NEWCASTLE MUNICIPALITY DRAFT TURNAROUND STRATEGY 2010

National KPA No. Priority Turn Around Focal Area Capacity Assessment Findings Target for December 2010 Municipal Action Unblocking Action Needed from other Spheres and Agencies COGTA(MIG) & DWA to consider increasing allocation per bus. Plans submitted Responsible Official Allocat ed SEDs Technical and Finance Project ed Budget

January 2010

BASIC SERVICE DELIVER Y

Access to Water

Funding

Lack of funding(Limited allocation from funders& internal fund)

Report on funding options for eradication of backlogs from internal funds and development of WCDM 11% eradication of backlogs

Develop & implement Water Conservation and Demand Management Plan

BASIC SERVICE DELIVERY

Access to Water

Eradication of backlog

26% Backlogs

Installation of standpipes within 200m from each household

DWA & MIG to provide/allocate more funding per bus. Plans submitted

Mr Ncube

R0.6m

R300m

BASIC SERVICE DELIVERY

Access to Water

Water loss

No WCDM and water balance

Final WCDM Plan

Develop & implement Water Conservation and Demand Management Plan Review all SLA

DWA to consider funding support

R3m

R15m

BASIC SERVICE DELIVERY

Access to Water

Service level agreement (SLA) not in place for WSP, NM & Seme Municipality Verification of baseline information

Outdated SLA with WSP & NO SLA for Seme Municipality.

Complete review for all SLA

COGTA to finalise sect.78 processes

Mr Ncube/M Nkosi

BASIC SERVICE DELIVERY

Access to Sanitation

Draft CIP

Verification of Baseline information in Draft CIP

Conduct a Comprehensive Backlog Study for all basic services

SED:Planning Cogta and Statsa to consider funding Backlog Study DWA to consider provide/allocate more funding per bus. Plans submitted R1,5m

R3m

BASIC SERVICE DELIVERY

Access to Sanitation

Eradication of backlog

27,3% backlogs

10% eradication of

Installation of VIPs in rural areas

R45m

NNTAS 2010 (DRAFT)

Page 1

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies through Regional Bulk Services Grant

Responsible Official

Budget Allocat ed Project ed

backlogs

BASIC SERVICE DELIVERY

Management and maintenance of water and sanitation

Management Information System(water management systems) for WSP

Service Level Agreement outdated for WSP

Task Team to submit recommendati ons on the review of the SLA with WSP

Review arrangements with regards to water service provision

Mr Ncube/M Nkosi

BASIC SERVICE DELIVERY

Management and maintenance of water and sanitation

Lack of strategic alignment between WSA and WSP Non compliance with reporting requirements by Entity Outdated WSDP (Last reviewed in 2006)

Business Plan from WSP (SP2030)outdated/ not in place

Business Plan reviewed 100%

Implement Business Plan

MEC to finalise recommendation s regarding intervention at Uthukela Water

BASIC SERVICE DELIVERY

Management and maintenance of water and sanitation

Ad hoc reporting by Entity

Final PMS for WSP by July 2010

Develop and Implement PMS for Entity

10

BASIC SERVICE DELIVERY

Management and maintenance of water and sanitation

Draft WSDP

Finalise WSDP

Finalise and Implement WSDP (to include rehabilitation of infrastructure)

MIG to increasing funding for new projects

Mr Ncube DWA /Cogta to assist with Technical and Financial Support

R215 000

R45m

11

BASIC SERVICE DELIVERY

Management and maintenance of water and

Insufficient provision in Budget for Operating and

Deteriorating condition of main bulk line

Investigate options regarding Bulk supply line from

Install new bulk supply line from Ntshingwayo Dam

DWA to consider funding of project on submission of a

R30m

NNTAS 2010 (DRAFT)

Page 2

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies business plan

Responsible Official

Budget Allocat ed Project ed

sanitation 12 BASIC SERVICE DELIVERY Management and maintenance of water and sanitation

Maintenance No maintenance program in place Ad hoc maintenance plans by WSP

Ntshingwayo Maintenance Program (Planned and Preventative Plan/Framewor k) To develop and implement a Maintenance Program( Planned and Preventative Framework) Implement WCDM

