Você está na página 1de 37

SP 2040

ENVIRONMENTAL RESTORATION UPGRADING PRESERVATION

The Team
Prof. Mario Thadeu Leme de Barros coord. Prof. Jos Goldemberg Profa. Monica F A Porto Profa. Maria Cecilia Loschiavo dos Santos Dr. Oswaldo Lucon Dr. Marco Antonio Palermo

MAIN ISSUES
Urban water Green areas/ spaces/ biodiversity Air quality Solid waste Noise control Greenhouse gases emission

CHALLENGES/DIFFICULTIES
SO PAULO in the context of the Upper Tiet River Basin Environmental issues is a multisector problem; strongly dependent on land use enforcement/ sanitation/ transportation Environmental issues are strongly dependent on integrated institutional management; many issues are not within PMSP responsibility

MRSP ALTO TIET BASIN


FRANCISCO MORATO FRANCO DA ROCHA CAJAMAR PIRAPORA DO BOM JESUS CAIEIRAS MAIRIPOR

SANTANA DE PARNABA

GUARULHOS

ITAQUAQUECETUBA

BARUERI BARUERI

PO PO FERRAZ DE FERRAZ DE VASCONCELOS VASCONCELOS SUZANO MOGI MOGI DAS CRUZES DAS CRUZES SALESPOLIS

ITAPEVI ITAPEVI

JANDIRA

BIRITIBA-MIRIM BIRITIBA-MIRIM

MAU DIADEMA DIADEMA SANTO ANDR RIBEIRO PIRES

SO BERNARDO DO CAMPO

RIO GRANDE DA SERRA

CONVENES

Cu rso d'gu a, reservatrio


Limite da Bacia do Alto Tiet

Divisa mu nicipal
Sede de Municpio

4 3 2 1

10

15 km

FONTES: ELABORAO:
Banco de Dados Espaciais da Bacia do Alto Tiet - Instituto de Geocincias da USP Laboratrio de Informtica Geolgica - LIG, 1999. CPRM IPT

ESCALA GRFICA Projeo Universal Transversa de Mercator

Instituto de Geocincias da USP - Laboratrio de Informtica Geolgica - LIG.

Figura 10 Mancha urbana na Bacia do Alto Tiet

MRSP ALTO TIET BASIN

MRSP ALTO TIET BASIN

URBAN WATER
Flood control Water quality restoration and pollution control Water conservation Protection of water sources

FLOOD CONTROL

SP, jan 2011

SP, jan 2011

SP, jan 2011

SP, jan 2011

SP, jan 2011

SP, jan 2011

SP, jan 2011

SP, jan 2011

SP, jan 2011

SP, jan 2011

SP, jan 2011

SP, jan 2011

SP, jan 2011

Floods at Tiete Banks


Solid Waste

Riparian Slums and Floods Flash Floods

PROPOSITIONS
Integrated planning at basin level; Upgrade urban drainage infrastructure to progressively gain 100-year protection; Resettlement of the population established in flood risk areas; Recovery and preservation of permanent river protection areas in the city, with special attention to the implementation of linear parks; Implementation of measures for the increase of infiltration areas; Implementation of structural measures (retention/detention); LANDSCAPE DESIGN Improve resilience, adaptation measures

Water quality restoration and pollution control

Water Quality
Rio Tiet 12 10

OD (mg/L)

8 6 4 2 0

Severe organic pollution!

400 ptos de amostragem

DBO (mg/L)

Dissolved Oxygen Profile: Headwaters to Downstream So Paulo 300 250 (2001-2007 data) 200
150

350

This period shows a 40% reduction in BOD concentration! (1978-2000) vs. (2001-2007)

100
50 0 Projeto Tiet: U$1.6 billion invested, U$ 3 ptos de amostragem billion more in 15 years Oxygen Biochemical (IDB) Demand Profile

04 90 0 TI PI 04 90 TI 0 R G 02 90 0 TI ET 02 35 0 TI ET 02 40 0 TI ET 02 45 0

02 05 0

02 09 0

03 12 0

04 15 0

04 17 0

04 18 0

04 20 0

Rio Tiet

TI ET

TI ET

TI ET

TI ET

TI ET

TI ET

TI ET

TI ES

PROPOSITIONS
To incorporate rivers and water bodies as an important landscape element Negotiate/Demand wastewater collection and treatment ( So Paulo + metropolitan region) Control illicit connections between sewage and drainage system Increase protection (vegetation) along river margins Control non-point sources; structural and non-structural measures

Water conservation

Current situation: why conservation?


So Paulo is facing water scarcity; Currently 5 water production systems are in operation to supply the metropolitan region; 70 m3/s The system will need an expansion in the near future to face population increase and risk reduction The next source is very difficult to find; conflict with neighboring basins

PROPOSITIONS
Negotiate/ Demand control of losses in distribution systems; Changes in construction codes; Incentives for intelligent/ green buildings; Incentives for water saving kitchen/ bathroom fixtures, appliances; Incentives for water reuse/ rain harvesting systems

Protection of water sources

PROPOSITIONS
Enforcement of land use control Urban requalification in illegal settlements Restoration of riparian vegetation

GREEN AREAS/ SPACES


CURRENT SITUATION
. 10 m2/ inhab.

. No parks in 53 of the 96 subdistricts of the city

Increase in new open/green spaces; to guarantee that there are parks and squares in the city of So Paulo within a 15-minute walk, at the maximum, from each residence; The target should be 50 m2/ inhab. of green area Creation of a fund for conserving natural landscape, cultural and historical sites

AIR QUALITY
CURRENT SITUATION
. Particulate

matter, ozone, NOx, volatile organic components in frequent standard violations . Traffic is the predominant cause . Diesel of poor quality . Legislation must be updated

Increase the use of renewable fuels; Better diesel quality; Update legislation for vehicles and air quality standards; Strongly dependent on improvements in traffic and mobility; Green buildings to reduce heat spots

SOLID WASTE
CURRENT SITUATION
. 17,000 tons/day . The entire area of the city is serviced with collection, but collection is difficult in illegal settlements . Low recycling levels

. Destination is sanitary landfills .

Reuse and recycling of waste in its full technological potential; Strict control of sediment production in construction sites and erosion; Promotion of special conditions for the composting of organic waste. Incineration of part of the MSW for power generation and the disposal of ash into controlled landfills.