INFORMACIÓN CONTRATO 22-11-20 29-11-20 06-12-20 13-12-20 20-12-20 27-12-20 03-01-21 10-01-21 17-01-21 24-01-21 31-01-21 07-02-21 14-02-21 21-02-21 28-02-21 07-03-21 14-03-21 21-03-21 28-03-21 04-04-21 11-04-21 18-04-21 25-04-21 02-05-21 09-05-21 16-05-21 23-05-21 30-05-21 06-06-21 13-06-21 20-06-21 27-06-21 04-07-21 11-07-21 18-07-21 25-07-21 01-08-21 08-08-21 15-08-21 22-08-21 29-08-21 05-09-21 12-09-21 19-09-21 26-09-21 03-10-21 10-10-21 17-10-21 24-10-21 31-10-21 07-11-21 14-11-21 21-11-21 28-11-21 05-12-21 12-12-21 19-12-21 26-12-21 02-01-22 09-01-22 16-01-22 23-01-22 30-01-22
MONTO UF 998,803.97 % COSTO PROGRAMADO ACUM. 0.00% 0.00% 0.04% 0.13% 0.58% 1.25% 2.14% 2.68% 4.55% 6.15% 7.30% 8.86% 9.98% 26.30% 26.91% 28.10% 32.76% 34.06% 35.54% 36.24% 42.62% 44.31% 48.32% 51.42% 52.84% 54.04% 67.97% 69.35% 79.50% 96.02% 101.42% 108.10% 111.65% 120.01% 127.35% 134.26% 137.85% 138.85% 140.24% 141.96% 143.90% 146.31% 148.73% 150.42% 153.26% 156.40% 158.40% 160.18% 162.40% 164.84% 167.09% 170.00% 172.73% 175.31% 177.50% 179.64% 181.45% 183.04% 185.28% 187.47% 189.32% 190.82% 191.88%
INICIO 14 OCTUBRE 2020 % COSTO PROGRAMADO 0.00% 0.00% 0.04% 0.09% 0.45% 0.68% 0.88% 0.54% 1.87% 1.61% 1.15% 1.56% 1.12% 16.32% 0.62% 1.18% 4.67% 1.30% 1.48% 0.70% 6.38% 1.69% 4.00% 3.10% 1.43% 1.20% 13.93% 1.38% 10.15% 16.53% 5.40% 6.67% 3.55% 8.36% 7.34% 6.91% 3.60% 1.00% 1.39% 1.72% 1.93% 2.41% 2.42% 1.69% 2.84% 3.14% 2.00% 1.78% 2.22% 2.44% 2.25% 2.91% 2.73% 2.58% 2.19% 2.15% 1.81% 1.59% 2.24% 2.19% 1.85% 1.50% 1.06%
TÉRMINO 13 ABRIL 2022 UF COSTO PROGRAMADO ACUM. 2.04 2.04 128.94 416.15 1,839.05 3,998.76 6,820.20 8,546.60 14,514.63 19,640.68 23,297.53 28,272.35 31,858.87 83,952.40 85,920.78 89,703.85 104,600.14 108,738.47 113,477.84 115,706.96 136,065.70 141,476.89 154,252.36 164,148.78 168,705.37 172,542.45 217,007.85 221,403.00 253,796.59 306,556.11 323,801.52 345,104.98 356,445.17 383,133.64 406,571.14 428,630.82 440,112.93 443,298.30 447,736.39 453,235.22 459,399.57 467,093.87 474,832.16 480,230.77 489,296.08 499,322.26 505,717.93 511,402.50 518,477.75 526,263.28 533,454.15 542,754.46 551,463.48 559,691.27 566,672.64 573,530.75 579,297.61 584,373.83 591,535.71 598,512.65 604,409.58 609,200.96 612,592.67
DURACIÓN 18 MESES UF COSTO PROGRAMADO 2.04 0.00 126.90 287.21 1,422.90 2,159.71 2,821.45 1,726.40 5,968.04 5,126.05 3,656.85 4,974.81 3,586.53 52,093.52 1,968.38 3,783.07 14,896.29 4,138.32 4,739.37 2,229.12 20,358.74 5,411.19 12,775.47 9,896.43 4,556.58 3,837.09 44,465.39 4,395.15 32,393.59 52,759.52 17,245.41 21,303.46 11,340.20 26,688.47 23,437.50 22,059.68 11,482.11 3,185.37 4,438.09 5,498.83 6,164.35 7,694.30 7,738.29 5,398.61 9,065.31 10,026.18 6,395.67 5,684.57 7,075.25 7,785.53 7,190.87 9,300.31 8,709.02 8,227.79 6,981.37 6,858.11 5,766.86 5,076.22 7,161.88 6,976.94 5,896.93 4,791.38 3,391.71
1,358,501.38 136.01%
% COSTO REAL ACUM. 0.36% 0.50% 1.74% 3.36% 5.79% 8.28% 11.34% 15.26% 21.95% 27.76% 32.70% 38.12% 43.42% 71.12% 76.51% 81.29% 92.18% 100.72% 108.96% 114.63% 130.40% 139.46% 151.85% 162.51% 171.06% 177.99% 205.50% 214.99% 235.21% 264.52% 277.67% 290.85% 300.41% 318.70% 333.96% 349.46% 360.41% 390.37% 405.37% 423.61% 480.52% 510.50% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30%
% COSTO REAL 0.36% 0.14% 1.24% 1.62% 2.42% 2.50% 3.06% 3.92% 6.69% 5.81% 4.94% 5.43% 5.30% 27.70% 5.39% 4.79% 10.89% 8.54% 8.24% 5.67% 15.77% 9.06% 12.39% 10.66% 8.55% 6.93% 27.51% 9.49% 20.22% 29.31% 13.15% 13.18% 9.56% 18.29% 15.26% 15.50% 10.95% 29.97% 14.99% 18.25% 56.91% 29.98% 75.80% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
UF COSTO REAL ACUM. 780.45 1,075.09 3,754.11 7,242.18 12,464.47 17,840.73 24,424.19 32,866.04 47,281.95 59,789.75 70,421.39 82,112.09 93,521.77 153,176.85 164,778.89 175,087.17 198,545.25 216,932.31 234,678.85 246,887.22 280,861.20 300,367.58 327,060.26 350,022.18 368,436.33 383,355.48 442,616.24 463,045.26 506,595.47 569,731.63 598,047.18 626,435.22 647,019.59 686,417.79 719,281.19 752,675.04 776,250.24 840,790.70 873,084.80 912,381.28 1,034,944.29 1,099,520.67 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45
UF COSTO REAL 780.45 294.64 2,679.02 3,488.07 5,222.29 5,376.26 6,583.46 8,441.85 14,415.91 12,507.80 10,631.64 11,690.69 11,409.68 59,655.08 11,602.03 10,308.28 23,458.08 18,387.06 17,746.54 12,208.37 33,973.98 19,506.38 26,692.68 22,961.92 18,414.15 14,919.16 59,260.76 20,429.01 43,550.22 63,136.16 28,315.54 28,388.04 20,584.37 39,398.20 32,863.40 33,393.85 23,575.20 64,540.45 32,294.10 39,296.48 122,563.01 64,576.38 163,263.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CONTRATO DE CONSTRUCCIÓN EN CONCESIÓN INTERNACIONAL RUTA 5 TRAMO CHILLÁN - COLLIPULLI 215,381.28 SEM 46 SEM 47 SEM 48 SEM 49 SEM 50 SEM 51 SEM 52 SEM 1 SEM 2 SEM 3 SEM 4 SEM 5 SEM 6 SEM 7 SEM 8 SEM 9 SEM 10 SEM 11 SEM 12 SEM 13 SEM 14 SEM 15 SEM 16 SEM 17 SEM 18 SEM 19 SEM 20 SEM 21 SEM 22 SEM 23 SEM 24 SEM 25 SEM 26 SEM 27 SEM 28 SEM 29 SEM 30 SEM 31 SEM 32 SEM 33 SEM 34 SEM 35 SEM 36 SEM 37 SEM 38 SEM 39 SEM 40 SEM 41 SEM 42 SEM 43 SEM 44 SEM 45 SEM 46 SEM 47 SEM 48 SEM 49 SEM 50 SEM 51 SEM 52 SEM 1 SEM 2 SEM 3 SEM 4
CANTIDADES PORCENTAJE % 16-11-20 23-11-20 30-11-20 07-12-20 14-12-20 21-12-20 28-12-20 04-01-21 11-01-21 18-01-21 25-01-21 01-02-21 08-02-21 15-02-21 22-02-21 01-03-21 08-03-21 15-03-21 22-03-21 29-03-21 05-04-21 12-04-21 19-04-21 26-04-21 03-05-21 10-05-21 17-05-21 24-05-21 31-05-21 07-06-21 14-06-21 21-06-21 28-06-21 05-07-21 12-07-21 19-07-21 26-07-21 02-08-21 09-08-21 16-08-21 23-08-21 30-08-21 06-09-21 13-09-21 20-09-21 27-09-21 04-10-21 11-10-21 18-10-21 25-10-21 01-11-21 08-11-21 15-11-21 22-11-21 29-11-21 06-12-21 13-12-21 20-12-21 27-12-21 03-01-22 10-01-22 17-01-22 24-01-22
ORDEN TRAMO OBRA KM INICIO KM FIN ITEM PARTIDA DESCRIPCIÓN UNIDAD CUBICACIÓN TOTAL UF
AVANCE SALDO AVANCE SALDO 22-11-20 29-11-20 06-12-20 13-12-20 20-12-20 27-12-20 03-01-21 10-01-21 17-01-21 24-01-21 31-01-21 07-02-21 14-02-21 21-02-21 28-02-21 07-03-21 14-03-21 21-03-21 28-03-21 04-04-21 11-04-21 18-04-21 25-04-21 02-05-21 09-05-21 16-05-21 23-05-21 30-05-21 06-06-21 13-06-21 20-06-21 27-06-21 04-07-21 11-07-21 18-07-21 25-07-21 01-08-21 08-08-21 15-08-21 22-08-21 29-08-21 05-09-21 12-09-21 19-09-21 26-09-21 03-10-21 10-10-21 17-10-21 24-10-21 31-10-21 07-11-21 14-11-21 21-11-21 28-11-21 05-12-21 12-12-21 19-12-21 26-12-21 02-01-22 09-01-22 16-01-22 23-01-22 30-01-22
1 OBRAS DE ACTUALIZACIÓN, NORMATIVAS Y SERVICIALIDAD-RUTA EL BOSQUE
3076 3 OA-14 549.750 506-20B Vigas Pretensadas de longitud menor a 15m (9,93m-9,98m) N° 8.00 893.74 3.00 5.00 37.50% 62.50% 0.00 3.00
3075 3 OA-14 549.750 506-20A Vigas Pretensadas de longitud menor a 15m (9,43m) N° 2.00 223.44 0.00 2.00 0.00% 100.00% 0.00
3654 3 OA-17 572.350 506-20A Vigas Pretensadas de longitud menor a 15m (9,43m) N° 2.00 223.44 0.00 2.00 0.00% 100.00% 0.00
3655 3 OA-17 572.350 506-20B Vigas Pretensadas de longitud menor a 15m (9,43-9,98m) N° 12.00 1,340.62 9.00 3.00 75.00% 25.00% 0.00 6.00 3.00
3078 3 OA-14 549.750 506-22B Vigas Pretensadas de longitud mayor a 20m y menor a 25m (22,04m) N° 1.00 593.24 0.00 1.00 0.00% 100.00% 0.00
3656 3 OA-17 572.350 506-22A Vigas Pretensadas de longitud mayor a 20m y menor a 25m (21,70m) N° 1.00 584.69 0.00 1.00 0.00% 100.00% 0.00
3077 3 OA-14 549.750 506-22A Vigas Pretensadas de longitud mayor a 15m y menor a 20m (21,16m) N° 1.00 571.12 0.00 1.00 0.00% 100.00% 0.00
2660 3 OA-12 525.600 VARIOS
3085 3 OA-14 549.750 VARIOS
3337 3 OA-19 559.800 VARIOS
3458 3 OA-15 564.300 VARIOS
3664 3 OA-17 572.350 VARIOS
3632 3 OA-17 572.350 Valla Peatonal en Mediana H=0,5m m 153.00 525.37 0.00 153.00 0.00% 100.00% 0.00
3052 3 OA-14 549.750 711-2 Valla Peatonal en Mediana m 365.00 1,253.34 0.00 365.00 0.00% 100.00% 0.00
3233 3 ON-16.2 558.880 711-2 Valla Peatonal en Mediana m 200.00 686.76 0.00 200.00 0.00% 100.00% 0.00
3548 3 OA-16 567.500 711-2 Valla Peatonal en Mediana m 256.00 879.05 0.00 256.00 0.00% 100.00% 0.00
3631 3 OA-17 572.350 711-2 Valla Peatonal en Mediana m 693.00 2,379.62 0.00 693.00 0.00% 100.00% 0.00
2550 3 OA-11 524.400 711-1 Valla Peatonal m 0.00 0.00 0.00 0.00 0.00% 100.00% 0.00
2626 3 OA-12 525.600 711-1 Valla Peatonal m 128.00 236.79 0.00 128.00 0.00% 100.00% 0.00
3051 3 OA-14 549.750 711-1 Valla Peatonal m 53.00 98.04 0.00 53.00 0.00% 100.00% 0.00
3232 3 ON-16.2 558.880 711-1 Valla Peatonal m 255.00 471.72 0.00 255.00 0.00% 100.00% 0.00
3303 3 OA-19 559.800 711-1 Valla Peatonal m 44.00 81.40 0.00 44.00 0.00% 100.00% 0.00
3424 3 OA-15 564.300 711-1 Valla Peatonal m 157.00 290.43 0.00 157.00 0.00% 100.00% 0.00
3547 3 OA-16 567.500 711-1 Valla Peatonal m 304.00 562.37 0.00 304.00 0.00% 100.00% 0.00
3630 3 OA-17 572.350 711-1 Valla Peatonal m 419.00 775.11 0.00 419.00 0.00% 100.00% 0.00
2837 3 OS-09 530.300 531.300 601-2c Tubos de Base Plana de Alta Resistencia de Hormigón Simple, D = 1,00 m m 12.00 64.42 0.00 12.00 0.00% 100.00% 0.00
2787 3 OS-08 529.300 530.300 601-2a Tubos de Base Plana de Alta Resistencia de Hormigón Simple, D = 0,60 m m 47.00 117.59 9.00 38.00 19.15% 80.85% 0.00 9.00
3611 3 OA-17 572.350 601-2a Tubos de Base Plana de Alta Resistencia de Hormigón Simple, D = 0,60 m m 47.00 117.59 4.70 42.30 10.00% 90.00% 0.00 4.70
3552 3 OA-16 567.500 2. TRAZADO Y NIVELES m2 5,465.00 59.57 0.00 5,465.00 0.00% 100.00% 0.00
2779 3 OS-08 529.300 530.300 407-2 Tratamiento Superficial Doble m2 4,505.48 1,382.73 0.00 4,505.48 0.00% 100.00% 0.00
2829 3 OS-09 530.300 531.300 407-2 Tratamiento Superficial Doble m2 7,004.71 2,149.75 0.00 7,004.71 0.00% 100.00% 0.00
3525 3 OA-16 567.500 407-2 Tratamiento Superficial Doble m2 0.00 0.00 0.00 0.00 100.00% 0.00%
2910 3 OA-13 539.000 Transporte Poste Fe galvanizado h>8m (10 x viaje de 10km) Viajes 100.00 155.47 67.00 33.00 67.00% 33.00% 0.00 20.00 16.00 1.00 22.00 8.00
2939 3 OA-13 539.000 Trámites frente a Empresa Distribuidora Eléctrica N° 4.00 197.88 3.00 1.00 75.00% 25.00% 0.00 3.00
2696 3 OA-12 525.600 C.6 TIPO DE ALIMENTACION
2935 3 OA-13 539.000 A.6 TIPO DE ALIMENTACION
3120 3 OA-14 549.750 C.6 TIPO DE ALIMENTACION
3371 3 OA-19 559.800 C.6 TIPO DE ALIMENTACION
3494 3 OA-15 564.300 C.6 TIPO DE ALIMENTACION
3702 3 OA-17 572.350 C.6 TIPO DE ALIMENTACION
3756 3 OA-18 573.550 A.6 TIPO DE ALIMENTACION
2504 3 OA-11 524.400 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
2580 3 OA-12 525.600 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
2705 3 ON-13 525.600 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
2756 3 OS-08 529.300 530.300 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
2808 3 OS-09 530.300 531.300 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
2902 3 OA-13 539.000 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
2944 3 ON-15 539.132 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
3000 3 OA-14 549.750 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
3129 3 ON-16.1 558.880 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
3190 3 ON-16.2 558.880 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
3271 3 OA-19 559.800 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
3380 3 OA-15 564.300 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
3503 3 OA-16 567.500 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
3575 3 OA-17 572.350 Término Ejecución de Trabajos 1 0.00 1.00 0.00% 100.00%
3054 3 OA-14 549.750 712-5 Terminales Atenuadores Certificados N° 2.00 312.04 0.00 2.00 0.00% 100.00% 0.00
3180 3 ON-16.1 558.880 712-5 Terminales Atenuadores Certificados N° 1.00 156.02 0.00 1.00 0.00% 100.00% 0.00
3235 3 ON-16.2 558.880 712-5 Terminales Atenuadores Certificados N° 2.00 312.04 0.00 2.00 0.00% 100.00% 0.00
3427 3 OA-15 564.300 712-5 Terminales Atenuadores Certificados N° 1.00 156.02 0.00 1.00 0.00% 100.00% 0.00
3633 3 OA-17 572.350 712-5 Terminales Atenuadores Certificados N° 1.00 156.02 0.00 1.00 0.00% 100.00% 0.00