Cogta to assist to technical support

WSA Manager : N Ncube

13

BASIC SERVICE DELIVERY

Management and maintenance of water and sanitation

High Water loss

High Water loss

Final WCDM

Mr Ncube

R3m

R15m

14

BASIC SERVICE DELIVERY

Management and maintenance of water and sanitation

Insufficient capacity of infrastructure

Ingress of stormwater into sewer

Research and analysis of results and costing

Upgrade infrastructure

15

BASIC SERVICE DELIVERY

Management and maintenance of water and sanitation

Lack of policy and and bylaws for infrastructure development Accuracy of household data

Ad hoc upgrade of infrastructure based on development demands 5560 Households (100%) backlogs (areas include

Develop Infrastructure Development Policies/Bylaw s 500 (9%) yr2010

Develop Infrastructure Development Policies/Bylaws

M Nkosi Legal Services

16

BASIC SERVICE DELIVERY

Access to electricity

DOE funding applications need to be submitted

DOE and Eskom technical support

S Dube

R7.358m

R70m

No Market survey Out of Munics

Ingogo 600, Rooipoint 800, Charlestown 1500, Bosworth 500), 2000 (36%) yr2011

NNTAS 2010 (DRAFT)

Page 3

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

license area demand High Eskom Budget. Of R13000 a connection

Siyahlalala 1000, Soul City Mad Sec 3 60, Dry Cut 500, Ingqayizivele 600) 1860 (33%) yr2012

1200(22%)yr 2013

17

BASIC SERVICE DELIVERY

Access to Electricity Riverside Capacity to be doubled

Insufficient capacity in the industrial area

100% Capacity

To maintain 100% capacity

To increase to 200% Capacity by installing a 20MVA transformer and substation

Municipal Manager and CFO to fast track approval of Bid

P Haripersad

R12 m

18

BASIC SERVICE DELIVERY

Access to Electricity Formosa Capacity to be increased

Insufficient capacity for expansion

100%

128%

To increase capacity at Formosa

None

P Haripersad

R1.2 m

R4 m

19

BASIC SERVICE DELIVERY

Access to lighting High Mast Lights

Capacity -Unlit areas Eskom license area

150 High Masts

18 at year end

To install High Mast Lights in line with allocated budget To improve turn around time for installation of High Mast Lights

None

P Haripersad

R3,2m

R10m

NNTAS 2010 (DRAFT)

Page 4

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies DOE and ESKOM to render technical and financial support

Responsible Official

Budget Allocat ed Project ed

BASIC SERVICE

Access to FBE

Roll out of Free Basic Electricity in ESKOM Licence Area

Communities not benfitting from FBE Subsidy through ESKOM Initiated engagements with ESKOM to resolve the matter

Formalise a data base of beneficiaries in ESKOM License area , aligned to Indigent Register of Newcastle municipality

Finalise roll out of FBE through ESKOM

P Haripersad

Access to Electricity (Infills)

Infills in ESKOM License area require electrification

Infill beneficiaries in ESKOM Licence area not electrifies

Formalise database of all existing Infills for electrification

Engage ESKOM for roll-out of electrification for Infills

DOE and ESKOM to consider Business Plan for Infrastructure Upgrade

P Haripersad

Review of ESDP to include Infills 20 BASIC SERVICE DELIVERY Management and Maintenance of electricity infrastructure Staff shortage 30% of budget 50% To fill critical posts in line with revised structure Cable faults & theft are variables Old municipal fleet 90%-100% end finance year To eliminate uncertainty by enforcing security measures To engage Community Services (Security Section) MM and CFO to fast track prioritization of critical posts P Haripersad To be confirme d and allocate d through prioritisa tion on 2010/11 provisio

NNTAS 2010 (DRAFT)

Page 5

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed n Project ed

21

BASIC SERVICE DELIVERY

Access to roads (new)

Funding

Lack of funding (Ltd allocation from funders & internal fund

Annually Submit additional business plans to relevant funding authorities

Cogta (MIG) to consider increasing allocations based on backlogs

Mr V Khumalo

R 62 m

Total of all Infrastru ctural projects

22

BASIC SERVICE DELIVERY

Access to roads (new)

Backlogs eradication

735 km backlog

15 km to be eradicated

Submit BP for approval to MIG

CoGTA-Mig for increasing allocation

Mr V Khumalo

R 32 m

R 1,728 b

23

BASIC SERVICE DELIVERY

Management and Maintenance of roads

Funding

Lack of funding (ltd allocation Municipality)

