.18
18.18
18.18
18.18

Total
US$
$ 596.36

$ 596.36

PLANILLA DE METRADOS
TRAZO Y REPLANTEO (36" )
DESCRIPCION

N ELEMETOS

N VECES

(a)

(b)

Caja Receptora
Zanja para Tubera TMC de 48"
Cabezal de Descarga
Eje de Quebrada

1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00

ANCHO
(m)
(c)
2.60
2.50
3.20
10.00

LARGO
(m)
(d)
2.80
9.72
1.80
10.00

TRAZO Y REPLANTEO (36" )

ALTO
(m)
.(e)

PESO UNIT.
(Kg/m)
(f)

137.34 (m2)

AREA
VOLUMEN
(m)
(m)
(g=a x b x ) (h= a*b*c*d*e)
7.28
24.30
5.76
100.00

PESO
(Kg)
(i=a*b*d*f)

PARCIAL
(m2)
(j)
7.28
24.30
5.76
100.00

(Promedio por Alcantarilla)

EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS ALC 36"


DESCRIPCION

N ELEMETOS

N VECES

(a)

(b)

Caja Receptora
Zanja para Tubera TMC de 36"
Alero

1.00
1.00
1.00

1.00
1.00
1.00

ANCHO
(m)
(c)
2.90
2.20
4.22

EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS ALC 36"

LARGO
(m)
(d)
2.90
9.72
1.71

ALTO
(m)
.(e)
1.90
1.80
2.10

69.62

PESO UNIT.
(Kg/m)
(f)

(m3)

AREA
VOLUMEN
(m)
(m)
(g=a x b x ) (h= a*b*c*d*e)
15.98
38.49
15.15

PESO
(Kg)
(i=a*b*d*f)

PARCIAL
(m3)
(j)
15.98
38.49
15.15

(Promedio por Alcantarilla)

CAMA DE ARENA 36"


DESCRIPCION

N ELEMETOS

N VECES

(a)

(b)

Zanja para Tubera TMC de 36"

1.00

1.00

ANCHO
(m)
(c)
2.10

CAMA DE ARENA 36"

LARGO
(m)
(d)
9.72

ALTO
(m)
.(e)
0.10

2.04

PESO UNIT.
(Kg/m)
(f)

(m3)

AREA
VOLUMEN
(m)
(m)
(g=a x b x ) (h= a*b*c*d*e)
2.04

PESO
(Kg)
(i=a*b*d*f)

PARCIAL
(m3)
(j)
2.04

(Promedio por Alcantarilla)

RELLENO COMPACTADO PARA ESTRUCTURAS 36"


DESCRIPCION

N ELEMETOS

N VECES

(a)

(b)

Caja Receptora
Zanja para Tubera TMC de 36"
Cabezal tipo Alero
Tubera TMC de 36"

1.00
1.00
1.00
-1.00

1.00
1.00
1.00
1.00

ANCHO
(m)
(c)
0.50
2.20
0.30
0.90

RELLENO COMPACTADO PARA ESTRUCTURAS 36"

LARGO
(m)
(d)
9.60
9.72
4.22
9.72

ALTO
(m)
.(e)
1.80
1.80
2.10

43.61

PESO UNIT.
(Kg/m)
(f)

(m3)

AREA
VOLUMEN
(m)
(m)
(g=a x b x ) (h= a*b*c*d*e)
8.64
38.49
2.66
-6.18

PESO
(Kg)
(i=a*b*d*f)

PARCIAL
(m3)
(j)
8.64
38.49
2.66
-6.18

(Promedio por Alcantarilla)

ARMADO DE ALCANTARILLAS TMC 36"


DESCRIPCION

Tubera TMC de 48"

N ELEMETOS

N VECES

(a)

(b)
1.00

1.00

ANCHO
(m)
(c)

LARGO
(m)
(d)
9.72

ALTO
(m)
.(e)