2683 3 OA-12 525.600 Tendido de Canalización PVC m 0.00 0.00 0.00 0.00 100.00% 0.00%
2926 3 OA-13 539.000 Tendido de Canalización PVC m 0.00 0.00 0.00 0.00 100.00% 0.00%
3107 3 OA-14 549.750 Tendido de Canalización PVC m 0.00 0.00 0.00 0.00 100.00% 0.00%
3254 3 ON-16.2 558.880 Tendido de Canalización PVC m 0.00 0.00 0.00 0.00 100.00% 0.00%
3358 3 OA-19 559.800 Tendido de Canalización PVC m 0.00 0.00 0.00 0.00 100.00% 0.00%
3481 3 OA-15 564.300 Tendido de Canalización PVC m 0.00 0.00 0.00 0.00 100.00% 0.00%
3689 3 OA-17 572.350 Tendido de Canalización PVC m 0.00 0.00 0.00 0.00 100.00% 0.00%
2680 3 OA-12 525.600 Tendido conductor en interior de ductos (por circuito) m 0.00 0.00 0.00 0.00 100.00% 0.00%
3104 3 OA-14 549.750 Tendido conductor en interior de ductos (por circuito) m 0.00 0.00 0.00 0.00 100.00% 0.00%
3251 3 ON-16.2 558.880 Tendido conductor en interior de ductos (por circuito) m 0.00 0.00 0.00 0.00 100.00% 0.00%
3355 3 OA-19 559.800 Tendido conductor en interior de ductos (por circuito) m 0.00 0.00 0.00 0.00 100.00% 0.00%
3478 3 OA-15 564.300 Tendido conductor en interior de ductos (por circuito) m 0.00 0.00 0.00 0.00 100.00% 0.00%
3686 3 OA-17 572.350 Tendido conductor en interior de ductos (por circuito) m 0.00 0.00 0.00 0.00 100.00% 0.00%
2677 3 OA-12 525.600 Tendido conductor 14 AWG en interior de postes m 0.00 0.00 0.00 0.00 100.00% 0.00%
2919 3 OA-13 539.000 Tendido conductor 14 AWG en interior de postes m 0.00 0.00 0.00 0.00 100.00% 0.00%
3102 3 OA-14 549.750 Tendido conductor 14 AWG en interior de postes m 0.00 0.00 0.00 0.00 100.00% 0.00%
3249 3 ON-16.2 558.880 Tendido conductor 14 AWG en interior de postes m 0.00 0.00 0.00 0.00 100.00% 0.00%
3353 3 OA-19 559.800 Tendido conductor 14 AWG en interior de postes m 0.00 0.00 0.00 0.00 100.00% 0.00%
3476 3 OA-15 564.300 Tendido conductor 14 AWG en interior de postes m 0.00 0.00 0.00 0.00 100.00% 0.00%
3684 3 OA-17 572.350 Tendido conductor 14 AWG en interior de postes m 0.00 0.00 0.00 0.00 100.00% 0.00%
2622 3 OA-12 525.600 705-1 Tachas Reflectantes N° 384.00 36.98 279.00 105.00 72.66% 27.34% 0.00 84.00 195.00
2800 3 OS-08 529.300 530.300 705-1 Tachas Reflectantes N° 90.00 8.67 0.00 90.00 0.00% 100.00% 0.00
2851 3 OS-09 530.300 531.300 705-1 Tachas Reflectantes N° 165.00 15.89 0.00 165.00 0.00% 100.00% 0.00
2990 3 ON-15 539.132 705-1 Tachas Reflectantes N° 222.00 21.38 90.00 132.00 40.54% 59.46% 0.00 90.00
3047 3 OA-14 549.750 705-1 Tachas Reflectantes N° 500.00 48.15 0.00 500.00 0.00% 100.00% 0.00
3178 3 ON-16.1 558.880 705-1 Tachas Reflectantes N° 313.00 30.14 0.00 313.00 0.00% 100.00% 0.00
3230 3 ON-16.2 558.880 705-1 Tachas Reflectantes N° 100.00 9.63 0.00 100.00 0.00% 100.00% 0.00
3420 3 OA-15 564.300 705-1 Tachas Reflectantes N° 440.00 42.37 0.00 440.00 0.00% 100.00% 0.00
3545 3 OA-16 567.500 705-1 Tachas Reflectantes N° 39.00 3.76 0.00 39.00 0.00% 100.00% 0.00
3626 3 OA-17 572.350 705-1 Tachas Reflectantes N° 34.00 3.27 0.00 34.00 0.00% 100.00% 0.00
2698 3 OA-12 525.600 Tablero de Protección y comandos N° 1.00 84.69 0.00 1.00 0.00% 100.00% 0.00
2749 3 ON-13 525.600 Tablero de Protección y comandos N° 1.00 84.69 0.50 0.50 50.00% 50.00% 0.00 0.50
2937 3 OA-13 539.000 Tablero de Protección y comandos N° 4.00 338.75 3.00 1.00 75.00% 25.00% 0.00 3.00
3122 3 OA-14 549.750 Tablero de Protección y comandos N° 1.00 84.69 0.00 1.00 0.00% 100.00% 0.00
3264 3 ON-16.2 558.880 Tablero de Protección y comandos N° 2.00 169.37 0.00 2.00 0.00% 100.00% 0.00
3373 3 OA-19 559.800 Tablero de Protección y comandos N° 1.00 84.69 0.00 1.00 0.00% 100.00% 0.00
3496 3 OA-15 564.300 Tablero de Protección y comandos N° 1.00 84.69 0.00 1.00 0.00% 100.00% 0.00
3704 3 OA-17 572.350 Tablero de Protección y comandos N° 2.00 169.37 0.00 2.00 0.00% 100.00% 0.00
2646 3 OA-12 525.600 SUPERESTRUCTURA
3071 3 OA-14 549.750 SUPERESTRUCTURA
3319 3 OA-19 559.800 SUPERESTRUCTURA
3444 3 OA-15 564.300 SUPERESTRUCTURA
3650 3 OA-17 572.350 SUPERESTRUCTURA
2662 3 OA-12 525.600 711-4 Esp. Suministro, Transporte y colocación de Cubierta de Policarbonato m 236.00 4,435.67 0.00 236.00 0.00% 100.00% 0.00
3087 3 OA-14 549.750 711-4 Esp. Suministro, Transporte y colocación de Cubierta de Policarbonato m 149.00 2,800.48 0.00 149.00 0.00% 100.00% 0.00
3339 3 OA-19 559.800 711-4 Esp. Suministro, Transporte y colocación de Cubierta de Policarbonato m 219.57 4,126.86 152.00 67.57 69.23% 30.77% 0.00 10.00 54.00 68.00 20.00
3460 3 OA-15 564.300 711-4 Esp. Suministro, Transporte y colocación de Cubierta de Policarbonato m 227.50 4,275.91 137.00 90.50 60.22% 39.78% 0.00 70.00 42.00 25.00
3666 3 OA-17 572.350 711-4 Esp. Suministro, Transporte y colocación de Cubierta de Policarbonato m 200.35 3,765.62 0.00 200.35 0.00% 100.00% 0.00
2661 3 OA-12 525.600 710-2 Suministro, transporte y Colocación de Baranda Metálica Peatonal (Incluye malla acma o similar de acuerdo a zonas m 18.00 208.33 0.00 18.00 0.00% 100.00% 0.00
3086 3 OA-14 549.750 710-2 Suministro, transporte y Colocación de Baranda Metálica Peatonal (Incluye malla acma o similar de acuerdo a zonas m 240.90 2,788.10 0.00 240.90 0.00% 100.00% 0.00
3338 3 OA-19 559.800 710-2 Suministro, transporte y Colocación de Baranda Metálica Peatonal (Incluye malla acma o similar de acuerdo a zonas m 176.00 2,036.97 126.50 49.50 71.88% 28.12% 0.00 7.50 54.00 45.00 20.00
3459 3 OA-15 564.300 710-2 Suministro, transporte y Colocación de Baranda Metálica Peatonal (Incluye malla acma o similar de acuerdo a zonas m 99.00 1,145.80 74.00 25.00 74.75% 25.25% 0.00 24.00 5.00 10.00 10.00 25.00
3665 3 OA-17 572.350 710-2 Suministro, transporte y Colocación de Baranda Metálica Peatonal (Incluye malla acma o similar de acuerdo a zonas m 16.00 185.18 0.00 16.00 0.00% 100.00% 0.00
2688 3 OA-12 525.600 Suministro y montaje de cámaras tipo B N° 3.00 15.88 0.00 3.00 0.00% 100.00% 0.00
2928 3 OA-13 539.000 Suministro y montaje de cámaras tipo B N° 16.00 84.67 11.00 5.00 68.75% 31.25% 0.00 6.00 5.00
3112 3 OA-14 549.750 Suministro y montaje de cámaras tipo B N° 3.00 15.88 0.00 3.00 0.00% 100.00% 0.00
3256 3 ON-16.2 558.880 Suministro y montaje de cámaras tipo B N° 5.00 26.46 0.00 5.00 0.00% 100.00% 0.00
3363 3 OA-19 559.800 Suministro y montaje de cámaras tipo B N° 2.00 10.58 0.00 2.00 0.00% 100.00% 0.00
3486 3 OA-15 564.300 Suministro y montaje de cámaras tipo B N° 5.00 26.46 0.00 5.00 0.00% 100.00% 0.00
3694 3 OA-17 572.350 Suministro y montaje de cámaras tipo B N° 11.00 58.21 0.00 11.00 0.00% 100.00% 0.00
3562 3 OA-16 567.500 6.3 Suministro y Colocación de Totora (Typa) o similar (A = 0,8 m) N° 20.00 26.02 0.00 20.00 0.00% 100.00% 0.00
3084 3 OA-14 549.750 514-1 ESP Suministro y Colocación de Topes de Neopreno N° 12.00 147.71 0.00 12.00 0.00% 100.00% 0.00
3663 3 OA-17 572.350 514-1 ESP Suministro y Colocación de Topes de Neopreno N° 16.00 196.95 0.00 16.00 0.00% 100.00% 0.00
3662 3 OA-17 572.350 514-1C Suministro y Colocación de Placas de Neopreno (160x160x36) N° 4.00 48.42 0.00 4.00 0.00% 100.00% 0.00
3083 3 OA-14 549.750 514-1C Suministro y Colocación de Placas de Neopreno (150x150x36) N° 4.00 47.78 0.00 4.00 0.00% 100.00% 0.00
3081 3 OA-14 549.750 514-1A Suministro y Colocación de Placas de Neopreno (120x120x89) N° 4.00 74.62 0.00 4.00 0.00% 100.00% 0.00
3660 3 OA-17 572.350 514-1A Suministro y Colocación de Placas de Neopreno (120x120x89) N° 4.00 74.62 0.00 4.00 0.00% 100.00% 0.00
3082 3 OA-14 549.750 514-1B Suministro y Colocación de Placas de Neopreno (120x120x36) N° 4.00 41.67 0.00 4.00 0.00% 100.00% 0.00
3661 3 OA-17 572.350 514-1B Suministro y Colocación de Placas de Neopreno (120x120x36) N° 8.00 83.33 0.00 8.00 0.00% 100.00% 0.00
2654 3 OA-12 525.600 512-3 Suministro y Colocación de Juntas de Dilatación en Estructuras m 4.00 47.42 0.00 4.00 0.00% 100.00% 0.00
3079 3 OA-14 549.750 512-3 Suministro y Colocación de Juntas de Dilatación en Estructuras m 4.00 47.42 0.00 4.00 0.00% 100.00% 0.00
3331 3 OA-19 559.800 512-3 Suministro y Colocación de Juntas de Dilatación en Estructuras m 6.00 71.12 0.00 6.00 0.00% 100.00% 0.00
3452 3 OA-15 564.300 512-3 Suministro y Colocación de Juntas de Dilatación en Estructuras m 4.00 47.42 0.00 4.00 0.00% 100.00% 0.00
3658 3 OA-17 572.350 512-3 Suministro y Colocación de Juntas de Dilatación en Estructuras m 4.00 47.42 0.00 4.00 0.00% 100.00% 0.00
3560 3 OA-16 567.500 5.1 Suministro y Colocación de Helecho Peineta o similar (A = 0,5 m) N° 20.00 26.02 0.00 20.00 0.00% 100.00% 0.00
3568 3 OA-16 567.500 9.1 Suministro y Colocación de Fajinas de madera m 300.00 200.67 0.00 300.00 0.00% 100.00% 0.00
3564 3 OA-16 567.500 7.1 Suministro y Colocación de Cola de Zorro (A = 1,0 m) N° 20.00 26.02 0.00 20.00 0.00% 100.00% 0.00
3566 3 OA-16 567.500 8.3 Suministro y Colocación de Capa de Tierra Vegetal de la zona (e = 0,2m) m3 700.00 585.83 630.00 70.00 90.00% 10.00% 0.00 410.00 20.00 200.00
3570 3 OA-16 567.500 10.1 Suministro y Colocación de Canaleta para drenaje e infiltración de Agua lluvia m 313.00 709.92 0.00 313.00 0.00% 100.00% 0.00

3558 3 OA-16 567.500 4.1 Suministro y Colocación de Arbusto (propuesta) (A = 1,4 m) N° 25.00 58.06 0.00 25.00 0.00% 100.00% 0.00
3554 3 OA-16 567.500 3.1 Suministro y Colocación de Árbol Quillay(A = 2,0 m) N° 15.00 34.83 0.00 15.00 0.00% 100.00% 0.00

3555 3 OA-16 567.500 3.2 Suministro y Colocación de Árbol Patagua (A = 2,0 m) N° 15.00 34.83 0.00 15.00 0.00% 100.00% 0.00

3556 3 OA-16 567.500 3.3 Suministro y Colocación de Árbol Arrayán (A = 2,0 m) N° 10.00 23.22 0.00 10.00 0.00% 100.00% 0.00
3080 3 OA-14 549.750 513-1 Suministro y Colocación de Anclajes Antisísmicos. Tableros Ancho Menor o Igual a 10m N° 6.00 41.47 0.00 6.00 0.00% 100.00% 0.00
3659 3 OA-17 572.350 513-1 Suministro y Colocación de Anclajes Antisísmicos. Tableros Ancho Menor o Igual a 10m N° 8.00 55.29 0.00 8.00 0.00% 100.00% 0.00
2598 3 OA-12 525.600 301-1 Subbase Granular, CBR ≥ 40% m3 807.68 669.73 707.68 100.00 87.62% 12.38% 380.00 0.00 100.00 185.00 20.00 22.68
2774 3 OS-08 529.300 530.300 301-1 Subbase Granular, CBR ≥ 40% m3 1,251.39 1,037.65 0.00 1,251.39 0.00% 100.00% 0.00
2825 3 OS-09 530.300 531.300 301-1 Subbase Granular, CBR ≥ 40% m3 2,080.52 1,725.17 128.20 1,952.32 6.16% 93.84% 0.00 128.20
2964 3 ON-15 539.132 301-1 Subbase Granular, CBR ≥ 40% m3 917.12 760.48 640.00 277.12 69.78% 30.22% 0.00 250.00 50.00 115.00 200.00 25.00
3020 3 OA-14 549.750 301-1 Subbase Granular, CBR ≥ 40% m3 984.30 816.18 0.00 984.30 0.00% 100.00% 0.00
3150 3 ON-16.1 558.880 301-1 Subbase Granular, CBR ≥ 40% m3 675.93 560.48 595.00 80.93 88.03% 11.97% 300.00 75.00 0.00 110.00 20.00 90.00
3210 3 ON-16.2 558.880 301-1 Subbase Granular, CBR ≥ 40% m3 287.56 238.44 0.00 287.56 0.00% 100.00% 0.00
3398 3 OA-15 564.300 301-1 Subbase Granular, CBR ≥ 40% m3 869.05 720.62 715.00 154.05 82.27% 17.73% 0.00 285.00 150.00 180.00 100.00
3520 3 OA-16 567.500 301-1 Subbase Granular, CBR ≥ 40% m3 63.39 52.56 0.00 63.39 0.00% 100.00% 0.00
3597 3 OA-17 572.350 301-1 Subbase Granular, CBR ≥ 40% m3 92.17 76.43 0.00 92.17 0.00% 100.00% 0.00
2789 3 OS-08 529.300 530.300 607-3 Soleras Tipo "C" m 94.00 84.46 0.00 94.00 0.00% 100.00% 0.00
2614 3 OA-12 525.600 607-1 Soleras Tipo "A" m 175.00 168.51 157.00 18.00 89.71% 10.29% 0.00 80.00 10.00 50.00 17.00
2714 3 ON-13 525.600 607-1 Soleras Tipo "A" m 577.00 555.59 552.00 25.00 95.67% 4.33% 0.00 50.00 80.00 47.00 120.00 110.00 75.00 70.00
3034 3 OA-14 549.750 607-1 Soleras Tipo "A" m 147.00 141.55 0.00 147.00 0.00% 100.00% 0.00
3165 3 ON-16.1 558.880 607-1 Soleras Tipo "A" m 270.00 259.98 187.00 83.00 69.26% 30.74% 0.00 40.00 30.00 92.00 25.00
3223 3 ON-16.2 558.880 607-1 Soleras Tipo "A" m 159.00 153.10 0.00 159.00 0.00% 100.00% 0.00
3412 3 OA-15 564.300 607-1 Soleras Tipo "A" m 151.00 145.40 0.00 151.00 0.00% 100.00% 0.00
3535 3 OA-16 567.500 607-1 Soleras Tipo "A" m 53.00 51.03 0.00 53.00 0.00% 100.00% 0.00
3614 3 OA-17 572.350 607-1 Soleras Tipo "A" m 539.00 519.00 0.00 539.00 0.00% 100.00% 0.00