An increase internal funding

Increase allocation through collecting of rates &taxes

DOT to upgrade their Gravel District Road

Mr S Dube

24

BASIC SERVICE DELIVERY

Management and Maintenance of roads Installation of Speed Humps

Roads maintenance

1 297 km existing gravel & tarred

649 km gravel and tarred roads to be maintained

To purchase new grader for gravel roads maintenance

DOT- possible handover of newly constructed gravel roads them

Mr J Thulasee

R 19m

R 180 m

High Accidents rates due to speeding

Budget allocation of R600k to install speed humps

60 Speed Humps to be installed

All future new roads infrastructure to include speed humps in specifications and designs Roll out of program for installation of speed humps in potential accident zones

Director : Civils

R600k

R600k pa

25

BASIC

% MIG

Non-

51 % spent

70 % targeted

Appointment of

Engagement

V Khumalo

R 62m

Total

NNTAS 2010 (DRAFT)

Page 6

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action competent consultants and/or Officials Improving contract management and cashflow management Ensure 100% of MIG expenditure annually

Unblocking Action Needed from other Spheres and Agencies with Cogta (MIG) and DWA regarding review of policies on the appointment of consultants for projects

Responsible Official

Budget Allocat ed Project ed required from MIG R 1,7b

SERVICE DELIVERY

expenditure

performance of appointed contractors

expenditure on MIG allocation

26

BASIC SERVICE DELIVERY

Incomplete Consolidated Infrastructure Plan

Incomplete infrastructure Plan

Finalise CIP through DBSA deployee through Siyenza Manje

Siyenza Manje has deployed Gert to assist with all DBSA reports

Infrastructure development Plan and high priority sector plans

DBSA to consider funding of CIP

SED : Technical Services

27

BASIC SERVICE DELIVERY

Undercapacitated PMU Strengthening of the PMU 90% position filled by December 2010 To investigate VAT Claimed to top up to projects

Identify funding through grants to increase capacity and engage National MIG on proposed business plan Source Additional funding to supplement MIG Allocations Cogta to assist and advise SED : Technical /BTO

28

BASIC SERVICE DELIVERY

Counter funding for MIG Projects

Limited internal funds to address demands/back log

To investigate the 14% contribution for consultants to be injected into project where internal capacity is available 29 BASIC SERVICE Fleet Old fleet (Average 20 Low turn around time for repairs to Report on Fleet Implementing Fleet Management Pravesh Haripersad R2.5m

NNTAS 2010 (DRAFT)

Page 7

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

DELIVERY

Management

year life for vehicles)

vehicles, replacement of vehicles to slow

Management Options

System

30

BASIC SERVICE DELIVERY

Skills development

Scarcity of artisans & apprenticeship and scarce skills

Capacity constraints iro of artisans & apprentices

Recommendat ions on training options to EXCO

Investigate option of Practical Experential Training in consultation with FET

DoE to render support

T Mjilo/All SEDs

31

BASIC SERVICE DELIVERY

Skills development

Assessments in terms of RPL (Phased approach) Finalise RPL process

32

BASIC SERVICE DELIVERY

Transfer of electricity to REDS

REDS revenue loss and impact on Financial viability Ring fencing process Finalised Quarterly Reports on Status of Reds to EXCO

NERSA to advise on roll out of REDS

P Haripersad

33

BASIC SERVICE DELIVERY

Stormwater No Storm Water Master Plan Provision on budget for 2010/11

Finalise Storm Water Master Plan for Newcastle and Madadeni areas

Finalise and implement Stormwater Master Plan for entire municipal area M Nkosi Legal/ WSA Manager DBSA and Cogta(MIG) to consider Business Plan R100 000.00 R50m

34

BASIC SERVICE DELIVERY

Infrastructure development for new developments

No Bulk water contributions for new developments

Bulk water contributions for new developments

Investigate best practice for implementation

NNTAS 2010 (DRAFT)

Page 8

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed In house Project ed

35

BASIC SERVICE DELIVERY

Fire hydrant maintenance and installation in previously unserviced areas

Fire hydrants Poorly maintained / non-existent / un-serviced areas Draft Plan for Fire Hydrants To develop an maintenance and provision plan for Fire Hydrants

WSA Manager

36

BASIC SERVICE DELIVERY

Refuse removal and solid waste disposal

Serious Challenges

Currently 55 thousand householdsinclusive of businesses

55 000 households (inclusive of business)

Procurement of additional fleet and recruitment of additional staff

None

N Swanepoel : Superintendan t Waste Removal

?????