PESO UNIT.
(Kg/m)
(f)

AREA
VOLUMEN
(m)
(m)
(g=a x b x ) (h= a*b*c*d*e)

PESO
(Kg)
(i=a*b*d*f)

PARCIAL
(m)
(j)
9.72

ARMADO DE ALCANTARILLAS TMC 36"

9.72 (m)

(Promedio por Alcantarilla)

ENCOFRADO Y DESENCOFRADO 36"


DESCRIPCION

N ELEMETOS

N VECES

(a)

(b)

Losa Caja receptora


Encofrado Interior Caja Receptora
Encofrado Exterior Caja Receptora
Tuberia TMC 36"
Losa en Cabezal de Salida tipo Alero Int.
Muro Perpendicular Salida Tipo Alero Int.
Muro Perpendicular Salida Tipo Alero Ext.
Tuberia TMC 36"
Muros Tipo Alero Int.
Muros Tipo Alero Ext.
Tapas en Extremos

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
-4.00
1.00
1.00
1.00
-2.00
2.00
2.00
2.00

ANCHO
(m)
(c)
1.90

ENCOFRADO Y DESENCOFRADO 36"

LARGO
(m)
(d)
1.90
5.60
7.60

ALTO
(m)
.(e)
0.40
1.70
1.70

9.11
1.30
1.70

0.40
1.90
1.90

1.60
1.60
0.30

1.20
1.20
0.70

47.21

PESO UNIT.
(Kg/m)
(f)

(m2)

AREA
VOLUMEN
(m)
(m)
(g=a x b x ) (h= a*b*c*d*e)
3.04
9.52
12.92
0.64
3.64
2.47
3.23
0.64
3.84
3.84
0.42

PESO
(Kg)
(i=a*b*d*f)

PARCIAL
(m2)
(j)
3.04
9.52
12.92
-2.54
3.64
2.47
3.23
-1.27
7.68
7.68
0.84

(Promedio por Alcantarilla)

ACERO DE REFUERZO 36"


DESCRIPCION

N ELEMETOS

N VECES

(a)

(b)

Muros Paralelos Caja Receptora Vert.


Muros Paralelos Caja Receptora Horiz.
Muros Perpendiculares Caja Receptora Vert.
Muros Perpendiculares Caja Receptora Horiz.
Muros Tipo Alero Vert.
Muros Tipo Alero Horiz.

1.00
1.00
1.00
1.00
1.00
1.00

ANCHO
(m)
(c)

7.00
2.00
4.00
2.00
8.00
2.00

ACERO DE REFUERZO 36"

LARGO
(m)
(d)
1.20
2.20
1.20
2.20
1.20
2.00

ALTO
(m)
.(e)

29.45

PESO UNIT.
AREA
VOLUMEN
(Kg/m)
(m)
(m)
(f)
(g=a x b x ) (h= a*b*c*d*e)
0.99
0.30
0.99
0.99
0.99
0.30
(Kg)

PESO
PARCIAL
(Kg)
(Kg)
(i=a*b*d*f)
(j)
8.32
8.32
1.32
1.32
4.75
4.75
4.36
4.36
9.50
9.50
1.20
1.20

(Promedio por Alcantarilla)

CONCRETO EN SOLADOS F'C= 100 KG/CM2 36"


DESCRIPCION

Losa Caja receptora


Losa en Cabezal de Salida tipo Alero Trapezo.