2798 3 OS-08 529.300 530.300 702-2f Señales Verticales Laterales Tipo 6, 7 m2 < Sp ≤ 12 m2 N° 2.00 149.01 0.00 2.00 0.00% 100.00% 0.00
3175 3 ON-16.1 558.880 702-2f Señales Verticales Laterales Tipo 6, 7 m2 < Sp ≤ 12 m2 N° 2.00 149.01 0.00 2.00 0.00% 100.00% 0.00
2620 3 OA-12 525.600 702-2e Señales Verticales Laterales Tipo 5, 3 m2 < Sp ≤ 7 m2 N° 1.00 51.72 0.00 1.00 0.00% 100.00% 0.00
2849 3 OS-09 530.300 531.300 702-2e Señales Verticales Laterales Tipo 5, 3 m2 < Sp ≤ 7 m2 N° 1.00 51.72 0.00 1.00 0.00% 100.00% 0.00
2988 3 ON-15 539.132 702-2e Señales Verticales Laterales Tipo 5, 3 m2 < Sp ≤ 7 m2 N° 4.00 206.88 0.00 4.00 0.00% 100.00% 0.00
3045 3 OA-14 549.750 702-2e Señales Verticales Laterales Tipo 5, 3 m2 < Sp ≤ 7 m2 N° 1.00 51.72 0.00 1.00 0.00% 100.00% 0.00
3174 3 ON-16.1 558.880 702-2e Señales Verticales Laterales Tipo 5, 3 m2 < Sp ≤ 7 m2 N° 1.00 51.72 0.00 1.00 0.00% 100.00% 0.00
3229 3 ON-16.2 558.880 702-2e Señales Verticales Laterales Tipo 5, 3 m2 < Sp ≤ 7 m2 N° 3.00 155.16 0.00 3.00 0.00% 100.00% 0.00
2619 3 OA-12 525.600 702-2d Señales Verticales Laterales Tipo 4, 2 m2 < Sp ≤ 3 m2 N° 2.00 38.87 0.00 2.00 0.00% 100.00% 0.00
2987 3 ON-15 539.132 702-2d Señales Verticales Laterales Tipo 4, 2 m2 < Sp ≤ 3 m2 N° 1.00 19.44 0.00 1.00 0.00% 100.00% 0.00
3044 3 OA-14 549.750 702-2d Señales Verticales Laterales Tipo 4, 2 m2 < Sp ≤ 3 m2 N° 2.00 38.87 0.00 2.00 0.00% 100.00% 0.00
3625 3 OA-17 572.350 702-2d Señales Verticales Laterales Tipo 4, 2 m2 < Sp ≤ 3 m2 N° 4.00 77.74 0.00 4.00 0.00% 100.00% 0.00
2618 3 OA-12 525.600 702-2c Señales Verticales Laterales Tipo 3, 1 m2 < Sp ≤ 2 m2 N° 5.00 57.18 0.00 5.00 0.00% 100.00% 0.00
2986 3 ON-15 539.132 702-2c Señales Verticales Laterales Tipo 3, 1 m2 < Sp ≤ 2 m2 N° 1.00 11.44 0.00 1.00 0.00% 100.00% 0.00
3043 3 OA-14 549.750 702-2c Señales Verticales Laterales Tipo 3, 1 m2 < Sp ≤ 2 m2 N° 6.00 68.61 0.00 6.00 0.00% 100.00% 0.00
3173 3 ON-16.1 558.880 702-2c Señales Verticales Laterales Tipo 3, 1 m2 < Sp ≤ 2 m2 N° 1.00 11.44 0.00 1.00 0.00% 100.00% 0.00
3228 3 ON-16.2 558.880 702-2c Señales Verticales Laterales Tipo 3, 1 m2 < Sp ≤ 2 m2 N° 3.00 34.31 0.00 3.00 0.00% 100.00% 0.00
3300 3 OA-19 559.800 702-2c Señales Verticales Laterales Tipo 3, 1 m2 < Sp ≤ 2 m2 N° 4.00 45.74 0.00 4.00 0.00% 100.00% 0.00
3418 3 OA-15 564.300 702-2c Señales Verticales Laterales Tipo 3, 1 m2 < Sp ≤ 2 m2 N° 6.00 68.61 0.00 6.00 0.00% 100.00% 0.00
3542 3 OA-16 567.500 702-2c Señales Verticales Laterales Tipo 3, 1 m2 < Sp ≤ 2 m2 N° 2.00 22.87 0.00 2.00 0.00% 100.00% 0.00
3624 3 OA-17 572.350 702-2c Señales Verticales Laterales Tipo 3, 1 m2 < Sp ≤ 2 m2 N° 2.00 22.87 0.00 2.00 0.00% 100.00% 0.00
2617 3 OA-12 525.600 702-2b Señales Verticales Laterales Tipo 2, Sp < Sp ≤ 1 m2 N° 2.00 11.45 0.00 2.00 0.00% 100.00% 0.00
2797 3 OS-08 529.300 530.300 702-2b Señales Verticales Laterales Tipo 2, Sp < Sp ≤ 1 m2 N° 13.00 74.40 0.00 13.00 0.00% 100.00% 0.00
2848 3 OS-09 530.300 531.300 702-2b Señales Verticales Laterales Tipo 2, Sp < Sp ≤ 1 m2 N° 21.00 120.18 0.00 21.00 0.00% 100.00% 0.00
2985 3 ON-15 539.132 702-2b Señales Verticales Laterales Tipo 2, Sp < Sp ≤ 1 m2 N° 14.00 80.12 0.00 14.00 0.00% 100.00% 0.00
3042 3 OA-14 549.750 702-2b Señales Verticales Laterales Tipo 2, Sp < Sp ≤ 1 m2 N° 3.00 17.17 0.00 3.00 0.00% 100.00% 0.00
3172 3 ON-16.1 558.880 702-2b Señales Verticales Laterales Tipo 2, Sp < Sp ≤ 1 m2 N° 10.00 57.23 0.00 10.00 0.00% 100.00% 0.00
3541 3 OA-16 567.500 702-2b Señales Verticales Laterales Tipo 2, Sp < Sp ≤ 1 m2 N° 3.00 17.17 0.00 3.00 0.00% 100.00% 0.00
3623 3 OA-17 572.350 702-2b Señales Verticales Laterales Tipo 2, Sp < Sp ≤ 1 m2 N° 6.00 34.34 0.00 6.00 0.00% 100.00% 0.00
2602 3 OA-12 525.600 402-1 Riego de Liga m2 5,108.17 122.09 4,021.00 1,087.17 78.72% 21.28% 0.00 2,100.00 985.00 146.00 790.00
2968 3 ON-15 539.132 402-1 Riego de Liga m2 5,116.92 122.29 2,010.00 3,106.92 39.28% 60.72% 0.00 1,760.00 250.00
3024 3 OA-14 549.750 402-1 Riego de Liga m2 6,068.47 145.04 0.00 6,068.47 0.00% 100.00% 0.00
3154 3 ON-16.1 558.880 402-1 Riego de Liga m2 4,096.52 97.91 1,480.00 2,616.52 36.13% 63.87% 480.00 0.00 500.00 500.00
3214 3 ON-16.2 558.880 402-1 Riego de Liga m2 1,515.21 36.21 0.00 1,515.21 0.00% 100.00% 0.00
3402 3 OA-15 564.300 402-1 Riego de Liga m2 5,266.99 125.88 2,600.00 2,666.99 49.36% 50.64% 0.00 1,300.00 1,300.00
3524 3 OA-16 567.500 402-1 Riego de Liga m2 419.20 10.02 0.00 419.20 0.00% 100.00% 0.00
3601 3 OA-17 572.350 402-1 Riego de Liga m2 611.54 14.62 0.00 611.54 0.00% 100.00% 0.00
2522 3 OA-11 524.400 5,400 REVESTIMIENTOS Y PAVIMENTO
2600 3 OA-12 525.600 5,400 REVESTIMIENTOS Y PAVIMENTO
2777 3 OS-08 529.300 530.300 5,400 REVESTIMIENTOS Y PAVIMENTO
2827 3 OS-09 530.300 531.300 5,400 REVESTIMIENTOS Y PAVIMENTO
2878 3 ON-14 537.060 5,400 REVESTIMIENTOS Y PAVIMENTO
2966 3 ON-15 539.132 5,400 REVESTIMIENTOS Y PAVIMENTO
3022 3 OA-14 549.750 5,400 REVESTIMIENTOS Y PAVIMENTO
3152 3 ON-16.1 558.880 5,400 REVESTIMIENTOS Y PAVIMENTO
3212 3 ON-16.2 558.880 5,400 REVESTIMIENTOS Y PAVIMENTO
3287 3 OA-19 559.800 5,400 REVESTIMIENTOS Y PAVIMENTO
3400 3 OA-15 564.300 5,400 REVESTIMIENTOS Y PAVIMENTO
3522 3 OA-16 567.500 5,400 REVESTIMIENTOS Y PAVIMENTO
3599 3 OA-17 572.350 5,400 REVESTIMIENTOS Y PAVIMENTO
2611 3 OA-12 525.600 508-1 Revestimiento de Mampostería de Piedra m2 21.00 40.14 0.00 21.00 0.00% 100.00% 0.00
2645 3 OA-12 525.600 508-1 Revestimiento de Mampostería de Piedra m2 137.56 262.93 0.00 137.56 0.00% 100.00% 0.00
2785 3 OS-08 529.300 530.300 508-1 Revestimiento de Mampostería de Piedra m2 131.77 251.87 0.00 131.77 0.00% 100.00% 0.00
2835 3 OS-09 530.300 531.300 508-1 Revestimiento de Mampostería de Piedra m2 61.00 116.60 0.00 61.00 0.00% 100.00% 0.00
2976 3 ON-15 539.132 508-1 Revestimiento de Mampostería de Piedra m2 102.00 194.96 0.00 102.00 0.00% 100.00% 0.00
3031 3 OA-14 549.750 508-1 Revestimiento de Mampostería de Piedra m2 17.00 32.49 0.00 17.00 0.00% 100.00% 0.00
3070 3 OA-14 549.750 508-1 Revestimiento de Mampostería de Piedra m2 244.36 467.07 0.00 244.36 0.00% 100.00% 0.00
3159 3 ON-16.1 558.880 508-1 Revestimiento de Mampostería de Piedra m2 33.00 63.08 0.00 33.00 0.00% 100.00% 0.00
3318 3 OA-19 559.800 508-1 Revestimiento de Mampostería de Piedra m2 252.25 482.15 0.00 252.25 0.00% 100.00% 0.00
3443 3 OA-15 564.300 508-1 Revestimiento de Mampostería de Piedra m2 205.29 392.39 0.00 205.29 0.00% 100.00% 0.00
3649 3 OA-17 572.350 508-1 Revestimiento de Mampostería de Piedra m2 14.60 27.91 0.00 14.60 0.00% 100.00% 0.00
2718 3 ON-13 525.600 614-1 Revestimiento de Fosos y Contrafosos m3 60.90 793.87 55.70 5.20 91.46% 8.54% 0.00 15.00 7.00 2.50 9.50 2.70 7.00 7.00 2.00 3.00
2794 3 OS-08 529.300 530.300 614-1 Revestimiento de Fosos y Contrafosos m3 90.37 1,178.04 0.00 90.37 0.00% 100.00% 0.00
2845 3 OS-09 530.300 531.300 614-1 Revestimiento de Fosos y Contrafosos m3 73.37 956.43 0.00 73.37 0.00% 100.00% 0.00
2983 3 ON-15 539.132 614-1 Revestimiento de Fosos y Contrafosos m3 662.15 8,631.59 441.00 221.15 66.60% 33.40% 0.00 35.00 100.00 110.00 24.00 35.00 78.00 47.00 12.00
3039 3 OA-14 549.750 614-1 Revestimiento de Fosos y Contrafosos m3 3.13 40.80 0.00 3.13 0.00% 100.00% 0.00
3225 3 ON-16.2 558.880 614-1 Revestimiento de Fosos y Contrafosos m3 182.10 2,373.80 0.00 182.10 0.00% 100.00% 0.00
3538 3 OA-16 567.500 614-1 Revestimiento de Fosos y Contrafosos m3 16.38 213.52 0.00 16.38 0.00% 100.00% 0.00
3620 3 OA-17 572.350 614-1 Revestimiento de Fosos y Contrafosos m3 65.78 857.49 0.00 65.78 0.00% 100.00% 0.00
2954 3 ON-15 539.132 101-8 Remoción de Señalización Vertical Lateral N° 2.00 1.87 1.50 0.50 75.00% 25.00% 0.00 1.00 0.50
3138 3 ON-16.1 558.880 101-8 Remoción de Señalización Vertical Lateral N° 6.00 2.54 5.00 1.00 83.33% 16.67% 0.00 3.00 1.20 0.80
3198 3 ON-16.2 558.880 101-8 Remoción de Señalización Vertical Lateral N° 2.00 1.87 0.00 2.00 0.00% 100.00% 0.00
3585 3 OA-17 572.350 101-8 Remoción de Señalización Vertical Lateral N° 3.00 2.80 0.00 3.00 0.00% 100.00% 0.00
3582 3 OA-17 572.350 101-3 Remoción de Pavimentos de Hormigón m2 80.00 9.67 0.00 80.00 0.00% 100.00% 0.00
3007 3 OA-14 549.750 101-4 Remoción de Pavimentos Asfálticos m2 2,449.00 233.14 1,081.00 1,368.00 44.14% 55.86% 0.00 470.00 433.00 178.00
3195 3 ON-16.2 558.880 101-4 Remoción de Pavimentos Asfálticos m2 785.00 74.73 85.00 700.00 10.83% 89.17% 0.00 85.00
3508 3 OA-16 567.500 101-4 Remoción de Pavimentos Asfálticos m2 96.00 9.14 48.00 48.00 50.00% 50.00% 0.00 48.00
3008 3 OA-14 549.750 101-5 Remoción de Obras de Drenaje Superficial m 796.00 145.43 384.00 412.00 48.24% 51.76% 0.00 79.00 305.00
3196 3 ON-16.2 558.880 101-5 Remoción de Obras de Drenaje Superficial m 308.00 56.27 154.00 154.00 50.00% 50.00% 0.00 154.00
3509 3 OA-16 567.500 101-5 Remoción de Obras de Drenaje Superficial m 40.00 7.31 0.00 40.00 0.00% 100.00% 0.00
3583 3 OA-17 572.350 101-5 Remoción de Obras de Drenaje Superficial m 100.00 18.27 0.00 100.00 0.00% 100.00% 0.00
2767 3 OS-08 529.300 530.300 201-2 Remoción de Material Inadecuado m3 167.00 50.72 45.00 122.00 26.95% 73.05% 0.00 45.00
2818 3 OS-09 530.300 531.300 201-2 Remoción de Material Inadecuado m3 131.00 39.78 70.00 61.00 53.44% 46.56% 0.00 70.00
2761 3 OS-08 529.300 530.300 101-1 Remoción de Estructuras m3 5.00 11.89 2.00 3.00 40.00% 60.00% 0.00 2.00
3005 3 OA-14 549.750 101-1 Remoción de Estructuras m3 2.00 4.75 1.00 1.00 50.00% 50.00% 0.00 1.00
3580 3 OA-17 572.350 101-1 Remoción de Estructuras m3 2.00 4.75 0.00 2.00 0.00% 100.00% 0.00
2950 3 ON-15 539.132 101-2 Remoción de Ductos m 118.00 146.36 71.00 47.00 60.17% 39.83% 0.00 38.00 10.00 23.00
3006 3 OA-14 549.750 101-2 Remoción de Ductos m 11.00 13.64 5.50 5.50 50.00% 50.00% 0.00 5.50
3581 3 OA-17 572.350 101-2 Remoción de Ductos m 4.00 4.96 1.00 3.00 25.00% 75.00% 0.00 1.00
2763 3 OS-08 529.300 530.300 101-11 Remoción de Cercos m 1,221.00 186.32 550.00 671.00 45.05% 54.95% 0.00 550.00
3010 3 OA-14 549.750 101-11 Remoción de Cercos m 341.00 52.04 170.00 171.00 49.85% 50.15% 0.00 170.00
3199 3 ON-16.2 558.880 101-11 Remoción de Cercos m 213.00 90.33 0.00 213.00 0.00% 100.00% 0.00
3200 3 ON-16.2 558.880 101-13 Remoción de Casetas de Paraderos Para la Locomoción Colectiva N° 2.00 66.53 0.00 2.00 0.00% 100.00% 0.00
2762 3 OS-08 529.300 530.300 101-6 Remoción de Barreras de Contención Laterales m 46.00 26.14 0.00 46.00 0.00% 100.00% 0.00
2953 3 ON-15 539.132 101-6 Remoción de Barreras de Contención Laterales m 149.00 63.19 134.00 15.00 89.93% 10.07% 0.00 50.00 25.00 28.00 31.00
3009 3 OA-14 549.750 101-6 Remoción de Barreras de Contención Laterales m 158.00 89.78 0.00 158.00 0.00% 100.00% 0.00
3137 3 ON-16.1 558.880 101-6 Remoción de Barreras de Contención Laterales m 129.00 73.30 116.00 13.00 89.92% 10.08% 32.00 16.00 0.00 10.00 33.00 25.00
3197 3 ON-16.2 558.880 101-6 Remoción de Barreras de Contención Laterales m 213.00 121.03 0.00 213.00 0.00% 100.00% 0.00
3510 3 OA-16 567.500 101-6 Remoción de Barreras de Contención Laterales m 44.00 25.00 0.00 44.00 0.00% 100.00% 0.00
3584 3 OA-17 572.350 101-6 Remoción de Barreras de Contención Laterales m 250.00 142.05 48.00 202.00 19.20% 80.80% 0.00 48.00
2639 3 OA-12 525.600 206-2 Relleno Estructural Permeable m3 1,017.62 1,131.08 989.62 28.00 97.25% 2.75% 458.00 50.00 0.00 209.00 250.00 22.62
3064 3 OA-14 549.750 206-2 Relleno Estructural Permeable m3 1,014.40 1,127.51 760.00 254.40 74.92% 25.08% 0.00 150.00 260.00 50.00 300.00
3643 3 OA-17 572.350 206-2 Relleno Estructural Permeable m3 1,522.71 1,692.49 900.00 622.71 59.11% 40.89% 0.00 200.00 200.00 500.00
2595 3 OA-12 525.600 206-1 Relleno Estructural m3 102.00 135.14 87.80 14.20 86.08% 13.92% 0.00 10.00 60.00 6.00 6.00 5.80
2771 3 OS-08 529.300 530.300 206-1 Relleno Estructural m3 663.00 878.41 100.00 563.00 15.08% 84.92% 0.00 100.00
2822 3 OS-09 530.300 531.300 206-1 Relleno Estructural m3 123.00 162.96 0.00 123.00 0.00% 100.00% 0.00