R60 million

37

BASIC SERVICE DELIVERY

Maintenance of current service Site is reaching design life

Alternative Technology for Waste reduction

Closure of existing site and Identification and permitting of a new landfill site

None

T.Kelly :Superintenda nt Waste Removal

R15 million

38

BASIC SERVICE DELIVERY Parking Meter Revenue Loss of parking meter revenue

Service Provider abandoned site Parking meters not functioning

Re-instate parking meter service

Investigate options for re-instating parking meter service

H Zungu Chief : Traffic

39

BASIC SERVICE DELIVERY

Unfunded mandates S 84 functions

Transfer of functions to the District

Negotiations through Provincial Task Team(Environmen tal Health)

Finalise Share Service Agreements with the ADM

Finalise Share Service Agreements with the ADM

SALGA(KZN) to submit directives regarding transfer of health functions MEC (Health) to

Municipal Manager and COO

NNTAS 2010 (DRAFT)

Page 9

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies fast track response on transfer of Health Provincial Cogta to respond to request made in 2009

Responsible Official

Budget Allocat ed Project ed

Cemetery space Cemeteries becoming exhausted

To develop a comprehensive cemetery plan

Amajuba District Municipality to consider funding / transferring function

R500 00

40

SPATIAL AND ENVIRONM ENT

Access to water and sanitation, electricity, refuse removal and roads

Non Alignment of basic services provision to housing development

SDF not covering the entire Municipal area. (Housing backlog estimated at 30 000 units)

Approved Local Area Development Plan for Kilbarchan Ingagane Balangeich Identify another Local Area for Spatial Development Framework planning Undertake SDF review.

SDF to be implemented incrementally Annual review. Facilitate approvals by Province Appoint project and programme managers for implementing approved projects. Implement approved projects. Annual review of

Department of Human Settlements to speed up approval of housing projects

E. Nyathikazi/SE D Technicall Services

Funded by Provinci al Departm ent of Human Settleme nts

Operatio nal budget to be confirme d

Internal Departments to include service provision in departmental plans and coordination through Coordination Committee

NNTAS 2010 (DRAFT)

Page 10

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

Implementatio n of funded housing projects. Review of Housing Sector Plan 41 Formalization of informal settlements (What is required i.r.o. township formalization, basic services and housing) No info Planning and settlements design stages with respect to Siyahlala la, JBC, H39, Khathide Rural project. Settlements Establishment Applications submission

the Housing Sector

Detailed layout planning Identify areas for infill and Greenfield development

Approval of PLS applications by Human Settlements Department: Provincial

M.O. Shozi

R500k

In-house

42

LED

Alignment of LED Strategy to Local, Provincial and National Programs

Alignment with other initiatives, e.g. URP, and implementatio n of LED proposals. Alignment needs to be ascertained.

There is a strategy in place

Reviewed LED Strategy

Annual Review of LED strategy to address alignment with URP and other provincial and national strategies Annual Review of LED strategy to address alignment with URP and other provincial and national strategies Appointment

N/A

F. Alberts

R400k

43

LED

LED Plan aligned to the PGDS and adopted by Council

LED Strategy aligned to PGDS and Adopted by Council

Reviewed LED Strategy

N/A

F. Alberts

44

LED

LED Directorate needs to be reengineered and capacitated

Lack of capacity to address all local economic development challenges

Finalizing Unit Structure

Appointment of LED Manager(critic al posts)

MM and CFO to prioritize critical posts

E. Nyathikazi

R540k

NNTAS 2010 (DRAFT)

Page 11

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action Incorporate the Tourism unit into the Municipality

Unblocking Action Needed from other Spheres and Agencies MM to consider untilization of funds for critical posts

Responsible Official

Budget Allocat ed R500k Project ed

45

LED

Increase focus on tourism as one of the key potential local economic development drivers Housing Delivery

Tourism function done externally

Report submitted for the incorporation of the Tourism unit to the Municipality

Incorporate the Tourism unit into the Municipality

E Nyathikazi/T Mjilo

46

BASIC SERVICE DELIVERY

Housing need and associated backlogs growing rapidly and not being addressed effectively

Busy packaging projects involving 21760 households; i.e. Siyahlala la (1200), Emawozeni (150), H39 (2000), Osizweni E Phase II (1240), Osizweni III (670), Khathide rural housing (1500) and JBC (15 000) Identifying and/or acquiring more land for housing development

Implementatio n of funded housing projects Reengineering of housing delivery processes. Initiate green field development.