N ELEMETOS

N VECES

(a)

(b)
1.00
1.00

CONCRETO EN SOLADOS F'C= 100 KG/CM2 36"

1.00
1.00

ANCHO
(m)
(c)
2.30
2.55

LARGO
(m)
(d)
2.30
1.71
0.48

ALTO
(m)
.(e)
0.05
0.05

PESO UNIT.
(Kg/m)
(f)

(m3)

AREA
VOLUMEN
(m)
(m)
(g=a x b x ) (h= a*b*c*d*e)
0.26
0.22

PESO
(Kg)
(i=a*b*d*f)

(Promedio por Alcantarilla)

PARCIAL
(m3)
(j)
0.26
0.22

CONCRETO FC=210 Kg/cm2 36"


DESCRIPCION

N ELEMETOS

N VECES

(a)

(b)

Losa Caja receptora


Ua Perimetral en Losa Caja Receptora
Muros Paralelos Caja Receptora
Muros Perpendiculares Caja Receptora
Tuberia TMC 36"
Losa en Cabezal de Salida tipo Alero Trapezo.
Ua Perimetral en Losa Salida Tipo Alero
Muro Perpendicular Salida Tipo Alero
Muros Tipo Alero

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
2.00
2.00
-2.00
1.00
1.00
1.00
2.00

ANCHO
(m)
(c)
1.90
0.30
0.30
0.30
2.55
0.30
0.30

CONCRETO FC=210 Kg/cm2 36"

LARGO
(m)
(d)
1.90
6.00
1.90
1.20

ALTO
(m)
.(e)
0.25

1.45
5.13
1.71
1.59

0.25

PESO UNIT.
(Kg/m)
(f)

1.70
1.95

1.90
1.40

7.76

(m3)

AREA
VOLUMEN
(m)
(m)
(g=a x b x ) (h= a*b*c*d*e)
0.90
0.05
0.32
1.94
1.40
0.64
-0.38
0.92
0.07
0.35
0.97
1.34

PESO
(Kg)
(i=a*b*d*f)

PARCIAL
(m3)
(j)
0.90
0.32
1.94
1.40
-0.38
0.92
0.35
0.97
1.34

(Promedio por Alcantarilla)

MAMPOSTERIA (Emboquillado)
DESCRIPCION

N ELEMETOS

N VECES

(a)

(b)

Losa de Entrada
Parapeto laterales
Diente de Anclaje
Losa de Salida
Parapeto laterales
Uas paralelas
Diente de Anclaje

1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
2.00
1.00
1.00
2.00
2.00
1.00

MAMPOSTERIA (Emboquillado)

PARTIDA
UNIDAD
TRAZO Y REPLANTEO
m2
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3
CAMA DE ARENA
m3
RELLENO COMPACTADO PARA ESTRUCTURAS
m3
ALCANTARILLA TMC 36"
m
ALCANTARILLA TMC 48"
m
ENCOFRADO Y DESENCOFRADO
m2
ACERO DE REFUERZO f`y=4200 Kg/cm2
Kg.
CONCRETO EN SOLADOS fc=100 Kg/cm2
m3
CONCRETO fc=210 Kg/cm2
m3
MAMPOSTERIA (EMBOQUILLADO)
m3

ANCHO
(m)
(c)
1.90
0.20
0.30
3.43
0.20
0.30
0.30

LARGO
(m)
(d)
2.00
1.90
2.00
3.00
3.00
3.42
3.42
3.08

MET x ALC 36"

137.34
69.62
2.04
43.61
9.72
47.21
29.45
0.48
7.76
3.08

7 de 36"

961.38
487.37
14.29
305.24
68.04
0.00
330.45
206.14
3.38
54.31
21.58

ALTO
(m)
.(e)
0.15
0.35
0.60
0.15
0.35
0.45
0.80

PESO UNIT.
(Kg/m)
(f)

(m3)

AREA
VOLUMEN
(m)
(m)
(g=a x b x ) (h= a*b*c*d*e)
0.57
0.14
0.18
1.54
0.14
0.27
0.24

PESO
(Kg)
(i=a*b*d*f)

(Promedio por Alcantarilla)

MET. TOTAL

961.38
487.37
14.29
305.24
68.04
0.00
330.45
206.14
3.38
54.31
21.58

PARCIAL
(m3)
(j)
0.57
0.14
0.18
1.54
0.14
0.27
0.24