2961 3 ON-15 539.132 206-1 Relleno Estructural m3 278.00 368.32 167.80 110.20 60.36% 39.64% 0.00 27.80 27.00 50.00 10.00 53.00
3207 3 ON-16.2 558.880 206-1 Relleno Estructural m3 51.00 67.57 0.00 51.00 0.00% 100.00% 0.00
3594 3 OA-17 572.350 206-1 Relleno Estructural m3 146.00 193.44 46.00 100.00 31.51% 68.49% 0.00 46.00
2690 3 OA-12 525.600 Relleno de arena protección de ductos m3 18.80 42.52 0.00 18.80 0.00% 100.00% 0.00
2930 3 OA-13 539.000 Relleno de arena protección de ductos m3 266.40 602.46 263.53 2.87 98.92% 1.08% 14.40 20.94 82.00 14.40 10.00 18.65 16.73 6.00 3.00 27.76 26.54 5.00 9.31 8.80
3114 3 OA-14 549.750 Relleno de arena protección de ductos m3 24.32 55.00 0.00 24.32 0.00% 100.00% 0.00
3258 3 ON-16.2 558.880 Relleno de arena protección de ductos m3 21.04 47.58 0.00 21.04 0.00% 100.00% 0.00
3365 3 OA-19 559.800 Relleno de arena protección de ductos m3 23.76 53.73 22.53 1.23 94.84% 5.16% 0.00 20.43 2.10
3488 3 OA-15 564.300 Relleno de arena protección de ductos m3 28.64 64.77 8.00 20.64 27.93% 72.07% 0.00 8.00
3696 3 OA-17 572.350 Relleno de arena protección de ductos m3 78.40 177.30 0.00 78.40 0.00% 100.00% 0.00
2791 3 OS-08 529.300 530.300 611-1 Rejillas para Sumideros N° 1.00 19.91 0.00 1.00 0.00% 100.00% 0.00
2716 3 ON-13 525.600 611-2 Rejilla para Cuneta de Hormigón, Tipo Rectangular N° 12.00 68.03 8.50 3.50 70.83% 29.17% 0.00 2.50 6.00
3037 3 OA-14 549.750 611-2 Rejilla para Cuneta de Hormigón, Tipo Rectangular m 185.00 261.87 150.00 35.00 81.08% 18.92% 0.00 150.00
3167 3 ON-16.1 558.880 611-2 Rejilla para Cuneta de Hormigón, Tipo Rectangular N° 7.00 39.68 0.00 7.00 0.00% 100.00% 0.00
3615 3 OA-17 572.350 611-2 Rejilla de Foso Rectangular N° 36.00 204.08 0.00 36.00 0.00% 100.00% 0.00
2506 3 OA-11 524.400 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
2582 3 OA-12 525.600 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
2707 3 ON-13 525.600 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
2758 3 OS-08 529.300 530.300 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
2810 3 OS-09 530.300 531.300 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
2904 3 OA-13 539.000 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
2946 3 ON-15 539.132 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
3002 3 OA-14 549.750 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
3131 3 ON-16.1 558.880 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
3192 3 ON-16.2 558.880 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
3273 3 OA-19 559.800 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
3382 3 OA-15 564.300 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
3505 3 OA-16 567.500 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
3577 3 OA-17 572.350 Recepción de la Obra 1 0.00 1.00 0.00% 100.00%
2699 3 OA-12 525.600 Provisión y Montaje Tierras de Protección de Empalmes N° 1.00 176.68 0.00 1.00 0.00% 100.00% 0.00
2938 3 OA-13 539.000 Provisión y Montaje Tierras de Protección de Empalmes N° 4.00 706.71 3.00 1.00 75.00% 25.00% 0.00 3.00
3123 3 OA-14 549.750 Provisión y Montaje Tierras de Protección de Empalmes N° 1.00 176.68 0.00 1.00 0.00% 100.00% 0.00
3265 3 ON-16.2 558.880 Provisión y Montaje Tierras de Protección de Empalmes N° 2.00 353.36 0.00 2.00 0.00% 100.00% 0.00
3374 3 OA-19 559.800 Provisión y Montaje Tierras de Protección de Empalmes N° 1.00 176.68 0.00 1.00 0.00% 100.00% 0.00
3497 3 OA-15 564.300 Provisión y Montaje Tierras de Protección de Empalmes N° 1.00 176.68 0.00 1.00 0.00% 100.00% 0.00
3705 3 OA-17 572.350 Provisión y Montaje Tierras de Protección de Empalmes N° 2.00 353.36 0.00 2.00 0.00% 100.00% 0.00
2670 3 OA-12 525.600 Prov. y Montaje Tierras de Protec. en Poste Fe galvanizado tubular N° 10.00 4.18 0.00 10.00 0.00% 100.00% 0.00
2912 3 OA-13 539.000 Prov. y Montaje Tierras de Protec. en Poste Fe galvanizado tubular N° 15.00 335.42 7.00 8.00 46.67% 53.33% 0.00 7.00
3095 3 OA-14 549.750 Prov. y Montaje Tierras de Protec. en Poste Fe galvanizado tubular N° 16.00 6.68 0.00 16.00 0.00% 100.00% 0.00
3243 3 ON-16.2 558.880 Prov. y Montaje Tierras de Protec. en Poste Fe galvanizado tubular N° 16.00 6.68 0.00 16.00 0.00% 100.00% 0.00
3347 3 OA-19 559.800 Prov. y Montaje Tierras de Protec. en Poste Fe galvanizado tubular N° 16.00 6.68 11.00 5.00 68.75% 31.25% 0.00 11.00
3468 3 OA-15 564.300 Prov. y Montaje Tierras de Protec. en Poste Fe galvanizado tubular N° 17.00 7.10 3.00 14.00 17.65% 82.35% 0.00 3.00
3676 3 OA-17 572.350 Prov. y Montaje Tierras de Protec. en Poste Fe galvanizado tubular N° 40.00 16.71 0.00 40.00 0.00% 100.00% 0.00
3539 3 OA-16 567.500 616-1 Protección de Taludes con Siembra Controlada m2 1,442.00 81.91 0.00 1,442.00 0.00% 100.00% 0.00
2508 3 OA-11 524.400 5.100 PREPARACION DEL AREA DE TRABAJO
2584 3 OA-12 525.600 5.100 PREPARACION DEL AREA DE TRABAJO
2760 3 OS-08 529.300 530.300 5.100 PREPARACION DEL AREA DE TRABAJO
2812 3 OS-09 530.300 531.300 5.100 PREPARACION DEL AREA DE TRABAJO
2866 3 ON-14 537.060 5.100 PREPARACION DEL AREA DE TRABAJO
2948 3 ON-15 539.132 5.100 PREPARACION DEL AREA DE TRABAJO
3004 3 OA-14 549.750 5.100 PREPARACION DEL AREA DE TRABAJO
3133 3 ON-16.1 558.880 5.100 PREPARACION DEL AREA DE TRABAJO
3194 3 ON-16.2 558.880 5.100 PREPARACION DEL AREA DE TRABAJO
3275 3 OA-19 559.800 5.100 PREPARACION DEL AREA DE TRABAJO
3384 3 OA-15 564.300 5.100 PREPARACION DEL AREA DE TRABAJO
3507 3 OA-16 567.500 5.100 PREPARACION DEL AREA DE TRABAJO
3579 3 OA-17 572.350 5.100 PREPARACION DEL AREA DE TRABAJO
3715 3 ON-17 572.700 573.240 5.100 PREPARACION DEL AREA DE TRABAJO
2596 3 OA-12 525.600 209-1 Preparación de la Subrasante m2 5,384.50 221.84 4,984.50 400.00 92.57% 7.43% 1,040.00 1,500.00 0.00 100.00 1,100.00 700.00 44.50 500.00
2772 3 OS-08 529.300 530.300 209-1 Preparación de la Subrasante m2 9,758.94 402.07 0.00 9,758.94 0.00% 100.00% 0.00
2823 3 OS-09 530.300 531.300 209-1 Preparación de la Subrasante m2 10,402.62 428.59 1,040.00 9,362.62 10.00% 90.00% 0.00 1,040.00
2962 3 ON-15 539.132 209-1 Preparación de la Subrasante m2 6,114.13 251.90 4,311.40 1,802.73 70.52% 29.48% 0.00 611.40 1,800.00 1,900.00
3018 3 OA-14 549.750 209-1 Preparación de la Subrasante m2 6,562.02 270.36 0.00 6,562.02 0.00% 100.00% 0.00
3148 3 ON-16.1 558.880 209-1 Preparación de la Subrasante m2 4,899.15 201.84 4,575.00 324.15 93.38% 6.62% 785.00 2,120.00 0.00 500.00 850.00 320.00
3208 3 ON-16.2 558.880 209-1 Preparación de la Subrasante m2 1,917.06 78.98 0.00 1,917.06 0.00% 100.00% 0.00
3396 3 OA-15 564.300 209-1 Preparación de la Subrasante m2 5,501.27 226.65 4,095.00 1,406.27 74.44% 25.56% 0.00 500.00 600.00 2,000.00 200.00 350.00 175.00 200.00 70.00
3518 3 OA-16 567.500 209-1 Preparación de la Subrasante m2 422.57 17.41 225.00 197.57 53.25% 46.75% 0.00 170.00 55.00
3595 3 OA-17 572.350 209-1 Preparación de la Subrasante m2 614.49 25.32 0.00 614.49 0.00% 100.00% 0.00
2665 3 OA-12 525.600 Poste Fe galvanizado tubular 12m, 1 brazo recto de 1,0 m N° 2.00 59.57 0.00 2.00 0.00% 100.00% 0.00
3090 3 OA-14 549.750 Poste Fe galvanizado tubular 12m, 1 brazo recto de 1,0 m N° 2.00 59.57 0.00 2.00 0.00% 100.00% 0.00
3463 3 OA-15 564.300 Poste Fe galvanizado tubular 12m, 1 brazo recto de 1,0 m N° 2.00 59.57 0.00 2.00 0.00% 100.00% 0.00
3669 3 OA-17 572.350 Poste Fe galvanizado tubular 12m, 1 brazo recto de 1,0 m N° 2.00 59.57 0.00 2.00 0.00% 100.00% 0.00
3464 3 OA-15 564.300 Poste Fe galvanizado tubular 10m, 1 brazo recto de 1,0 m N° 6.00 127.86 0.00 6.00 0.00% 100.00% 0.00
3670 3 OA-17 572.350 Poste Fe galvanizado tubular 10m, 1 brazo recto de 1,0 m N° 8.00 170.48 0.00 8.00 0.00% 100.00% 0.00
2664 3 OA-12 525.600 C.1 POSTACIÓN
2720 3 ON-13 525.600 B.1 POSTACIÓN
2906 3 OA-13 539.000 A.1 POSTACIÓN
3089 3 OA-14 549.750 C.1 POSTACIÓN
3240 3 ON-16.2 558.880 B.1 POSTACIÓN
3341 3 OA-19 559.800 C.1 POSTACIÓN
3462 3 OA-15 564.300 C.1 POSTACIÓN
3668 3 OA-17 572.350 C.1 POSTACIÓN
3737 3 OA-18 573.550 A.1 POSTACIÓN
2566 3 OA-11 524.400 5. PLANTACION HELECHOS
3559 3 OA-16 567.500 5. PLANTACION HELECHOS
2570 3 OA-11 524.400 7. PLANTACION DE HERBÁCEAS
3563 3 OA-16 567.500 7. PLANTACION DE HERBÁCEAS
2568 3 OA-11 524.400 6. PLANTACION DE ESPECIES PALUSTRES DE BORDE DE AGUA
3561 3 OA-16 567.500 6. PLANTACION DE ESPECIES PALUSTRES DE BORDE DE AGUA
2564 3 OA-11 524.400 4. PLANTACION ARBUSTOS
3557 3 OA-16 567.500 4. PLANTACION ARBUSTOS
2560 3 OA-11 524.400 3. PLANTACION ARBOLES
3553 3 OA-16 567.500 3. PLANTACION ARBOLES
2572 3 OA-11 524.400 8. PAVIMENTOS, PETREOS Y SUELOS
3565 3 OA-16 567.500 8. PAVIMENTOS, PETREOS Y SUELOS
3267 3 OA-19 559.800 PASARELA PEATONAL MININCO, SECTOR ENLACE MININCO
3707 3 ON-17 572.700 573.240 PANTALLAS ACÚSTICAS POBLACIÓN MICHIGAN
2558 3 OA-11 524.400 B. PAISAJISMO
3551 3 OA-16 567.500 B. PAISAJISMO
2555 3 OA-11 524.400 5.800 OBRAS VARIAS
2858 3 ON-14 537.060 NUEVO PARADERO ORIENTE, SECTOR ENLACE MULCHÉN
2512 3 OA-11 524.400 5.200 MOVIMIENTO DE TIERRAS
2590 3 OA-12 525.600 5.200 MOVIMIENTO DE TIERRAS
2709 3 ON-13 525.600 5.200 MOVIMIENTO DE TIERRAS
2765 3 OS-08 529.300 530.300 5.200 MOVIMIENTO DE TIERRAS
2816 3 OS-09 530.300 531.300 5.200 MOVIMIENTO DE TIERRAS
2869 3 ON-14 537.060 5.200 MOVIMIENTO DE TIERRAS
2956 3 ON-15 539.132 5.200 MOVIMIENTO DE TIERRAS
3012 3 OA-14 549.750 5.200 MOVIMIENTO DE TIERRAS
3142 3 ON-16.1 558.880 5.200 MOVIMIENTO DE TIERRAS
3202 3 ON-16.2 558.880 5.200 MOVIMIENTO DE TIERRAS
3281 3 OA-19 559.800 5.200 MOVIMIENTO DE TIERRAS
3390 3 OA-15 564.300 5.200 MOVIMIENTO DE TIERRAS 350.00
3512 3 OA-16 567.500 5.200 MOVIMIENTO DE TIERRAS
3588 3 OA-17 572.350 5.200 MOVIMIENTO DE TIERRAS
3718 3 ON-17 572.700 573.240 5.200 MOVIMIENTO DE TIERRAS
2669 3 OA-12 525.600 Montaje de Poste Fe galvanizado tubular N° 10.00 15.55 0.00 10.00 0.00% 100.00% 0.00
2723 3 ON-13 525.600 Montaje de Poste Fe galvanizado tubular N° 6.00 9.33 0.00 6.00 0.00% 100.00% 0.00
2911 3 OA-13 539.000 Montaje de Poste Fe galvanizado tubular N° 100.00 41.77 89.00 11.00 89.00% 11.00% 0.00 20.00 16.00 1.00 22.00 7.00 8.00 7.00 7.00 1.00
3094 3 OA-14 549.750 Montaje de Poste Fe galvanizado tubular N° 16.00 24.88 0.00 16.00 0.00% 100.00% 0.00
3242 3 ON-16.2 558.880 Montaje de Poste Fe galvanizado tubular N° 16.00 24.88 0.00 16.00 0.00% 100.00% 0.00
3346 3 OA-19 559.800 Montaje de Poste Fe galvanizado tubular N° 16.00 24.88 0.00 16.00 0.00% 100.00% 0.00
3467 3 OA-15 564.300 Montaje de Poste Fe galvanizado tubular N° 17.00 26.43 3.00 14.00 17.65% 82.35% 0.00 3.00
3675 3 OA-17 572.350 Montaje de Poste Fe galvanizado tubular N° 40.00 62.19 0.00 40.00 0.00% 100.00% 0.00
2686 3 OA-12 525.600 Montaje de Canalización c.a.g. m 0.00 0.00 0.00 0.00 0.00% 100.00%
3110 3 OA-14 549.750 Montaje de Canalización c.a.g. m 0.00 0.00 0.00 0.00 0.00% 100.00%
3361 3 OA-19 559.800 Montaje de Canalización c.a.g. m 0.00 0.00 0.00 0.00 0.00% 100.00%
3484 3 OA-15 564.300 Montaje de Canalización c.a.g. m 0.00 0.00 0.00 0.00 0.00% 100.00%
3692 3 OA-17 572.350 Montaje de Canalización c.a.g. m 0.00 0.00 0.00 0.00 0.00% 100.00%
2647 3 OA-12 525.600 504-1 Moldajes m2 49.48 85.56 46.90 2.58 94.79% 5.21% 24.00 3.00 0.00 5.60 12.00 2.30
3069 3 OA-14 549.750 504-1 Moldajes m2 336.27 581.48 251.00 85.27 74.64% 25.36% 0.00 70.00 66.00 115.00
3072 3 OA-14 549.750 504-1 Moldajes m2 29.98 51.84 0.00 29.98 0.00% 100.00% 0.00
3648 3 OA-17 572.350 504-1 Moldajes m2 377.09 652.06 235.00 142.09 62.32% 37.68% 0.00 185.00 35.00 15.00
3653 3 OA-17 572.350 504-1 Moldajes m2 39.89 68.98 22.00 17.89 55.15% 44.85% 0.00 22.00
2701 3 ON-13 525.600 MEJORAMIENTO SANEAMIENTO, PASO DE MAQUINARIAS SECTOR MIRADOR DEL BÍO BÍO
3125 3 ON-16.1 558.880 MEJORAMIENTO PARADEROS ORIENTE Y PONIENTE, VILLA ESPERANZA
3186 3 ON-16.2 558.880 MEJORAMIENTO PARADEROS ORIENTE Y PONIENTE, VILLA ESPERANZA
3063 3 OA-14 549.750 206-1 ESP Mejoramiento de Suelos m3 579.77 644.41 526.00 53.77 90.73% 9.27% 0.00 221.00 80.00 23.00 150.00 52.00