Appoint project and programme managers for implementing approved projects. Identify and release land for various income group and various housing forms Finalise Land Disposal Policy (Investigate options for the release of land below market value to cater for varying income categories) Set-up and maintain housing data base

MM

S. Mkhize

Servicing suitable municipal owned land for middle income housing and releasing it

Identify land for infill development and release of municipal owned land for middle income development. Have in place a fully functional and updated housing data-

NNTAS 2010 (DRAFT)

Page 12

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

base 47 BASIC SERVICE DELIVERY Tenure upgrade Process of transferring state provided houses to beneficiaries too slow 48 LED SMME Development SMME Development should be part and parcels of the economic development strategy. 49 LED Implement "Sebenzel iKhaya" program 50 Good Governanc e and Public Participati on Functionality of Ward Committees Wards established insufficient human and financial support for functionality. No mechanism to participate in municipal matters, Currently only one municipal official is responsible to service 31 wards. All 31 wards are now functional. Public Participation Unit needs additional staff. Quarterly Reports on Ward Committees to be tabled to Council and Continuous training about Ensure that the full functionality, effectiveness is sustained. Implement "Sebenzel iKhaya" program as a component of SMME development Ward Committee reports to be N/A EJ Nyathikazi and S Dube R100k SMME development currently undertaken on an ad hoc basis Mainstreaming SMME development within the organization N/A F Alberts Significant number of Beneficiaries of government housing schemes still do not have full title over properties they occupy Assign more people in EEDBS and estate section Finalize EEDBS implementatio n Accelerate Implementation of EEDBS MM K. kubheka

Development of an SMME Framework

COGTAs Intervention

Mthi Mduna

NNTAS 2010 (DRAFT)

Page 13

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

(reporting to council and feed back to communities)

There still has no mechanism to participate in Municipal matters. Currently the ward committee reports go as far as the COO but not to Council.

feedback. Improve the relationship between Ward Commitees and Ward Councillors.

roles and responsibilities

51

Broader public participation policies and plans (Implemented framework) Public Communication systems

No framework

Draft Framework.

Review and Adopted. Implementatio n Commences

Review implementation

Engage other Stakeholders e.g. NGO and CBOs.

Mthi Mduna

52

No info

Media (Press releases). Ward Committee

Not applicable.

Improve feedback mechanism. Strengthen the

None

Siza

Improve Ward public meetings feedback

relationship with the media. Provide feedback

IDP Forums Revisit/Reprior Investigate the financial implication of extending communication via the national radio 53 Complaints management systems No customer satisfaction survey Not available Set up a call centre itise the draft budget by May 2010

mechanism processes. Review the organogram of the Public Relations Unit.

Customer satisfaction survey, every two years.

COGTA, Office of the

Siza Ntombela

NNTAS 2010 (DRAFT)

Page 14

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action Review the effectiveness of the call centre.

Unblocking Action Needed from other Spheres and Agencies Premier.

Responsible Official

Budget Allocat ed Project ed

54

Front Desk Interface

Customer complaints

Through enquiries desk. Continuous staff training on Batho Pele principles.

Drafting Generic Customer Care Policy

Monitor Feedback from Communities through customer survey reports.

Internal Process

Siza Ntombela

55

Appointment of CDWs vs. number of wards

Not all wards have CDWs and no formal links. Council opinion CDWs not accountable to them as they are part of Province but should be transferred to municipality accountable to Manager for Public participation.

There are only 4 CDW for 31 Wards which are shared with other sector Depts. No control over CDWs.

Investigate the Cadre system for Newcastle

Engage other sectors for shared resources.

