MOC: BE-0240 Title: MAWD SWIMS 2011 for D-20

FR Type 6 2 3 4 5 6 HES Risk Assessment Operations I&E Piping HES Process

Functional Reviewer
Thapanee Sengarsai Sakniran Tancharoen

Signature*

Date

Sarote Tongra-ar Yuthasil Pipatnawakit Soda Roypromma


Tipparat Wamanon

Signature indicates Functional Review is complete and the change can be initiated (construction can begin).

2007 Chevron Corporation. All rights reserved.

Chevron Thailand Exploration and Production Ltd.

Contents
1. MOC Forms and Documents .................................................................. a 2. Scope of Work ......................................................................................... 1
2.1 Background................................................................................................... 2 2.2 Project Scope................................................................................................ 3 2.3 Justification .................................................................................................. 3 2.4 Execution Procedure .................................................................................... 4 2.5 Execution Roles............................................................................................ 5

3. Drawings .................................................................................................. 6 3.1 PFD/P&ID ................................................................................................ 7 3.2 Cause & Effect Chart ............................................................................ 9 3.3 Plot Plan/Layouts ................................................................................ 10 3.4 Instrumentation ................................................................................... 11 3.5 Online Corrosion Monitoring Probe .................................................. 12 4. Risk Analysis ......................................................................................... 14 5. Procedures & Guidelines ..................................................................... 16 5.1 Operating Manual ................................................................................ 17 5.2 Corrosion ............................................................................................. 19 6. AFE ......................................................................................................... 21 7 Equipment Specifications ..................................................................... 23 7.1 Electrical Equipment ........................................................................... 24 7.2 Piping & Mechanical ........................................................................... 25 7.3 Pumps................................................................................................... 26 8 MSDSs .................................................................................................... 27 9 Project Records ...................................................................................... 29 APPENDICES ............................................................................................. 30

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

1. MOC Forms and Documents

MOC Number: BE-0196 MOC Title: SWIMS UNIT FOR MAWC Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

Please insert MOC forms and documents that include: 1. 2. 3. 4. 5. 6. The approved Change Request Form Functional Review Form All Functional Review Templates that already completed by Functional Reviewers FR Based Action Item Form PSSR Form Close Out Action Item Form

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

2. Scope of Work

MOC Number: BE-0196 MOC Title: SWIMS UNIT FOR MAWC Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

2.1 Background
Reservoir engineers have identified an opportunity for waterflooding at MAWD platform, injecting into well MAWD-20. The 59-9 MAWD sands to be waterflooded by injecting water at MAWD-20 to support oil production at MAWD-01 and gain incremental oil recovery of typically 1000 BOPD expected over 3 months. The project was put out to bid and Expro-PTI was selected as the Vendor / Operator for the project. SPECIFICATION Sea Water capacity: 5,000-10,000 BWPD Actual injection pressure and pump horsepower, therefore we understand that this flow rates might not be fully achievable with installed pumps. 2000 psig 3000 psig estimated 24 hour continuous 20 microns Oxygen scavenger continuous (minimum 5 minutes residence time for mixing required) Biocide Anti-scalant batched when required Mixing tank: Duration: Maintenance: Operation: Accommodation: General: Vendor to provide 2xchemical injection pumps Minimum of 5 mins residence time required. Gas blanketing Expectation is for 3 months Maintenance required Operating personnel to be provided. To be provided by Chevron Equipment to be mobile for skid-mounted installation and removal at the end of the injection period. To be suitable for offshore crane lifts.

Injection Pressure for waterflood: Fracture pressure required: Operation: Water filtration spec: Chemical injection required:

Note: Chemicals for injection to be provided by Nalco.

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

2.2 Project Scope


The scope pertaining to this MOC is as follows: - Mobilization & rig-up of SWIMS equipment to MAWD platform - Hydro-fracturing of the reservoir - SWIMS waterflood to well MAWD-20 - Corrosion control and monitoring - Producer well controls and monitoring is part of ongoing operations as at present and lies outside the scope of this MOC. - De-mobilization

2.3 Justification
Economics are good, with around 1000 BOPD additional production as a result of waterflood operations over 3 months.

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

2.4 Execution Procedure


Planning activities - Design review of P&IDs supplied by vendor - Site surveys and equipment layout planning by vendor, to be submitted for approval - Logistical issues for rig-up - Well preparation by RM Project implementation Rig-up Piping installation o Install per vendor procedure, see Section 6 o Piping is field run, to conform to layout plan o Pressure test procedure to be carried out before start-up Pre-startup checks Start up and operation, including initial hydrofracing o o o Pumping operations Pump maintenance, filter cleaning, monitoring Chemical treatment and testing, sampling

De-mobilization - Final anti-scalant injection if requested by PE - Shutdown, and de-rig - Return platform to original house-keeping Close out MOC

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

2.5 Execution Roles

TASKS Site survey Site preparation Ensure equipment in good condition MOC completion Well preparation Kick-off meeting if required Rig-up & Installation Tie-ins between Vendor & Chevron Pre-Start-up Safety Checks Start-up of equipment, testing Hydro-fracturing Operation Normal Operations Chemical injection (together with above operations) Corrosion monitoring Reservoir monitoring (out-of-scope here) Stop injection: Anti-scalant injection Demobilization

RESPONSIBILITY Expro-PTI Operations Expro-PTI B8/32 Facilities Engineer RM & Well Services Facilitated by B8/32 FE Supervised by Operations Operations, Expro-PTI B8/32 FE & Operations Operations, Expro-PTI Operations, Expro-PTI Expro-PTI Expro-PTI, with input from B8/32 FE and RM Expro-PTI, B8/32 FE and RM B8/32 PE & RM Operations, Expro-PTI

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

3. Drawings

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

3.1 PFD/P&ID

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

3.2 Cause & Effect Chart

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

3.3 Plot Plan/Layouts

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

3.4 Instrumentation

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

3.5 Online Corrosion Monitoring Probe

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

4. Risk Analysis

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

5. Procedures & Guidelines

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

5.1 Operating Manual

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

5.2 Corrosion

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

6. AFE

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

7 Equipment Specifications

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

7.1 Electrical Equipment

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

7.2 Piping & Mechanical

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

7.3 Pumps

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

8 MSDSs

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

9 Project Records

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009

Chevron Thailand Exploration and Production Ltd.

APPENDICES

MOC Number: BE-0240 MOC Title: MAWD SWIMS 2011 for D-20 Template Revision 2.0: Revised 27 October 2009