2940 3 ON-15 539.132 MEJORAMIENTO DE DRENAJE, SECTOR ORIENTE ENLACE NEGRETE
2502 3 OA-11 524.400 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
2578 3 OA-12 525.600 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
2703 3 ON-13 525.600 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
2754 3 OS-08 529.300 530.300 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
2806 3 OS-09 530.300 531.300 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
2900 3 OA-13 539.000 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
2942 3 ON-15 539.132 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
2998 3 OA-14 549.750 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
3127 3 ON-16.1 558.880 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
3188 3 ON-16.2 558.880 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
3269 3 OA-19 559.800 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
3378 3 OA-15 564.300 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
3501 3 OA-16 567.500 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
3573 3 OA-17 572.350 Liberación de Interferencias 1 0.00 1.00 0.00% 100.00%
2505 3 OA-11 524.400 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
2581 3 OA-12 525.600 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
2706 3 ON-13 525.600 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
2757 3 OS-08 529.300 530.300 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
2809 3 OS-09 530.300 531.300 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
2903 3 OA-13 539.000 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
2945 3 ON-15 539.132 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
3001 3 OA-14 549.750 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
3130 3 ON-16.1 558.880 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
3191 3 ON-16.2 558.880 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
3272 3 OA-19 559.800 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
3381 3 OA-15 564.300 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
3504 3 OA-16 567.500 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
3576 3 OA-17 572.350 Levantamiento Observaciones 1 0.00 1.00 0.00% 100.00%
3714 3 ON-17 572.700 573.240 A. INSTALACIÓN PANTALLA ANTIRRUIDO
2635 3 OA-12 525.600 INFRAESTRUCTURA
3060 3 OA-14 549.750 INFRAESTRUCTURA
3308 3 OA-19 559.800 INFRAESTRUCTURA
3433 3 OA-15 564.300 INFRAESTRUCTURA
3639 3 OA-17 572.350 INFRAESTRUCTURA
2601 3 OA-12 525.600 401-1 Imprimación m2 5,198.17 147.11 4,108.00 1,090.17 79.03% 20.97% 0.00 2,200.00 950.00 168.00 790.00
2778 3 OS-08 529.300 530.300 401-1 Imprimación m2 4,577.48 129.54 0.00 4,577.48 0.00% 100.00% 0.00
2828 3 OS-09 530.300 531.300 401-1 Imprimación m2 7,120.01 201.50 0.00 7,120.01 0.00% 100.00% 0.00
2967 3 ON-15 539.132 401-1 Imprimación m2 5,173.22 146.40 3,840.00 1,333.22 74.23% 25.77% 0.00 1,760.00 2,080.00
3023 3 OA-14 549.750 401-1 Imprimación m2 6,194.87 175.31 0.00 6,194.87 0.00% 100.00% 0.00
3153 3 ON-16.1 558.880 401-1 Imprimación m2 4,195.22 118.72 3,000.00 1,195.22 71.51% 28.49% 1,200.00 0.00 500.00 500.00 800.00
3213 3 ON-16.2 558.880 401-1 Imprimación m2 1,613.91 45.67 0.00 1,613.91 0.00% 100.00% 0.00
3401 3 OA-15 564.300 401-1 Imprimación m2 5,371.04 152.00 2,700.00 2,671.04 50.27% 49.73% 0.00 1,150.00 200.00 1,350.00
3523 3 OA-16 567.500 401-1 Imprimación m2 429.60 12.16 0.00 429.60 0.00% 100.00% 0.00
3600 3 OA-17 572.350 401-1 Imprimación m2 632.74 17.91 0.00 632.74 0.00% 100.00% 0.00
3065 3 OA-14 549.750 412-2 Impermeabilización de Muros m2 377.30 41.31 266.00 111.30 70.50% 29.50% 0.00 156.00 30.00 80.00
3644 3 OA-17 572.350 412-2 Impermeabilización de Muros m2 356.75 39.06 205.00 151.75 57.46% 42.54% 0.00 140.00 65.00
2898 3 OA-13 539.000 ILUMINACIÓN ENLACE NEGRETE
2663 3 OA-12 525.600 C. ILUMINACIÓN
2719 3 ON-13 525.600 B. ILUMINACIÓN
2905 3 OA-13 539.000 A. ILUMINACIÓN
3088 3 OA-14 549.750 C. ILUMINACIÓN
3239 3 ON-16.2 558.880 B. ILUMINACIÓN
3340 3 OA-19 559.800 C. ILUMINACIÓN
3461 3 OA-15 564.300 C. ILUMINACIÓN
3667 3 OA-17 572.350 C. ILUMINACIÓN
3736 3 OA-18 573.550 A. ILUMINACIÓN
2649 3 OA-12 525.600 501-15 Hormigón G30 S/M m3 9.96 54.03 9.50 0.46 95.38% 4.62% 4.50 1.00 0.00 1.00 2.00 1.00
3067 3 OA-14 549.750 501-15 Hormigón G30 S/M m3 195.38 1,059.98 178.00 17.38 91.10% 8.90% 0.00 40.00 8.00 35.00 65.00 30.00
3074 3 OA-14 549.750 501-15 Hormigón G30 S/M m3 6.20 33.64 0.00 6.20 0.00% 100.00% 0.00
3646 3 OA-17 572.350 501-15 Hormigón G30 S/M m3 155.75 844.97 101.10 54.65 64.91% 35.09% 0.00 30.00 19.00 35.00 13.60 3.50
3651 3 OA-17 572.350 501-15 Hormigón G30 S/M m3 8.93 48.45 6.20 2.73 69.43% 30.57% 0.00 3.00 3.00 0.20
2783 3 OS-08 529.300 530.300 501-6 Hormigón G25 m3 219.06 3,082.37 74.00 145.06 33.78% 66.22% 0.00 18.00 39.00 2.00 15.00
2833 3 OS-09 530.300 531.300 501-6 Hormigón G25 m3 44.66 628.41 0.00 44.66 0.00% 100.00% 0.00
2974 3 ON-15 539.132 501-6 Hormigón G25 m3 215.72 3,035.37 160.00 55.72 74.17% 25.83% 0.00 160.00
3220 3 ON-16.2 558.880 501-6 Hormigón G25 m3 8.64 121.57 0.00 8.64 0.00% 100.00% 0.00
2782 3 OS-08 529.300 530.300 501-4 Hormigón G17 m3 44.32 463.26 9.52 34.80 21.48% 78.52% 0.00 9.52
2832 3 OS-09 530.300 531.300 501-4 Hormigón G17 m3 15.35 160.45 0.00 15.35 0.00% 100.00% 0.00
2973 3 ON-15 539.132 501-4 Hormigón G17 m3 31.44 328.63 23.00 8.44 73.16% 26.84% 0.00 23.00
3607 3 OA-17 572.350 501-4 Hormigón G17 m3 2.68 28.01 0.00 2.68 0.00% 100.00% 0.00
3066 3 OA-14 549.750 501-2 Hormigón G10 m3 19.87 76.84 17.90 1.97 90.09% 9.91% 0.00 5.00 5.00 5.00 2.90
3645 3 OA-17 572.350 501-2 Hormigón G10 m3 17.99 69.57 11.00 6.99 61.15% 38.85% 0.00 9.00 2.00
2781 3 OS-08 529.300 530.300 501-1 Hormigón G05 m3 14.52 56.16 5.00 9.52 34.44% 65.56% 0.00 5.00
2831 3 OS-09 530.300 531.300 501-1 Hormigón G05 m3 3.52 13.61 0.00 3.52 0.00% 100.00% 0.00
3219 3 ON-16.2 558.880 501-1 Hormigón G05 m3 0.58 2.24 0.00 0.58 0.00% 100.00% 0.00
2692 3 OA-12 525.600 Fundaciones postes PFV o Fe galvanizados de 12m m3 0.49 2.19 0.22 0.27 44.08% 55.92% 0.00 0.22
3116 3 OA-14 549.750 Fundaciones postes PFV o Fe galvanizados de 12m m3 0.49 2.19 0.00 0.49 0.00% 100.00% 0.00
3490 3 OA-15 564.300 Fundaciones postes PFV o Fe galvanizados de 12m m3 0.49 2.19 0.00 0.49 0.00% 100.00% 0.00
3698 3 OA-17 572.350 Fundaciones postes PFV o Fe galvanizados de 12m m3 0.49 2.19 0.00 0.49 0.00% 100.00% 0.00
2693 3 OA-12 525.600 Fundaciones postes PFV o Fe galvanizados de 10m m3 0.97 4.34 0.86 0.11 89.07% 10.93% 0.00 0.86
2932 3 OA-13 539.000 Fundaciones postes PFV o Fe galvanizados de 10m m3 23.33 104.38 18.53 4.80 79.44% 20.56% 0.00 2.38 4.10 2.77 3.46 5.83
3117 3 OA-14 549.750 Fundaciones postes PFV o Fe galvanizados de 10m m3 0.97 4.34 0.00 0.97 0.00% 100.00% 0.00
3491 3 OA-15 564.300 Fundaciones postes PFV o Fe galvanizados de 10m m3 1.46 6.53 0.00 1.46 0.00% 100.00% 0.00
3699 3 OA-17 572.350 Fundaciones postes PFV o Fe galvanizados de 10m m3 1.94 8.68 0.00 1.94 0.00% 100.00% 0.00
2694 3 OA-12 525.600 Fundaciones postes PFV o Fe galvanizados < 6m m3 0.49 1.07 0.00 0.49 0.00% 100.00% 0.00
3118 3 OA-14 549.750 Fundaciones postes PFV o Fe galvanizados < 6m m3 1.22 2.67 0.00 1.22 0.00% 100.00% 0.00
3260 3 ON-16.2 558.880 Fundaciones postes PFV o Fe galvanizados < 6m m3 3.89 8.50 0.00 3.89 0.00% 100.00% 0.00
3492 3 OA-15 564.300 Fundaciones postes PFV o Fe galvanizados < 6m m3 1.09 2.38 0.00 1.09 0.00% 100.00% 0.00
3700 3 OA-17 572.350 Fundaciones postes PFV o Fe galvanizados < 6m m3 3.65 7.98 0.00 3.65 0.00% 100.00% 0.00
2770 3 OS-08 529.300 530.300 205-1 Formación y Compactación de Terraplenes m3 23,589.00 13,176.82 13,255.00 10,334.00 56.19% 43.81% 0.00 1,500.00 1,000.00 4,000.00 2,000.00 2,500.00 1,000.00 770.00 485.00
2821 3 OS-09 530.300 531.300 205-1 Formación y Compactación de Terraplenes m3 19,577.00 10,935.71 1,250.00 18,327.00 6.39% 93.61% 0.00 1,250.00
3016 3 OA-14 549.750 205-1 Formación y Compactación de Terraplenes m3 353.87 197.67 171.30 182.57 48.41% 51.59% 0.00 35.30 73.00 63.00
3206 3 ON-16.2 558.880 205-1 Formación y Compactación de Terraplenes m3 4,959.71 2,770.49 1,650.00 3,309.71 33.27% 66.73% 0.00 250.00 300.00 300.00 800.00
3593 3 OA-17 572.350 205-1 Formación y Compactación de Terraplenes m3 829.60 463.41 0.00 829.60 0.00% 100.00% 0.00
2500 3 OA-11 524.400 FACILIDADES PEATONALES SECTOR SAN CARLOS DE PURÉN
2996 3 OA-14 549.750 FACILIDADES PEATONALES SECTOR PIEDRA AMARILLA
2576 3 OA-12 525.600 FACILIDADES PEATONALES SECTOR MIRADOR BÍO-BÍO
3376 3 OA-15 564.300 FACILIDADES PEATONALES SECTOR ESCUELA FORESTA
3729 3 OA-18 573.550 FACILIDADES PEATONALES SECTOR COLLIPULLI SUR 0.00
3571 3 OA-17 572.350 FACILIDADES PEATONALES SECTOR COLLIPULLI
3499 3 OA-16 567.500 FACILIDADES PEATONALES SECTOR BRIGADA FORESTAL (MININCO)
2695 3 OA-12 525.600 Excavaciones fundaciones postes PFV o Fe galv. m3 3.15 1.48 1.00 2.15 31.75% 68.25% 0.00 1.00
2934 3 OA-13 539.000 Excavaciones fundaciones postes PFV o Fe galv. m3 36.90 17.39 33.10 3.80 89.71% 10.29% 0.00 7.38 5.35 2.21 8.00 2.00 4.50 1.96 1.70
3119 3 OA-14 549.750 Excavaciones fundaciones postes PFV o Fe galv. m3 4.50 2.12 0.00 4.50 0.00% 100.00% 0.00
3261 3 ON-16.2 558.880 Excavaciones fundaciones postes PFV o Fe galv. m3 6.00 2.83 0.00 6.00 0.00% 100.00% 0.00
3370 3 OA-19 559.800 Excavaciones fundaciones postes PFV o Fe galv. m3 4.95 2.33 4.42 0.53 89.20% 10.80% 0.00 3.42 1.00
3493 3 OA-15 564.300 Excavaciones fundaciones postes PFV o Fe galv. m3 5.03 2.37 1.50 3.53 29.82% 70.18% 0.00 1.50
3701 3 OA-17 572.350 Excavaciones fundaciones postes PFV o Fe galv. m3 10.50 4.95 0.00 10.50 0.00% 100.00% 0.00
2689 3 OA-12 525.600 Excavación y tapado de zanja para Tendido de ducto PVC m3 56.40 23.92 0.00 56.40 0.00% 100.00% 0.00
2929 3 OA-13 539.000 Excavación y tapado de zanja para Tendido de ducto PVC m3 808.24 342.77 802.48 5.76 99.29% 0.71% 15.00 12.00 22.40 445.74 57.60 24.00 16.00 4.00 111.04 36.70 20.00 30.00 8.00
3113 3 OA-14 549.750 Excavación y tapado de zanja para Tendido de ducto PVC m3 72.96 30.94 0.00 72.96 0.00% 100.00% 0.00
3257 3 ON-16.2 558.880 Excavación y tapado de zanja para Tendido de ducto PVC m3 63.12 26.77 0.00 63.12 0.00% 100.00% 0.00
3364 3 OA-19 559.800 Excavación y tapado de zanja para Tendido de ducto PVC m3 71.28 30.23 67.58 3.70 94.81% 5.19% 0.00 61.30 6.28
3487 3 OA-15 564.300 Excavación y tapado de zanja para Tendido de ducto PVC m3 85.92 36.44 24.00 61.92 27.93% 72.07% 0.00 24.00
3695 3 OA-17 572.350 Excavación y tapado de zanja para Tendido de ducto PVC m3 237.28 100.63 0.00 237.28 0.00% 100.00% 0.00
2769 3 OS-08 529.300 530.300 202-1 Excavación en TCN para Obras de Drenaje m3 725.00 307.47 598.00 127.00 82.48% 17.52% 0.00 72.00 30.00 160.00 180.00 156.00
2820 3 OS-09 530.300 531.300 202-1 Excavación en TCN para Obras de Drenaje m3 122.00 51.74 0.00 122.00 0.00% 100.00% 0.00
2870 3 ON-14 537.060 Excavación en TCN para Obras de Drenaje 100%
2959 3 ON-15 539.132 202-1 Excavación en TCN para Obras de Drenaje m3 1,813.00 768.89 1,331.00 482.00 73.41% 26.59% 0.00 13.00 55.00 515.00 170.00 60.00 480.00 38.00
3015 3 OA-14 549.750 202-1 Excavación en TCN para Obras de Drenaje m3 116.00 49.20 101.00 15.00 87.07% 12.93% 0.00 10.00 40.00 51.00
3205 3 ON-16.2 558.880 202-1 Excavación en TCN para Obras de Drenaje m3 537.00 227.74 0.00 537.00 0.00% 100.00% 0.00
3591 3 OA-17 572.350 202-1 Excavación en TCN para Obras de Drenaje m3 219.00 92.88 0.00 219.00 0.00% 100.00% 0.00
3719 3 ON-17 572.700 573.240 Excavación en TCN para Obras de Drenaje 100.00%
3592 3 OA-17 572.350 202-3 Excavación en Roca para Obras de Drenaje m3 92.00 89.82 0.00 92.00 0.00% 100.00% 0.00
3062 3 OA-14 549.750 202-7 Excavación Directa con Agotamiento m3 644.25 711.12 590.00 54.25 91.58% 8.42% 0.00 200.00 110.00 65.00 80.00 65.00 64.00 6.00
2766 3 OS-08 529.300 530.300 201-1 Excavación de Escarpe m3 3,612.00 1,009.92 2,111.00 1,501.00 58.44% 41.56% 0.00 361.00 550.00 950.00 250.00