Shared resources with other sectors. Example Premiers flagship programmes

Mthi Mduna

56

Good Governanc e and Public Participati on

Stability of Council

Relationship between parties is poor due to power struggle, resulting in distrust and walk outs. Does not function as a cooperative structure rather with individual issues.

The political climate has stabilised.

To get input from Council.

Get MEC s Office to intervene, through IGR meetings.

NNTAS 2010 (DRAFT)

Page 15

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

No Relationship with District 57 Delegation of functions between political and administration No delegations Draft delegation Approved by Council Finalise the delegation policy and implementation with annual review. COGTA and Provincial Treasury Manager Legal Service M. Nkosi

There is a perception that politics has filtered down to the administration Council to identify training needs Need for councillors to understand the administration .

Council

58

Training of Councillors

Planning the workshop on Roles and Responsibility

Roles and responsibility work shop in Feb 2010

Continuous annual workshop on roles, responsibility and protocol

COGTA and Whips

Mr Hauptfleisch

59

Councillor Oversight Framework (functioning scopa)

Does not have a oversight framework. Cllrs not aware of oversight role, and indicate they receive no monthly reports. Reports from Exco to Council are submitted, but no feedback on resolutions taken. Council not aware of systems and procedures in place in the

No Oversight Framework

Develop an oversight Framework.

Implementation and review of Framework

None

MUNICIPAL MANAGER/SED s

No follow up on implementation of resolutions.

Workshop Councillors on oversight roles. Reintroduce the execution of resoultion reports.

SED to submit and/or present reports on execution of resolutions monthly to Portfolio Committees

NNTAS 2010 (DRAFT)

Page 16

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

municipality. 60 Feedback to communities (Ward councillor to ward committee and vice versa) Perception council does not take community view into consideration. Communicatio n takes place on ad hoc basis. Perception council does not take community view into consideration 61 Oversight Committee/ Municipal SCOPA composition 62 Finalise strategies for development of high Priority Sector Plans 63 Evaluate effectiveness of Organisational Structure Finalise the Micro Structure MM Departments to draft sector plans in house Dysfunctional Oversight COmmittee Establish a SCOPA by June 2010 Establish and ensure a functional Municipal SCOPA Cogta to render technical support Speaker/ COO Public participation framework will address the issue. Steamlining of communication through ward publi meetings. Mthi

NNTAS 2010 (DRAFT)

Page 17

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

aligned to IDP 64 Institution al developme nt and transforma tion 65 Vacancies (S57) Status of filling of vacant positions MM & 1 S57 offical is on suspension but would appear that the process is not in accordance with the regulations Approx 50% vacancy rate In progress to be finalized by Council in May 2010 All section 57 positions to be filled Fill all Section 57 positions T Mjilo Included in 2010/11 Budget HR Policies availability, adoption and implementation Council not aware of systems and procedures in place in the municipality. All HR policies and procedures in place however subject to review and workshop as and when required Workshop targeted stakeholders on all current HR policies and procedures Annually to review SALGA to at least 3 policies as provide generic and when required policies and assistance To develop and approve HR Plan by 2011 T Mjilo Nil R1m for 2010/11 required for consulta nts to assist

66

% Vacancies in other levels Status of filling of critical vacant positions

30 Critical vacancies to be filled

All critical positions as identified and funded and approved by MM to be filled prior to December 2010

Critical positions to be filled as and when vacancies occur Workstudy to be involved in identifying critical vacancies and advise MM on the urgent filling thereof All Section 57 Agreements to be finalized within 1 month of approval of budget

LLF and MM

T Mjilo

67

S57 appointed with signed Performance Agreements

MM and SED Corporate Services suspended, vacancy for SED Community Services

All section 57 agreements finalized. To finalise agreements for Acting posts

All Section 57 agreements finalized and implemented. Monthly evaluations and monitoring in line with PA

None

MM/N TickaRagunanan IDP/PM & Mayor

NNTAS 2010 (DRAFT)

Page 18

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

68

Performance Evaluations processes not finalised Has a Skills Audit been conducted for all employees No info and as well there is a gap identified regarding the implementatio n of WSP

