Abstract—Following in the steps of the gas industry, the tradi- becomes one of the most competitive sources of renewable
tional paradigm of the vertically integrated electric utility struc- energy. However, wind has some disadvantages. For example,
ture has begun to change. In the United States, the Federal En- wind power is considered as an intermittent power supply
ergy Regulatory Commission has issued several rules and Notices
of Proposed Rulemaking to set the road map for the deregulated because wind does not blow 100% of the time. Besides, the su-
utility industry. The crisis in California has drawn great atten- perior wind sites are usually located in remote areas, therefore,
tion and sparked intense discussion within the utility industry. One it may require substantial infrastructure improvement to deliver
general conclusion is to rejuvenate the idea of integrated resource the wind-generated power to the load center.
planning and promote the distributed generation via traditional Mostly, wind-powered generators are induction genera-
or renewable generation facilities for the deregulated utility sys-
tems. Wind generation is one of the most mature and cost-effec- tors. The induction generator absorbs reactive power during
tive resources among different renewable energy technologies. Re- its normal operating condition. This may create low-voltage
cently, several large-scale wind generation projects have been im- issues in the power system. In addition, power flow pattern
plemented in the U.S. and other parts of the world. Similar to other and system dynamic characteristics will also change when
new generation facilities, the impacts of a large-scale wind gener- a large-scale wind-powered generation is integrated into the
ation on the system operation, voltage profile, and system security
have to be investigated and studied. Remedies for possible opera- utility gird [2]–[4]. In the procedure of system impact study,
tion issues have to be evaluated and implemented. This paper dis- the steady-state power flow both in normal and contingency
cusses the impact study of connecting a 120-MW wind farm into conditions has to be studied to check potential overloading of
the transmission system of a utility company within the Southwest the transmission lines. The short-circuit currents on both before
Power Pool. and after the installation of the new wind generation plant have
Index Terms—Dynamic stability, generation interconnection, in- to be calculated to check the increment of short circuit current
duction generator, system impact study. level and the possible needs of infrastructure improvement
(split-bus or breaker upgrade). In addition, system dynamic
I. INTRODUCTION simulations have to be performed to ensure the stability of the
power system.
(3)
where is the radius of the wind turbine rotor. Fig. 3. Aggregated turbines model (parallel connection) [7].
TABLE I
SHORT-CIRCUIT CURRENT LEVEL AT INTERESTED BUSES
Fig. 7. A momentary 5-cycle three-phase fault is applied at Bus A (Case Fig. 10. A three-phase fault is applied at Bus C. Line A is opened at 5 cycles
3). to clear the fault (Case 6).
Fig. 14. The new wind generation unit is operated at 0.95 lagging PF. A
Fig. 12. A three-phase fault is applied at bus C. The new generator is removed three-phase fault is applied to system at bus A. Line B is opened at 5 cycles to
(Case 8). clear the fault (Case 9).
Fig. 15. The new wind generation unit is operated at 0.95 leading PF. A 5-cycle
Fig. 13. Voltage profile of the new generator at Case 5 and Case 7 analyses. three-phase fault is applied at bus C. Undervoltage relay with 30-cycle delay is
activated to disconnect wind farm (Case 10).
• Operate the new generator at 0.95 lagging power factor. Chai Chompoo-inwai (S’01) received the Bachelors
• Install an undervoltage relay at the new generator bus. This and Masters degrees in electrical engineering from
the Department of Electrical Engineering, Faculty of
undervoltage relay will trip the new generator units when Engineering, King Mongkut’s Institute Technology
its terminal voltage drops down to the setting value. An of Ladkrabang, Bangkok, Thailand. He is currently
undervoltage relay with 30-cycle delay is implemented in working toward the Ph.D. degree in the Energy
System Research Center, The University of Texas,
the study to avoid immediate tripping of the unit during Arlington.
temporary voltage sags. His major interests include electric power system
• Perform a transfer trip to drop at least 10 MW from the analysis, deregulated power systems, power system
transients and dynamic stability, and the Congestion
wind farm when the line B is tripped. Management Scheme in power systems.