2817 3 OS-09 530.300 531.300 201-1 Excavación de Escarpe m3 2,609.00 729.48 1,710.00 899.00 65.54% 34.46% 0.00 260.00 300.00 350.00 650.00 150.00
3203 3 ON-16.2 558.880 201-1 Excavación de Escarpe m3 692.00 193.48 492.00 200.00 71.10% 28.90% 0.00 210.00 160.00 122.00
3589 3 OA-17 572.350 201-1 Excavación de Escarpe m3 505.50 141.34 0.00 505.50 0.00% 100.00% 0.00
2768 3 OS-08 529.300 530.300 201-3 Excavación de Corte en Terreno de Cualquier Naturaleza m3 254.00 78.99 90.40 163.60 35.59% 64.41% 0.00 25.40 45.00 20.00
2819 3 OS-09 530.300 531.300 201-3 Excavación de Corte en Terreno de Cualquier Naturaleza m3 1,464.00 455.30 740.00 724.00 50.55% 49.45% 0.00 260.00 480.00
3014 3 OA-14 549.750 201-3 Excavación de Corte en Terreno de Cualquier Naturaleza m3 7,068.84 2,198.41 6,176.00 892.84 87.37% 12.63% 0.00 354.00 1,285.00 1,200.00 350.00 800.00 116.00 560.00 388.00 1,123.00
3204 3 ON-16.2 558.880 201-3 Excavación de Corte en Terreno de Cualquier Naturaleza m3 1,219.00 379.11 600.00 619.00 49.22% 50.78% 0.00 200.00 400.00
3514 3 OA-16 567.500 201-3 Excavación de Corte en Terreno de Cualquier Naturaleza m3 217.74 67.72 191.00 26.74 87.72% 12.28% 0.00 21.00 170.00
3590 3 OA-17 572.350 201-3 Excavación de Corte en Terreno de Cualquier Naturaleza m3 126.02 39.19 0.00 126.02 0.00% 100.00% 0.00
3061 3 OA-14 549.750 202-5 Excavación a Máquina m3 870.33 960.67 793.00 77.33 91.11% 8.89% 0.00 250.00 200.00 155.00 98.00 40.00 40.00 10.00
2528 3 OA-11 524.400 5.500 ESTRUCTURA Y OBRAS CONEXAS
2606 3 OA-12 525.600 5.500 ESTRUCTURA Y OBRAS CONEXAS
2780 3 OS-08 529.300 530.300 5.500 ESTRUCTURA Y OBRAS CONEXAS
2830 3 OS-09 530.300 531.300 5.500 ESTRUCTURA Y OBRAS CONEXAS
2971 3 ON-15 539.132 5.500 ESTRUCTURA Y OBRAS CONEXAS
3028 3 OA-14 549.750 5.500 ESTRUCTURA Y OBRAS CONEXAS
3157 3 ON-16.1 558.880 5.500 ESTRUCTURA Y OBRAS CONEXAS
3218 3 ON-16.2 558.880 5.500 ESTRUCTURA Y OBRAS CONEXAS
3289 3 OA-19 559.800 5.500 ESTRUCTURA Y OBRAS CONEXAS
3406 3 OA-15 564.300 5.500 ESTRUCTURA Y OBRAS CONEXAS
3529 3 OA-16 567.500 5.500 ESTRUCTURA Y OBRAS CONEXAS
3605 3 OA-17 572.350 5.500 ESTRUCTURA Y OBRAS CONEXAS
3723 3 ON-17 572.700 573.240 5,500 ESTRUCTURA Y OBRAS CONEXAS
2634 3 OA-12 525.600 B. ESTRUCTURA
3059 3 OA-14 549.750 B. ESTRUCTURA
3307 3 OA-19 559.800 B. ESTRUCTURA
3432 3 OA-15 564.300 B. ESTRUCTURA
3638 3 OA-17 572.350 B. ESTRUCTURA
2753 3 OS-08 529.300 530.300 Entrega de terreno 14 10.00 4.00 71.43% 28.57%
2697 3 OA-12 525.600 Empalme Monofásico en B.T. Aereo N° 1.00 152.19 0.00 1.00 0.00% 100.00% 0.00
3121 3 OA-14 549.750 Empalme Monofásico en B.T. Aereo N° 1.00 152.19 0.00 1.00 0.00% 100.00% 0.00
3263 3 ON-16.2 558.880 Empalme Monofásico en B.T. Aereo N° 2.00 304.37 0.00 2.00 0.00% 100.00% 0.00
3372 3 OA-19 559.800 Empalme Monofásico en B.T. Aereo N° 1.00 152.19 0.00 1.00 0.00% 100.00% 0.00
3495 3 OA-15 564.300 Empalme Monofásico en B.T. Aereo N° 1.00 152.19 0.00 1.00 0.00% 100.00% 0.00
3703 3 OA-17 572.350 Empalme Monofásico en B.T. Aereo N° 2.00 304.37 0.00 2.00 0.00% 100.00% 0.00
2712 3 ON-13 525.600 605-1 Embudos para Descargas de Agua N° 1.00 0.42 0.00 1.00 0.00% 100.00% 0.00
2838 3 OS-09 530.300 531.300 605-1 Embudos para Descargas de Agua N° 3.00 67.75 0.00 3.00 0.00% 100.00% 0.00
2980 3 ON-15 539.132 605-1 Embudos para Descargas de Agua N° 3.00 67.75 0.00 3.00 0.00% 100.00% 0.00
3162 3 ON-16.1 558.880 605-1 Embudos para Descargas de Agua N° 1.00 22.58 0.00 1.00 0.00% 100.00% 0.00
3410 3 OA-15 564.300 605-1 Embudos para Descargas de Agua N° 1.00 22.58 0.00 1.00 0.00% 100.00% 0.00
3533 3 OA-16 567.500 605-1 Embudos para Descargas de Agua N° 3.00 67.75 0.00 3.00 0.00% 100.00% 0.00
2545 3 OA-11 524.400 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
2616 3 OA-12 525.600 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
2795 3 OS-08 529.300 530.300 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
2846 3 OS-09 530.300 531.300 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
2891 3 ON-14 537.060 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
2984 3 ON-15 539.132 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
3040 3 OA-14 549.750 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
3170 3 ON-16.1 558.880 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
3226 3 ON-16.2 558.880 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
3299 3 OA-19 559.800 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
3415 3 OA-15 564.300 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
3540 3 OA-16 567.500 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
3621 3 OA-17 572.350 5.700 ELEMENTOS DE CONTROL Y SEGURIDAD
3727 3 ON-17 572.700 573.240 5,700 ELEMENTOS DE CONTROL Y SEGURIDAD
2535 3 OA-11 524.400 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
2612 3 OA-12 525.600 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
2711 3 ON-13 525.600 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
2786 3 OS-08 529.300 530.300 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
2836 3 OS-09 530.300 531.300 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
2884 3 ON-14 537.060 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
2977 3 ON-15 539.132 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
3032 3 OA-14 549.750 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
3160 3 ON-16.1 558.880 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
3222 3 ON-16.2 558.880 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
3294 3 OA-19 559.800 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
3408 3 OA-15 564.300 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
3531 3 OA-16 567.500 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
3610 3 OA-17 572.350 5.600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
3725 3 ON-17 572.700 573.240 5,600 DRENAJE Y PROTECCIÓN DE LA PLATAFORMA
3569 3 OA-16 567.500 10. DRENAJE
2764 3 OS-08 529.300 530.300 102-1 Despeje y Limpieza de la Faja Km 1.15 242.53 0.75 0.40 65.22% 34.78% 0.00 0.50 0.25
2815 3 OS-09 530.300 531.300 102-1 Despeje y Limpieza de la Faja Km 1.15 242.53 0.90 0.25 78.26% 21.74% 0.00 0.20 0.05 0.35 0.10 0.20
3201 3 ON-16.2 558.880 102-1 Despeje y Limpieza de la Faja Km 0.50 105.45 0.30 0.20 60.00% 40.00% 0.30 0.00
2713 3 ON-13 525.600 605-2a Descargas de Agua en Tubos Corrugados de Media Caña, D=0,60 m m 20.60 131.28 0.00 20.60 0.00% 100.00% 0.00
2839 3 OS-09 530.300 531.300 605-2A Descargas de Agua en Tubos Corrugados de Media Caña, D=0,60 m m 12.00 76.47 0.00 12.00 0.00% 100.00% 0.00
2979 3 ON-15 539.132 605-2a Descargas de Agua en Tubos Corrugados de Media Caña, D=0,60 m m 23.00 146.58 0.00 23.00 0.00% 100.00% 0.00
3163 3 ON-16.1 558.880 605-2a Descargas de Agua en Tubos Corrugados de Media Caña, D=0,60 m m 29.00 184.81 0.00 29.00 0.00% 100.00% 0.00
3411 3 OA-15 564.300 605-2 Descargas de Agua en Tubos Corrugados de Media Caña, D=0,60 m m 5.00 34.27 0.00 5.00 0.00% 100.00% 0.00
3534 3 OA-16 567.500 605-2a Descargas de Agua en Tubos Corrugados de Media Caña, D=0,60 m m 9.00 57.36 0.00 9.00 0.00% 100.00% 0.00
3612 3 OA-17 572.350 605-2a Descargas de Agua en Tubos Corrugados de Media Caña, D=0,60 m m 3.00 19.12 0.00 3.00 0.00% 100.00% 0.00
3164 3 ON-16.1 558.880 605-4 Descargas de Agua en Canaletas de Hormigón m 6.00 61.48 0.00 6.00 0.00% 100.00% 0.00
3613 3 OA-17 572.350 605-4 Descargas de Agua en Canaletas de Hormigón m 2.00 20.49 0.00 2.00 0.00% 100.00% 0.00
2633 3 OA-12 525.600 714-8 Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. m2 2.00 1.36 1.30 0.70 65.00% 35.00% 0.00 0.40 0.55 0.35
2803 3 OS-08 529.300 530.300 714-8b Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. m2 16.70 11.36 0.00 16.70 0.00% 100.00% 0.00
2857 3 OS-09 530.300 531.300 714-8b Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. m2 22.18 15.09 0.00 22.18 0.00% 100.00% 0.00
2995 3 ON-15 539.132 714-8B Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. m2 72.15 49.08 16.00 56.15 22.18% 77.82% 0.00 16.00
3058 3 OA-14 549.750 714-8 Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. m2 105.37 71.67 0.00 105.37 0.00% 100.00% 0.00
3184 3 ON-16.1 558.880 714-8A Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. m2 65.90 44.83 0.00 65.90 0.00% 100.00% 0.00
3185 3 ON-16.1 558.880 714-8B Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. m2 111.30 75.71 0.00 111.30 0.00% 100.00% 0.00
3238 3 ON-16.2 558.880 714-8a Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. m2 70.92 48.24 0.00 70.92 0.00% 100.00% 0.00
3431 3 OA-15 564.300 714-8 Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. m2 16.02 10.90 0.00 16.02 0.00% 100.00% 0.00
3550 3 OA-16 567.500 714-8 Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. m2 36.87 25.08 0.00 36.87 0.00% 100.00% 0.00
3637 3 OA-17 572.350 714-8 Demarcación Certificada, Línea, Achurados, Símbolos y Leyendas. km 104.33 70.97 0.00 104.33 0.00% 100.00% 0.00
3182 3 ON-16.1 558.880 714-5A Demarcación Certificada, Línea Segmentada Separación de Pistas. km 0.36 14.29 0.00 0.36 0.00% 100.00% 0.00
3236 3 ON-16.2 558.880 714-5a Demarcación Certificada, Línea Segmentada Separación de Pistas. km 0.24 9.52 0.00 0.24 0.00% 100.00% 0.00
3543 3 OA-16 567.500 714-5a Demarcación Certificada, Línea Segmentada Separación de Pistas. km 0.10 5.10 0.00 0.10 0.00% 100.00% 0.00
2631 3 OA-12 525.600 714-6 Demarcación Certificada, Línea Lateral Segmentada. km 1.03 52.55 0.75 0.28 72.82% 27.18% 0.00 0.40 0.10 0.25
3056 3 OA-14 549.750 714-6 Demarcación Certificada, Línea Lateral Segmentada. km 1.33 67.86 0.00 1.33 0.00% 100.00% 0.00
3429 3 OA-15 564.300 714-6 Demarcación Certificada, Línea Lateral Segmentada. km 1.19 60.71 0.60 0.59 50.42% 49.58% 0.00 0.05 0.55
3636 3 OA-17 572.350 714-6 Demarcación Certificada, Línea Lateral Segmentada. km 0.10 5.10 0.00 0.10 0.00% 100.00% 0.00
2632 3 OA-12 525.600 714-7 Demarcación Certificada, Línea Lateral Continua. km 0.85 81.92 0.65 0.20 76.47% 23.53% 0.00 0.40 0.05 0.20
2856 3 OS-09 530.300 531.300 714-7b Demarcación Certificada, Línea Lateral Continua. km 0.04 3.85 0.00 0.04 0.00% 100.00% 0.00
2994 3 ON-15 539.132 714-7B Demarcación Certificada, Línea Lateral Continua. km 1.21 116.61 0.50 0.71 41.32% 58.68% 0.00 0.50
3057 3 OA-14 549.750 714-7 Demarcación Certificada, Línea Lateral Continua. km 1.25 120.46 0.00 1.25 0.00% 100.00% 0.00
3183 3 ON-16.1 558.880 714-7B Demarcación Certificada, Línea Lateral Continua. km 1.22 117.57 0.00 1.22 0.00% 100.00% 0.00
3237 3 ON-16.2 558.880 714-7a Demarcación Certificada, Línea Lateral Continua. km 0.24 23.13 0.00 0.24 0.00% 100.00% 0.00
3430 3 OA-15 564.300 714-7 Demarcación Certificada, Línea Lateral Continua. km 1.21 116.61 0.60 0.61 49.59% 50.41% 0.00 0.60
3544 3 OA-16 567.500 714-7a Demarcación Certificada, Línea Lateral Continua. km 0.10 9.64 0.00 0.10 0.00% 100.00% 0.00
2854 3 OS-09 530.300 531.300 714-3b Demarcación Certificada, Línea de Eje Segmentadas. km 0.22 7.48 0.00 0.22 0.00% 100.00% 0.00
2855 3 OS-09 530.300 531.300 714-4b Demarcación Certificada, Línea de Eje Mixta. km 0.35 38.69 0.00 0.35 0.00% 100.00% 0.00
2993 3 ON-15 539.132 714-2B Demarcación Certificada, Línea de Eje Continua Simple. km 0.04 3.06 0.02 0.03 37.50% 62.50% 0.00 0.02
2802 3 OS-08 529.300 530.300 714-1b Demarcación Certificada, Línea de Eje Continua Doble. km 0.71 72.45 0.00 0.71 0.00% 100.00% 0.00
2853 3 OS-09 530.300 531.300 714-1b Demarcación Certificada, Línea de Eje Continua Doble. km 0.57 58.16 0.00 0.57 0.00% 100.00% 0.00
2992 3 ON-15 539.132 714-1B Demarcación Certificada, Línea de Eje Continua Doble. km 0.53 54.08 0.21 0.32 39.62% 60.38% 0.00 0.21
3181 3 ON-16.1 558.880 714-1B Demarcación Certificada, Línea de Eje Continua Doble. km 0.32 32.65 0.00 0.32 0.00% 100.00% 0.00
2621 3 OA-12 525.600 702-5a Delineadores verticales N° 4.00 15.18 0.00 4.00 0.00% 100.00% 0.00
2799 3 OS-08 529.300 530.300 702-5a Delineadores verticales N° 24.00 91.09 0.00 24.00 0.00% 100.00% 0.00