2007/08 and 08/09 evaluations outstanding

Performance evaluations finalized upto 2009/10 Skills Audit report will be presented by December 2010 Will have Skills Audit Report by 2011. Quarterly reports to be submitted to LLF and Manco on the implementation of the WSP Annually review WSP and implement SALGA, LGSETA, LOGOLA to rollout training T Mjilo D Jansen CoGTA to render technical support on Skills audit D Jansen N/A

69

In progress with Skills Audit for all employees

70

Does the municipality have a Workplace Skills plan

No info- non compliance with minimum competency levels and need for the development of strategies

2009/10 WSP in place with compliance certificate and in progress with 2010/11 WSP

WSP will approved and submitted to LGSETA by 30 June 2010 and incorporate the Minimum Competency levels in WSP Establish committee to undertake minimum competency assessments and submit recommendati ons to comply with Regulations

71

Comply with Minimum Competency Levels for senior managers

LGSETA and Kwanaloga to offer technical support/funding

D Jansen /T Mjilo

?????

No accredited training plan for Councillors

Develop a Councillor Training Policy Skills Audit and PDPs for all Councillors finalised and Accredited Training Plan incorporated

Develop and implement an Accredited Training Plan for all Councillors

Cogta and Kwanaloga to offer funding and on-going training support

SED : Corporate Services/ Directors HR and Administration

NNTAS 2010 (DRAFT)

Page 19

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

into WPSP 72 Functionality of LLF Relationship between management and unions is poor. No regular meetings. LLF meetings take place and workshop has been conducted by Kwanaloga to enhance the good relationship between the unions and managementEmployer side should be represented(all SEDs to attend) MM and all SEDs to attend LLFs To review the composition of management , EXCO and Portfolio Committee members in the LLF. All SEDs to attend and have LLF meetings at least once a month to comply with the agreements but if no items there will be no meeting To be approved by December 2010 Will have the plan in place by December 2010 Quarterly reports to the Portfolio Committee on implementation of EEP 74 Decentralized Office Accommodation office accommodatio n Appointment of Consortium for Office accommodation proposals Appointment of Contractor 75 Finalise office rental arrangements as an interim measure (if Implement Phase 1 by 2010/11 To consider office rental as an interim measures Manco 30% of Planning Phase 1 complete Finalise extension plans for Civic Building for centralization of office accommodation E Hauptfleisch R10m Capital LLF, Manco, Porfolio, Exco and Council T Mjilo T Mjilo

73

Employment equity plan

No Info

Draft EEP in the process of consultation

NNTAS 2010 (DRAFT)

Page 20

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

approved by Manco) 76 ICT - Upgrade infrastructure 77 No IT Section Recruitment Process for ICT Manager Establish IT Section and develop IT policies IT Manager N Kadiramwando

Draft ICT policies

Proposed ICT Section Structure

78

Health and safety issues not managed in terms of Occupational Health and Safety Act Designation of official as a Chief Safety Officer

To comply with OHSA legislation

T Mjilo Director HR/MM

In-House

79

HR Plan does not include induction of new employees No induction process

Incorporation into the HR Plan

Induction programme for all employees

T Mjilo

80

Training for senior managers for conducting induction departmentall y for new employees

81

Labour matters Collective

Supervisors not being held

All disciplinary matters referred

Training on Disciplinary

To identify and train supervisors to conduct

Kwanaloga to support

M Nkosi MMs office/ V

In-house

NNTAS 2010 (DRAFT)

Page 21

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action disciplinary processes

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

agreements and procedures non compliance 82 Revenue enhancement strategies incomplete

accountable/re sponsible for discipline of subordinates Revenue Enhancement Strategy has been developed. RES has been submitted to Exco and was referred to the FSPC. to HR

Nzuza

Procedures for all levels of management Implement the RES.

Financial Viability

Employ Staff, coordinate departments within the Municipality and public participation. Review TOR for appointment of a new service provider. Intervention by Provincial Treasury to assist in the recovery of Government Debt.

R2 000 0 00 SED: BTO

R2 500 000

83

Debtors management

A credit control, Customer Care and Debt Management Policy is in place.

Outstanding Debtors of R500m

Reduce debt by at least 20%

Manager : Income J Muir

Implement incentives scheme to recover outstanding debt. Install flow regulators(pha sed Approach annually) Verification of Indigents (10% per ward) 90% of verification processed to be phased Implement the Revenue Enhancement Strategy.

SED : Technical and BTO SED : BTO

R3m ????

