Você está na página 1de 5

DO NOT SCALE - IF IN DOUBT ASK

Status:

FOR INFORMATION
Keyplan:
N

THIS DRAWING

Shrubs and trees along fence boundary shown indicative only MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE Thames Water boundary metal palisade fencing THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED Pumping station beyond FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT. RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

RESIDENTIAL

ACTON STORM TANKS THAMES WATER PROPERTY

FOOT BRIDGE

RESIDENTIAL

As Existing: North Elevation

Secondary maintenance access to ventilation column only 15m high ventilation column with combined passive ventilation at lower level. Brick finish

Maintenance access to ventilation column only High glass window for public viewing of mechanical equipment inside Stone bench seating area Secondary access to Thames Water compound. Main access for carbon delivery Ventilation Building in brick finish

New metal rail fencing

MAINTENANCE ACCESS

VENTILATION BUILDING

VENTILATION COLUMN

Proposed: North Elevation


N

10 m

10 m

Acton Park Estate

Thames Water Utilities


n o i vt ea l hE r ot N
Playground

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

Project Name:
Mast

THAMES TUNNEL
Purpose:

FOR PHASE 2 CONSULTATION


Location / Site Name:

EALING - CS01X - ACTON SR PEG2X - ACTON STORM TANKS


Drawing Title:

AS EXISTING AND PROPOSED NORTH ELEVATION BOOK OF PLANS


LB TCBs

Drawing No.:

Scale:

110-DA-ARC-PEG2X-000352
c Thames Water Utilities Ltd 2008

1:400@ A3 1:200@ A1

5 0

1 0 0

1 0 5

2 0 m 0 m

N
Status:

DO NOT SCALE - IF IN DOUBT ASK

Acton Park Industrial Estate


Keyplan:

FOR INFORMATION
N

THIS DRAWING

ad re n s

Work/ Industrial Building

Existing access to Thames Water compound

St a l ne yG

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY 105.73 ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE Residential NUMBER 100019345

m a ah C n

od R a

apartment block Residential THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING Residential MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT. Residential apartment block Vegetation COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.

105.75 Vegetation

apartment block

Hall

106.06

KEY:
Pumping Station Above ground overflow chamber 107.96 Storm water tank 6 Super Structure THAMES WATER ACCESS DRAFT LIMITS OF LAND TO BE ACQUIRED OR USED (LLAU)

W e pl ar W ay
104.60

EXISTING LEVELS (ABOVE TUNNEL DATUM)

Pumping Station Storm water Wet well Mobile communication Fuel storage mast THAMES WATER LAND THAMES WATER BUILDINGS/ STRUCTURES

o a d

tank 5

u g b y

BUILDINGS/TREES TO BE DEMOLISHED/REMOVED

Stormwater tanks 5 and 6 to be decommisioned as part of proposed works

EXISTING TREES WITHIN SURVEYED AREA

Storm water tank 4

Residential apartment block Storm water tank 3 Residential

d a d o lR bo ob C
Storm water tank 2

S al t c oa t s

oa d

G r e e n e n d

Storm water

R o a d

C a r P a r k

tank 1

am

i l t on

oa d

10 m

40 m

Thames Water Utilities


Screen housing

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

Project Name:

THAMES TUNNEL
Purpose:

FOR PHASE 2 CONSULTATION


Location / Site Name:

o a d

Ha wk s h e a dR

EALING - CS01X - ACTON SR PEG2X - ACTON STORM TANKS


Drawing Title:

AS EXISTING SITE FEATURES PLAN BOOK OF PLANS


Drawing No.: Scale:

110-DA-ARC-PEG2X-000350
c Thames Water Utilities Ltd 2008

1:1000@ A3 1:500@ A1

5 0

1 0 0

1 0 5

2 0 m 0 m

DO NOT SCALE - IF IN DOUBT ASK


Status:

FOR INFORMATION
Keyplan:
N

THIS DRAWING

Existing balustrade

Thames Water boundary fence vertical palasade

Storm water tanks

Above ground overflow chamber

Existing trees and shrubs

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES Section cut through industrial building TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

STORM WATER TANK

SCRUBLAND

CANHAM ROAD

WORK/ INDUSTRIAL BUILDING

As Existing: East Elevation

15m Ventilation Column

Loading bay door double height for carbon delivery Widened pavement Brown roof Low maintenance landscaping/ wild flower Ventilation Building

Interception chamber with handrail

Section cut through industrial building

PROPOSED VEGETATION

HARDSTANDING FOR CRANE ACCESS

VENTILATION BUILDING

Proposed : East Elevation


10 m
N
Y A TW LI MU

10 m

6.4m

5.8m

Acton Park Estate

6.1m

Playground

Thames Water Utilities

D A O MR A H N A C

5.8m

5.8m

HA T F I E L D

R O A D

E a s t E l e v a t i o n

The Point, 7th Floor,


t& s on

37 North Wharf Road,


5.5m

Paddington, London W2 1AF

Mast

6.1m

B Y

A D

Project Name:

THAMES TUNNEL
A O D L R O D O B C B

Purpose:

Un d

A D

FOR PHASE 2 CONSULTATION


Location / Site Name:

S A LT C

G R E E N E N D

A T S

R O A D

EALING - CS01X - ACTON SR PEG2X - ACTON STORM TANKS


Drawing Title:

A M

I LT O

A D

RO

5.8m

AD

KS HE AD

B o r o

o n s t , G

HA W

A s l y

o n s t & L B B d y
f De

LB TCBs
OR C DR EST I VE ER

5.6m
U SO

HA W KS RO HE AD AD

B O R O KI FE L R D O A D

AS EXISTING AND PROPOSED EAST ELEVATION BOOK OF PLANS


BS

CE DR STE I VE R

OR

Drawing No.:
5.4m

Scale:

4.8m 4.8m

5.3m
CF

c Thames Water Utilities Ltd 2008

5.5m

110-DA-ARC-PEG2X-000353

1:400@ A3 1:200@ A1

5 0

1 0 0

1 0 5

2 0 m 0 m
D
f e

R A E L P

W Y A
o or B C

,G t s on
L

y l s A C LB
dy B

E L W ARP

EK W AY

D EL FI TH AD RO

N
Status:

DO NOT SCALE - IF IN DOUBT ASK

FOR INFORMATION
Keyplan:
N

000354
Section AA

THIS DRAWING

New line of boundary fencing

Work/ Industrial building

a od mR a h n a C
105.73

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED Gated access for carbon filter delivery FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION Building set back from boundary

000352
North Elev

OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

Existing footpath to be widened

COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.

High pressure air release 4m minimum above ground level.

KEY: Residential
THAMES WATER ACCESS

Gated permanent maintenance accesses to the ventilation column


l a Fl

1 0 G

DRAFT LIMITS OF LAND TO BE ACQUIRED OR USED (LLAU) G01 REPLACEMENT/ NEW GATE REFERENCE

106.00 15m High Ventilation column


5 7 0. 15

Existing Vegetation Brown Roof


l a Fl

104.60

EXISTING LEVELS (ABOVE TUNNEL DATUM)

104.60

PROPOSED LEVELS (ABOVE TUNNEL DATUM)

2 0 0. 17

000353
Roof hatch
2 0 G
l a Fl

EXISTING TREES WITHIN SURVEYED AREA

h gt i ol of R

East Elev

4 0 G

PROPOSED TREES

3 0 G

106.00

l a Fl

l a Fl

106.00 107.97

Overflow Chamber
107.96 Gated access to existing chamber

Landscaping to be agreed with landowner

s Paving material

Balustrade shown dotted

Grey Granite seating

Grey Granite kerb upstand

Permeable self bound gravel


2 0 m 0 m New extension to existing chamber. See engineers drawing New fencing to match existing Interception chamber.

Resin bound gravel Gravel strip along building frontage Grey, Granite setts Paving to match existing

Reinstate existing fence boundary


10 m Access hatches 0 10 m 1 0 5 0 5 0 1 0 0
Scale:

Soft landscaping
3 types of herbaceous, shade tolerant planting Ground cover - low at 100 200mm Ground cover - 300mm

Top cover to align with the existing chamber top level

Open channel to be retained

Storm water tank 4

Thames Water Utilities

Woodland understory planting

Wildflower mix

Car Park

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

Japanese Cherry trees


Project Name:

Silver Birch Specimens

THAMES TUNNEL Housing/ Residential


Purpose:

Multi Silver Birch Specimens

FOR PHASE 2 CONSULTATION


Ornamental Pear
Location / Site Name:

Woodland Planting

Storm water tank 3

EALING - CS01X - ACTON SR PEG2X - ACTON STORM TANKS


Drawing Title:

PROPOSED LANDSCAPE PLAN BOOK OF PLANS


Existing Trees
Drawing No.:

110-DA-ARC-PEG2X-000351
c Thames Water Utilities Ltd 2008

1:400@ A3 1:200@ A1

DO NOT SCALE - IF IN DOUBT ASK


Status:

FOR INFORMATION
Keyplan:
N

THIS DRAWING

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345 15m Ventilation column Mezzanine for access to top of carbon filters Storm water tanks Low maintenance landscaping/ Wild flower Ventilation Building High pressure release 4m high minimum Interception Chamber with handrail Brown roof THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

Canham Road
Interception Chamber beyond

Proposed: Section A-A

Valve Chamber beyond

Main shaft 15m internal diameter

Tunnel shown for illustrative purposes only

10 m
N

10 m

Thames Water Utilities


Playground

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

A
Mast

Project Name:

THAMES TUNNEL
Purpose:

FOR PHASE 2 CONSULTATION


Location / Site Name:

EALING - CS01X - ACTON SR PEG2X - ACTON STORM TANKS


Drawing Title:

PROPOSED SECTION AA BOOK OF PLANS


Drawing No.: Scale:

110-DA-ARC-PEG2X-000354
c Thames Water Utilities Ltd 2008

1:400@ A3 1:200@ A1

5 0

1 0 0

1 0 5

2 0 m 0 m

Você também pode gostar