2850 3 OS-09 530.300 531.300 702-5a Delineadores verticales N° 4.00 15.18 0.00 4.00 0.00% 100.00% 0.00
2989 3 ON-15 539.132 702-5a Delineadores verticales N° 12.00 45.55 0.00 12.00 0.00% 100.00% 0.00
3046 3 OA-14 549.750 702-5a Delineadores verticales N° 8.00 30.36 0.00 8.00 0.00% 100.00% 0.00
3176 3 ON-16.1 558.880 702-5a Delineadores verticales N° 4.00 15.18 0.00 4.00 0.00% 100.00% 0.00
3419 3 OA-15 564.300 702-5a Delineadores verticales N° 8.00 30.36 0.00 8.00 0.00% 100.00% 0.00
2715 3 ON-13 525.600 610-2 Cunetas de Hormigón, Tipo Rectangular m 12.00 16.99 1.20 10.80 10.00% 90.00% 0.00 1.20
2841 3 OS-09 530.300 531.300 610-2a Cunetas de Hormigón, Tipo Rectangular m 298.00 421.82 0.00 298.00 0.00% 100.00% 0.00
3036 3 OA-14 549.750 610-2 Cunetas de Hormigón, Tipo Rectangular m 185.00 261.87 0.00 185.00 0.00% 100.00% 0.00
3166 3 ON-16.1 558.880 610-2 Cunetas de Hormigón, Tipo Rectangular m 7.00 9.91 0.00 7.00 0.00% 100.00% 0.00
3414 3 OA-15 564.300 610-1 Cunetas de Hormigón, Tipo Badén m 14.00 19.82 0.00 14.00 0.00% 100.00% 0.00
2790 3 OS-08 529.300 530.300 609-1b Cunetas de Hormigón, Tipo 2 m 731.00 1,034.73 0.00 731.00 0.00% 100.00% 0.00
2840 3 OS-09 530.300 531.300 609-1a Cunetas de Hormigón, Tipo 1 m 232.00 328.40 0.00 232.00 0.00% 100.00% 0.00
2981 3 ON-15 539.132 609-1a Cunetas de Hormigón, Tipo 1 m 62.00 87.76 0.00 62.00 0.00% 100.00% 0.00
3035 3 OA-14 549.750 609-1a Cunetas de Hormigón, Tipo 1 m 510.00 721.91 0.00 510.00 0.00% 100.00% 0.00
3413 3 OA-15 564.300 609-1a Cunetas de Hormigón, Tipo 1 m 376.00 532.23 0.00 376.00 0.00% 100.00% 0.00
3536 3 OA-16 567.500 609-1a Cunetas de Hormigón, Tipo 1 m 16.00 22.65 0.00 16.00 0.00% 100.00% 0.00
2691 3 OA-12 525.600 Cubierta de ductos con ladrillo fiscal atravesado (5 cada m) m 235.00 34.85 0.00 235.00 0.00% 100.00% 0.00
3115 3 OA-14 549.750 Cubierta de ductos con ladrillo fiscal atravesado (5 cada m) m 304.00 45.08 0.00 304.00 0.00% 100.00% 0.00
3259 3 ON-16.2 558.880 Cubierta de ductos con ladrillo fiscal atravesado (5 cada m) m 263.00 39.00 0.00 263.00 0.00% 100.00% 0.00
3366 3 OA-19 559.800 Cubierta de ductos con ladrillo fiscal atravesado (5 cada m) m 297.00 44.05 283.42 13.58 95.43% 4.57% 0.00 255.42 28.00
3489 3 OA-15 564.300 Cubierta de ductos con ladrillo fiscal atravesado (5 cada m) m 358.00 53.09 100.00 258.00 27.93% 72.07% 0.00 100.00
3697 3 OA-17 572.350 Cubierta de ductos con ladrillo fiscal atravesado (5 cada m) m 954.00 141.48 0.00 954.00 0.00% 100.00% 0.00
2574 3 OA-11 524.400 9. CONTROL EROSIÓN
3567 3 OA-16 567.500 9. CONTROL EROSIÓN
2792 3 OS-08 529.300 530.300 613-1a Construccion de Fosos y Contrafosos sin Revestir, Tipo 1 (0,50 x 0,50 m) m 326.00 60.44 0.00 326.00 0.00% 100.00% 0.00
3616 3 OA-17 572.350 613-1a Construccion de Fosos y Contrafosos sin Revestir, Tipo 1 (0,50 x 0,50 m) m 22.00 4.08 0.00 22.00 0.00% 100.00% 0.00
2615 3 OA-12 525.600 613-3 Construcción de Fosos y Contrafosos con Cotas de Fondo Preestablecidas m3 32.00 20.86 5.00 27.00 15.63% 84.37% 0.00 5.00
2982 3 ON-15 539.132 613-3 Construcción de Fosos y Contrafosos con Cotas de Fondo Preestablecidas m3 3,046.00 1,985.38 2,133.00 913.00 70.03% 29.97% 0.00 1,250.00 225.00 68.00 48.00 170.00 350.00 22.00
3224 3 ON-16.2 558.880 613-3 Construcción de Fosos y Contrafosos con Cotas de Fondo Preestablecidas m3 68.00 44.32 14.00 54.00 20.59% 79.41% 14.00 0.00
3619 3 OA-17 572.350 613-3 Construcción de Fosos y Contrafosos con Cotas de Fondo Preestablecidas m3 72.00 46.93 0.00 72.00 0.00% 100.00% 0.00
2844 3 OS-09 530.300 531.300 613-2c Construccion de Fosos y Contrafosos a Revestir con Hormigón, Tipo 3 (1,00 x 0,50 m) m 33.00 6.12 0.00 33.00 0.00% 100.00% 0.00
2843 3 OS-09 530.300 531.300 613-2b Construccion de Fosos y Contrafosos a Revestir con Hormigón, Tipo 2 (0,80 x 0,50 m) m 243.00 45.05 0.00 243.00 0.00% 100.00% 0.00
3618 3 OA-17 572.350 613-2b Construccion de Fosos y Contrafosos a Revestir con Hormigón, Tipo 2 (0,80 x 0,50 m) m 36.00 6.67 0.00 36.00 0.00% 100.00% 0.00
2793 3 OS-08 529.300 530.300 613-2a Construccion de Fosos y Contrafosos a Revestir con Hormigón, Tipo 1 (0,50 x 0,50 m) m 447.00 82.87 0.00 447.00 0.00% 100.00% 0.00
2842 3 OS-09 530.300 531.300 613-2a Construccion de Fosos y Contrafosos a Revestir con Hormigón, Tipo 1 (0,50 x 0,50 m) m 53.00 9.83 0.00 53.00 0.00% 100.00% 0.00
3038 3 OA-14 549.750 613-2a Construccion de Fosos y Contrafosos a Revestir con Hormigón, Tipo 1 (0,50 x 0,50 m) m 18.00 3.34 0.00 18.00 0.00% 100.00% 0.00
3537 3 OA-16 567.500 613-2a Construccion de Fosos y Contrafosos a Revestir con Hormigón, Tipo 1 (0,50 x 0,50 m) m 27.00 5.01 0.00 27.00 0.00% 100.00% 0.00
3617 3 OA-17 572.350 613-2a Construccion de Fosos y Contrafosos a Revestir con Hormigón, Tipo 1 (0,50 x 0,50 m) m 110.00 20.39 0.00 110.00 0.00% 100.00% 0.00
3050 3 OA-14 549.750 708-3 Conexión de Barrera Metálica Triple Onda N° 4.00 19.48 0.00 4.00 0.00% 100.00% 0.00
3302 3 OA-19 559.800 708-3 Conexión de Barrera Metálica Triple Onda N° 4.00 19.48 0.00 4.00 0.00% 100.00% 0.00
3423 3 OA-15 564.300 708-3 Conexión de Barrera Metálica Triple Onda N° 4.00 19.48 2.00 2.00 50.00% 50.00% 0.00 2.00
3629 3 OA-17 572.350 708-3 Conexión de Barrera Metálica Triple Onda N° 8.00 38.96 4.00 4.00 50.00% 50.00% 0.00 4.00
2679 3 OA-12 525.600 Conductor XTU 5,3 mm2 (10 AWG) m 0.00 0.00 0.00 0.00 50.00% 50.00%
2920 3 OA-13 539.000 Conductor XTU 5,3 mm2 (10 AWG) m 7,342.65 411.19 6,602.00 740.65 89.91% 10.09% 0.00 2,210.00 260.00 2,516.00 1,616.00
3103 3 OA-14 549.750 Conductor XTU 5,3 mm2 (10 AWG) m 1,140.30 63.86 0.00 1,140.30 0.00% 100.00% 0.00
3250 3 ON-16.2 558.880 Conductor XTU 5,3 mm2 (10 AWG) m 828.45 46.39 0.00 828.45 0.00% 100.00% 0.00
3354 3 OA-19 559.800 Conductor XTU 5,3 mm2 (10 AWG) m 1,118.25 62.62 0.00 1,118.25 0.00% 100.00% 0.00
3477 3 OA-15 564.300 Conductor XTU 5,3 mm2 (10 AWG) m 1,345.05 75.32 0.00 1,345.05 0.00% 100.00% 0.00
3685 3 OA-17 572.350 Conductor XTU 5,3 mm2 (10 AWG) m 3,502.80 196.16 0.00 3,502.80 0.00% 100.00% 0.00
2678 3 OA-12 525.600 Conductor XTU 3,3 mm2 (12 AWG) m 951.30 53.27 0.00 951.30 0.00% 100.00% 0.00
2676 3 OA-12 525.600 Conductor Cu Flexible 2,08 mm2. Similar THW m 300.00 47.10 90.00 210.00 30.00% 70.00% 0.00 90.00
2918 3 OA-13 539.000 Conductor Cu Flexible 2,08 mm2. Similar THW m 3,528.00 553.90 3,240.20 287.80 91.84% 8.16% 0.00 705.60 705.60 705.00 250.00 120.00 400.00 324.00 30.00
3101 3 OA-14 549.750 Conductor Cu Flexible 2,08 mm2. Similar THW m 408.00 64.06 0.00 408.00 0.00% 100.00% 0.00
3248 3 ON-16.2 558.880 Conductor Cu Flexible 2,08 mm2. Similar THW m 288.00 45.22 0.00 288.00 0.00% 100.00% 0.00
3352 3 OA-19 559.800 Conductor Cu Flexible 2,08 mm2. Similar THW m 462.00 72.53 220.00 242.00 47.62% 52.38% 0.00 220.00
3475 3 OA-15 564.300 Conductor Cu Flexible 2,08 mm2. Similar THW m 462.00 72.53 60.00 402.00 12.99% 87.01% 0.00 60.00
3683 3 OA-17 572.350 Conductor Cu Flexible 2,08 mm2. Similar THW m 912.00 143.18 0.00 912.00 0.00% 100.00% 0.00
2603 3 OA-12 525.600 408-1 Concreto Asfáltico de Rodadura m3 306.52 2,385.68 258.00 48.52 84.17% 15.83% 0.00 141.00 45.00 14.00 58.00
2969 3 ON-15 539.132 408-1 Concreto Asfáltico de Rodadura m3 307.02 2,389.57 105.60 201.42 34.40% 65.60% 0.00 105.60
3025 3 OA-14 549.750 408-1 Concreto Asfáltico de Rodadura m3 364.11 2,833.90 0.00 364.11 0.00% 100.00% 0.00
3155 3 ON-16.1 558.880 408-1 Concreto Asfáltico de Rodadura m3 245.79 1,913.01 110.00 135.79 44.75% 55.25% 40.00 0.00 10.00 60.00
3215 3 ON-16.2 558.880 408-1 Concreto Asfáltico de Rodadura m3 90.91 707.56 0.00 90.91 0.00% 100.00% 0.00
3403 3 OA-15 564.300 408-1 Concreto Asfáltico de Rodadura m3 316.02 2,459.62 162.00 154.02 51.26% 48.74% 0.00 20.00 25.00 39.00 78.00
3526 3 OA-16 567.500 408-1 Concreto Asfáltico de Rodadura m3 25.15 195.74 0.00 25.15 0.00% 100.00% 0.00
3602 3 OA-17 572.350 408-1 Concreto Asfáltico de Rodadura m3 36.69 285.56 0.00 36.69 0.00% 100.00% 0.00
2604 3 OA-12 525.600 408-2 Concreto Asfáltico Capa Intermedia m3 306.52 2,441.68 268.00 38.52 87.43% 12.57% 0.00 141.00 45.00 24.00 58.00
2970 3 ON-15 539.132 408-2 Concreto Asfáltico Capa Intermedia m3 358.18 2,853.19 263.20 94.98 73.48% 26.52% 0.00 123.20 140.00
3026 3 OA-14 549.750 408-2 Concreto Asfáltico Capa Intermedia m3 424.79 3,383.79 0.00 424.79 0.00% 100.00% 0.00
3156 3 ON-16.1 558.880 408-2 Concreto Asfáltico Capa Intermedia m3 286.76 2,284.27 172.50 114.26 60.15% 39.85% 45.00 0.00 10.00 60.00 57.50
3216 3 ON-16.2 558.880 408-2 Concreto Asfáltico Capa Intermedia m3 106.06 844.85 0.00 106.06 0.00% 100.00% 0.00
3404 3 OA-15 564.300 408-2 Concreto Asfáltico Capa Intermedia m3 368.69 2,936.91 184.00 184.69 49.91% 50.09% 0.00 25.00 20.00 25.00 39.00 75.00
3527 3 OA-16 567.500 408-2 Concreto Asfáltico Capa Intermedia m3 25.15 200.34 0.00 25.15 0.00% 100.00% 0.00
3603 3 OA-17 572.350 408-2 Concreto Asfáltico Capa Intermedia m3 36.69 292.27 0.00 36.69 0.00% 100.00% 0.00
2807 3 OS-09 530.300 531.300 Comienzo de Trabajos 1 0.00 1.00 0.00% 100.00%
3574 3 OA-17 572.350 Comienzo de Trabajos 1 0.00 1.00 0.00% 100.00%
2796 3 OS-08 529.300 530.300 701-1 Cerco de Alambre de Púas m 1,221.00 575.21 906.13 314.87 74.21% 25.79% 106.13 600.00 200.00
3041 3 OA-14 549.750 701-1 Cerco de Alambre de Púas m 341.00 160.65 187.00 154.00 54.84% 45.16% 187.00 0.00
3171 3 ON-16.1 558.880 701-1 Cerco de Alambre de Púas m 70.00 32.98 0.00 70.00 0.00% 100.00% 0.00
3227 3 ON-16.2 558.880 701-1 Cerco de Alambre de Púas m 213.00 100.34 0.00 213.00 0.00% 100.00% 0.00
3622 3 OA-17 572.350 701-1 Cerco de Alambre de Púas m 133.00 62.66 50.00 83.00 37.59% 62.41% 50.00 0.00
3048 3 OA-14 549.750 706-1 Casetas para Paraderos de Locomoción Colectiva N° 2.00 367.70 0.00 2.00 0.00% 100.00% 0.00
3231 3 ON-16.2 558.880 706-1 Casetas para Paraderos de Locomoción Colectiva N° 2.00 367.70 0.00 2.00 0.00% 100.00% 0.00
3421 3 OA-15 564.300 706-1 Casetas para Paraderos de Locomoción Colectiva N° 2.00 367.70 0.00 2.00 0.00% 100.00% 0.00
3546 3 OA-16 567.500 706-1 Casetas para Paraderos de Locomoción Colectiva N° 2.00 367.70 0.00 2.00 0.00% 100.00% 0.00
3627 3 OA-17 572.350 706-1 Casetas para Paraderos de Locomoción Colectiva N° 2.00 367.70 0.00 2.00 0.00% 100.00% 0.00
2519 3 OA-11 524.400 5.300 CAPAS GRANULARES
2597 3 OA-12 525.600 5.300 CAPAS GRANULARES
2773 3 OS-08 529.300 530.300 5.300 CAPAS GRANULARES
2824 3 OS-09 530.300 531.300 5.300 CAPAS GRANULARES
2875 3 ON-14 537.060 5.300 CAPAS GRANULARES
2963 3 ON-15 539.132 5.300 CAPAS GRANULARES
3019 3 OA-14 549.750 5.300 CAPAS GRANULARES
3149 3 ON-16.1 558.880 5.300 CAPAS GRANULARES
3209 3 ON-16.2 558.880 5.300 CAPAS GRANULARES
3397 3 OA-15 564.300 5.300 CAPAS GRANULARES
3519 3 OA-16 567.500 5.300 CAPAS GRANULARES
3596 3 OA-17 572.350 5.300 CAPAS GRANULARES
2776 3 OS-08 529.300 530.300 303-1 Capa Granular de Rodadura m3 686.80 604.38 0.00 686.80 0.00% 100.00% 0.00
2682 3 OA-12 525.600 Canalización PVC Sch.40, 40mm ø m 235.00 56.12 0.00 235.00 0.00% 100.00% 0.00
2925 3 OA-13 539.000 Canalización PVC Sch.40, 40mm ø m 3,217.00 768.22 3,204.68 12.32 99.62% 0.38% 144.00 0.00 1,291.00 180.00 421.00 202.00 100.00 100.00 347.00 131.68 90.00 198.00
3106 3 OA-14 549.750 Canalización PVC Sch.40, 40mm ø m 304.00 72.60 0.00 304.00 0.00% 100.00% 0.00
3253 3 ON-16.2 558.880 Canalización PVC Sch.40, 40mm ø m 263.00 62.80 0.00 263.00 0.00% 100.00% 0.00
3357 3 OA-19 559.800 Canalización PVC Sch.40, 40mm ø m 297.00 70.92 248.00 49.00 83.50% 16.50% 0.00 220.00 28.00
3480 3 OA-15 564.300 Canalización PVC Sch.40, 40mm ø m 358.00 85.49 100.00 258.00 27.93% 72.07% 0.00 100.00
3688 3 OA-17 572.350 Canalización PVC Sch.40, 40mm ø m 954.00 227.82 0.00 954.00 0.00% 100.00% 0.00
2684 3 OA-12 525.600 Canalización c.a.g. C80.1 de 40mm ø (1 1/2"ø) m 66.00 132.03 0.00 66.00 0.00% 100.00% 0.00
3108 3 OA-14 549.750 Canalización c.a.g. C80.1 de 40mm ø (1 1/2"ø) m 60.00 120.02 0.00 60.00 0.00% 100.00% 0.00