????

84

Cash flow management

A cash and investment policy as well credit control and debt collection policy is in place. Provision is note adequately

Low payment factor (75%), however municipal commitments are honored.

Increase payment factor by at least 20%

Manager: Budget Implementatio n

85

Repairs and maintenance provision

Investigate cost allocation model for repairs and

SED : BTO

NNTAS 2010 (DRAFT)

Page 22

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action maintenance of assets

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

made on the budget. As the capital budget provision increase, this provision must also increase proportionally. 86 Capital expenditure Slow spending 24% spent 50% Monthly reporting of turnaround times for SCM and Creditors

Employ and train staff in the SCM Unit. (Critical Posts) SCM processes to kick in May 2010.

Manager: SCMU/ALL SEDs

?????

Communicate SCM norms and standards to all internal role-players by July 2010 87 Clean Audit Unqualified audit 2007/2008. Qualified Audit 2008/2009. Budget not aligned to IDP of local or district. Favourable audit opinion for 09/10 Complete the asset classification ito GRAP 17. Consolidate the AFS . Clean audit for 10/11 and onwards

Assets not classified according to GRAP 17. Consolidated AFS has not been achieved due to non submission from Uthukela Water. Budget aligned to IDP locally

Engage Auditor General/ MEC CoGTA

SED : BTO

Consult with Uthukela Water and the AG due to the backlog of financial statements.

MM to intervene when necessary

NNTAS 2010 (DRAFT)

Page 23

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action Consult with Uthukela Water and the AG due to the backlog of financial statements.

Unblocking Action Needed from other Spheres and Agencies MM/AG/MEC CoGTA

Responsible Official

Budget Allocat ed Project ed

88

Submission of Annual Financial Statements

Submitted on time. Consolidated AFS has not been achieved due to non submission from Uthukela Water.

Consolidated AFS has not been achieved due to non submission from Uthukela Water.

Submit Consolidated AFS.

SED : BTO

89

To internally prepare financial statements for Financial Year 10/11 by August 2010 Asset management Current Asset Register is not GRAP compliant. A service provider was appointed to verify and tag assets. To have a GRAP compliant asset register. Implement recommendation of the Service Provider ito business processes and asset management policy. Develop and implement an Asset Management Plan Credibility, and transparency of Supply Chain Management Council aware they are not involved in SCM system, but unaware of oversight role. Reports on the implementation of the Supply Chain Management Policy and Deviations are submitted quarterly since July 2009 Workshop on roles and responsibilities on SCM matters for Councillors and officials Implement the new FMS. New Service Provider Manager : SCMU Manager: Budget Implementatio n R2 000 000

90

91

???

92

Concerns regarding the effectiveness

A report on the different ranges of procurement will be

R4,5m

NNTAS 2010 (DRAFT)

Page 24

No.

National KPA

Priority Turn Around Focal Area

Capacity Assessment Findings

January 2010

Target for December 2010

Municipal Action

Unblocking Action Needed from other Spheres and Agencies

Responsible Official

Budget Allocat ed Project ed

of SCM systems and possibility of maladministra tion.

submitted with the implementatio n of the new FMS quarterly

Appoint staff (Critical Posts)

Appointment of additional staff with required competency standards Review of the composition of Bid Committees By June 2010 Workshop/Trai ned Committees on SCM related matters and case law 93 and Anti Fraud and Corruption Approval of Anti Fraud and Corruption Policy by July 2010 Risk Manager

NEWCASTLE MUNICIPALITY TOP 10 TURN AROUND PRIORITIES


1. Service Delivery (Maintenance existing levels , Rehabilitation of infrastructure and backlogs)

NNTAS 2010 (DRAFT)

Page 25

2. Fast Track Sustainable Human Settlements through Housing and Rural Development Program 3. Finalise Consolidated Infrastructure Plan and Capital program implementation 4. Debt Management increase payment factor

5. Finalisation of Micro Structure, Filling of critical posts & Compliance Minimum Competency levels and training of
Councillors by 2012 6. Clean Audit 2014 7. Effective functioning of municipal SCOPA 8. Effective and functioning ward committees 9. Anti- Corruption and Fraud Prevention program 10. Halving poverty and unemployment by 2014

NNTAS 2010 (DRAFT)

Page 26