3359 3 OA-19 559.800 Canalización c.a.g. C80.1 de 40mm ø (1 1/2"ø) m 60.00 120.02 0.00 60.00 0.00% 100.00% 0.00
3482 3 OA-15 564.300 Canalización c.a.g. C80.1 de 40mm ø (1 1/2"ø) m 68.00 136.03 0.00 68.00 0.00% 100.00% 0.00
3690 3 OA-17 572.350 Canalización c.a.g. C80.1 de 40mm ø (1 1/2"ø) m 158.00 316.06 0.00 158.00 0.00% 100.00% 0.00
2507 3 OA-11 524.400 A. CAMINO
2583 3 OA-12 525.600 A. CAMINO
2708 3 ON-13 525.600 A. CAMINO
2759 3 OS-08 529.300 530.300 A. CAMINO
2811 3 OS-09 530.300 531.300 A. CAMINO
2865 3 ON-14 537.060 A. CAMINO
2947 3 ON-15 539.132 A. CAMINO
3003 3 OA-14 549.750 A. CAMINO
3132 3 ON-16.1 558.880 A. CAMINO
3193 3 ON-16.2 558.880 A. CAMINO
3274 3 OA-19 559.800 A. CAMINO
3383 3 OA-15 564.300 A. CAMINO
3506 3 OA-16 567.500 A. CAMINO
3578 3 OA-17 572.350 A. CAMINO
2804 3 OS-09 530.300 531.300 CALLE DE SERVICIO LICURA-MUNILQUE LADO SURPONIENTE DE LA RUTA 5
2752 3 OS-08 529.300 530.300 CALLE DE SERVICIO LICURA - MUNILQUE LADO NORORIENTE DE LA RUTA 5
2685 3 OA-12 525.600 Caja de Derivación de Canalización c.a.g. N° 7.00 7.49 0.00 7.00 0.00% 100.00% 0.00
3109 3 OA-14 549.750 Caja de Derivación de Canalización c.a.g. N° 7.00 7.49 0.00 7.00 0.00% 100.00% 0.00
3360 3 OA-19 559.800 Caja de Derivación de Canalización c.a.g. m 7.00 7.49 0.00 7.00 0.00% 100.00% 0.00
3483 3 OA-15 564.300 Caja de Derivación de Canalización c.a.g. N° 8.00 8.56 0.00 8.00 0.00% 100.00% 0.00
3691 3 OA-17 572.350 Caja de Derivación de Canalización c.a.g. m 13.00 13.92 0.00 13.00 0.00% 100.00% 0.00
2599 3 OA-12 525.600 302-1 Base Granular, CBR ≥ 80% m3 807.68 669.73 707.68 100.00 87.62% 12.38% 350.00 0.00 150.00 170.00 20.00 17.68
2965 3 ON-15 539.132 302-1 Base Granular, CBR ≥ 80% m3 917.12 760.48 640.00 277.12 69.78% 30.22% 0.00 250.00 50.00 115.00 200.00 25.00
3021 3 OA-14 549.750 302-1 Base Granular, CBR ≥ 80% m3 984.30 816.18 0.00 984.30 0.00% 100.00% 0.00
3151 3 ON-16.1 558.880 302-1 Base Granular, CBR ≥ 80% m3 675.93 560.48 595.00 80.93 88.03% 11.97% 300.00 75.00 0.00 110.00 20.00 90.00
3211 3 ON-16.2 558.880 302-1 Base Granular, CBR ≥ 80% m3 287.56 238.44 0.00 287.56 0.00% 100.00% 0.00
3399 3 OA-15 564.300 302-1 Base Granular, CBR ≥ 80% m3 869.05 720.62 675.00 194.05 77.67% 22.33% 0.00 285.00 150.00 140.00 100.00
3521 3 OA-16 567.500 302-1 Base Granular, CBR ≥ 80% m3 63.39 52.56 0.00 63.39 0.00% 100.00% 0.00
3598 3 OA-17 572.350 302-1 Base Granular, CBR ≥ 80% m3 92.17 76.43 0.00 92.17 0.00% 100.00% 0.00
2775 3 OS-08 529.300 530.300 302-2 Base Granular, CBR ≥ 100% m3 1,564.24 1,297.07 0.00 1,564.24 0.00% 100.00% 0.00
2826 3 OS-09 530.300 531.300 302-2 Base Granular, CBR ≥ 100% m3 2,600.66 2,156.47 0.00 2,600.66 0.00% 100.00% 0.00
3049 3 OA-14 549.750 708-1 Barreras Metálicas Laterales de Triple Onda m 80.00 329.66 0.00 80.00 0.00% 100.00% 0.00
3301 3 OA-19 559.800 708-1 Barreras Metálicas Laterales de Triple Onda m 80.00 329.66 0.00 80.00 0.00% 100.00% 0.00
3422 3 OA-15 564.300 708-1 Barreras Metálicas Laterales de Triple Onda m 80.00 329.66 0.00 80.00 0.00% 100.00% 0.00
3628 3 OA-17 572.350 708-1 Barreras Metálicas Laterales de Triple Onda m 160.00 659.31 0.00 160.00 0.00% 100.00% 0.00
3053 3 OA-14 549.750 712-1c Barreras de contención certificadas metálicas, NC Medio Alto m 343.00 749.28 0.00 343.00 0.00% 100.00% 0.00
3179 3 ON-16.1 558.880 712-1c Barreras de contención certificadas metálicas, NC Medio Alto m 368.00 803.90 0.00 368.00 0.00% 100.00% 0.00
3234 3 ON-16.2 558.880 712-1c Barreras de contención certificadas metálicas, NC Medio Alto m 112.00 244.66 0.00 112.00 0.00% 100.00% 0.00
3305 3 OA-19 559.800 712-1c Barreras de contención certificadas metálicas, NC Medio Alto m 391.00 854.14 0.00 391.00 0.00% 100.00% 0.00
3426 3 OA-15 564.300 712-1c Barreras de contención certificadas metálicas, NC Medio Alto m 71.00 155.10 0.00 71.00 0.00% 100.00% 0.00
2991 3 ON-15 539.132 712-1b Barreras de contención certificadas metálicas, NC Medio m 522.00 898.78 0.00 522.00 0.00% 100.00% 0.00
2801 3 OS-08 529.300 530.300 712-1a Barreras de contención certificadas metálicas, NC Liviano m 488.00 593.41 0.00 488.00 0.00% 100.00% 0.00
2852 3 OS-09 530.300 531.300 712-1a Barreras de contención certificadas metálicas, NC Liviano m 402.00 488.83 0.00 402.00 0.00% 100.00% 0.00
3055 3 OA-14 549.750 713-2b Barrera Lateral de Hormigón In Situ, H=1,070 m m 90.00 273.65 0.00 90.00 0.00% 100.00% 0.00
3634 3 OA-17 572.350 713-2b Barrera Lateral de Hormigón In Situ, H=1,070 m m 285.00 866.57 144.00 141.00 50.53% 49.47% 0.00 144.00
3635 3 OA-17 572.350 Barrera de Hormigón Simétrica in Situ, H=1,4m m 130.00 395.28 0.00 130.00 0.00% 100.00% 0.00
3177 3 ON-16.1 558.880 703-1 Bandera Portaseñal N° 1.00 743.78 0.00 1.00 0.00% 100.00% 0.00
2648 3 OA-12 525.600 503-2 Acero para Armaduras A63-42H kg 2,749.74 130.06 2,602.00 147.74 94.63% 5.37% 1,152.00 500.00 0.00 300.00 500.00 150.00
2784 3 OS-08 529.300 530.300 503-2 Acero para Armaduras A63-42H kg 18,326.80 866.86 6,131.00 12,195.80 33.45% 66.55% 0.00 4,581.00 450.00 1,100.00
2834 3 OS-09 530.300 531.300 503-2 Acero para Armaduras A63-42H kg 3,164.00 149.66 0.00 3,164.00 0.00% 100.00% 0.00
2975 3 ON-15 539.132 503-2 Acero para Armaduras A63-42H kg 15,064.60 712.56 11,280.00 3,784.60 74.88% 25.12% 0.00 3,850.00 1,580.00 5,850.00
3068 3 OA-14 549.750 503-2 Acero para Armaduras A63-42H kg 18,069.63 854.69 16,300.00 1,769.63 90.21% 9.79% 0.00 7,300.00 3,500.00 3,000.00 2,500.00
3073 3 OA-14 549.750 503-2 Acero para Armaduras A63-42H kg 1,769.10 83.68 0.00 1,769.10 0.00% 100.00% 0.00
3221 3 ON-16.2 558.880 503-2 Acero para Armaduras A63-42H kg 433.92 20.52 0.00 433.92 0.00% 100.00% 0.00
3647 3 OA-17 572.350 503-2 Acero para Armaduras A63-42H Kg 18,820.97 890.23 14,480.00 4,340.97 76.94% 23.06% 0.00 9,400.00 500.00 1,500.00 600.00 2,480.00
3652 3 OA-17 572.350 503-2 Acero para Armaduras A63-42H Kg 2,378.74 112.51 1,180.00 1,198.74 49.61% 50.39% 0.00 850.00 250.00 80.00
2605 3 OA-12 525.600 417-1 Aceras de Hormigón m2 357.05 287.82 220.00 137.05 61.62% 38.38% 0.00 90.00 70.00 60.00
3027 3 OA-14 549.750 417-1 Aceras de Hormigón m2 406.22 327.45 0.00 406.22 0.00% 100.00% 0.00
3217 3 ON-16.2 558.880 417-1 Aceras de Hormigón m2 553.45 446.14 0.00 553.45 0.00% 100.00% 0.00
3288 3 OA-19 559.800 417-1 Aceras de Hormigón m2 239.25 192.86 155.00 84.25 64.79% 35.21% 0.00 25.00 35.00 95.00
3405 3 OA-15 564.300 417-1 Aceras de Hormigón m2 307.17 247.61 95.00 212.17 30.93% 69.07% 0.00 60.00 35.00
3528 3 OA-16 567.500 417-1 Aceras de Hormigón m2 547.52 441.36 229.00 318.52 41.82% 58.18% 0.00 112.00 22.00 95.00
3604 3 OA-17 572.350 417-1 Aceras de Hormigón m2 953.35 768.50 0.00 953.35 0.00% 100.00% 0.00
2687 3 OA-12 525.600 C.5 OBRAS CIVILES m3
2740 3 ON-13 525.600 B.5 OBRAS CIVILES
2927 3 OA-13 539.000 A.5 OBRAS CIVILES
3111 3 OA-14 549.750 C.5 OBRAS CIVILES
3255 3 ON-16.2 558.880 B.5 OBRAS CIVILES
3362 3 OA-19 559.800 C.5 OBRAS CIVILES
3485 3 OA-15 564.300 C.5 OBRAS CIVILES
3693 3 OA-17 572.350 C.5 OBRAS CIVILES
3752 3 OA-18 573.550 A.5 OBRAS CIVILES m3
2671 3 OA-12 525.600 C.2 LUMINARIAS
2725 3 ON-13 525.600 B.2 LUMINARIAS
2913 3 OA-13 539.000 A.2 LUMINARIAS
3096 3 OA-14 549.750 C.2 LUMINARIAS
3244 3 ON-16.2 558.880 B.2 LUMINARIAS
3348 3 OA-19 559.800 C.2 LUMINARIAS
3469 3 OA-15 564.300 C.2 LUMINARIAS
3677 3 OA-17 572.350 C.2 LUMINARIAS
3741 3 OA-18 573.550 A.2 LUMINARIAS
3472 3 OA-15 564.300 Lumin. LED Canoa 21W a 500 mA, 2 kLm, 21 LEDs, Sim. Canoa Philips N° 6.00 18.78 0.00 6.00 0.00% 100.00% 0.00
3680 3 OA-17 572.350 Lumin. LED Canoa 21W a 500 mA, 2 kLm, 21 LEDs, Sim. Canoa Philips N° 9.00 28.16 0.00 9.00 0.00% 100.00% 0.00
3097 3 OA-14 549.750 Lumin. LED A.P. 35W a 500 mA, 5 kLm, 54 LEDs, Sim. Philips Lighting N° 23.00 255.27 0.00 23.00 0.00% 100.00% 0.00
3245 3 ON-16.2 558.880 Lumin. LED A.P. 34W a 500 mA, 5 kLm, 54 LEDs, Sim. Philips Lighting N° 8.00 88.79 0.00 8.00 0.00% 100.00% 0.00
2673 3 OA-12 525.600 Lumin. LED A.P. 34W a 500 mA, 4 kLm, 45 LEDs, Sim. Philips Lighting N° 5.00 15.65 0.00 5.00 0.00% 100.00% 0.00
2916 3 OA-13 539.000 Lumin. LED A.P. 34W a 500 mA, 4 kLm, 45 LEDs, Sim. Philips Lighting N° 4.00 44.39 0.00 4.00 0.00% 100.00% 0.00
3471 3 OA-15 564.300 Lumin. LED A.P. 34W a 500 mA, 4 kLm, 45 LEDs, Sim. Philips Lighting N° 4.00 44.39 0.00 4.00 0.00% 100.00% 0.00
3679 3 OA-17 572.350 Lumin. LED A.P. 34W a 500 mA, 4 kLm, 45 LEDs, Sim. Philips Lighting N° 4.00 44.39 0.00 4.00 0.00% 100.00% 0.00
3473 3 OA-15 564.300 Lumin. LED A.P. 17W a 500 mA, 2 kLm, 20 LEDs, Sim. Philips Lighting N° 5.00 37.63 0.00 5.00 0.00% 100.00% 0.00
3681 3 OA-17 572.350 Lumin. LED A.P. 17W a 500 mA, 2 kLm, 20 LEDs, Sim. Philips Lighting N° 26.00 195.68 0.00 26.00 0.00% 100.00% 0.00
3246 3 ON-16.2 558.880 Lumin. LED A.P. 17W a 500 mA, 2 kLm, 16 LEDs, Sim. Teceo1 N° 8.00 60.21 0.00 8.00 0.00% 100.00% 0.00
3099 3 OA-14 549.750 Lumin. LED A.P. 17W a 350 mA, 2 kLm, 20 LEDs, Sim. Philips Lighting N° 6.00 45.16 0.00 6.00 0.00% 100.00% 0.00
3350 3 OA-19 559.800 Lumin. LED A.P. 17W a 350 mA, 2 kLm, 20 LEDs, Sim. Philips Lighting N° 49.00 368.78 11.00 38.00 22.45% 77.55% 0.00 11.00
2672 3 OA-12 525.600 Lumin. LED A.P. 152W a 500 mA, 20 kLm, 200 LEDs, Sim. Philips Lighting N° 23.00 255.27 0.00 23.00 0.00% 100.00% 0.00
2914 3 OA-13 539.000 Lumin. LED A.P. 152W a 500 mA, 20 kLm, 200 LEDs, Sim. Philips Lighting N° 27.00 949.29 22.00 5.00 81.48% 18.52% 0.00 4.00 7.00 9.00 1.00 1.00
3470 3 OA-15 564.300 Lumin. LED A.P. 152W a 500 mA, 20 kLm, 200 LEDs, Sim. Philips Lighting N° 8.00 281.27 3.00 5.00 37.50% 62.50% 0.00 3.00
3678 3 OA-17 572.350 Lumin. LED A.P. 152W a 500 mA, 20 kLm, 200 LEDs, Sim. Philips Lighting N° 10.00 351.59 0.00 10.00 0.00% 100.00% 0.00
2915 3 OA-13 539.000 Lumin. LED A.P. 102W a 500 mA, 14 kLm, 139 LEDs, Sim. Philips Lighting N° 83.00 1,300.52 67.00 16.00 80.72% 19.28% 0.00 24.00 6.00 20.00 2.00 7.00 8.00
2674 3 OA-12 525.600 Lumin. Fl. Canoa 21W a 500 mA, 2 kLm, 21 LEDs, Sim. Canoa Philips TL5 N° 6.00 18.78 0.00 6.00 0.00% 100.00% 0.00
3098 3 OA-14 549.750 Lumin. Fl. Canoa 21W a 500 mA, 2 kLm, 21 LEDs, Sim. Canoa Philips TL5 N° 5.00 15.65 0.00 5.00 0.00% 100.00% 0.00
3349 3 OA-19 559.800 Lumin. Fl. Canoa 21W a 500 mA, 2 kLm, 21 LEDs, Sim. Canoa Philips TL5 N° 5.00 15.65 0.00 5.00 0.00% 100.00% 0.00
2747 3 ON-13 525.600 B.6 EMPALMES Y TABLEROS
3262 3 ON-16.2 558.880 B.6 EMPALMES Y TABLEROS
2681 3 OA-12 525.600 C.4 CANALIZACIONES
2733 3 ON-13 525.600 B.4 CANALIZACIONES
2924 3 OA-13 539.000 A.4 CANALIZACIONES
3105 3 OA-14 549.750 C.4 CANALIZACIONES
3252 3 ON-16.2 558.880 B.4 CANALIZACIONES
3356 3 OA-19 559.800 C.4 CANALIZACIONES
3479 3 OA-15 564.300 C.4 CANALIZACIONES
3687 3 OA-17 572.350 C.4 CANALIZACIONES
3748 3 OA-18 573.550 A.4 CANALIZACIONES
2675 3 OA-12 525.600 C.3 CABLEADO
2728 3 ON-13 525.600 B.3 CABLEADO
2917 3 OA-13 539.000 A.3 CABLEADO
3100 3 OA-14 549.750 C.3 CABLEADO
3247 3 ON-16.2 558.880 B.3 CABLEADO
3351 3 OA-19 559.800 C.3 CABLEADO
3474 3 OA-15 564.300 C.3 CABLEADO
3682 3 OA-17 572.350 C.3 CABLEADO
3743 3 OA-18 573.550 A.3 CABLEADO
06-02-22 13-02-22 20-02-22 27-02-22 06-03-22 13-03-22 20-03-22 27-03-22 03-04-22 10-04-22 13-04-22
192.61% 193.46% 194.01% 194.42% 194.43% 194.43% 194.43% 194.43% 194.43% 194.43% 194.43%
0.73% 0.85% 0.55% 0.41% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
614,938.30 617,646.70 619,392.86 620,687.01 620,719.48 620,719.48 620,719.48 620,719.48 620,719.48 620,719.48 620,719.48
2,345.63 2,708.40 1,746.16 1,294.15 32.47 0.00 0.00 0.00 0.00 0.00 0.00

586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30% 586.30%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45 1,262,784.45
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SEM 5 SEM 6 SEM 7 SEM 8 SEM 9 SEM 10 SEM 11 SEM 12 SEM 13 SEM 14 SEM 15
31-01-22 07-02-22 14-02-22 21-02-22 28-02-22 07-03-22 14-03-22 21-03-22 28-03-22 04-04-22 11-04-22
06-02-22 13-02-22 20-02-22 27-02-22 06-03-22 13-03-22 20-03-22 27-03-22 03-04-22 10-04-22 13-04-22